ENGINEERING PROCESS FOR PREPARATION OF
WATER SUPPLY AND SANITATION MASTER PLAN
FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DIT WORKSHOP
16 March 2023
1. INTRODUCTION
2. FIELDWORK & MEETINGS
3. STAKEHOLDERS AND DATA COLLECTION
4. DATA COLLECTION
5. WORK PLAN, ACTIVITIES, DELIVERABLES AND DEADLINES
6. TEAM – HUMAN RESOURCES & MAIN TASKS
7. SUAI EXISTING SITUATION
8. SUAI OPTIONS ANALYSIS
9. SUAI PROPOSED SOLUTION
10. WATER CYCLE
11. WATER SOURCES PROTECTION
12. SANITATION
13. NEXT STEPS
14. COMMENTS, SUGGESTIONS, CONCLUSIONS
2
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION
MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
TABLE OF CONTENTS
1. INTRODUCTION
• A strategic plan answers the question “where do we want to
go?”
• A master plan provides a road map that shows how we can
get there. It is a blueprint for the future of an organization
and must be directly tied to goals and planning. It identifies
economic, social, technical, environmental factors, such as
infrastructure development, planning, acquisition and
sustainability.
• The elaboration and development of a Master Plan have:
-activities to get information (primary &secondary
data);
-options analysis and proposed solution;
-institutional arrangements and legal framework; and
-implementation plan.
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 3
4
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
1. INTRODUCTION
This presentation concerns to the project for “Engineering Process for
Preparation of Water Supply and Sanitation Master Plan for Suai , Municipal
Capital of Covalima”. First step, team mobilization (stage 0), compilation of
stakeholders contacts, documents and baseline information.
Stage 0 includes Inception Report, it’s presentation, discussion and delivery,
the project scope consists of three main stages:
• Stage I - Assessment of Existing Water and Sanitation Situation;
• Stage II - Water Supply and Sanitation Options Analysis;
• Stage III - Feasibility Assessment of Priority Water Supply and Sanitation
Investments.
5
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
Field work developed: Suai, (Covalima), water sources, boreholes, water
tanks, network operating valves, schools, hospitals, existent fecal sludge
treatment plant built by UN in 2001;
2. FIELD WORK &
MEETINGS
Findings: the payment for water supply service is a strategic matter, also
to ensure a rational water consumption and to achieve financial
sustainability for the service. Other way, clients closer to water tanks
easily access water, other clients hardly will.
Water quality monitoring and control is very
important regarding public health, and limestone,
frequently a big problem in Timor-Leste.
6
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
2. FIELD WORK & MEETINGS
Suai Borehole, not working Américo Spring chamber, Suai,
rehabilitation works needed
Existent FSTP built by UN, 2001, Suai
Rehabilitated in 2011, but never worked
Booster pump, Suai
Santa Rosa reservoir (#3 cells), Suai,
rehabilitation works are needed
7
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
Water Sources:
- A campaign to know flow in dry season, water quality, availability;
- Water supply infrastructures need rehabilitation;
Sanitation:
- There is no information about desludging procedures of existing septic
septic tanks;
- There are no desludging trucks or faecal sludge treatment plants
(FSTP) in the studied area;
- The existing public toilets are not working properly, don’t have tap
water, and no operation and maintenance;
- Septic tanks are broken, leaking into the ground and infiltrate. Often,
when septic tanks are full, a new septic tank is built, and the existent
one is abandoned (sealed);
2. FIELD WORK &
MEETINGS
8
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
2. FIELD WORK & MEETINGS
Miguel Armada, Suai Prison’s
Vice Administrator
Suco’s leader Dato and
secretary, Suai
Arakat and Village Leader,
Suai
Village leader meeting, Suai Water supply system at Suai
Airport
Suai’s vice-administrator
9
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
3. STAKEHOLDERS
STAKEHOLDERS IDENTIFICATION
- National Level
● Bee Timor Leste, E.P.;
● ANAS, I.P.;
● DNPCC (road improvements);
● DNHPU (urban planning);
● Ministry of Health (water bourn diseases);
● Ministry of Public Works (MPW);
● Ministry of Agriculture (MAP);
● Ministry of Finance - AID Coordination;
● Ministry of State Administration (MSA);
● Ministry of Planning and Territory (MPT);
● ANPM; Timor GAP - Tasi Mane Project; IPG;
● ADN; ANLA; SGP/MPS;
FOCAL POINT – MPW / BTL.EP
- Local Level and Others
● Local Administration (Aldeia; Suco,
Municipio);
● Community Leaders (Leorai, Lia'nain,
Church, School Headmasters);
● Community Groups;
● Municipal BTL.EP delegations;
● Health officials;
● Agriculture office officials;
● Private sector;
● NGOs;
● PLAN International;
● WaterAid; CVTL; Care International;
● GMF;
● Steering Committee
10
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
3. STAKEHOLDERS
TECHNICAL
SUPPORT
ADMINISTRATIVE
SUPPORT
LOGISTIC
SUPPORT
CONSULTING TEAM
[MOP]
CONTRACTING
INSTITUTION
QUALITY CONTROL
COMMITTEE
STEERING
COMMITTEE
FOCAL POINT
AdP + ENGIDRO
STAKEHOLDERS:
MOP + MPO + BTL +
ANAS
Others Ministries, National &
Local Authorities and NGO’s
ORGANIZATIONAL STRUCTURE - COMMUNICATION FLOW
11
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
4. DATA COLLECTION
DATA COLLECTION
● Existing Studies, data, documents:
-water supply; sanitation;
-urban planning; land
use;
-socio demographics;
population projections;
census; dwelling;
-geotechnical and
geologic data;
-contour lines;
-water resources,
precipitation, watersheds
and their levels, rivers,
streams and their flow);
- water quality analysis,
along the year and
through time since it
started to be registered -
historical data;
● Field work (existing infrastructure, characteristics and status -
cadastre);
● Water sources Catchment Boundaries and Project Area;
● Schools, Hospitals, Restaurants and Hotels, Markets, Public buildings;
● Identification of water sources for each system, respective quality and
yield;
● Water quality analysis (Historical data);
● Unit costs;
12
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
ID DELIVERABLE NAME
SUBMISSION
DEADLINES
D1 INCEPTION REPORT 1 month
D2 ASSESSMENT REPORT 1.5 months
D3 OPTIONS ANALYSIS REPORT 2 months
D4 FEASIBILITY ASSESSMENT REPORT 2 months
D5 DRAFT MASTER PLAN 2 months
D6 FINAL MASTER PLAN 1 month
5. WORK PLAN - DELIVERABLES
13
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DELIVERABLES:
D1 – Inception Report
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE 0
 Activity 1.i) Team Mobilization
 Activity 1.ii) Preliminary assessment of the Information to collect
 Activity 1.iii) Stakeholder Identification
 Activity 1.iv) Methodology and Work Plan Definition
 Activity 1.v) Preparation and Presentation of Findings – Kick-off Meeting
 Activity 1.vi) Preparation of D1 - Inception Report - Draft Report
 Activity 1.vii) Client Review
 Activity 1.viii) Incorporating comments and final edition of D1 - Inception Report
14
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
5. WORK PLAN – STAGE 0
No.
05-Oct
12-Oct
19-Oct
26-Oct
02-Nov
09-Nov
16-Nov
23-Nov
30-Nov
07-Dec
14-Dec
21-Dec
28-Dec
04-Jan
11-Jan
18-Jan
25-Jan
0. Stage 0 – InceptionReport 1.00
D1 - InceptionReport 1.00
Activity1.i) Team Mobilization 0.25
Activity1.ii) Preliminary assessment of theInformationto collect 0.50
Activity1.iii) Stakeholder Identification 0.50
Activity1.iv) Methodology and WorkPlanDefinition 0.50
Activity1.v) Preparationand Presentationof Findings - Kick-off Meeting 0.30
Activity1.vi) Preparationof D1 - InceptionReport - Draft Report 0.30
Activity1.vii) Client Review 0.25
Activity1.viii) Incorporating comments and final editionof D1 - InceptionReport 0.25
D1 - Inception Report
TOTAL
[months]
1 2 3 4
Deliverables/ PhasesandActivities
Months/Weeks
Inception
Report
Criticalactivity
CriticalPath
Meetingforreportpresentation/ discussion
DraftreportsandproductsoftheConsulting
FinalreportsandproductsoftheConsulting
Legend:
Consulting Phase / Deliverable
Consulting Activity
Client Review
Public Consultation and Validation Workshops
15
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DELIVERABLES:
D2 – Assessment of
Existing Situation
Report
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE I
 Activity 2.i) Institutional, Policy and Regulatory Framework Review
 Activity 2.ii) Delineation of Project Area
 Activity 2.iii) Review of Previous and On-going Activities
 Activity 2.iv) Data collection and Review
 Activity 2.v) Field Investigations and Consultations
 Activity 2.vi) Identification and Assessment of existing Infrastructures and Services
 Activity 2.vii) Assessment of Key Environmental Conditions and Hydrological
