SlideShare a Scribd company logo
1 of 3
MANOJ PANDEY
:00966-533094081, 09999591624 : mpandeymanoj@rediffmail.com / inductengineers@gmail.com;
:Please mention link
~ MANAGERIALLEVEL POSITIONS ~
~ Operations & Maintenance ~Project Management ~ Production Operations-Over 16 years of Experience
Location Preference: UAE / Bahrain / Qatar / India
P R O F I L E S N A P S H O T
 Gained insightful experience in executing multiple Projects while meeting business needs in a fast paced, dynamic and
globally expanding MNC environment
 Expertise in devisingstrategicplans & schedules foroperations &maintenanceactivities with focus on optimum utilization
of manpower & materials; performing installation & commissioning activities as per the specified designs
 Successfully commissioned around 100 factories at Bangladesh, North India & Vietnam
 Proficientinanalyzing and mapping existing processes to thedesiredlevels (GAPAnalysis),evaluating available technology-
based solutions and restructuring/reengineering the process to achieve higher levels of efficiency & effectiveness
 Resourceful in resolving technical issues & inconsistencies through performing Root Cause Analysisand
troubleshooting the same to avoid further escalation
 Skilled in recommending modifications to minimize escalations &
rejections in the production process; realizing operational efficiencies and
controlling costs & cycle time
 Expertise in working with a strong vigilance for any potential hazards by
performing regular inspections and ensuring adherence to health & safety
parameters as per the rules & regulations
 Analytical, meticulous and quality-oriented professional with an eye for detail
 Strong problem solving & technical skills coupled with sound decision making for enabling effective solutions leading
to high customer satisfaction and low operational costs
A R E A S O F E X P E R T I S E
Operations & Maintenance Project Management Production Operations
Strategic Planning Troubleshooting Process Optimization & Automation
Quality Management Training & Development Team Management
W O R K E X P E R I E N C E
Since Dec’10 Al-Jazeera Ambitions Factory Co. (Saudi Arabia) as Plant Manager
Key Result Areas:
 Developingbaselines;controllingprojects with respect to cost, resource deployment, time over-runs and quality compliance to
ensure satisfactory execution of the same
Photo
 Devising & implementing:
o Maintenance schedules of electronics/ Electrical equipment to increase machine up time/ equipment reliability;
thereby accomplishing planned production targets
o Maintenance plans/schedules for reducing machinery downtime to minimum for ensuring smooth production.
 Identifying areas of obstruction/breakdowns & take steps to rectify the same through application of trouble shooting tools
Implementing cost saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures
and work within the budget
 Implementing Total Productive Maintenance (TPM) and improving quality of machines, equipment & processes
 Leading testing & maintenance of equipment, machineries & utilities for facilitating smooth &uninterrupted operations
 Spearheading commissioning with per formation of Induction Furnaces and Auto-pouring Machine at customer site in
India, Bangladesh, Vietnam & Saudi Arabia
 Administering servicing & maintenance /repairing as pert customer’s terms and conditions
 Preparing SOPs, manuals & work instructions for operations and maintaining reports for facilitating decision making by
the management
 Managing testing of Induction Furnace, Auto-pour System, Electronics Cards & Modules
 Administering project activities of steel plant and foundry industry installation with production performance
 Automating process for XX activities
Accomplishments: (Please fill if applicable)
 Implemented several measures to identify deformities, malfunctions or other abnormalities such as XX (please mention
the details) in parts / components / products
 Streamlined XX process in the organization using XX strategies which resulted in XX benefits to the company
 Completed quality projects within time by taking XX initiatives (please mention the contribution)
 Reduced downtime by XX% (please mention) through measures such as XX(please mention)
 Achieved savings of INR XX Thousand/Lakhs by implementing XX initiatives
 Increased in-plant capability by XX% (please mention) through effective maintenance; was appreciated for the same
P R E V I O U S E X P E R I E N C E
Jan’05 – Nov’10 Inductotherm India Pvt. Ltd., Location –New Delhi as Senior Engineer
Jan’04 – Jan’05 Sri Venketashwara Sponge & Power Pvt. Ltd., Location- Tirupati (A.P) as Electrical Dept. &
Project In-charge
.
Jul’00 – Dec’03 Maa Chhinmastike Sponge Iron Ltd., Location- Ramgarh (Jharkhand)
Growth Path:
Jul’00 – Sept’02 Assistant Electronics Engineer &Project In-charge
Oct’02 – Dec’03 Electrical & Electronics Project In-charge
.
E D U C A T I O N
2000 B.E. in Electronics Engineering from Swami RamanandTeerthMarathwada University with 71%
1996 Diploma in Export Management fromIIEM, Bangalore with 61%
C E R T I F I C A T I O N
 Certification in Financial Markets (NCFM) and Capital Market (Dealers) Module from NSE, Mumbai
I N D U S T R I A L T R A I N I N G
 Completed 1 month Industrial Training from BHEL, Jhansi (U.P) in 1998.
I T S K I L L S
 Sound knowledge of DOS, OS-98/ 2000, ME, , Window XP, M S-Office, C++, Oracle, Networking& Internet Applications
E X T R A C U R R I C U L A R A C T I V I T I E S
 Served as Student Member of:
o Amateur Radio Society of India, Mumbai
o Indian Technical Education Society, Mumbai
o National Foundation of Indian Engineer's New Delhi
P E R S O N A L D E T A I L S
Date of Birth : 1st March 1977
Languages Known : English & Hindi
Address : S-2; B-65; B block, Ext-2, Shalimer garden; Distt- Ghaziabad (U.P)
Nationality : Indian
Marital Status : Married
Visa Details : Saudi Arabia Residence Visa.
Driving License : Saudi & India
No. of Dependents : 06
Passport Details : L 8834870

