PREPARED BY
Safeen Dlshad Taha
Aza M.Ali
Darya Mahdi
SUPERVISED BY
Mr. Ali illyas
Drilling engineering
drilling economics
Safeen Dlshad Taha
Aza Mohammad Ali
Darya Mahdi Rasheed
Safeen
• Drilling Cost Prediction
• Cost Specification
Aza
• Authorization For Expenditure
(AFE)
Darya
• Drilling Optimization
• Drilling cost equation
Safeen
► Drilling Cost Prediction
 Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
Drilling cost predictions are made so that sound
economic decision can be made.
Predictions depend primarily on:
 Location – governs the cost of preparing wellsite,
moving rig to location, and daily operating cost.
 Depth – governs the lithologies to be penetrated, thus
the time required to complete the well.
1
Safeen
► Drilling Cost Prediction
 Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
Drilling costs tend to
increase exponentially
with depth.
exp( )C a bD
C = cost, $
a, b = constants depending on well location
D = depth, ft.2
Safeen
► Drilling Cost Prediction
 Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
ln lnC a
D
b b
 
3
Safeen
 Drilling Cost Prediction
► Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
Drilling costs can be broken down into 3 groups:
I. Fixed
II. Daily
III. Unit
4
Safeen
 Drilling Cost Prediction
► Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
Fixed Costs
Fixed costs are determined by the nature of the well, such
as:
• Wellheads
• Site preparation
• Casing, cement, tubing and packers
5
Safeen
 Drilling Cost Prediction
► Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
Daily Costs
× Daily costs are related to the time spent on the operation.
× Off shore rigs have high expenses which listed below.
× Daily costs include:
• Payments to drilling contractors (rig time)
• Tool rental
• Payment to specialist services
• Salaries, wages etc.
• Fuel
• Lubricating oil, grease
• Drilling consumables (rope, soap and dope)
• Transport of materials6
Safeen
 Drilling Cost Prediction
► Cost Specification
Aza
 Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
Unit Costs
× This is the price of a unit of a commodity such as the
price per tonne of barite or bentonite.
× This can be optimized in the tendering process, which is
Drilling Manager responsibility.
× Good site supervision can ensure that
consumption is not excessive.
7
Safeen
 Drilling Cost Prediction
 Cost Specification
Aza
► Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
• An AFE is a budgeting and approval form used during the
planning process for a well about to be drilled (and for
other projects).
• It includes an estimate of costs to be incurred during the
IDC (intangible drilling cost) category and in the tangible
equipment category. Costs are shown in total with
accompanying breakdowns.
8
Safeen
 Drilling Cost Prediction
 Cost Specification
Aza
► Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
• The term AFE stands for Authorization for Expenditure.
This particular term is used in order to drilling and
completion costs. ... Sometimes even for approval of
Operating Expenditure related to exploration,
development and production as well AFE is used.
9
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
 Dril. Optimization
 Dril. cost equation
• The AFE form represents:
(1)A budget for the project against which actual expenditures
are compared.
(2)A joint venture form for evidencing agreement by joint
interest owners to participate in the budgeted project.
Aza
► Authorization For
Expenditure (AFE)
1
0
Safeen
 Drilling Cost Prediction
 Cost Specification
Aza
► Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
 AFE components:-
Both the onshore and offshore AFEs are broken down into
the following sections: preparation, drilling and
abandonment, testing, and completion.
1. Preparation
This part of the AFE covers the costs incurred to the point
at which the rig is brought on to location.
For onshore wells this would include site building and well
engineering as the main cost centers.
For offshore wells, the main cost centers are site surveying
and well engineering.
1
1
Safeen
 Drilling Cost Prediction
 Cost Specification
Aza
► Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
2. Drilling and abandonment
This is the 'dry hole' drilling component of the well. It
assumes drilling to Total Depth, logging and finding nothing
of interest. The well is, therefore, proposed for
abandonment and costed accordingly.
3. Testing
This is the additional cost incurred by a testing
programmed. It is not merely the testing cost charged by the
testing company but must also include all the ongoing daily
costs associated with the rig such as:
rig day rate fuel oil site personnel office personnel office
overheads
1
2
Safeen
 Drilling Cost Prediction
 Cost Specification
Aza
► Authorization For
Expenditure (AFE)
Darya
 Dril. Optimization
 Dril. cost equation
4. Completion
This is the further additional cost incurred following testing
once the decision to complete the well has been made.
As with testing, the cost centers are not only the cost
of completion equipment and services but also the costs of:
rig day rate fuel oil extra casing string if run perforation site
personnel office personnel office overheads
1
3
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
► Dril. Optimization
 Dril. cost equation
Aza
 Authorization For
Expenditure (AFE)
 Drilling optimization is minimizing the cost of wells objective while
maintaining safety standard
 The minimum drilling cost is also the optimum drilling cost
 The optimization process is a cycle that starts with using the
existing data base of drilling information
 More data are collected during the practical drilling
process
 The new data are then analyzed to update the
data base for future use1
4
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
► Dril. Optimization
 Dril. cost equation
Aza
 Authorization For
Expenditure (AFE)
1
5
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
► Dril. Optimization
 Dril. cost equation
Aza
 Authorization For
Expenditure (AFE)
 The process of optimizing drilling process is not
always straight-forward.
 Because of uncertainties involved there is always need
for some trade-offs.
 For example ,optimization might mean
paying more obtain a better tool,
such as choosing a rig with a higher day
rate to obtain better equipment.
1
6
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
 Drilling Optimization
► Drilling cost equation
Aza
 Authorization For
Expenditure (AFE)
Drilling cost equation
Also known as the cost per foot equation
1
7
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
 Drilling Optimization
► Drilling cost equation
Aza
 Authorization For
Expenditure (AFE)
Example-cost per foot calculation
*a 17-1/2 bit drills 1,050 of hole at an average penetration rate of 35
ft/hr . Given the following data ,what is the cost per foot?
+round trip=6hrs bit purchase cost =3,000$
+bit life =30hrs tool purchase =100$
+rig cost=800$/hrs interval mud cost =5,000$
+Tool rental=100$/hrs support cost=200$/hrs
+T trib=6hrs C bit=3,000$ ROP avg =35ft/hr
+T bit =30 hrs C mud= 5,000$ C rig =800$/hr
+C tools =100$ C tool rental=100$ C support =200$/hr1
8
Safeen
 Drilling Cost Prediction
 Cost Specification
Darya
 Drilling Optimization
► Drilling cost equation
Aza
 Authorization For
Expenditure (AFE)
Solution:
8,100 39,600
1,050
45.43$ /
drill
drill
C
C ft