Resources
 Activity 2.viii) Demography, Land-use and Socio-economic Profiling
 Activity 2.ix) Assessment of the Performance of the Existing Institutional,
Management, Service Delivery and Financing Arrangements
16
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
D2 – Assessment of
Existing Situation
Report (cont.)
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE I
 Activity 2.x) Review on-site sanitation and faecal sludge management practices
 Activity 2.xi) GIS Analysis and Mapping
 Activity 2.xii) Identification and Characterization of Key Issues, Challenges and
Constraints
 Activity 2.xiii) Preparation and Presentation of Findings
 Activity 2.xiv) Preparation of the D2 - Assessment Report of Water Supply and
Sanitation (draft report)
 Activity 2. xv) Client Review
 Activity 2.xvi) Incorporating comments and final edition of the D2 - Assessment
Report of Water Supply and Sanitation
17
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
5. WORK PLAN – STAGE I
No.
05-Oct
12-Oct
19-Oct
26-Oct
02-Nov
09-Nov
16-Nov
23-Nov
30-Nov
07-Dec
14-Dec
21-Dec
28-Dec
04-Jan
11-Jan
18-Jan
25-Jan
1. Stage I – A
ssessment of E
xisting Water and Sanitation Situation 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 3.00
D2 – A
ssessment Report of Water Supply and Sanitation 0.00
A
ctivity 2.i) Institutional, Policy and Regulatory Framework Review 0.75
A
ctivity 2.ii) Delineation of C
atchment Boundaries and Project Area 0.30
A
ctivity 2.iii) Review of Previous and O
n-going Activities 0.50
A
ctivity iv) Data collection and Review 1.00
A
ctivity 2.v) Field Investigations and C
onsultations 0.75
A
ctivity 2.vi) Identification and Assessment of existing Infrastructures and Services 0.70
A
ctivity 2.vii) Assessment of Key E
nvironmental C
onditions and Hydrological Resources 0.30
A
ctivity 2.viii) Demography, Land-use and Socio-economic Profiling 0.70
A
ctivity 2.ix) Assessment of the Performance of the E
xisting Institutional, Management, Service
Delivery and Financing Arrangements
1.00
A
ctivity 2.x) Review on-site sanitation and faecal sludge management practices 0.30
A
ctivity 2.xi) G
IS Analysis and Mapping 1.25
A
ctivity 2.xii) Identification and C
haracterization of Key Issues, C
hallenges and C
onstraints 0.75
A
ctivity 2.xiii) Preparation and presentation of findings 0.40
A
ctivity 2.xiv) Preparation of the D2 - Assessment Report of Water Supply and Sanitation (draft
report)
0.40
A
ctivity 2. xv) C
lient Review 0.40
A
ctivity 2.xvi) Incorporating comments and final edition of the D2 - Assessment Report of Water
Supply and Sanitation
0.25
D2 – A
ssessment R
eport of Water Supply and Sanitation
Months /Weeks
TO
TA
L
[months]
3 4
Deliverables / Phases and A
ctivities
1 2
Assessment Report of Water
Supply and Sanitation
18
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DELIVERABLES:
D3 - Water Supply and
Sanitation Options
Analysis Report
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE II
 Activity 3.i) Identification of Potential Options and Solutions
 Activity 3.ii) Develop.Methodology for Screening Solutions, Options
Assessment
 Activity 3.iii) Collection of Additional Data Required for the Assessment
 Activity 3.iv) Determin.of Preliminary Cost Estimates and Potential Benefits
 Activity 3.v) Options Assessment
 Activity 3.vi) Solutions Rank.,Determin.of Short, Medium, Long-Term Priorities
 Activity 3.vii) Preparation and Presentation of Findings
 Activity 3.viii) Prep.of D3-Water Supply and Sanitation Options Analysis Rpt (draft
rpt)
 Activity 3.ix) Client Review
 Activity 3.x) Incorpor.comments, final ed. D3-Water Supply Sanitation Options
19
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
5. WORK PLAN – STAGE II
No.
07-Jan
14-Jan
21-Jan
28-Jan
04-Feb
11-Feb
18-Feb
25-Feb
03-Mar
10-Mar
17-Mar
24-Mar
31-Mar
07-Apr
14-Apr
21-Apr
2. Stage II – Water SupplyandSanitationOptionsAnalysis 3.00
D3 - Water SupplyandSanitationOptionsAnalysisReport 3.00
Activity3.i) Identificationof Potential Options and Solutions 0.25 1.00
Activity3.ii) Development of theMethodology for Screening Solutions and Options Assessment 0.25 0.25 0.75
Activity3.iii) Collectionof Additional DataRequired for theAssessment 0.25 0.25 0.25 0.50
Activity3.iv) Determinationof Preliminary Cost Estimates and Potential Benefits 0.25 0.25 1.00
Activity3.v) Options Assessment 0.25 0.25 0.25 0.25 1.00
Activity3.vi) Solutions Ranking and Determinationof short, Medium and Long Term Priorities 0.25 0.25 0.25 0.25 0.40
Activity3.vii) Preparationand Presentationof Findings 0.25 0.25 0.25 0.25 0.75
Activity3.viii) Preparationof theD3 - Water Supply and SanitationOptions Analysis Report (draft
report)
0.25 0.25 1.00
Activity3.ix) Client Review 0.25 0.25 0.25 0.25 0.30
Activity3.x) Incorporating comments and final editionof theD3 - Water Supply and Sanitation
Options Analysis Report
0.25 0.25
D3.1 - Water Supply and Sanitation Options Analysis Report – Ainaro
D3.2 - Water Supply and Sanitation Options Analysis Report – Maliana
D3.3 - Water Supply and Sanitation Options Analysis Report – Suai
Months/Weeks
TOTAL
[months]
3 4 5 6
Deliverables/ PhasesandActivities
Water Supply and Sanitation
Options Analysis Report
20
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DELIVERABLES:
D4 – Feasibility
Studies Report
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE III
 Activity 4.i) Prep.Preliminary Technical Designs for Agreed Project
Components
 Activity 4.ii) Develop.of ToR for Detailed Engineering Design,Preparation
Procurement Plan
 Activity 4.iii) Environmental and Social Assessments
 Activity 4.iv) Cost-Benefit Analysis (CBA)
 Activity 4.v) Preparation and Presentation of Feasible Solutions
 Activity 4.vi) Prep.D4-Feasib.Assess.Rpt.-Prior.Water S.&Sanit.Invest.(draft rpt)
 Activity 4.vii) Client Review
 Activity 4.viii) Incorp.comments, final edition D4 –
Feasib.Assess.Rpt.Prior.W.S.&S.Invest.
21
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
5. WORK PLAN – STAGE III
No.
01-Feb
08-Feb
15-Feb
22-Feb
01-Mar
08-Mar
15-Mar
22-Mar
29-Mar
05-A
pr
12-A
pr
19-A
pr
26-A
pr
03-May
10-May
17-May
24-May
31-May
07-Jun
14-Jun
21-Jun
3. Stage III – FeasibilityStudiesandMaster Plans 3.00
D4 - FeasibilityAssessmentReportofPriorityWater SupplyandSanitationInvestment 3.00
Activity4.i) Preparationof Preliminary Technical Designs for theAgreed Project Components 0.75
Activity4.ii) Development of Terms of Referencefor theDetailed Engineering Designand
Preparationof aProcurement Plan
0.75
Activity4.iii) Environmental and Social Assessments 1.00
Activity4.iv) Economic and Financial Analysis 0.75
Activity4.v) Preparationand Presentationof FeasibleSolutions 0.50
Activity4.vi) Preparationof theD4 - Feasibility Assessment Report of Priority Water Supply and
SanitationInvestment (draft report)
0.85
Activity4.vii) Client Review 0.50
Activity4.viii) Incorporating comments and final editiontheD4 - Feasibility Assessment Report of
Priority Water Supply and SanitationInvestment
0.50
D4.1 - FeasibilityAssessment Report of PriorityWater SupplyandSanitationInvestment – Ainaro
D4.2 - FeasibilityAssessment Report of PriorityWater SupplyandSanitationInvestment – Maliana
D4.3 - FeasibilityAssessment Report of PriorityWater SupplyandSanitationInvestment – Suai
Months/Weeks
TOTAL
[months]
8 9
Deliverables/ PhasesandActivities
5 6 7
Feasibility Assessment Report of Priority
Water Supply and Sanitation Investment
22
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DELIVERABLES:
D5 – Draft Master Plan
D6 – Final Master Plan
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE III
 Activity 5.i) Compilation of Results of Previous Stages
 Activity 5.ii) Investments Planning and Recommendations
 Activity 5.iii) Preparation and Presentation of Findings
 Activity 5.iv) Preparation of the Draft Master Plan
 Activity 6.i) Client Review
 Activity 6.ii) Incorporating comments and final edition the D6 - Final Master
Plan
 Activity 6.iii) Preparation of the Final Master Plan
 Activity 6.vi) Presentation of the Final Master Plans at National Level
23
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
5. WORK PLAN – STAGE III
No.
01-Feb
08-Feb
15-Feb
22-Feb
01-Mar
08-Mar
15-Mar
22-Mar
29-Mar
05-Apr
12-Apr
19-Apr
26-Apr
03-May
10-May
17-May
24-May
31-May
07-Jun
14-Jun
21-Jun
3. Stage III – FeasibilityStudiesandMaster Plans 3.00
D5 - DraftMaster Plan 2.00
Activity5.i) Compilationof Results of Previous Stages 0.40
Activity5.ii) Investments Planning and Recommendations 1.50
Activity5.iii) Preparationand Presentationof Findings 0.50
Activity5.iv) Preparationof theD5 - Draft Master Plan 1.00
D5.1 - Draft Master Plan– Ainaro
D5.2 - Draft Master Plan– Maliana
D5.3 - Draft Master Plan– Suai
D6 - Final Master Plan 2.00
Activity6.i) Client Review 1.00
Activity6.ii) Incorporating comments and final editiontheD6 - Final Master Plan 1.50
