Critical Control Management
Part 2 of 6: Critical Controls
Terry Swanton,
Director,
Fefo Consulting
1. Material Unwanted Events ✓
2. Identifying the Critical Few →
3. Critical Performance Standards
4. Critical Control Verification
5. Critical Control Measurement
6. myosh
Adam Jackson,
Head of HSSE, PDS
Jones Lang LaSalle (JLL)
TEAM CLIENTS REACH OUTCOMES
About Us
✓ Statistically reliable >0.9 benchmarks
✓ Credible Lead Indicators
✓ Integrated Health AND Safety
2
info@fefo.com.au fefo.com.au
3
Desired
Current State A. Webinar #1 Recap
B. What is a Critical Control?
C. Options to identify critical controls
D. Pitfalls and Leading Practices
CCM
Act
Measure Focus
4
Webinar #1 Recap: Material Unwanted Events
info@fefo.com.au | fefo.com.au
Facilitating a Risk Analysis
5
info@fefo.com.au | fefo.com.au
Seek Input
MUE Select Method
Examples:
• Safety in Design
• Risk Register
• Bow-tie
• Fishbone
Case Study #1: Safety in Design
6
info@fefo.com.au | fefo.com.au
Operation
& Use
Maintenance End of Life
Demo &
Construction
7
info@fefo.com.au | fefo.com.au
Critical Controls:
• Crucial to preventing the event or mitigating the consequences
• The absence or failure of a critical control would significantly increase the risk despite existence of other controls; or
• Control that prevents more than one unwanted event or mitigates more than one consequence
Critical
Critical
Critical
Critical
Preventative
Controls
Mitigating
Controls
Control vs Critical Control?
8
info@fefo.com.au | fefo.com.au
Critical Control
SWMS
Control
Critical Control
Control
Integrity | Collaboration | Ingenuity | Challenge 9
Layers of
Defence
Minimise
Exposure
Detect &
Deflect
Last Chance
Intervention
Protection
Control
Isolation &
Containment
Recover &
Restoration
Absent
Absent
Absent
Absent
Absent-
PPE
Absent
Absent
Absent
Critical
Controls
Absent
Case Study #2: Missing Critical Controls
Before & After Risk Analysis
Unclear Scope
Missing Material Unwanted
Events
Developing procedures before
identifying critical controls
Define Supply Chain / Life-cycle Scope
Right capability involved
Critical controls inform procedures,
plant, equipment, training etc.
Critical Controls
Safe Work Methods / Procedure Critical Controls within SWMS
Common Pitfalls Leading Practices
10
info@fefo.com.au | fefo.com.au
Poor risk workshop facilitation
and / or critical control design
Critical control and risk workshop
performance standards
Case Study #3: Safety at Speed
Poll
12
What topics would benefit your organisation?
You can choose more than one option:
A. General business risk management
B. HSE risk management
C. Material Unwanted Events (MUE) identification
D. Critical control identification
E. Risk workshop facilitation
F. Other?
info@fefo.com.au | fefo.com.au
CCM
Measure & Focus
Act with a
Self-Directed Workbook
Risk
Workshops
Third-Party
Verification
Strategy &
Reporting
13
CCM Training &
System Development
Additional Help
info@fefo.com.au | fefo.com.au
Complimentary
Discovery Workshop
http://calendly.com/mark-wright
https://calendly.com/fefo_terry
http://calendly.com/mark-wright
https://calendly.com/fefo_terry
14
Additional Resources
info@fefo.com.au | fefo.com.au
CCM Workbook Samples:
✓ Facilitator guidance
✓ Bow-tie risk template
✓ Anything else?
Complimentary
Discovery Workshop
Future Webinar: 6-Part Series
Wednesday’s 3 Nov – 1 Dec
3
4
5
6
15
info@fefo.com.au | fefo.com.au

Part 2 - Critical Controls: How to identify the critical few

  • 1.
    Critical Control Management Part2 of 6: Critical Controls Terry Swanton, Director, Fefo Consulting 1. Material Unwanted Events ✓ 2. Identifying the Critical Few → 3. Critical Performance Standards 4. Critical Control Verification 5. Critical Control Measurement 6. myosh Adam Jackson, Head of HSSE, PDS Jones Lang LaSalle (JLL)
  • 2.
    TEAM CLIENTS REACHOUTCOMES About Us ✓ Statistically reliable >0.9 benchmarks ✓ Credible Lead Indicators ✓ Integrated Health AND Safety 2 info@fefo.com.au fefo.com.au
  • 3.
    3 Desired Current State A.Webinar #1 Recap B. What is a Critical Control? C. Options to identify critical controls D. Pitfalls and Leading Practices CCM
  • 4.
    Act Measure Focus 4 Webinar #1Recap: Material Unwanted Events info@fefo.com.au | fefo.com.au
  • 5.
    Facilitating a RiskAnalysis 5 info@fefo.com.au | fefo.com.au Seek Input MUE Select Method Examples: • Safety in Design • Risk Register • Bow-tie • Fishbone
  • 6.
    Case Study #1:Safety in Design 6 info@fefo.com.au | fefo.com.au Operation & Use Maintenance End of Life Demo & Construction
  • 7.
    7 info@fefo.com.au | fefo.com.au CriticalControls: • Crucial to preventing the event or mitigating the consequences • The absence or failure of a critical control would significantly increase the risk despite existence of other controls; or • Control that prevents more than one unwanted event or mitigates more than one consequence Critical Critical Critical Critical Preventative Controls Mitigating Controls
  • 8.
    Control vs CriticalControl? 8 info@fefo.com.au | fefo.com.au Critical Control SWMS Control Critical Control Control
  • 9.
    Integrity | Collaboration| Ingenuity | Challenge 9 Layers of Defence Minimise Exposure Detect & Deflect Last Chance Intervention Protection Control Isolation & Containment Recover & Restoration Absent Absent Absent Absent Absent- PPE Absent Absent Absent Critical Controls Absent Case Study #2: Missing Critical Controls Before & After Risk Analysis
  • 10.
    Unclear Scope Missing MaterialUnwanted Events Developing procedures before identifying critical controls Define Supply Chain / Life-cycle Scope Right capability involved Critical controls inform procedures, plant, equipment, training etc. Critical Controls Safe Work Methods / Procedure Critical Controls within SWMS Common Pitfalls Leading Practices 10 info@fefo.com.au | fefo.com.au Poor risk workshop facilitation and / or critical control design Critical control and risk workshop performance standards
  • 11.
    Case Study #3:Safety at Speed
  • 12.
    Poll 12 What topics wouldbenefit your organisation? You can choose more than one option: A. General business risk management B. HSE risk management C. Material Unwanted Events (MUE) identification D. Critical control identification E. Risk workshop facilitation F. Other? info@fefo.com.au | fefo.com.au CCM
  • 13.
    Measure & Focus Actwith a Self-Directed Workbook Risk Workshops Third-Party Verification Strategy & Reporting 13 CCM Training & System Development Additional Help info@fefo.com.au | fefo.com.au Complimentary Discovery Workshop http://calendly.com/mark-wright https://calendly.com/fefo_terry
  • 14.
    http://calendly.com/mark-wright https://calendly.com/fefo_terry 14 Additional Resources info@fefo.com.au |fefo.com.au CCM Workbook Samples: ✓ Facilitator guidance ✓ Bow-tie risk template ✓ Anything else? Complimentary Discovery Workshop
  • 15.
    Future Webinar: 6-PartSeries Wednesday’s 3 Nov – 1 Dec 3 4 5 6 15 info@fefo.com.au | fefo.com.au