1. S/O Bashir Ahmad
Electrical Engineer
Email: irfanbashir585@gmail.com
Cell No.Cell No. PAK-0092-PAK-0092-302-7357585 (ABU-DHUBAI-00971-563437404)
OOBJECTIVEBJECTIVE::
Seeking a suitable, carrier-oriented, challenging assignment leading to a position of
responsibility. To enhances my potential & skills by working with commitment &
excellence in a dynamic & progressive.
Expertise:Expertise:
Calibration & Maintenance of Field Sensors.Calibration & Maintenance of Field Sensors.
Trouble shooting and Maintenance of Power Generation.Trouble shooting and Maintenance of Power Generation.
Variable Frequency Drives.Variable Frequency Drives.
Preventive & overhauling AC & DC Motors and Gearing assemblies.Preventive & overhauling AC & DC Motors and Gearing assemblies.
Implementation of 5’s and Kaizen activities.Implementation of 5’s and Kaizen activities.
Generator Skills:Generator Skills:
♣ Worked on three phase heavy Generators.
♣ Small Generators overhauling & Maintenance.
♣ Worked on all types of ATS & Generators.
♣ Normal & High Level Generator Coupling.
♣ Worked on all types of star & Delta Motors.
Power Generation and HT Skills.Power Generation and HT Skills.
♣ Performed Maintenance of Power Transformer 3000 KVA to 30 MVA.
♣ Performed Maintenance of MCCs of 400 volt, 3.3KV & 11 KV.
♣ Performed Power & Controlling Cable Gland.
♣ Trouble shooting & over hauling of 11KV, 33KV & 66 KV. Switchgear room.
House # 1024/A Chowk Rasheed Abdad Khanewal Road, Multan
2. Professional Training:Professional Training:
♣♣ Three Phase Transformer Maintenance Electrical Isolation Procedures for Low voltage,Three Phase Transformer Maintenance Electrical Isolation Procedures for Low voltage,
Medium voltage & High Voltage.Medium voltage & High Voltage.
♣♣ Fire Fighting Training.Fire Fighting Training.
♣♣ Special Training of Breathing Apparatus (BA) Sets.Special Training of Breathing Apparatus (BA) Sets.
♣♣ Site Safety Health & Environment Training.Site Safety Health & Environment Training.
Construction Skill:Construction Skill:
♣♣ Building Starting Time View Point.Building Starting Time View Point.
♣♣ Auto Cad mapping necessary.Auto Cad mapping necessary.
♣♣ Material Testing & Gravity Checking.Material Testing & Gravity Checking.
♣♣ Quantity wise material Checking.Quantity wise material Checking.
♣♣ During Installation of Electrical Conduit to Designed check & balance according to Map.During Installation of Electrical Conduit to Designed check & balance according to Map.
♣♣ Electrical designing of flour Installation & Electric wiring.Electrical designing of flour Installation & Electric wiring.
Electrical wiring Skill.Electrical wiring Skill.
♣♣ Single Phase.Single Phase.
♣♣ Three Phase open.Three Phase open.
♣♣ PVC conduct wiring groundPVC conduct wiring ground
♣♣ PVC Conduct under ground wiringPVC Conduct under ground wiring
♣♣ Beaten wiringBeaten wiring
♣♣ Tray & TrunkingTray & Trunking
♣♣ All Types of wiring skill to Traced Fault Very easyAll Types of wiring skill to Traced Fault Very easy
HVAC Skill.HVAC Skill.
♣♣ Worked on All Type of Sip let and window type A.C very easy.Worked on All Type of Sip let and window type A.C very easy.
♣♣ Worked on A.C Maintenance and Overhalling.Worked on A.C Maintenance and Overhalling.
♣♣ A.C Installation on Different Modes & Situation.A.C Installation on Different Modes & Situation.
2009-2011:. PAST2009-2011:. PAST
♣♣ Two Year Experience in Siemens Company.Two Year Experience in Siemens Company.
♣♣ Work as Power Transformer Maintenance & operating.Work as Power Transformer Maintenance & operating.
♣♣ Check Test ALL Type of TransformerCheck Test ALL Type of Transformer
♣♣ Worked on High/ Low Voltage site ControllingWorked on High/ Low Voltage site Controlling
20011-2012:. PAST20011-2012:. PAST
♣♣ One Year Experience In Descon Engineering Ltd.One Year Experience In Descon Engineering Ltd.