Activity6.iii) Preparationand Presentationof theFinal Master Planat National Level 1.00
D6.1 - Final Master Plan– Ainaro
D6.2 - Final Master Plan– Maliana
D6.3 - Final Master Plan– Suai
Months/Weeks
TOTAL
[months]
8 9
Deliverables/ PhasesandActivities
5 6 7
Draft Master Plans
Final Master Plans
24
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
DELIVERABLES:
D6 – Final Master Plan
STAGE I
Assessment of
Existing Water and
Sanitation Situation
STAGE II
Water Supply
and Sanitation
Options Analysis
STAGE III
Feasibility
Studies and
Master Plans
STAGE 0
Inception Report
ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE
TRANSFER
5. WORK PLAN – STAGE III
 Activity 6.i) Client Review
 Activity 6.ii) Incorporating comments and final edition the D6 - Final Master Plan
 Activity 6.iii) Preparation of the D6.1 - Final Master Plan of Ainaro
 Activity 6.iv) Preparation of the D6.2 - Final Master Plan of Maliana
 Activity 6.v) Preparation of the D6.3 - Final Master Plan of Suai
 Activity 6.vi) Presentation of the Final Master Plans at National Level
25
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
6. TEAM-HUMAN RESOURCES
Support Team
ST-1 Water Supply & Sanitation in Developing Countries
ST-2 Citywide Inclusive Sanitation
ST-3 Strategic Options and Planning; Asset Management
ST-4 Hydraulic Modelling; Water Safety
ST-5 Laboratory, Analyses and Water Quality
The Team positions
are presented in the
tables:
ID Position
Key Experts (International)
KEI-1 Water Supply & Sanitation Engineer / Team Leader
KEI-2
Social, Poverty and Gender Specialist
KEI-3 Water Resources Specialist
KEI-4 Water Quality & Water Treatment Specialist
KEI-5 Geographic Information System (GIS) / Computer-Aided Design (CAD)
KEI-6 Water and Sanitation Economics and Finance Specialist
KEI-7 Environmental and Climate Change Specialist
KEI-8 Social Safeguards Specialist
Key Experts (National)
KEN-1 Water Supply and Sanitation Engineer / Deputy Team Leader
KEN-2 Social Poverty and Gender Specialist
KEN-3 Water Resources Engineer
KEN-4 Water Quality Technician
KEN-5 Environmental Specialist
KEN-6 GPS/CAD Operator
KEN-7 Logistics and Support Assistant
• Chefes Suco interviews, February and March 2021;
• House hold Survey was held in August 2021;
• Hydraulic Modelling with EPANET;
• Water Flow Measurement (WFM), September 2021;
• Water Quality Analysis Campaign (WQA), September 2021;
• Focus Discussion Groups (FDG) for Gender, October 2021;
• The Preliminary Ressetlement Action Plan (PRAP), January 2022.
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
NATIONAL TEAM
Main Tasks
26
6. TEAM-MAIN TASKS
27
7. SUAI – EXISTING SITUATION
DWELLINGS AND
PUBLIC BUILDINGS
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
28
WATER SUPPLY
SYSTEMS AND
INFRASTRUCTURES
7. SUAI – EXISTING SITUATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
29
WATER DISTRIBUTION NETWORK
PRESSURE ANALYSIS
7. SUAI – EXISTING SITUATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
30
ALTIMETRY SCHEME
7. SUAI – EXISTING SITUATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
31
HYDRAULIC CIRCUIT
DIAGRAMS
7. SUAI – EXISTING SITUATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
32
SANITATION
INFRASTRUCTURES
7. SUAI – EXISTING SITUATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
33
Existing Water Supply System and Service:
1. The poor state of the infrastructures, lack of knowledge of transmission
transmission lines and water distribution networks;
2. The existence of illegal connections;.
3. The installation of pipes not buried or shallow depth, without
knowledge about quality and hydraulic performance.
4. The low storage capacity of the water tanks and their location;
5. Need to improve water sources and water treatment plants (WTP);
The construction of new water supply systems will be the best option to
to achieve control and optimize operation and maintenance (O&M),
water losses, reasonable consumption, service working 24hours/day, 7
days/week.
7. SUAI – EXISTING SITUATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
34
8. OPTIONS ANALYSIS
A water supply and sanitation master plan after identification of
water sources, must be supported by a urban development plan,
where we can find answers for the following questions:
- How much water is needed;
- Where the water will be needed;
- When the water will be needed.
The urban development plans are under elaboration.
Engineering team needed to collect information and meet municipal
authorities to identify the future needs for municipal capital and find
the answer for the aforementioned three questions.
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
GENERAL LAYOUT_O1A1
35
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS - 1
ALTIMETRY SCHEME_O1A1
36
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS -1
ENERGY LINE-SUAI O1A1
37
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS - 1
1. Elevation Data (Nasa + Google Earth)
2. Tool : Global Mapper
3. Output: Digital Terrain Model (DTM)
4. QGIS + Civil 3D + Autocad ->
Longitudinal profiles
5. Hydraulic calculations - Excel
GENERAL LAYOUT_O1A2
38
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS - 1
ALTIMETRY SCHEME_O1A2
39
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS - 2
ENERGY LINE-SUAI O1A2
40
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS - 2
O1A2.Mountain, gravity flow, no pumping systems needed, is more reliable, less O&M;
The water sources are 26km far from Bereloik WTP.
O1A1.Road, two pumping systems, 81 mH2O and 94 mH2O.
This solution is the third with the lowest investment of the three, even if not considering
the energy cost of 1.88M$. The water sources are 30.7km far from Bereloik WTP.
O2A1.Aquifer, this solution relies on three existing boreholes and eight new boreholes,
three pumping stations, one for Tabacolot Water Tank, another to Santa Rosa Water Tank,
and the third to Bonuc Water Tank. From Santa Rosa Water Tank a pumping station to
Baulela Water Tank.
This solution depends on aquifer sustainability and energy. Energy cost estimation for 20
years is almost 5.15M$.
On the environmental factor, there are important impacts regarding the future
sustainability of this water resource, possible saline intrusion and hydrocarbon
contamination.
8. OPTIONS ANALYSIS
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 41
• The option O1A1.Road needs pumping stations, energy and more costs with
O&M procedures and teams to operate and maintain;
• Recommended option O1A2.Mountain, reliable, lowest investment considering
energy.
• O2A1.Aquifer is the option with lowest investment, but highly expensive in
energy and O&M. And low reliability for an option with 11 boreholes, 4 pumping
stations and a water source with the possibility of saline intrusion from the
ocean, hydrocarbon contamination and future sustainability.
• The increase of groundwater abstraction on the coast could lead to the
salinization of the boreholes. In-depth hydrogeology studies will have to be
carried out to define the wells' location and maximum flow rate.
• There is enough water, but it is not infinite. This applies to the aquifer with
particular sensitive. The challenge is to manage this scarce resource, so that
everyone has access, in quantity and quality accordingly to national standards.
42
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
8. OPTIONS ANALYSIS
9. SUAI PROPOSED SOLUTION
WATER SOURCES, WATER FLOW MEASUREMENT, SEPTEMBER 2021
• Wemasei (Dato Rua), 60 , 43 Lps, 75% of total flow;
• Naes (Lactos), 40 Lps, 32 Lps, 78% of total flow;
• Wekbotuk (Dato Tolu), 35 Lps, 32 Lps, 89% of total flow;
Aquifer, three boreholes: Sukabi Laran I; Sukabi Laran II; Ladi, a total of 35 ;
Boreholes for backup and increase service resilience;
Water Quality and Treatment:
• Calgon injection (Naes - Lactos);
• Filtration, Chlorine injection (Bereloik);
Wemasei Spring, September 2021
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 43
WATER BALANCE-SUAI
Year Unit 2020 2025 2030 2035 2040
Urban Population persons 26,857 37,632 35,900 38,322 44,630
Population served by BTL % 37.8% 90.0% 95.0% 96.0% 97.0%
Population served by BTL persons 10,140 33,869 34,105 36,789 43,291
by House connection % 84.2% 100.0% 100.0% 100.0% 100.0%
by House connection persons 8,537 33,869 34,105 36,789 43,291
by Public Taps % 15.8% 0.0% 0.0% 0.0% 0.0%
by Public Taps persons 1,603 0 0 0 0
Per capita Consumption
House connection lcd 100 120 120 120 120
p/conn 6.9 6.0 5.0 5.0 5.0
Public Taps lcd 30 30 30 30 30
Custumers Projection Conn's 1,514 5,705 6,891 7,437 8,748
House connection Conn's 1,231 5,645 6,821 7,357 8,658
Public Taps Conn's 229 0 0 0 0
Other social incl govt Offices Conn's 22 25 30 35 40
General - Commercial Conn's 32 35 40 45 50
Total Demand (Daily Mean;MDD) m3pd 1,020 4,194 4,243 4,585 5,385