1
9
Safeen
 Drilling Cost Prediction
 Cost Specification
Aza
 Authorization For
Expenditure (AFE)
1. Hossain, M.E., 2015. Drilling Costs Estimation for Hydrocarbon
Wells. Journal of Sustainable Energy Engineering, 3(1), pp.3-32.
2. Leamon, G.R., 2006. Petroleum well costs. University of New South
Wales.
3. In slide share line: https://www.slideshare.net/akincraig/drilling-
engineering-drilling-economics
4. Lukawski, M.Z., Anderson, B.J., Augustine, C., Capuano Jr, L.E.,
Beckers, K.F., Livesay, B. and Tester, J.W., 2014. Cost analysis of oil,
gas, and geothermal well drilling. Journal of Petroleum Science and
Engineering, 118, pp.1-14.
2
0
Darya
 Dril. Optimization
 Dril. cost equation
Drilling economics drilling engineering

More Related Content

What's hot

Fluid Saturation
Fluid SaturationFluid Saturation
Fluid SaturationM.T.H Group
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 
Cement Slurry Design for Oil and Gas Well Cementation
Cement Slurry Design for Oil and Gas Well CementationCement Slurry Design for Oil and Gas Well Cementation
Cement Slurry Design for Oil and Gas Well CementationHimanshu Rajawat
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERAndi Anriansyah
 
Routine core analysis and special core analysis
Routine core analysis and special core analysisRoutine core analysis and special core analysis
Routine core analysis and special core analysisShujaSamejo
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing DesignJames Craig
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationJames Craig
 
Special core analysis
Special core analysisSpecial core analysis
Special core analysisWajid09
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary CementingHtet Naing Htoo
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)majeed talal
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)James Craig
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsAFATous
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drillingMubarik Rao
 

What's hot (20)

Fluid Saturation
Fluid SaturationFluid Saturation
Fluid Saturation
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Well completion
Well completionWell completion
Well completion
 