More Related Content

What's hot (20)

varsha arora (2)
varsha arora (2)varsha arora (2)
varsha arora (2)
 
Resume new
Resume newResume new
Resume new
 
Yajuvendra Bamrara CV
Yajuvendra Bamrara CVYajuvendra Bamrara CV
Yajuvendra Bamrara CV
 
Deepak Chandel Resume for Production Engineer
Deepak Chandel Resume for Production EngineerDeepak Chandel Resume for Production Engineer
Deepak Chandel Resume for Production Engineer
 
sathish resume -MAY 2016 updated
sathish resume -MAY 2016 updatedsathish resume -MAY 2016 updated
sathish resume -MAY 2016 updated
 
Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_Updated
 
CV Agapito Cardiel 26-8
CV Agapito Cardiel 26-8CV Agapito Cardiel 26-8
CV Agapito Cardiel 26-8
 
rhishav production resume
rhishav production resumerhishav production resume
rhishav production resume
 
CV ajay parikh
CV ajay parikhCV ajay parikh
CV ajay parikh
 
Manoj kulkarni.docx
Manoj kulkarni.docxManoj kulkarni.docx
Manoj kulkarni.docx
 
Resume for production Enng
Resume for production EnngResume for production Enng
Resume for production Enng
 
C.V
C.VC.V
C.V
 
Resume
ResumeResume
Resume
 
BJ Fardi - Resume
BJ Fardi - ResumeBJ Fardi - Resume
BJ Fardi - Resume
 
M.3 resume
M.3 resume M.3 resume
M.3 resume
 
David Carmichael Brief Resume
David Carmichael Brief ResumeDavid Carmichael Brief Resume
David Carmichael Brief Resume
 
Resume2017
Resume2017Resume2017
Resume2017
 
Resume for production Engineer
Resume for production EngineerResume for production Engineer
Resume for production Engineer
 
Davenport_IE_Resume_12_Caljobs
Davenport_IE_Resume_12_CaljobsDavenport_IE_Resume_12_Caljobs
Davenport_IE_Resume_12_Caljobs
 
Christopher_Alfante_CV_170201
Christopher_Alfante_CV_170201Christopher_Alfante_CV_170201
Christopher_Alfante_CV_170201
 

Viewers also liked (18)

Schools
SchoolsSchools
Schools
 
Serge Stroynov - graphic designer portfolio
Serge Stroynov - graphic designer portfolioSerge Stroynov - graphic designer portfolio
Serge Stroynov - graphic designer portfolio
 
Office y libre office
Office y libre officeOffice y libre office
Office y libre office
 