Domestic Demand m3pd 902 4,064 4,093 4,415 5,195
Non-domestic demand m3pd 118 130 150 170 190
Leakage Rate % 48.6% 25.0% 20.0% 20.0% 20.0%
Leakage m3pd 963 1,398 1,061 1,146 1,346
Leakage 11.1 16.2 12.3 13.3 15.6
Total Demand (Daily Max;PDD, f=1.2)
m3pd 2,379 6,711 6,364 6,877 8,077
27.5 77.7 73.7 79.6 93.5
Reservoir m3 877 6,800 6,400 6,900 8,100
Reservoir Construction Capacity m3 0 8,100 8,100 8,100 8,100
1 day 1 day 1 day 1 day
Total Production
m3pd 1,983 8,077 8,077 8,077 8,077
23.0 93.5 93.5 93.5 93.5
• Per capita 120 l/inhab./day;
• 26 857 inhab. year 2020;
• 44 630 inhab. year 2040;
• Leakage rate 49%, year 2020;
• Leakage rate 20%, year 2040;
• Water Tank capacity 8500m3;
• Average demand: 5385m3/day (62.3 );
• Productivity - Daily Max (+20%) and
leakage (93.5 +12.5=106 );
• Tasi Mane Project water needs
for SSB and NSC considered;
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 44
9. SUAI PROPOSED SOLUTION
SUAI WATER SOURCES WATER CONSUMPTION ()
36.2
34.4
33.1
33.1
32.9
34.6
34.7
35.1
35.3
37.0
37.0
39.3
39.7
40.8
41.8
42.6
27.0
25.6
24.6
24.6
24.5
25.8
25.8
26.1
26.3
27.5
27.5
29.2
29.5
30.4
31.1
31.7
27.0
25.6
24.6
24.6
24.5
25.8
25.8
26.1
26.3
27.5
27.5
29.2
29.5
30.4
31.1
31.7
0
20
40
60
80
100
120
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
Suai Water Sources and Water Consumption ()
Wemasei (Dato Rua)
Naes (Lactos)
Wekbotuk (Dato Tolu)
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 45
9. SUAI PROPOSED SOLUTION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 46
GENERAL LAYOUT
9. SUAI PROPOSED SOLUTION
PRESSURE ZONES
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 47
9. SUAI PROPOSED SOLUTION
ALTIMETRY SCHEME
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 48
9. SUAI PROPOSED SOLUTION
HYDRAULIC FLOW SCHEME
Water Distribution Network
Pressure Zone
Water Tank/BPT
Water Treatment Plant
Water Resources
(m3/day) ()
Wemasei 3715 (43) Elev.917m
Naes 2765 (32) Elev.935m
Wekbotuk 2765 (32) Elev.680m
Total 9245 m/day (107 )
(m3/day) ()
WTP Bereloik 9245 (107 )
Water Tank 2000 m3 Elev.211m
BPT Baulela Elev.150m
BackUp/Resilience
Aquifer, Boreholes Depth 80m
(m3/day) ()
BH Sukabi Laran 634 (11) Elev. 21m
BH Sukabi Laran II 691 (12) Elev. 15m
Ladi 691 (12) Elev. 26m
Total 2016 (35)
WT Sta.Rosa 2000m3 Elev.105m
WT Tabacolot 1000m3 Elev.75m
BPT Tabacolot Elev. 65m
WT Matai 500m3 Elev.65m
WT Bonuc 2000m3 Elev. 105m
WT Dais 1000m3 Elev.65m
Pressure Zone 1
Pressure Zone 4
Pressure Zone 5
Pressure Zone 2
Pressure Zone 3
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 49
9. SUAI PROPOSED SOLUTION
RAW WATER TRANSMISSION, WATER
SOURCES-WTP
Material DN PN Length
(-) (mm) (bar) (m)
HPDE 250 12.5 12009
HPDE 250 16 2066
DIP 250 25 4612
HPDE 315 12.5 6457
HPDE 315 20 662
DIP 300 25 1750
DIP 300 30 760
Total 28316
DISTRIBUTION NETWORK
HDPE.PN12.5 AINARO
DN (mm) Length (m)
63 48485
110 13326
125 4754
160 19177
200 8047
250 5031
315 26
Total 98846
WATER TANKS CAPACITY
(m3)
Water Tank Bereloik 2000
Water Tank St. Rosa 2000
Water Tank Tabacolot 1000
Water Tank Bonuc 2000
Water Tank Matai 500
Water Tank Dais 1000
Total 8500
BPTs 6
Service Connections Quantity (un.)
Domestic, Institutional,
Commercial and Industrial 8748
TRANSMISSION MAINS
HDPE.PN12.5 Length
DN (mm) (m)
160 28725
200 5319
225 4408
250 2766
315 3646
400 3480
Total 48345
area (km2)
Current Water supply area 11.1
Proposed Solution área 54.1
Increased area 390%
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 50
9. SUAI PROPOSED SOLUTION
51
10. WATER CYCLE
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
52
We, humans with numerous of our actions affect directly the water
cycle, and other human activities have indirect effects.
- Climate change is causing numerous changes to the water cycle. Sea
levels are rising in some areas and dropping in others, glaciers are
retreating and disappearing affecting rivers, more frequent droughts
and floods, coastlines some islands are disappearing, the polar ice cap
is melting, and so forth.
- Deforestation, for timber, coal or to clear land for agriculture or
development, increases runoff. And land sliding. Certain emissions
from industry cause acid rain .
- Chemicals used by humans pesticides, herbicides, and nitrogen for
farming runs off into rivers and streams and pollutes groundwater.
10. WATER CYCLE
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
53
10. WATER CYCLE
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
54
10. WATER CYCLE
Land use is a main issue for water resources, the trees (forests) avoid
erosion, promote infiltration and ensure water sources productivity.
Deforestation promotes erosion as it can be seen in the pictures.
Reforestation is complex, difficult. If possible, prevent deforestation.
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
11. WATER SOURCES PROTECTION
• What: Watershed reforestation and Aquifers;
• Why: Minimizing landslide, promoting water infiltration and therefore
future sustainability for the water sources, including aquifers;
• Who: Min.Agriculture(operation), Min.Education(schools-education),
Church’s, NGO’s, ANAS, local communities;
• How: Involvement and commitment of local communities;
• Where: Wemasei, Naes, Wekbotuk catchment areas;
Boreholes survey and water consumption control in Covalima;
• Coordination & supervision: BTL Engineer & infrastructures Department;
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 55
SANITATION MAIN STRATEGY LINES:
-> A faecal sludge treatment plant (FSTP);
-> Desludging truck with skilled operation team;
-> a septic tank desludging WorkPlan, at least each septic tank once a year;
-> "Public Toilets“, in markets, bus terminals, and good conditions for public use
(O&M);
-> Technical guidelines and technical support for construction of (communal) septic
septic tanks to avoid contamination, sewage household connections, a first step for
a possible centralized sewage system (WWTP);
-> Education, Information, Communication (EIC), Action Plan;
-> A “symbolic” sanitation tariff is very important, the proposed fix tariff 2$ per month;
12. SANITATION
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 56
12. SANITATION
• Who: Municipal Delegation of BTL supported by BTL engineering department, together with
municipal authorities and local authorities (chefe posto administrativo, chefe suco, chefe
aldeia,focalpoint);
• How: BTL will design solutions and technical drawings. Will provide construction materials
for (communal) septic tanks and pipes for household connections;
• What: Desludging truck for Septic Tanks and Plan. Team of 2 O&M operators for the
desludging truck and FSTP operation. FSTP (faecal sludge treatment plant). Public Toilets
in the urban area, strategic places, like markets, churches and for rural areas, one per village
/ local community. O&M by local communities with Focal Point / BTL supervision;
• Coordination & supervision: BTL Sanitation Department & BTL Engineering Department;
• Remarks: O&M by local communities with Focal Point/ BTL coordination, orientation,
supervision.
• - The desludge team will be responsible for septic tanks survey, identification of
areas which need infrastructures improvement;
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 57
12. SANITATION
FAECAL SLUDGE TREATMENT PLANT (FSTP) – STANDARD DRAWING
Legend:
A. Inlet Structure
B. Primary (Sludge)
Facultative Lagoon
C. Flow Distribution
Chamber
D. Secondary Aerobic
Lagoon
E. Treated Efluent /
Irrigation Storage
F. Irrigation / Tree
Cropping Area
G. Control Room
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 58
12. SANITATION
PUBLIC TOILET– STANDARD DRAWING
Front Elevation
Layout Plan
Segregated Toilets for Man,
Women and elderly and people
with reduced mobility
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 59
13. NEXT STEPS
SUPERVISION, REPORT, “GUIDANCE” AND TECHNICAL SUPPORT
a) Tendering process DED Consultant Selection (6 months)
b) DED (12 months)
• Review the project Lifetime from 2040 to 2050;
• Review hydraulic sizing/pressure zones according to the latest Urban Development
Plans;
• Water resources investigation, ground water (including drilling) & Surface water,
Water quality monitoring & Water flow measurements;
• Topographic Survey (Classical and Drone);
• Geotechnical investigation;
• Environment Assessment and Licensing and Social Safeguards;
c) Tendering process for Building Contractor Selection (6 months)
d) BUILDING,CONSTRUCTION PHASE & COMMISSIONING
Construction and Commissioning (O&M), 3 years;
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 60
14. COMMENTS, SUGGESTIONS,
CONCLUSIONS
Time for Comments,
Suggestions and
Conclusions
ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND
SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 61
HAMUTUK ITA BELE
OBRIGADU BARAK

