Curriculum Vitae
1. Educational Qualifications
I graduated from Regional Engineering College (Now NIT) Kurukshetra, Haryana; a premier institute in
India after getting Electrical Engineering (HONS.) degree in 1989.
2. Key functional competency
a. Electrical power generation & distribution system
I) Project, Planning & System Design
II) Procurement, Erection & commissioning
III) Maintenance
b. Automation system
i) Project, Planning & System Design
ii) Procurement, Erection & commissioning
iii) Maintenance
3. Managerial Competency
Name: Shiv Ratan Sethia
Field: Electrical & controls
D.O.B. : 11-11-1966
Experience: 27 years
Email id : ssethia.2012@hotmail.com
Contact no: +91 9904200503
Location : Birla cellulosic,Gujarat , India
a. Ability to manage cross-functional teams & multi-disciplinary project
b. Critical thinker, decision maker & problem solver
c. Top planning & organizing skill
d. Excellent personal communication skills
e. Management skills
i) Influencing
ii) Leading
iii) Negotiating
iv) Delegating
v) Coaching
vi) Persuading
f. Conflict managing
g. Adaptability
h. Highly inquisitive, creative, resourceful & goal oriented
i. Committed to maintaining quality & efficiency
j. Expert troubleshooter & problem solver
k. Committed to excellent service & customer satisfaction
l. Leadership quality
m. Team Development & Team working
n. Subordinate development
o. Innovative & cost consciousness
p. Adoption of new technology
4. Work Experience
(A) Vikram Ispat ( Joined in 1989 till 1995 )
This plant produces hot briquette iron (HBI & DRI) from iron ore.
Immediately after graduation, I joined M/S Vikram Ispat in Alibaug, near Mumbai. I was responsible for
erection & commissioning of the complete plant including power plant having 4x2.5 MW DG set of SKODA
make & 1x 10.8 MW STG set of BHEL make. I have worked here in green field project from inception of the
project. I have done erection, commissioning and maintenance of the entire electrical system
(B) Oswal chemicals & fertilizer (Uttar Pradesh, India) (from 1995-1996)
This plant produces urea fertilizer.
I was responsible for commissioning of entire electrical work related to Urea plant. I have joined here as
Assistant Manager & did erection & commissioning of the entire plant within the tenure of 10 months.
(C) P.T. INDO BHARAT RAYON, INDONESIA (FROM 1996 TILL Oct 2016)
This plant produces viscose staple fibre. It is a chemical plant having corrosive gasses as CS2, SO2, and H2S.
To maintain & operate electronic & electrical appliances in this most corrosive area is a challenge to perform.
I joined PT Indo Bharat Indonesia as deputy Manager & currently working as Deputy General Manager.
The Year 1996 to 2003 (worked as Deputy Manager of electrical department): Maintenance of the entire
electrical installation in 230 TPD Viscose staple fiber plant
The Year 2003 to 2006 (worked as Manager of electrical department) : The additional responsibility of
expansion project of installing 100 TPD line with 2x10.8 MW coal based power plant with 3x75 TPH capacity
boilers beside electrical maintenance of old 230 TPD VSF plant.
The Year 2006 to 2007 (promoted to Assistant General Manager of electrical department): The additional
responsibility of putting up one more line of 100 TPD to add viscose manufacturing facility, besides electrical
maintenance of 330 TPD VSF plant & 22 MW power plant.