Cement Slurry Design for Oil and Gas Well Cementation
Cement Slurry Design for Oil and Gas Well CementationCement Slurry Design for Oil and Gas Well Cementation
Cement Slurry Design for Oil and Gas Well Cementation
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
Routine core analysis and special core analysis
Routine core analysis and special core analysisRoutine core analysis and special core analysis
Routine core analysis and special core analysis
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
Cementing
CementingCementing
Cementing
 
Gas lift design
Gas lift designGas lift design
Gas lift design
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Special core analysis
Special core analysisSpecial core analysis
Special core analysis
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation Systems
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 
Casing design
Casing designCasing design
Casing design
 

Similar to Drilling economics drilling engineering

Difference between depreciation and depletion
Difference between depreciation and depletionDifference between depreciation and depletion
Difference between depreciation and depletionAli RazA
 
Oil and gas accounting
Oil and gas accountingOil and gas accounting
Oil and gas accountingAnupam Basu
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CVAli Khidr
 
accounting for oil and gas producing activities.ppt
accounting for oil and gas producing activities.pptaccounting for oil and gas producing activities.ppt
accounting for oil and gas producing activities.ppt32342
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionSarbesh Mishra
 
Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...Hamdy Rashed
 
Using a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids andUsing a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids andamrhaggag
 
Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020Mason Taylor
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs SAJJAD KHUDHUR ABBAS
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrcnarayanch1979
 

Similar to Drilling economics drilling engineering (20)

Presentation 2
Presentation 2Presentation 2
Presentation 2
 
3.estimating
3.estimating3.estimating
3.estimating
 
Oil & gas
Oil & gasOil & gas
Oil & gas
 
Difference between depreciation and depletion
Difference between depreciation and depletionDifference between depreciation and depletion
Difference between depreciation and depletion
 
Drill.pptx
Drill.pptxDrill.pptx
Drill.pptx
 
Oil and gas accounting
Oil and gas accountingOil and gas accounting
Oil and gas accounting
 
Section 3-2.pptx
Section 3-2.pptxSection 3-2.pptx
Section 3-2.pptx
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
accounting for oil and gas producing activities.ppt
accounting for oil and gas producing activities.pptaccounting for oil and gas producing activities.ppt
accounting for oil and gas producing activities.ppt
 
Contract Management
Contract ManagementContract Management
Contract Management
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in Construction
 
Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
Using a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids andUsing a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids and
 
Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020
 
2014 Wind Turbine Blade Workshop- Wetzel
2014 Wind Turbine Blade Workshop- Wetzel2014 Wind Turbine Blade Workshop- Wetzel
2014 Wind Turbine Blade Workshop- Wetzel
 
Published
PublishedPublished
Published
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
A498 Project
A498 ProjectA498 Project
A498 Project
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
 

More from Safen D Taha

Gas plant unit process
Gas plant unit processGas plant unit process
Gas plant unit processSafen D Taha
 
Integration - Mathematics - UoZ
Integration - Mathematics - UoZ Integration - Mathematics - UoZ
Integration - Mathematics - UoZ Safen D Taha
 
Compiler - Computer Programming - UOZ
Compiler - Computer Programming - UOZ Compiler - Computer Programming - UOZ
Compiler - Computer Programming - UOZ Safen D Taha
 
magnetic field - electricity - UOZ
magnetic field - electricity - UOZmagnetic field - electricity - UOZ
magnetic field - electricity - UOZSafen D Taha
 
Earth is Flat ? or Round ?
Earth is Flat ? or Round ?Earth is Flat ? or Round ?
Earth is Flat ? or Round ?Safen D Taha
 
health & safety at work
health & safety at work health & safety at work
health & safety at work Safen D Taha
 
Fluid Dynamics (Continuity Equation - Bernoulli Equation - head loss - Appli...
Fluid Dynamics  (Continuity Equation - Bernoulli Equation - head loss - Appli...Fluid Dynamics  (Continuity Equation - Bernoulli Equation - head loss - Appli...
Fluid Dynamics (Continuity Equation - Bernoulli Equation - head loss - Appli...Safen D Taha
 

More from Safen D Taha (7)

Gas plant unit process
Gas plant unit processGas plant unit process
Gas plant unit process
 
Integration - Mathematics - UoZ
Integration - Mathematics - UoZ Integration - Mathematics - UoZ
Integration - Mathematics - UoZ
 