♣♣ Worked on Generator Operating of any Type & any Rating.Worked on Generator Operating of any Type & any Rating.
♣♣ Coupling and Operating Star-Delta and Delta to Star Connection Motors of anyCoupling and Operating Star-Delta and Delta to Star Connection Motors of any
Rating.Rating.
PEROFESSIONAL EXPERIENCE ,(Past ) 01-06-2013 to 26-11-2013.PEROFESSIONAL EXPERIENCE ,(Past ) 01-06-2013 to 26-11-2013.
♣♣ Electrical Supervisor worked in LCC company on Telenor RMS Project.Electrical Supervisor worked in LCC company on Telenor RMS Project.
3. REMOTE MONITRING SYSTEMREMOTE MONITRING SYSTEM..
♣♣ Working on High volt sell.Working on High volt sell.
♣♣ Constellation all RMS D.B on site.Constellation all RMS D.B on site.
♣♣ BSM InstallationBSM Installation
♣♣ FLS InstallationFLS Installation
♣♣ Working on Generator ATS, With AMF hold & Wapda Cutoff Connection.Working on Generator ATS, With AMF hold & Wapda Cutoff Connection.
♣♣ Rectification workingRectification working
♣♣ Site calibration with LAPTOP.Site calibration with LAPTOP.
♣♣ 2013-2014:. Past2013-2014:. Past
♣ Worked onon F.S.HF.S.H ProjectProject as a Electrical Supervisor inElectrical Supervisor in MERCURY.MIDDLE .EAST in
BAHRAIN BAY.
♣ Worked on ADIB-282 ProjectWorked on ADIB-282 Project as a Electrical Supervisor inElectrical Supervisor in MERCURYMINA ABU-
DHUBAI.
MEP. Project Working.MEP. Project Working.
♣♣ Cable tray installationCable tray installation
♣♣ Cable trunking installationCable trunking installation
♣♣ Small Power DBs installationSmall Power DBs installation
♣♣ Normal & Emergency lighting controlNormal & Emergency lighting control
♣♣ Fire alarm control systemFire alarm control system
♣♣ Testing & commissioning of LV/ HV site workingTesting & commissioning of LV/ HV site working
♣♣ QA/QC jobQA/QC job
High voltage Termination & Glanding:High voltage Termination & Glanding:
♣♣ Different size & different type.Different size & different type.
In FCC-I , Working Responsibilities:In FCC-I , Working Responsibilities:
♣♣ Earthing and Bonding Rebars 16mm Dia installingEarthing and Bonding Rebars 16mm Dia installing
♣♣ CAD Welding joined cable 120mm PVC insulated typicalCAD Welding joined cable 120mm PVC insulated typical
PERSONAL INFORMATION:.PERSONAL INFORMATION:.
Father’s NameFather’s Name :: Bashir AhmadBashir Ahmad
Date of BirthDate of Birth :: 15-03-199215-03-1992
DomicileDomicile :: Multan (Punjab)Multan (Punjab)
N.I.C NoN.I.C No :: 36302-6238588-336302-6238588-3
NationalityNationality :: PakistaniPakistani
ReligionReligion :: IslamIslam
Marital StatusMarital Status :: MarriedMarried
Contact NumberContact Number :: (BAHRAIN)+97335122638,(BAHRAIN)+97335122638,
4. ( ABU-DHUBAI)+971-563437404( ABU-DHUBAI)+971-563437404
( KSA.+966-544624514( KSA.+966-544624514
(PAKISTAN+923027357585(PAKISTAN+923027357585
+923055599055+923055599055
EEDUCATIONDUCATION::
Degrees Division Year Board/University
Matriculation 51% 2006 B.I.S.E Multan.
DAE in Electrical 69% 2009 P.B.T.E Lahore
B-Tech
Electrical(Pass)
64% 2011
B.Z.U Multan.
B-Tech
Electrical(Hons) 58% 2016 I.U.B Bahawalpur
TTECHNICALECHNICAL SSKILLSKILLS / E/ EDUCATIONDUCATION::
Three Months diploma of “D.I.T” at JINNAH AN DIVERSE INSTITUTE MULTAN”
from 2008.
Windows XP/Vista/Windows7/Windows8, 8.1/Windows10
℘ Internet
℘ M.s Office
℘ M.s Excel
2016:. Present2016:. Present
Currently working on Riyadh Metro Project (Saudi Arabia) with
FCC-Industrial on the site of Line -5 (5C4).