The Year 2007 to 2010 (promoted to Deputy General Manager of electrical department): The additional
responsibility of putting one more line of 120 TPD with 1x15 MW turbine & 120 TPH CFBC boiler, besides
electrical maintenance of 430 TPD Viscose Staple Fibre plant & 22 MW power plant.
The Year 2010 to 2012 (HOD of electrical department): The total responsibility of Electrical maintenance of
550 TPD viscose staple fiber plant with 36 MW power plant.
The Year 2012 to 2014 (HOD of electrical department): The additional responsibility of putting one more
spinning line of 180 TPD, besides maintenance of electrical installation of 550 TPD Viscose Staple Fibre plant &
37 MW power plant.
The Year 2014- till Oct 2016: ): The additional responsibility of putting 120 TPD Wet Sulphuric acid plant
besides maintenance of electrical installation of 580 TPD VSF plant & 37 MW power plant.
I have designed, installed & commissioned the complete electrical system for the entire above stated projects
& presently looking after Maintenance of the above-stated project.
(D) BIRLA CELLULOSIC, INDIA (FROM NOV’ 2016 TILL NOW)
This plant produces viscose staple fiber. It is a chemical plant having corrosive gasses as CS2, SO2, and H2S.
To maintain & operate electronic & electrical appliances in this most corrosive area is a challenge to perform.
I am currently working as Deputy General Manager in Birla cellulosic.
Financial summary of project completed
Year Erection &
Commissioning of
Electrical Budget in
million USD
Total Budget in
million USD
2003-2004 100 TPD line 2.5 20
2004-2006 2x10.8 MW TG 21 125
&3x75 TPH Boiler
2006-2007 100 TPD line 3.0 25
2008 120 TPD line 3.5 33
2008-2010 1x15 MW TG &
1x120 TPH Boiler
35 125
2012-2013 180 TPD line 5.3 51
My Present Responsibilities in electrical & automation item maintenance are:
(A) MAIN PLANT ELECTRICAL EQUIPMENT
1. MV panel ( Siemens/ABB): 12 KV Vacuum & SF6 breakers
2. Relays ( Siemens/ABB/SEL/AREVA/ENGLISH ELECTRIC): Numerical and electromagnetic type relays
3. Transformer ( Pauwell/Crompton/ TRAFINDO): Oil filled type ranging from 10 MVA to 2 MVA
4. Bus Duct (GE/DBTS): Epoxy filled sandwiched type 4000 AMPS.
5. PCC (ABB/SIEMENS): Air insulated 4000 amps
6. Substation design: with arc detection system, air conditioning & Fire extinguishing system
7. MCC (ABB/SIEMENS): Fixed /draw out/ semi draw out type
8. Battery charger(Saft Knife,Chloride,Amaraja & Chhabi): 24 V Dc & 110 DC up to 450AH capacity with
one working & auto changeover to standby.
9. Motors (ABB/SIEMENS/CMG/CROMPTON/KIRLOSKAR/BROOK HANSEN): 380 volt & 6600 volt AC
motor & smaller rating DC motors & slip ring motors in crane duty
10. Lightning protection: Conventional type & Early Streamer type
11. Cable (Power/control/Instrumentation: XLPE /PVC/ DTA copper cable 12kv (UE) & low voltage
variety of cable with variety of instrumentation cables.
12. UPS ( DB power system/Emerson): 2x20 KVA with static bypass
13. Emergency Diesel set & emergency power: 1500KVA Diesel Generator set
14. Telephone system: complete telephone exchange with VOIP systems, with 30 trunk lines & 600
internal lines.
15. Public address system : Philips make system
16. Fire detection & protection system for electrical panels
17. Corrosion protection of electronic & electrical items: As per IEC 60721-3-3 & ISA S701.04
18. Emergency power
19. PLC based load shedding scheme: GE makes PLC- based system with fibre optic communication