More Related Content

Similar to E1405_2022.03.16.DIT.Water.Sanitation.MP.Engineering.Studies_v1.pptx

Comprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewComprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewCity of College Station
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )sandeepprasad87
 
Musquodoboit harbour watershed studies information meeting
Musquodoboit harbour watershed studies information meetingMusquodoboit harbour watershed studies information meeting
Musquodoboit harbour watershed studies information meetingMarcus Garnet
 
L4- Water Supply Scheme & Importance.pptx
L4- Water Supply Scheme & Importance.pptxL4- Water Supply Scheme & Importance.pptx
L4- Water Supply Scheme & Importance.pptxPRACHI DESSAI
 
Use of Water Supply Atlas in Water Sector Performance Monitoring in Uganda
Use of Water Supply Atlas in Water Sector Performance Monitoring in UgandaUse of Water Supply Atlas in Water Sector Performance Monitoring in Uganda
Use of Water Supply Atlas in Water Sector Performance Monitoring in UgandaIRC
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...Deltares
 
Resource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingResource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingMashilo Kabedi
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceGeorge Liddle
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportFesto Wasukira
 
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...India-EU Water Partnership
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014indiawrm
 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design aberanegash
 
Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City
Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City
Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City Rodelon Ramos
 
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...LOWaterkeeper
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 

Similar to E1405_2022.03.16.DIT.Water.Sanitation.MP.Engineering.Studies_v1.pptx (20)

Comprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewComprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance Review
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
 
Musquodoboit harbour watershed studies information meeting
Musquodoboit harbour watershed studies information meetingMusquodoboit harbour watershed studies information meeting
Musquodoboit harbour watershed studies information meeting
 
Stormwater Management Program
Stormwater Management ProgramStormwater Management Program
Stormwater Management Program
 
L4- Water Supply Scheme & Importance.pptx
L4- Water Supply Scheme & Importance.pptxL4- Water Supply Scheme & Importance.pptx
L4- Water Supply Scheme & Importance.pptx
 
Use of Water Supply Atlas in Water Sector Performance Monitoring in Uganda
Use of Water Supply Atlas in Water Sector Performance Monitoring in UgandaUse of Water Supply Atlas in Water Sector Performance Monitoring in Uganda
Use of Water Supply Atlas in Water Sector Performance Monitoring in Uganda
 
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
DSD-SEA 2018 Software Application in Integrated Water Resources Management in...
 
Resource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingResource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder Meeting
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work Experience
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement Report
 
SustSan workshop: Integrated Urban Water Management by Ankur Gupta
SustSan workshop:  Integrated Urban Water Management by Ankur GuptaSustSan workshop:  Integrated Urban Water Management by Ankur Gupta
SustSan workshop: Integrated Urban Water Management by Ankur Gupta
 
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
 
S_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_CopyS_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_Copy
 
2019 MATC Fall Webinar Series - Dr. Ricardo Mantilla
2019 MATC Fall Webinar Series - Dr. Ricardo Mantilla2019 MATC Fall Webinar Series - Dr. Ricardo Mantilla
2019 MATC Fall Webinar Series - Dr. Ricardo Mantilla
 
Olympic_Village_Project Plan FINAL
Olympic_Village_Project Plan FINALOlympic_Village_Project Plan FINAL
Olympic_Village_Project Plan FINAL
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design
 
Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City
Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City
Goals on Safety & Health, and Social Inclusivity of Wastewater in Makati City
 
