PLAIN
CEMENT
CONCRETE
 Plain Cement Concrete (PCC) is
also called as Cement Concrete
(CC) or Blinding concrete.
 It is used for leveling, bedding for
footings, grade slabs, concrete
roads etc.
 PCC is used to provide non-porous,
rigid, impervious, firm and leveled
bed for laying RCC, where earth is
soft and yielding.
 Anti termite treatment is a process
in which soil treatment is applied
to a building in early stages of its
construction.
 The purpose of anti termite
treatment is to provide the
building with a chemical barrier
against the sub terrain termites.
 Executed through specialized
agencies only
 The pre constructional soil
treatment is required to be
applied during the construction
stages of the sub - structure up to
plinth level.
 The effectiveness of chemical
depends upon the choice of the
chemical, the dosage adopted
and the thoroughness of
application.
Anti Termite Treatment
 Stone masonry is made of stone units
bonded together with mortar, where the
stones are available in a abundance in
nature, they provide an economical
material for the construction of various
building components such as columns,
footings, arches, lintels, beams etc.
 USES:
 Building foundations, walls, piers,
pillars, and architectural works
 Lintels, beams, arches domes etc
 Roofs and roof coverings
 Cladding works,
 Dams, Monumental structures
STONE MASONRY
General Principals
 The stones to be used for stone
masonry should be hard, tough and
durable,
 The pressure acting on stones should
be vertical
 The Stones should be perfectly
dressed as per the requirements
 The heads and bond stones should
not be of a dumbbell shape
 The mortar to be used should be
good quality and in the specified
faces
 The construction work of stone
masonry should e raised uniformly
 The plumb bob should be used to
check the verticality of erected
wall
 The Masonry work should be
properly cured after the
completion of work, for a period
of 2 to 3 weeks
 As far as possible broken stones
or small stones chips should not
to be used in construction
 Double scaffolding should be
used for working at higher level
 The properly wetted stones
should be used to avoid mortar
moisture being sucked
PCC [Autosaved].pptx

PCC [Autosaved].pptx

  • 1.
  • 2.
     Plain CementConcrete (PCC) is also called as Cement Concrete (CC) or Blinding concrete.  It is used for leveling, bedding for footings, grade slabs, concrete roads etc.  PCC is used to provide non-porous, rigid, impervious, firm and leveled bed for laying RCC, where earth is soft and yielding.
  • 4.
     Anti termitetreatment is a process in which soil treatment is applied to a building in early stages of its construction.  The purpose of anti termite treatment is to provide the building with a chemical barrier against the sub terrain termites.  Executed through specialized agencies only  The pre constructional soil treatment is required to be applied during the construction stages of the sub - structure up to plinth level.  The effectiveness of chemical depends upon the choice of the chemical, the dosage adopted and the thoroughness of application. Anti Termite Treatment
  • 6.
     Stone masonryis made of stone units bonded together with mortar, where the stones are available in a abundance in nature, they provide an economical material for the construction of various building components such as columns, footings, arches, lintels, beams etc.  USES:  Building foundations, walls, piers, pillars, and architectural works  Lintels, beams, arches domes etc  Roofs and roof coverings  Cladding works,  Dams, Monumental structures STONE MASONRY
  • 7.
    General Principals  Thestones to be used for stone masonry should be hard, tough and durable,  The pressure acting on stones should be vertical  The Stones should be perfectly dressed as per the requirements  The heads and bond stones should not be of a dumbbell shape  The mortar to be used should be good quality and in the specified faces  The construction work of stone masonry should e raised uniformly
  • 8.
     The plumbbob should be used to check the verticality of erected wall  The Masonry work should be properly cured after the completion of work, for a period of 2 to 3 weeks  As far as possible broken stones or small stones chips should not to be used in construction  Double scaffolding should be used for working at higher level  The properly wetted stones should be used to avoid mortar moisture being sucked