20. Hazardous area classification: Equipment suitable for IIC,T6 for CS2 gas
21. MIS report for power generation, Transmission & distribution.
22. Various schemes preparation for reliability & safety of entire electrical installation & submitting it to
management for approval.
23. Planning of monthly expenditure of USD 80,000 towards maintenance.
24. Chillers, compressor & other utility related electrical maintenance.
25. Leader of power saving project team.
(B) CAPTIVE POWER PLANT AND GRID ELECTRICAL EQUIPMENT.
1. 1x15 MW double extraction with condensing Turbine & 2x10.8 MW extraction cum backpressure
turbine.
2. 1x120TPH CFBC boiler & 3x75 TPH AFBC boilers.
3. Electrostatic precipitator for all the boilers.
4. DM plant having 4 streams of rating 100 TPH each.
5. Coal handling plant suitable for handling 1000 T of coal /day with primary crusher & secondary
crusher and double Girder crane of 45 Ton
6. Ash handling plant suitable for handling 75 T of ash/day.
7. 70 KV switchyard having three power transformer 1x10 MVA & 2x 7.5 MVA ratings.
8. Synchronization & parallel running of all the Turbines with each other & with Grid.
9. Import/export control of Grid power so as to maintain the minimum flow of power from Grid.
10. PLC based Load shedding to maintain the stability of power plant in case of grid disturbances or
internal disturbance.
11. Islanding of the captive power plant in case of Grid disturbance or internal disturbance
12. Emergency Diesel Generator with auto start up & back synchronization arrangement.
(C ) AUTOMATION EQUIPMENT
1. High-end Siemens Automation system like PLC S7-400/1200 & WIN CC/TIA portal.
2. High-end Rockwell automation system like PLC RS Logix -5000 & RS view.
3. Various communication protocol like Profibus, ethernet, control net, MPI etc.
4. Variable frequency drive of ABB/Siemens/Yasakawa/Allen Bradley/Danfoss/Vacon etc
5. Field equipments like sensors, proximity switches etc.
Additional Skills
 I am familiar with Hazop analysis & have done it for my existing plant.
 I am a computer literate & know how to MS Word, Excel & Power Point & CAD
 I have done training in MS projects & have designed the complete project with the formation of S
curve.
 SAP literate & fully conversant with MM module/ project module
Special Achievement
I have designed integration of Grid receiving substation power with own power generation & complete
islanding system in case of a disturbance in the grid. I was successful in islanding our power plant from State
Grid successfully in more than 100’s of the event. There is no BLACK OUT due to PLN disturbances for last 3
years in spite of heavy thunder storm & lightning in Indonesia.
1. Cultural dimensions
I belong to the Hindu community and am religiously tolerant. I know following languages.
Sr. no. Languages known Speak Read Write
1 English Fluent Fluent Fluent
2 Bahasa Indonesia Fluent Fluent Moderate
3 Hindi Fluent Fluent Fluent
4 Marathi Fluent Fluent Fluent
5 Gujarati Fluent Fluent Moderate
REFERENCES
A. Mr. J. M. SIPANI
P.T. INDO RAMA SYNTHETICS
Email id jmsipani@gmail.com
Contact no +62 81546508494
B. Mr. Shivnath Agarwal
P.T. INDO BHARAT RAYON
Email id shivnath.agrawal@adityabirla.com
Contact no +62 81546569622
C. Mr. C. R. Dugar
ADITYA BIRLA MANAGEMENT
Email id cr.dugar@adityabirla.com
D. Mr. Hemant Apte
GVK, Mumbai Airport
Email id hemant.apte@gvk.com
Contact no +91 9833756638
E. Mr. B.R. Nahar
M.D.
Birla corporation
Email id bnahar@yahoo.com