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 

E1405_2022.03.16.DIT.Water.Sanitation.MP.Engineering.Studies_v1.pptx

  • 1. ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DIT WORKSHOP 16 March 2023
  • 2. 1. INTRODUCTION 2. FIELDWORK & MEETINGS 3. STAKEHOLDERS AND DATA COLLECTION 4. DATA COLLECTION 5. WORK PLAN, ACTIVITIES, DELIVERABLES AND DEADLINES 6. TEAM – HUMAN RESOURCES & MAIN TASKS 7. SUAI EXISTING SITUATION 8. SUAI OPTIONS ANALYSIS 9. SUAI PROPOSED SOLUTION 10. WATER CYCLE 11. WATER SOURCES PROTECTION 12. SANITATION 13. NEXT STEPS 14. COMMENTS, SUGGESTIONS, CONCLUSIONS 2 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA TABLE OF CONTENTS
  • 3. 1. INTRODUCTION • A strategic plan answers the question “where do we want to go?” • A master plan provides a road map that shows how we can get there. It is a blueprint for the future of an organization and must be directly tied to goals and planning. It identifies economic, social, technical, environmental factors, such as infrastructure development, planning, acquisition and sustainability. • The elaboration and development of a Master Plan have: -activities to get information (primary &secondary data); -options analysis and proposed solution; -institutional arrangements and legal framework; and -implementation plan. ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 3
  • 4. 4 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 1. INTRODUCTION This presentation concerns to the project for “Engineering Process for Preparation of Water Supply and Sanitation Master Plan for Suai , Municipal Capital of Covalima”. First step, team mobilization (stage 0), compilation of stakeholders contacts, documents and baseline information. Stage 0 includes Inception Report, it’s presentation, discussion and delivery, the project scope consists of three main stages: • Stage I - Assessment of Existing Water and Sanitation Situation; • Stage II - Water Supply and Sanitation Options Analysis; • Stage III - Feasibility Assessment of Priority Water Supply and Sanitation Investments.
  • 5. 5 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA Field work developed: Suai, (Covalima), water sources, boreholes, water tanks, network operating valves, schools, hospitals, existent fecal sludge treatment plant built by UN in 2001; 2. FIELD WORK & MEETINGS Findings: the payment for water supply service is a strategic matter, also to ensure a rational water consumption and to achieve financial sustainability for the service. Other way, clients closer to water tanks easily access water, other clients hardly will. Water quality monitoring and control is very important regarding public health, and limestone, frequently a big problem in Timor-Leste.
  • 6. 6 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 2. FIELD WORK & MEETINGS Suai Borehole, not working Américo Spring chamber, Suai, rehabilitation works needed Existent FSTP built by UN, 2001, Suai Rehabilitated in 2011, but never worked Booster pump, Suai Santa Rosa reservoir (#3 cells), Suai, rehabilitation works are needed
  • 7. 7 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA Water Sources: - A campaign to know flow in dry season, water quality, availability; - Water supply infrastructures need rehabilitation; Sanitation: - There is no information about desludging procedures of existing septic septic tanks; - There are no desludging trucks or faecal sludge treatment plants (FSTP) in the studied area; - The existing public toilets are not working properly, don’t have tap water, and no operation and maintenance; - Septic tanks are broken, leaking into the ground and infiltrate. Often, when septic tanks are full, a new septic tank is built, and the existent one is abandoned (sealed); 2. FIELD WORK & MEETINGS
  • 8. 8 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 2. FIELD WORK & MEETINGS Miguel Armada, Suai Prison’s Vice Administrator Suco’s leader Dato and secretary, Suai Arakat and Village Leader, Suai Village leader meeting, Suai Water supply system at Suai Airport Suai’s vice-administrator
  • 9. 9 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 3. STAKEHOLDERS STAKEHOLDERS IDENTIFICATION - National Level ● Bee Timor Leste, E.P.; ● ANAS, I.P.; ● DNPCC (road improvements); ● DNHPU (urban planning); ● Ministry of Health (water bourn diseases); ● Ministry of Public Works (MPW); ● Ministry of Agriculture (MAP); ● Ministry of Finance - AID Coordination; ● Ministry of State Administration (MSA); ● Ministry of Planning and Territory (MPT); ● ANPM; Timor GAP - Tasi Mane Project; IPG; ● ADN; ANLA; SGP/MPS; FOCAL POINT – MPW / BTL.EP - Local Level and Others ● Local Administration (Aldeia; Suco, Municipio); ● Community Leaders (Leorai, Lia'nain, Church, School Headmasters); ● Community Groups; ● Municipal BTL.EP delegations; ● Health officials; ● Agriculture office officials; ● Private sector; ● NGOs; ● PLAN International; ● WaterAid; CVTL; Care International; ● GMF; ● Steering Committee
  • 10. 10 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 3. STAKEHOLDERS TECHNICAL SUPPORT ADMINISTRATIVE SUPPORT LOGISTIC SUPPORT CONSULTING TEAM [MOP] CONTRACTING INSTITUTION QUALITY CONTROL COMMITTEE STEERING COMMITTEE FOCAL POINT AdP + ENGIDRO STAKEHOLDERS: MOP + MPO + BTL + ANAS Others Ministries, National & Local Authorities and NGO’s ORGANIZATIONAL STRUCTURE - COMMUNICATION FLOW
  • 11. 11 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 4. DATA COLLECTION DATA COLLECTION ● Existing Studies, data, documents: -water supply; sanitation; -urban planning; land use; -socio demographics; population projections; census; dwelling; -geotechnical and geologic data; -contour lines; -water resources, precipitation, watersheds and their levels, rivers, streams and their flow); - water quality analysis, along the year and through time since it started to be registered - historical data; ● Field work (existing infrastructure, characteristics and status - cadastre); ● Water sources Catchment Boundaries and Project Area; ● Schools, Hospitals, Restaurants and Hotels, Markets, Public buildings; ● Identification of water sources for each system, respective quality and yield; ● Water quality analysis (Historical data); ● Unit costs;
  • 12. 12 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA ID DELIVERABLE NAME SUBMISSION DEADLINES D1 INCEPTION REPORT 1 month D2 ASSESSMENT REPORT 1.5 months D3 OPTIONS ANALYSIS REPORT 2 months D4 FEASIBILITY ASSESSMENT REPORT 2 months D5 DRAFT MASTER PLAN 2 months D6 FINAL MASTER PLAN 1 month 5. WORK PLAN - DELIVERABLES
  • 13. 13 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DELIVERABLES: D1 – Inception Report STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE 0  Activity 1.i) Team Mobilization  Activity 1.ii) Preliminary assessment of the Information to collect  Activity 1.iii) Stakeholder Identification  Activity 1.iv) Methodology and Work Plan Definition  Activity 1.v) Preparation and Presentation of Findings – Kick-off Meeting  Activity 1.vi) Preparation of D1 - Inception Report - Draft Report  Activity 1.vii) Client Review  Activity 1.viii) Incorporating comments and final edition of D1 - Inception Report
  • 14. 14 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 5. WORK PLAN – STAGE 0 No. 05-Oct 12-Oct 19-Oct 26-Oct 02-Nov 09-Nov 16-Nov 23-Nov 30-Nov 07-Dec 14-Dec 21-Dec 28-Dec 04-Jan 11-Jan 18-Jan 25-Jan 0. Stage 0 – InceptionReport 1.00 D1 - InceptionReport 1.00 Activity1.i) Team Mobilization 0.25 Activity1.ii) Preliminary assessment of theInformationto collect 0.50 Activity1.iii) Stakeholder Identification 0.50 Activity1.iv) Methodology and WorkPlanDefinition 0.50 Activity1.v) Preparationand Presentationof Findings - Kick-off Meeting 0.30 Activity1.vi) Preparationof D1 - InceptionReport - Draft Report 0.30 Activity1.vii) Client Review 0.25 Activity1.viii) Incorporating comments and final editionof D1 - InceptionReport 0.25 D1 - Inception Report TOTAL [months] 1 2 3 4 Deliverables/ PhasesandActivities Months/Weeks Inception Report Criticalactivity CriticalPath Meetingforreportpresentation/ discussion DraftreportsandproductsoftheConsulting FinalreportsandproductsoftheConsulting Legend: Consulting Phase / Deliverable Consulting Activity Client Review Public Consultation and Validation Workshops
  • 15. 15 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DELIVERABLES: D2 – Assessment of Existing Situation Report STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE I  Activity 2.i) Institutional, Policy and Regulatory Framework Review  Activity 2.ii) Delineation of Project Area  Activity 2.iii) Review of Previous and On-going Activities  Activity 2.iv) Data collection and Review  Activity 2.v) Field Investigations and Consultations  Activity 2.vi) Identification and Assessment of existing Infrastructures and Services  Activity 2.vii) Assessment of Key Environmental Conditions and Hydrological Resources  Activity 2.viii) Demography, Land-use and Socio-economic Profiling  Activity 2.ix) Assessment of the Performance of the Existing Institutional, Management, Service Delivery and Financing Arrangements