TF-04D Outdoor WPC Wll Cladding
TF-04D Outdoor WPC Wll CladdingTF-04D Outdoor WPC Wll Cladding
TF-04D Outdoor WPC Wll Cladding
 
era
eraera
era
 
Análisis de problemas y tomas de decisiones
Análisis de problemas y tomas de decisionesAnálisis de problemas y tomas de decisiones
Análisis de problemas y tomas de decisiones
 
Robin18
Robin18Robin18
Robin18
 
Periodo 2
Periodo 2Periodo 2
Periodo 2
 
ALEX SOARES - CV - SECRETARY AND HR EXECUTIVE
ALEX SOARES - CV - SECRETARY AND HR EXECUTIVEALEX SOARES - CV - SECRETARY AND HR EXECUTIVE
ALEX SOARES - CV - SECRETARY AND HR EXECUTIVE
 
Code Enforcement spars with BTV landlord
Code Enforcement spars with BTV landlordCode Enforcement spars with BTV landlord
Code Enforcement spars with BTV landlord
 
Tecnologia saberes 11
Tecnologia saberes 11Tecnologia saberes 11
Tecnologia saberes 11
 
Final Design Review
Final Design ReviewFinal Design Review
Final Design Review
 
Recreación fotográfica con conceptos del Expresionismo Alemán
Recreación fotográfica con conceptos del Expresionismo AlemánRecreación fotográfica con conceptos del Expresionismo Alemán
Recreación fotográfica con conceptos del Expresionismo Alemán
 
Valorsul centro triagem do lumiar
Valorsul  centro triagem do lumiarValorsul  centro triagem do lumiar
Valorsul centro triagem do lumiar
 
Potrebitel
PotrebitelPotrebitel
Potrebitel
 
Oficina do papel
Oficina do papelOficina do papel
Oficina do papel
 
Outlast
OutlastOutlast
Outlast
 
MSE Broadcast
MSE BroadcastMSE Broadcast
MSE Broadcast
 

Similar to M.Pandey( New resume) (20)

Manish Gujarathi - Copy
Manish Gujarathi  - CopyManish Gujarathi  - Copy
Manish Gujarathi - Copy
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
NIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATEDNIKET SONI RESUME UPDATED
NIKET SONI RESUME UPDATED
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
RR CV
RR CVRR CV
RR CV
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
 
CV_Vinod
CV_VinodCV_Vinod
CV_Vinod
 
praveen
praveenpraveen
praveen
 
Rsume
RsumeRsume
Rsume
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
C.V.(I.E)
C.V.(I.E)C.V.(I.E)
C.V.(I.E)
 
CURRICULUM VITEA
CURRICULUM VITEACURRICULUM VITEA
CURRICULUM VITEA
 
Resume
ResumeResume
Resume
 
VASANT MANGALE FINAL_new
VASANT MANGALE FINAL_newVASANT MANGALE FINAL_new
VASANT MANGALE FINAL_new
 
Maintenance Engineer having 9 years experience
Maintenance  Engineer having 9 years experienceMaintenance  Engineer having 9 years experience
Maintenance Engineer having 9 years experience
 
Mahendra_BE(Mech)_Design
Mahendra_BE(Mech)_DesignMahendra_BE(Mech)_Design
Mahendra_BE(Mech)_Design
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 

M.Pandey( New resume)