More Related Content

What's hot

IRJET- Continuous Power Supply by Switching Three Sources
IRJET- Continuous Power Supply by Switching Three SourcesIRJET- Continuous Power Supply by Switching Three Sources
IRJET- Continuous Power Supply by Switching Three SourcesIRJET Journal
 
IRJET - Power Generation using Windmill using Movement of Vehicles in Highways
IRJET - Power Generation using Windmill using Movement of Vehicles in HighwaysIRJET - Power Generation using Windmill using Movement of Vehicles in Highways
IRJET - Power Generation using Windmill using Movement of Vehicles in HighwaysIRJET Journal
 
Selva updated resume
Selva updated resumeSelva updated resume
Selva updated resumeSelva rajan
 
yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)YOGESH PATEL
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemSulaman Muhammad
 
IRJET- Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
IRJET-  	  Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...IRJET-  	  Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
IRJET- Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...IRJET Journal
 
Implementation of Solar Powered BLDC Motor Drive
Implementation of Solar Powered BLDC Motor DriveImplementation of Solar Powered BLDC Motor Drive
Implementation of Solar Powered BLDC Motor Driveijsrd.com
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
PGVCL Training Report
PGVCL Training ReportPGVCL Training Report
PGVCL Training ReportPriten Vasa
 
IRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV System
IRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV SystemIRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV System
IRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV SystemIRJET Journal
 

What's hot (20)

Quotation 50 kva_std_ongrid
Quotation 50 kva_std_ongridQuotation 50 kva_std_ongrid
Quotation 50 kva_std_ongrid
 
IRJET- Continuous Power Supply by Switching Three Sources
IRJET- Continuous Power Supply by Switching Three SourcesIRJET- Continuous Power Supply by Switching Three Sources
IRJET- Continuous Power Supply by Switching Three Sources
 
IRJET - Power Generation using Windmill using Movement of Vehicles in Highways
IRJET - Power Generation using Windmill using Movement of Vehicles in HighwaysIRJET - Power Generation using Windmill using Movement of Vehicles in Highways
IRJET - Power Generation using Windmill using Movement of Vehicles in Highways
 
Resume Y
Resume YResume Y
Resume Y
 
Quotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshjiQuotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshji
 
Selva updated resume
Selva updated resumeSelva updated resume
Selva updated resume
 
Dgvcl rerport
Dgvcl rerportDgvcl rerport
Dgvcl rerport
 
Db Solar V2 09
Db Solar V2 09Db Solar V2 09
Db Solar V2 09
 
Quotation 10 kw_ongrid_rajkot_std
Quotation 10 kw_ongrid_rajkot_stdQuotation 10 kw_ongrid_rajkot_std
Quotation 10 kw_ongrid_rajkot_std
 
yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
CV-MURUGAN PARAMASIVAM
CV-MURUGAN PARAMASIVAMCV-MURUGAN PARAMASIVAM
CV-MURUGAN PARAMASIVAM
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic System
 
IRJET- Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
IRJET-  	  Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...IRJET-  	  Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
IRJET- Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
 
new-2-2 (1)
new-2-2 (1)new-2-2 (1)
new-2-2 (1)
 
Implementation of Solar Powered BLDC Motor Drive
Implementation of Solar Powered BLDC Motor DriveImplementation of Solar Powered BLDC Motor Drive
Implementation of Solar Powered BLDC Motor Drive
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
EDS_REPORT_FINAL
EDS_REPORT_FINALEDS_REPORT_FINAL
EDS_REPORT_FINAL
 
PGVCL Training Report
PGVCL Training ReportPGVCL Training Report
PGVCL Training Report
 
IRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV System
IRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV SystemIRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV System
IRJET- Cascaded Multilevel Inverter with MPPT for Grid Connected PV System
 

Viewers also liked

Curriculum Vitae-1 rev sept(r) 16 with photo
Curriculum Vitae-1 rev sept(r) 16 with photoCurriculum Vitae-1 rev sept(r) 16 with photo
Curriculum Vitae-1 rev sept(r) 16 with photoS.R Sethia
 
Resume-LequiciaSimmons-2016
Resume-LequiciaSimmons-2016Resume-LequiciaSimmons-2016
Resume-LequiciaSimmons-2016Lequicia Simmons
 
1 fil prov. especifica 3 bimestre
1 fil    prov. especifica 3 bimestre1 fil    prov. especifica 3 bimestre
1 fil prov. especifica 3 bimestreFelipe Serra
 
Geo-Esp 3º A Luna, Aprendizaje Colaborativo
Geo-Esp 3º A Luna, Aprendizaje ColaborativoGeo-Esp 3º A Luna, Aprendizaje Colaborativo
Geo-Esp 3º A Luna, Aprendizaje Colaborativofabriciopelerino
 