  • 16. 16 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA D2 – Assessment of Existing Situation Report (cont.) STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE I  Activity 2.x) Review on-site sanitation and faecal sludge management practices  Activity 2.xi) GIS Analysis and Mapping  Activity 2.xii) Identification and Characterization of Key Issues, Challenges and Constraints  Activity 2.xiii) Preparation and Presentation of Findings  Activity 2.xiv) Preparation of the D2 - Assessment Report of Water Supply and Sanitation (draft report)  Activity 2. xv) Client Review  Activity 2.xvi) Incorporating comments and final edition of the D2 - Assessment Report of Water Supply and Sanitation
  • 17. 17 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 5. WORK PLAN – STAGE I No. 05-Oct 12-Oct 19-Oct 26-Oct 02-Nov 09-Nov 16-Nov 23-Nov 30-Nov 07-Dec 14-Dec 21-Dec 28-Dec 04-Jan 11-Jan 18-Jan 25-Jan 1. Stage I – A ssessment of E xisting Water and Sanitation Situation 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 3.00 D2 – A ssessment Report of Water Supply and Sanitation 0.00 A ctivity 2.i) Institutional, Policy and Regulatory Framework Review 0.75 A ctivity 2.ii) Delineation of C atchment Boundaries and Project Area 0.30 A ctivity 2.iii) Review of Previous and O n-going Activities 0.50 A ctivity iv) Data collection and Review 1.00 A ctivity 2.v) Field Investigations and C onsultations 0.75 A ctivity 2.vi) Identification and Assessment of existing Infrastructures and Services 0.70 A ctivity 2.vii) Assessment of Key E nvironmental C onditions and Hydrological Resources 0.30 A ctivity 2.viii) Demography, Land-use and Socio-economic Profiling 0.70 A ctivity 2.ix) Assessment of the Performance of the E xisting Institutional, Management, Service Delivery and Financing Arrangements 1.00 A ctivity 2.x) Review on-site sanitation and faecal sludge management practices 0.30 A ctivity 2.xi) G IS Analysis and Mapping 1.25 A ctivity 2.xii) Identification and C haracterization of Key Issues, C hallenges and C onstraints 0.75 A ctivity 2.xiii) Preparation and presentation of findings 0.40 A ctivity 2.xiv) Preparation of the D2 - Assessment Report of Water Supply and Sanitation (draft report) 0.40 A ctivity 2. xv) C lient Review 0.40 A ctivity 2.xvi) Incorporating comments and final edition of the D2 - Assessment Report of Water Supply and Sanitation 0.25 D2 – A ssessment R eport of Water Supply and Sanitation Months /Weeks TO TA L [months] 3 4 Deliverables / Phases and A ctivities 1 2 Assessment Report of Water Supply and Sanitation
  • 18. 18 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DELIVERABLES: D3 - Water Supply and Sanitation Options Analysis Report STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE II  Activity 3.i) Identification of Potential Options and Solutions  Activity 3.ii) Develop.Methodology for Screening Solutions, Options Assessment  Activity 3.iii) Collection of Additional Data Required for the Assessment  Activity 3.iv) Determin.of Preliminary Cost Estimates and Potential Benefits  Activity 3.v) Options Assessment  Activity 3.vi) Solutions Rank.,Determin.of Short, Medium, Long-Term Priorities  Activity 3.vii) Preparation and Presentation of Findings  Activity 3.viii) Prep.of D3-Water Supply and Sanitation Options Analysis Rpt (draft rpt)  Activity 3.ix) Client Review  Activity 3.x) Incorpor.comments, final ed. D3-Water Supply Sanitation Options
  • 19. 19 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 5. WORK PLAN – STAGE II No. 07-Jan 14-Jan 21-Jan 28-Jan 04-Feb 11-Feb 18-Feb 25-Feb 03-Mar 10-Mar 17-Mar 24-Mar 31-Mar 07-Apr 14-Apr 21-Apr 2. Stage II – Water SupplyandSanitationOptionsAnalysis 3.00 D3 - Water SupplyandSanitationOptionsAnalysisReport 3.00 Activity3.i) Identificationof Potential Options and Solutions 0.25 1.00 Activity3.ii) Development of theMethodology for Screening Solutions and Options Assessment 0.25 0.25 0.75 Activity3.iii) Collectionof Additional DataRequired for theAssessment 0.25 0.25 0.25 0.50 Activity3.iv) Determinationof Preliminary Cost Estimates and Potential Benefits 0.25 0.25 1.00 Activity3.v) Options Assessment 0.25 0.25 0.25 0.25 1.00 Activity3.vi) Solutions Ranking and Determinationof short, Medium and Long Term Priorities 0.25 0.25 0.25 0.25 0.40 Activity3.vii) Preparationand Presentationof Findings 0.25 0.25 0.25 0.25 0.75 Activity3.viii) Preparationof theD3 - Water Supply and SanitationOptions Analysis Report (draft report) 0.25 0.25 1.00 Activity3.ix) Client Review 0.25 0.25 0.25 0.25 0.30 Activity3.x) Incorporating comments and final editionof theD3 - Water Supply and Sanitation Options Analysis Report 0.25 0.25 D3.1 - Water Supply and Sanitation Options Analysis Report – Ainaro D3.2 - Water Supply and Sanitation Options Analysis Report – Maliana D3.3 - Water Supply and Sanitation Options Analysis Report – Suai Months/Weeks TOTAL [months] 3 4 5 6 Deliverables/ PhasesandActivities Water Supply and Sanitation Options Analysis Report
  • 20. 20 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DELIVERABLES: D4 – Feasibility Studies Report STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE III  Activity 4.i) Prep.Preliminary Technical Designs for Agreed Project Components  Activity 4.ii) Develop.of ToR for Detailed Engineering Design,Preparation Procurement Plan  Activity 4.iii) Environmental and Social Assessments  Activity 4.iv) Cost-Benefit Analysis (CBA)  Activity 4.v) Preparation and Presentation of Feasible Solutions  Activity 4.vi) Prep.D4-Feasib.Assess.Rpt.-Prior.Water S.&Sanit.Invest.(draft rpt)  Activity 4.vii) Client Review  Activity 4.viii) Incorp.comments, final edition D4 – Feasib.Assess.Rpt.Prior.W.S.&S.Invest.
  • 21. 21 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 5. WORK PLAN – STAGE III No. 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-A pr 12-A pr 19-A pr 26-A pr 03-May 10-May 17-May 24-May 31-May 07-Jun 14-Jun 21-Jun 3. Stage III – FeasibilityStudiesandMaster Plans 3.00 D4 - FeasibilityAssessmentReportofPriorityWater SupplyandSanitationInvestment 3.00 Activity4.i) Preparationof Preliminary Technical Designs for theAgreed Project Components 0.75 Activity4.ii) Development of Terms of Referencefor theDetailed Engineering Designand Preparationof aProcurement Plan 0.75 Activity4.iii) Environmental and Social Assessments 1.00 Activity4.iv) Economic and Financial Analysis 0.75 Activity4.v) Preparationand Presentationof FeasibleSolutions 0.50 Activity4.vi) Preparationof theD4 - Feasibility Assessment Report of Priority Water Supply and SanitationInvestment (draft report) 0.85 Activity4.vii) Client Review 0.50 Activity4.viii) Incorporating comments and final editiontheD4 - Feasibility Assessment Report of Priority Water Supply and SanitationInvestment 0.50 D4.1 - FeasibilityAssessment Report of PriorityWater SupplyandSanitationInvestment – Ainaro D4.2 - FeasibilityAssessment Report of PriorityWater SupplyandSanitationInvestment – Maliana D4.3 - FeasibilityAssessment Report of PriorityWater SupplyandSanitationInvestment – Suai Months/Weeks TOTAL [months] 8 9 Deliverables/ PhasesandActivities 5 6 7 Feasibility Assessment Report of Priority Water Supply and Sanitation Investment
  • 22. 22 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DELIVERABLES: D5 – Draft Master Plan D6 – Final Master Plan STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE III  Activity 5.i) Compilation of Results of Previous Stages  Activity 5.ii) Investments Planning and Recommendations  Activity 5.iii) Preparation and Presentation of Findings  Activity 5.iv) Preparation of the Draft Master Plan  Activity 6.i) Client Review  Activity 6.ii) Incorporating comments and final edition the D6 - Final Master Plan  Activity 6.iii) Preparation of the Final Master Plan  Activity 6.vi) Presentation of the Final Master Plans at National Level
  • 23. 23 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 5. WORK PLAN – STAGE III No. 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun 14-Jun 21-Jun 3. Stage III – FeasibilityStudiesandMaster Plans 3.00 D5 - DraftMaster Plan 2.00 Activity5.i) Compilationof Results of Previous Stages 0.40 Activity5.ii) Investments Planning and Recommendations 1.50 Activity5.iii) Preparationand Presentationof Findings 0.50 Activity5.iv) Preparationof theD5 - Draft Master Plan 1.00 D5.1 - Draft Master Plan– Ainaro D5.2 - Draft Master Plan– Maliana D5.3 - Draft Master Plan– Suai D6 - Final Master Plan 2.00 Activity6.i) Client Review 1.00 Activity6.ii) Incorporating comments and final editiontheD6 - Final Master Plan 1.50 Activity6.iii) Preparationand Presentationof theFinal Master Planat National Level 1.00 D6.1 - Final Master Plan– Ainaro D6.2 - Final Master Plan– Maliana D6.3 - Final Master Plan– Suai Months/Weeks TOTAL [months] 8 9 Deliverables/ PhasesandActivities 5 6 7 Draft Master Plans Final Master Plans
  • 24. 24 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA DELIVERABLES: D6 – Final Master Plan STAGE I Assessment of Existing Water and Sanitation Situation STAGE II Water Supply and Sanitation Options Analysis STAGE III Feasibility Studies and Master Plans STAGE 0 Inception Report ENVIRONMENTAL AND SOCIAL ANALYSIS/ CAPACITATION AND KNOWLEDGE TRANSFER 5. WORK PLAN – STAGE III  Activity 6.i) Client Review  Activity 6.ii) Incorporating comments and final edition the D6 - Final Master Plan  Activity 6.iii) Preparation of the D6.1 - Final Master Plan of Ainaro  Activity 6.iv) Preparation of the D6.2 - Final Master Plan of Maliana  Activity 6.v) Preparation of the D6.3 - Final Master Plan of Suai  Activity 6.vi) Presentation of the Final Master Plans at National Level