  • 1. MANOJ PANDEY :00966-533094081, 09999591624 : mpandeymanoj@rediffmail.com / inductengineers@gmail.com; :Please mention link ~ MANAGERIALLEVEL POSITIONS ~ ~ Operations & Maintenance ~Project Management ~ Production Operations-Over 16 years of Experience Location Preference: UAE / Bahrain / Qatar / India P R O F I L E S N A P S H O T  Gained insightful experience in executing multiple Projects while meeting business needs in a fast paced, dynamic and globally expanding MNC environment  Expertise in devisingstrategicplans & schedules foroperations &maintenanceactivities with focus on optimum utilization of manpower & materials; performing installation & commissioning activities as per the specified designs  Successfully commissioned around 100 factories at Bangladesh, North India & Vietnam  Proficientinanalyzing and mapping existing processes to thedesiredlevels (GAPAnalysis),evaluating available technology- based solutions and restructuring/reengineering the process to achieve higher levels of efficiency & effectiveness  Resourceful in resolving technical issues & inconsistencies through performing Root Cause Analysisand troubleshooting the same to avoid further escalation  Skilled in recommending modifications to minimize escalations & rejections in the production process; realizing operational efficiencies and controlling costs & cycle time  Expertise in working with a strong vigilance for any potential hazards by performing regular inspections and ensuring adherence to health & safety parameters as per the rules & regulations  Analytical, meticulous and quality-oriented professional with an eye for detail  Strong problem solving & technical skills coupled with sound decision making for enabling effective solutions leading to high customer satisfaction and low operational costs A R E A S O F E X P E R T I S E Operations & Maintenance Project Management Production Operations Strategic Planning Troubleshooting Process Optimization & Automation Quality Management Training & Development Team Management W O R K E X P E R I E N C E Since Dec’10 Al-Jazeera Ambitions Factory Co. (Saudi Arabia) as Plant Manager Key Result Areas:  Developingbaselines;controllingprojects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of the same Photo
  • 2.  Devising & implementing: o Maintenance schedules of electronics/ Electrical equipment to increase machine up time/ equipment reliability; thereby accomplishing planned production targets o Maintenance plans/schedules for reducing machinery downtime to minimum for ensuring smooth production.  Identifying areas of obstruction/breakdowns & take steps to rectify the same through application of trouble shooting tools Implementing cost saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the budget  Implementing Total Productive Maintenance (TPM) and improving quality of machines, equipment & processes  Leading testing & maintenance of equipment, machineries & utilities for facilitating smooth &uninterrupted operations  Spearheading commissioning with per formation of Induction Furnaces and Auto-pouring Machine at customer site in India, Bangladesh, Vietnam & Saudi Arabia  Administering servicing & maintenance /repairing as pert customer’s terms and conditions  Preparing SOPs, manuals & work instructions for operations and maintaining reports for facilitating decision making by the management  Managing testing of Induction Furnace, Auto-pour System, Electronics Cards & Modules  Administering project activities of steel plant and foundry industry installation with production performance  Automating process for XX activities Accomplishments: (Please fill if applicable)  Implemented several measures to identify deformities, malfunctions or other abnormalities such as XX (please mention the details) in parts / components / products  Streamlined XX process in the organization using XX strategies which resulted in XX benefits to the company  Completed quality projects within time by taking XX initiatives (please mention the contribution)  Reduced downtime by XX% (please mention) through measures such as XX(please mention)  Achieved savings of INR XX Thousand/Lakhs by implementing XX initiatives  Increased in-plant capability by XX% (please mention) through effective maintenance; was appreciated for the same P R E V I O U S E X P E R I E N C E Jan’05 – Nov’10 Inductotherm India Pvt. Ltd., Location –New Delhi as Senior Engineer Jan’04 – Jan’05 Sri Venketashwara Sponge & Power Pvt. Ltd., Location- Tirupati (A.P) as Electrical Dept. & Project In-charge . Jul’00 – Dec’03 Maa Chhinmastike Sponge Iron Ltd., Location- Ramgarh (Jharkhand) Growth Path: Jul’00 – Sept’02 Assistant Electronics Engineer &Project In-charge Oct’02 – Dec’03 Electrical & Electronics Project In-charge . E D U C A T I O N 2000 B.E. in Electronics Engineering from Swami RamanandTeerthMarathwada University with 71% 1996 Diploma in Export Management fromIIEM, Bangalore with 61% C E R T I F I C A T I O N  Certification in Financial Markets (NCFM) and Capital Market (Dealers) Module from NSE, Mumbai I N D U S T R I A L T R A I N I N G  Completed 1 month Industrial Training from BHEL, Jhansi (U.P) in 1998.
  • 3. I T S K I L L S  Sound knowledge of DOS, OS-98/ 2000, ME, , Window XP, M S-Office, C++, Oracle, Networking& Internet Applications E X T R A C U R R I C U L A R A C T I V I T I E S  Served as Student Member of: o Amateur Radio Society of India, Mumbai o Indian Technical Education Society, Mumbai o National Foundation of Indian Engineer's New Delhi P E R S O N A L D E T A I L S Date of Birth : 1st March 1977 Languages Known : English & Hindi Address : S-2; B-65; B block, Ext-2, Shalimer garden; Distt- Ghaziabad (U.P) Nationality : Indian Marital Status : Married Visa Details : Saudi Arabia Residence Visa. Driving License : Saudi & India No. of Dependents : 06 Passport Details : L 8834870