Presentation of SunOn Mould
Presentation of SunOn MouldPresentation of SunOn Mould
Presentation of SunOn MouldLinda Tsai
 
Low Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV rays
Low Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV raysLow Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV rays
Low Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV raysRaNa ALi HaiDer
 
Luận văn tiếng anh
Luận văn tiếng anhLuận văn tiếng anh
Luận văn tiếng anhPhi Pham
 
Asha Resume
Asha ResumeAsha Resume
Asha Resumeasha ha
 
The selfish giant
The selfish giantThe selfish giant
The selfish giantPhi Pham
 
Sysdig - Introducing a new definition of Monitoring
Sysdig - Introducing a new definition of MonitoringSysdig - Introducing a new definition of Monitoring
Sysdig - Introducing a new definition of MonitoringRamit Surana
 
Chuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vn
Chuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vnChuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vn
Chuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vnMegabook
 
Graduation thesis of English Major
Graduation thesis of English MajorGraduation thesis of English Major
Graduation thesis of English MajorPhi Pham
 
Tổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vn
Tổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vnTổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vn
Tổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vnMegabook
 

Viewers also liked (18)

Curriculum Vitae-1 rev sept(r) 16 with photo
Curriculum Vitae-1 rev sept(r) 16 with photoCurriculum Vitae-1 rev sept(r) 16 with photo
Curriculum Vitae-1 rev sept(r) 16 with photo
 
Resume-LequiciaSimmons-2016
Resume-LequiciaSimmons-2016Resume-LequiciaSimmons-2016
Resume-LequiciaSimmons-2016
 
A levegőszennyezés
A levegőszennyezésA levegőszennyezés
A levegőszennyezés
 
October Newsletter
October NewsletterOctober Newsletter
October Newsletter
 
1 fil prov. especifica 3 bimestre
1 fil    prov. especifica 3 bimestre1 fil    prov. especifica 3 bimestre
1 fil prov. especifica 3 bimestre
 
Análisis de-sitio-web
Análisis de-sitio-webAnálisis de-sitio-web
Análisis de-sitio-web
 
Geo-Esp 3º A Luna, Aprendizaje Colaborativo
Geo-Esp 3º A Luna, Aprendizaje ColaborativoGeo-Esp 3º A Luna, Aprendizaje Colaborativo
Geo-Esp 3º A Luna, Aprendizaje Colaborativo
 
Nuevo documento de microsoft word
Nuevo documento de microsoft wordNuevo documento de microsoft word
Nuevo documento de microsoft word
 
Presentation of SunOn Mould
Presentation of SunOn MouldPresentation of SunOn Mould
Presentation of SunOn Mould
 
Low Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV rays
Low Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV raysLow Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV rays
Low Temprature Dyeing Of Wool by Acid Dyes after pretreatment with UV rays
 
Luận văn tiếng anh
Luận văn tiếng anhLuận văn tiếng anh
Luận văn tiếng anh
 
Asha Resume
Asha ResumeAsha Resume
Asha Resume
 
The selfish giant
The selfish giantThe selfish giant
The selfish giant
 
Sysdig - Introducing a new definition of Monitoring
Sysdig - Introducing a new definition of MonitoringSysdig - Introducing a new definition of Monitoring
Sysdig - Introducing a new definition of Monitoring
 
Chuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vn
Chuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vnChuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vn
Chuyên đề ngữ pháp tiếng Anh 50 câu lần 1 - Megabook.vn
 
Graduation thesis of English Major
Graduation thesis of English MajorGraduation thesis of English Major
Graduation thesis of English Major
 
Tổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vn
Tổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vnTổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vn
Tổng hợp lý thuyết Hóa học siêu dễ nhớ - Megabook.vn
 
313456 - skill
313456 - skill313456 - skill
313456 - skill
 

Similar to Curriculum Vitae-1 rev sept(r) 16 with photo

Similar to Curriculum Vitae-1 rev sept(r) 16 with photo (20)