Compiler - Computer Programming - UOZ
Compiler - Computer Programming - UOZ Compiler - Computer Programming - UOZ
Compiler - Computer Programming - UOZ
 
magnetic field - electricity - UOZ
magnetic field - electricity - UOZmagnetic field - electricity - UOZ
magnetic field - electricity - UOZ
 
Earth is Flat ? or Round ?
Earth is Flat ? or Round ?Earth is Flat ? or Round ?
Earth is Flat ? or Round ?
 
health & safety at work
health & safety at work health & safety at work
health & safety at work
 
Fluid Dynamics (Continuity Equation - Bernoulli Equation - head loss - Appli...
Fluid Dynamics  (Continuity Equation - Bernoulli Equation - head loss - Appli...Fluid Dynamics  (Continuity Equation - Bernoulli Equation - head loss - Appli...
Fluid Dynamics (Continuity Equation - Bernoulli Equation - head loss - Appli...
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Drilling economics drilling engineering

  • 1. PREPARED BY Safeen Dlshad Taha Aza M.Ali Darya Mahdi SUPERVISED BY Mr. Ali illyas Drilling engineering drilling economics
  • 2. Safeen Dlshad Taha Aza Mohammad Ali Darya Mahdi Rasheed
  • 3. Safeen • Drilling Cost Prediction • Cost Specification Aza • Authorization For Expenditure (AFE) Darya • Drilling Optimization • Drilling cost equation
  • 4. Safeen ► Drilling Cost Prediction  Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation Drilling cost predictions are made so that sound economic decision can be made. Predictions depend primarily on:  Location – governs the cost of preparing wellsite, moving rig to location, and daily operating cost.  Depth – governs the lithologies to be penetrated, thus the time required to complete the well. 1
  • 5. Safeen ► Drilling Cost Prediction  Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation Drilling costs tend to increase exponentially with depth. exp( )C a bD C = cost, $ a, b = constants depending on well location D = depth, ft.2
  • 6. Safeen ► Drilling Cost Prediction  Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation ln lnC a D b b   3
  • 7. Safeen  Drilling Cost Prediction ► Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation Drilling costs can be broken down into 3 groups: I. Fixed II. Daily III. Unit 4
  • 8. Safeen  Drilling Cost Prediction ► Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation Fixed Costs Fixed costs are determined by the nature of the well, such as: • Wellheads • Site preparation • Casing, cement, tubing and packers 5
  • 9. Safeen  Drilling Cost Prediction ► Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation Daily Costs × Daily costs are related to the time spent on the operation. × Off shore rigs have high expenses which listed below. × Daily costs include: • Payments to drilling contractors (rig time) • Tool rental • Payment to specialist services • Salaries, wages etc. • Fuel • Lubricating oil, grease • Drilling consumables (rope, soap and dope) • Transport of materials6
  • 10. Safeen  Drilling Cost Prediction ► Cost Specification Aza  Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation Unit Costs × This is the price of a unit of a commodity such as the price per tonne of barite or bentonite. × This can be optimized in the tendering process, which is Drilling Manager responsibility. × Good site supervision can ensure that consumption is not excessive. 7
  • 11. Safeen  Drilling Cost Prediction  Cost Specification Aza ► Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation • An AFE is a budgeting and approval form used during the planning process for a well about to be drilled (and for other projects). • It includes an estimate of costs to be incurred during the IDC (intangible drilling cost) category and in the tangible equipment category. Costs are shown in total with accompanying breakdowns. 8
  • 12. Safeen  Drilling Cost Prediction  Cost Specification Aza ► Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation • The term AFE stands for Authorization for Expenditure. This particular term is used in order to drilling and completion costs. ... Sometimes even for approval of Operating Expenditure related to exploration, development and production as well AFE is used. 9
  • 13. Safeen  Drilling Cost Prediction  Cost Specification Darya  Dril. Optimization  Dril. cost equation • The AFE form represents: (1)A budget for the project against which actual expenditures are compared. (2)A joint venture form for evidencing agreement by joint interest owners to participate in the budgeted project. Aza ► Authorization For Expenditure (AFE) 1 0