Cv
CvCv
Cv
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Eng_Ahmad_Hamdy_CV
Eng_Ahmad_Hamdy_CVEng_Ahmad_Hamdy_CV
Eng_Ahmad_Hamdy_CV
 
RESUME
RESUMERESUME
RESUME
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
1 vijay new small resume
1 vijay new  small resume1 vijay new  small resume
1 vijay new small resume
 
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Resume Superintendent Head Electrical
Resume Superintendent Head ElectricalResume Superintendent Head Electrical
Resume Superintendent Head Electrical
 
Asad Ali Shah cv
Asad Ali Shah cvAsad Ali Shah cv
Asad Ali Shah cv
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
Kdmc
KdmcKdmc
Kdmc
 
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
Abdou fattouh cv
Abdou fattouh cvAbdou fattouh cv
Abdou fattouh cv
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystDesign and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
 
CV
CVCV
CV
 

Curriculum Vitae-1 rev sept(r) 16 with photo

  • 1. Curriculum Vitae 1. Educational Qualifications I graduated from Regional Engineering College (Now NIT) Kurukshetra, Haryana; a premier institute in India after getting Electrical Engineering (HONS.) degree in 1989. 2. Key functional competency a. Electrical power generation & distribution system I) Project, Planning & System Design II) Procurement, Erection & commissioning III) Maintenance b. Automation system i) Project, Planning & System Design ii) Procurement, Erection & commissioning iii) Maintenance 3. Managerial Competency Name: Shiv Ratan Sethia Field: Electrical & controls D.O.B. : 11-11-1966 Experience: 27 years Email id : ssethia.2012@hotmail.com Contact no: +91 9904200503 Location : Birla cellulosic,Gujarat , India
  • 2. a. Ability to manage cross-functional teams & multi-disciplinary project b. Critical thinker, decision maker & problem solver c. Top planning & organizing skill d. Excellent personal communication skills e. Management skills i) Influencing ii) Leading iii) Negotiating iv) Delegating v) Coaching vi) Persuading f. Conflict managing g. Adaptability h. Highly inquisitive, creative, resourceful & goal oriented i. Committed to maintaining quality & efficiency j. Expert troubleshooter & problem solver k. Committed to excellent service & customer satisfaction l. Leadership quality m. Team Development & Team working n. Subordinate development o. Innovative & cost consciousness p. Adoption of new technology 4. Work Experience (A) Vikram Ispat ( Joined in 1989 till 1995 ) This plant produces hot briquette iron (HBI & DRI) from iron ore. Immediately after graduation, I joined M/S Vikram Ispat in Alibaug, near Mumbai. I was responsible for erection & commissioning of the complete plant including power plant having 4x2.5 MW DG set of SKODA make & 1x 10.8 MW STG set of BHEL make. I have worked here in green field project from inception of the project. I have done erection, commissioning and maintenance of the entire electrical system (B) Oswal chemicals & fertilizer (Uttar Pradesh, India) (from 1995-1996) This plant produces urea fertilizer. I was responsible for commissioning of entire electrical work related to Urea plant. I have joined here as Assistant Manager & did erection & commissioning of the entire plant within the tenure of 10 months. (C) P.T. INDO BHARAT RAYON, INDONESIA (FROM 1996 TILL Oct 2016)
  • 3. This plant produces viscose staple fibre. It is a chemical plant having corrosive gasses as CS2, SO2, and H2S. To maintain & operate electronic & electrical appliances in this most corrosive area is a challenge to perform. I joined PT Indo Bharat Indonesia as deputy Manager & currently working as Deputy General Manager. The Year 1996 to 2003 (worked as Deputy Manager of electrical department): Maintenance of the entire electrical installation in 230 TPD Viscose staple fiber plant The Year 2003 to 2006 (worked as Manager of electrical department) : The additional responsibility of expansion project of installing 100 TPD line with 2x10.8 MW coal based power plant with 3x75 TPH capacity boilers beside electrical maintenance of old 230 TPD VSF plant. The Year 2006 to 2007 (promoted to Assistant General Manager of electrical department): The additional responsibility of putting up one more line of 100 TPD to add viscose manufacturing facility, besides electrical maintenance of 330 TPD VSF plant & 22 MW power plant. The Year 2007 to 2010 (promoted to Deputy General Manager of electrical department): The additional responsibility of putting one more line of 120 TPD with 1x15 MW turbine & 120 TPH CFBC boiler, besides electrical maintenance of 430 TPD Viscose Staple Fibre plant & 22 MW power plant. The Year 2010 to 2012 (HOD of electrical department): The total responsibility of Electrical maintenance of 550 TPD viscose staple fiber plant with 36 MW power plant. The Year 2012 to 2014 (HOD of electrical department): The additional responsibility of putting one more spinning line of 180 TPD, besides maintenance of electrical installation of 550 TPD Viscose Staple Fibre plant & 37 MW power plant. The Year 2014- till Oct 2016: ): The additional responsibility of putting 120 TPD Wet Sulphuric acid plant besides maintenance of electrical installation of 580 TPD VSF plant & 37 MW power plant. I have designed, installed & commissioned the complete electrical system for the entire above stated projects & presently looking after Maintenance of the above-stated project. (D) BIRLA CELLULOSIC, INDIA (FROM NOV’ 2016 TILL NOW) This plant produces viscose staple fiber. It is a chemical plant having corrosive gasses as CS2, SO2, and H2S. To maintain & operate electronic & electrical appliances in this most corrosive area is a challenge to perform. I am currently working as Deputy General Manager in Birla cellulosic. Financial summary of project completed Year Erection & Commissioning of Electrical Budget in million USD Total Budget in million USD 2003-2004 100 TPD line 2.5 20 2004-2006 2x10.8 MW TG 21 125
  • 4. &3x75 TPH Boiler 2006-2007 100 TPD line 3.0 25 2008 120 TPD line 3.5 33 2008-2010 1x15 MW TG & 1x120 TPH Boiler 35 125 2012-2013 180 TPD line 5.3 51 My Present Responsibilities in electrical & automation item maintenance are: (A) MAIN PLANT ELECTRICAL EQUIPMENT 1. MV panel ( Siemens/ABB): 12 KV Vacuum & SF6 breakers 2. Relays ( Siemens/ABB/SEL/AREVA/ENGLISH ELECTRIC): Numerical and electromagnetic type relays 3. Transformer ( Pauwell/Crompton/ TRAFINDO): Oil filled type ranging from 10 MVA to 2 MVA 4. Bus Duct (GE/DBTS): Epoxy filled sandwiched type 4000 AMPS. 5. PCC (ABB/SIEMENS): Air insulated 4000 amps 6. Substation design: with arc detection system, air conditioning & Fire extinguishing system 7. MCC (ABB/SIEMENS): Fixed /draw out/ semi draw out type 8. Battery charger(Saft Knife,Chloride,Amaraja & Chhabi): 24 V Dc & 110 DC up to 450AH capacity with one working & auto changeover to standby. 9. Motors (ABB/SIEMENS/CMG/CROMPTON/KIRLOSKAR/BROOK HANSEN): 380 volt & 6600 volt AC motor & smaller rating DC motors & slip ring motors in crane duty 10. Lightning protection: Conventional type & Early Streamer type 11. Cable (Power/control/Instrumentation: XLPE /PVC/ DTA copper cable 12kv (UE) & low voltage variety of cable with variety of instrumentation cables. 12. UPS ( DB power system/Emerson): 2x20 KVA with static bypass 13. Emergency Diesel set & emergency power: 1500KVA Diesel Generator set 14. Telephone system: complete telephone exchange with VOIP systems, with 30 trunk lines & 600 internal lines. 