  • 14. Safeen  Drilling Cost Prediction  Cost Specification Aza ► Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation  AFE components:- Both the onshore and offshore AFEs are broken down into the following sections: preparation, drilling and abandonment, testing, and completion. 1. Preparation This part of the AFE covers the costs incurred to the point at which the rig is brought on to location. For onshore wells this would include site building and well engineering as the main cost centers. For offshore wells, the main cost centers are site surveying and well engineering. 1 1
  • 15. Safeen  Drilling Cost Prediction  Cost Specification Aza ► Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation 2. Drilling and abandonment This is the 'dry hole' drilling component of the well. It assumes drilling to Total Depth, logging and finding nothing of interest. The well is, therefore, proposed for abandonment and costed accordingly. 3. Testing This is the additional cost incurred by a testing programmed. It is not merely the testing cost charged by the testing company but must also include all the ongoing daily costs associated with the rig such as: rig day rate fuel oil site personnel office personnel office overheads 1 2
  • 16. Safeen  Drilling Cost Prediction  Cost Specification Aza ► Authorization For Expenditure (AFE) Darya  Dril. Optimization  Dril. cost equation 4. Completion This is the further additional cost incurred following testing once the decision to complete the well has been made. As with testing, the cost centers are not only the cost of completion equipment and services but also the costs of: rig day rate fuel oil extra casing string if run perforation site personnel office personnel office overheads 1 3
  • 17. Safeen  Drilling Cost Prediction  Cost Specification Darya ► Dril. Optimization  Dril. cost equation Aza  Authorization For Expenditure (AFE)  Drilling optimization is minimizing the cost of wells objective while maintaining safety standard  The minimum drilling cost is also the optimum drilling cost  The optimization process is a cycle that starts with using the existing data base of drilling information  More data are collected during the practical drilling process  The new data are then analyzed to update the data base for future use1 4
  • 18. Safeen  Drilling Cost Prediction  Cost Specification Darya ► Dril. Optimization  Dril. cost equation Aza  Authorization For Expenditure (AFE) 1 5
  • 19. Safeen  Drilling Cost Prediction  Cost Specification Darya ► Dril. Optimization  Dril. cost equation Aza  Authorization For Expenditure (AFE)  The process of optimizing drilling process is not always straight-forward.  Because of uncertainties involved there is always need for some trade-offs.  For example ,optimization might mean paying more obtain a better tool, such as choosing a rig with a higher day rate to obtain better equipment. 1 6
  • 20. Safeen  Drilling Cost Prediction  Cost Specification Darya  Drilling Optimization ► Drilling cost equation Aza  Authorization For Expenditure (AFE) Drilling cost equation Also known as the cost per foot equation 1 7
  • 21. Safeen  Drilling Cost Prediction  Cost Specification Darya  Drilling Optimization ► Drilling cost equation Aza  Authorization For Expenditure (AFE) Example-cost per foot calculation *a 17-1/2 bit drills 1,050 of hole at an average penetration rate of 35 ft/hr . Given the following data ,what is the cost per foot? +round trip=6hrs bit purchase cost =3,000$ +bit life =30hrs tool purchase =100$ +rig cost=800$/hrs interval mud cost =5,000$ +Tool rental=100$/hrs support cost=200$/hrs +T trib=6hrs C bit=3,000$ ROP avg =35ft/hr +T bit =30 hrs C mud= 5,000$ C rig =800$/hr +C tools =100$ C tool rental=100$ C support =200$/hr1 8
  • 22. Safeen  Drilling Cost Prediction  Cost Specification Darya  Drilling Optimization ► Drilling cost equation Aza  Authorization For Expenditure (AFE) Solution: 8,100 39,600 1,050 45.43$ / drill drill C C ft    1 9
  • 23. Safeen  Drilling Cost Prediction  Cost Specification Aza  Authorization For Expenditure (AFE) 1. Hossain, M.E., 2015. Drilling Costs Estimation for Hydrocarbon Wells. Journal of Sustainable Energy Engineering, 3(1), pp.3-32. 2. Leamon, G.R., 2006. Petroleum well costs. University of New South Wales. 3. In slide share line: https://www.slideshare.net/akincraig/drilling- engineering-drilling-economics 4. Lukawski, M.Z., Anderson, B.J., Augustine, C., Capuano Jr, L.E., Beckers, K.F., Livesay, B. and Tester, J.W., 2014. Cost analysis of oil, gas, and geothermal well drilling. Journal of Petroleum Science and Engineering, 118, pp.1-14. 2 0 Darya  Dril. Optimization  Dril. cost equation