15. Public address system : Philips make system 16. Fire detection & protection system for electrical panels 17. Corrosion protection of electronic & electrical items: As per IEC 60721-3-3 & ISA S701.04 18. Emergency power 19. PLC based load shedding scheme: GE makes PLC- based system with fibre optic communication 20. Hazardous area classification: Equipment suitable for IIC,T6 for CS2 gas 21. MIS report for power generation, Transmission & distribution. 22. Various schemes preparation for reliability & safety of entire electrical installation & submitting it to management for approval. 23. Planning of monthly expenditure of USD 80,000 towards maintenance.
  • 5. 24. Chillers, compressor & other utility related electrical maintenance. 25. Leader of power saving project team. (B) CAPTIVE POWER PLANT AND GRID ELECTRICAL EQUIPMENT. 1. 1x15 MW double extraction with condensing Turbine & 2x10.8 MW extraction cum backpressure turbine. 2. 1x120TPH CFBC boiler & 3x75 TPH AFBC boilers. 3. Electrostatic precipitator for all the boilers. 4. DM plant having 4 streams of rating 100 TPH each. 5. Coal handling plant suitable for handling 1000 T of coal /day with primary crusher & secondary crusher and double Girder crane of 45 Ton 6. Ash handling plant suitable for handling 75 T of ash/day. 7. 70 KV switchyard having three power transformer 1x10 MVA & 2x 7.5 MVA ratings. 8. Synchronization & parallel running of all the Turbines with each other & with Grid. 9. Import/export control of Grid power so as to maintain the minimum flow of power from Grid. 10. PLC based Load shedding to maintain the stability of power plant in case of grid disturbances or internal disturbance. 11. Islanding of the captive power plant in case of Grid disturbance or internal disturbance 12. Emergency Diesel Generator with auto start up & back synchronization arrangement. (C ) AUTOMATION EQUIPMENT 1. High-end Siemens Automation system like PLC S7-400/1200 & WIN CC/TIA portal. 2. High-end Rockwell automation system like PLC RS Logix -5000 & RS view. 3. Various communication protocol like Profibus, ethernet, control net, MPI etc. 4. Variable frequency drive of ABB/Siemens/Yasakawa/Allen Bradley/Danfoss/Vacon etc 5. Field equipments like sensors, proximity switches etc. Additional Skills  I am familiar with Hazop analysis & have done it for my existing plant.  I am a computer literate & know how to MS Word, Excel & Power Point & CAD  I have done training in MS projects & have designed the complete project with the formation of S curve.  SAP literate & fully conversant with MM module/ project module Special Achievement I have designed integration of Grid receiving substation power with own power generation & complete islanding system in case of a disturbance in the grid. I was successful in islanding our power plant from State Grid successfully in more than 100’s of the event. There is no BLACK OUT due to PLN disturbances for last 3 years in spite of heavy thunder storm & lightning in Indonesia.
  • 6. 1. Cultural dimensions I belong to the Hindu community and am religiously tolerant. I know following languages. Sr. no. Languages known Speak Read Write 1 English Fluent Fluent Fluent 2 Bahasa Indonesia Fluent Fluent Moderate 3 Hindi Fluent Fluent Fluent 4 Marathi Fluent Fluent Fluent 5 Gujarati Fluent Fluent Moderate REFERENCES A. Mr. J. M. SIPANI P.T. INDO RAMA SYNTHETICS Email id jmsipani@gmail.com Contact no +62 81546508494 B. Mr. Shivnath Agarwal P.T. INDO BHARAT RAYON Email id shivnath.agrawal@adityabirla.com Contact no +62 81546569622 C. Mr. C. R. Dugar ADITYA BIRLA MANAGEMENT Email id cr.dugar@adityabirla.com D. Mr. Hemant Apte GVK, Mumbai Airport Email id hemant.apte@gvk.com Contact no +91 9833756638 E. Mr. B.R. Nahar M.D. Birla corporation Email id bnahar@yahoo.com