  • 25. 25 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 6. TEAM-HUMAN RESOURCES Support Team ST-1 Water Supply & Sanitation in Developing Countries ST-2 Citywide Inclusive Sanitation ST-3 Strategic Options and Planning; Asset Management ST-4 Hydraulic Modelling; Water Safety ST-5 Laboratory, Analyses and Water Quality The Team positions are presented in the tables: ID Position Key Experts (International) KEI-1 Water Supply & Sanitation Engineer / Team Leader KEI-2 Social, Poverty and Gender Specialist KEI-3 Water Resources Specialist KEI-4 Water Quality & Water Treatment Specialist KEI-5 Geographic Information System (GIS) / Computer-Aided Design (CAD) KEI-6 Water and Sanitation Economics and Finance Specialist KEI-7 Environmental and Climate Change Specialist KEI-8 Social Safeguards Specialist Key Experts (National) KEN-1 Water Supply and Sanitation Engineer / Deputy Team Leader KEN-2 Social Poverty and Gender Specialist KEN-3 Water Resources Engineer KEN-4 Water Quality Technician KEN-5 Environmental Specialist KEN-6 GPS/CAD Operator KEN-7 Logistics and Support Assistant
  • 26. • Chefes Suco interviews, February and March 2021; • House hold Survey was held in August 2021; • Hydraulic Modelling with EPANET; • Water Flow Measurement (WFM), September 2021; • Water Quality Analysis Campaign (WQA), September 2021; • Focus Discussion Groups (FDG) for Gender, October 2021; • The Preliminary Ressetlement Action Plan (PRAP), January 2022. ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA NATIONAL TEAM Main Tasks 26 6. TEAM-MAIN TASKS
  • 27. 27 7. SUAI – EXISTING SITUATION DWELLINGS AND PUBLIC BUILDINGS ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 28. 28 WATER SUPPLY SYSTEMS AND INFRASTRUCTURES 7. SUAI – EXISTING SITUATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 29. 29 WATER DISTRIBUTION NETWORK PRESSURE ANALYSIS 7. SUAI – EXISTING SITUATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 30. 30 ALTIMETRY SCHEME 7. SUAI – EXISTING SITUATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 31. 31 HYDRAULIC CIRCUIT DIAGRAMS 7. SUAI – EXISTING SITUATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 32. 32 SANITATION INFRASTRUCTURES 7. SUAI – EXISTING SITUATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 33. 33 Existing Water Supply System and Service: 1. The poor state of the infrastructures, lack of knowledge of transmission transmission lines and water distribution networks; 2. The existence of illegal connections;. 3. The installation of pipes not buried or shallow depth, without knowledge about quality and hydraulic performance. 4. The low storage capacity of the water tanks and their location; 5. Need to improve water sources and water treatment plants (WTP); The construction of new water supply systems will be the best option to to achieve control and optimize operation and maintenance (O&M), water losses, reasonable consumption, service working 24hours/day, 7 days/week. 7. SUAI – EXISTING SITUATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 34. 34 8. OPTIONS ANALYSIS A water supply and sanitation master plan after identification of water sources, must be supported by a urban development plan, where we can find answers for the following questions: - How much water is needed; - Where the water will be needed; - When the water will be needed. The urban development plans are under elaboration. Engineering team needed to collect information and meet municipal authorities to identify the future needs for municipal capital and find the answer for the aforementioned three questions. ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 35. GENERAL LAYOUT_O1A1 35 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS - 1
  • 36. ALTIMETRY SCHEME_O1A1 36 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS -1
  • 37. ENERGY LINE-SUAI O1A1 37 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS - 1 1. Elevation Data (Nasa + Google Earth) 2. Tool : Global Mapper 3. Output: Digital Terrain Model (DTM) 4. QGIS + Civil 3D + Autocad -> Longitudinal profiles 5. Hydraulic calculations - Excel
  • 38. GENERAL LAYOUT_O1A2 38 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS - 1
  • 39. ALTIMETRY SCHEME_O1A2 39 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS - 2
  • 40. ENERGY LINE-SUAI O1A2 40 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS - 2
  • 41. O1A2.Mountain, gravity flow, no pumping systems needed, is more reliable, less O&M; The water sources are 26km far from Bereloik WTP. O1A1.Road, two pumping systems, 81 mH2O and 94 mH2O. This solution is the third with the lowest investment of the three, even if not considering the energy cost of 1.88M$. The water sources are 30.7km far from Bereloik WTP. O2A1.Aquifer, this solution relies on three existing boreholes and eight new boreholes, three pumping stations, one for Tabacolot Water Tank, another to Santa Rosa Water Tank, and the third to Bonuc Water Tank. From Santa Rosa Water Tank a pumping station to Baulela Water Tank. This solution depends on aquifer sustainability and energy. Energy cost estimation for 20 years is almost 5.15M$. On the environmental factor, there are important impacts regarding the future sustainability of this water resource, possible saline intrusion and hydrocarbon contamination. 8. OPTIONS ANALYSIS ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 41
  • 42. • The option O1A1.Road needs pumping stations, energy and more costs with O&M procedures and teams to operate and maintain; • Recommended option O1A2.Mountain, reliable, lowest investment considering energy. • O2A1.Aquifer is the option with lowest investment, but highly expensive in energy and O&M. And low reliability for an option with 11 boreholes, 4 pumping stations and a water source with the possibility of saline intrusion from the ocean, hydrocarbon contamination and future sustainability. • The increase of groundwater abstraction on the coast could lead to the salinization of the boreholes. In-depth hydrogeology studies will have to be carried out to define the wells' location and maximum flow rate. • There is enough water, but it is not infinite. This applies to the aquifer with particular sensitive. The challenge is to manage this scarce resource, so that everyone has access, in quantity and quality accordingly to national standards. 42 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 8. OPTIONS ANALYSIS
  • 43. 9. SUAI PROPOSED SOLUTION WATER SOURCES, WATER FLOW MEASUREMENT, SEPTEMBER 2021 • Wemasei (Dato Rua), 60 , 43 Lps, 75% of total flow; • Naes (Lactos), 40 Lps, 32 Lps, 78% of total flow; • Wekbotuk (Dato Tolu), 35 Lps, 32 Lps, 89% of total flow; Aquifer, three boreholes: Sukabi Laran I; Sukabi Laran II; Ladi, a total of 35 ; Boreholes for backup and increase service resilience; Water Quality and Treatment: • Calgon injection (Naes - Lactos); • Filtration, Chlorine injection (Bereloik); Wemasei Spring, September 2021 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 43
  • 44. WATER BALANCE-SUAI Year Unit 2020 2025 2030 2035 2040 Urban Population persons 26,857 37,632 35,900 38,322 44,630 Population served by BTL % 37.8% 90.0% 95.0% 96.0% 97.0% Population served by BTL persons 10,140 33,869 34,105 36,789 43,291 by House connection % 84.2% 100.0% 100.0% 100.0% 100.0% by House connection persons 8,537 33,869 34,105 36,789 43,291 by Public Taps % 15.8% 0.0% 0.0% 0.0% 0.0% by Public Taps persons 1,603 0 0 0 0 Per capita Consumption House connection lcd 100 120 120 120 120 p/conn 6.9 6.0 5.0 5.0 5.0 Public Taps lcd 30 30 30 30 30 Custumers Projection Conn's 1,514 5,705 6,891 7,437 8,748 House connection Conn's 1,231 5,645 6,821 7,357 8,658 Public Taps Conn's 229 0 0 0 0 Other social incl govt Offices Conn's 22 25 30 35 40 General - Commercial Conn's 32 35 40 45 50 Total Demand (Daily Mean;MDD) m3pd 1,020 4,194 4,243 4,585 5,385 Domestic Demand m3pd 902 4,064 4,093 4,415 5,195 Non-domestic demand m3pd 118 130 150 170 190 Leakage Rate % 48.6% 25.0% 20.0% 20.0% 20.0% Leakage m3pd 963 1,398 1,061 1,146 1,346 Leakage 11.1 16.2 12.3 13.3 15.6 Total Demand (Daily Max;PDD, f=1.2) m3pd 2,379 6,711 6,364 6,877 8,077 27.5 77.7 73.7 79.6 93.5 Reservoir m3 877 6,800 6,400 6,900 8,100 Reservoir Construction Capacity m3 0 8,100 8,100 8,100 8,100 1 day 1 day 1 day 1 day Total Production m3pd 1,983 8,077 8,077 8,077 8,077 23.0 93.5 93.5 93.5 93.5 • Per capita 120 l/inhab./day; • 26 857 inhab. year 2020; • 44 630 inhab. year 2040; • Leakage rate 49%, year 2020; • Leakage rate 20%, year 2040; • Water Tank capacity 8500m3; • Average demand: 5385m3/day (62.3 ); • Productivity - Daily Max (+20%) and leakage (93.5 +12.5=106 ); • Tasi Mane Project water needs for SSB and NSC considered; ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 44 9. SUAI PROPOSED SOLUTION
  • 45. SUAI WATER SOURCES WATER CONSUMPTION () 36.2 34.4 33.1 33.1 32.9 34.6 34.7 35.1 35.3 37.0 37.0 39.3 39.7 40.8 41.8 42.6 27.0 25.6 24.6 24.6 24.5 25.8 25.8 26.1 26.3 27.5 27.5 29.2 29.5 30.4 31.1 31.7 27.0 25.6 24.6 24.6 24.5 25.8 25.8 26.1 26.3 27.5 27.5 29.2 29.5 30.4 31.1 31.7 0 20 40 60 80 100 120 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Suai Water Sources and Water Consumption () Wemasei (Dato Rua) Naes (Lactos) Wekbotuk (Dato Tolu) ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 45 9. SUAI PROPOSED SOLUTION
  • 46. ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 46 GENERAL LAYOUT 9. SUAI PROPOSED SOLUTION
  • 47. PRESSURE ZONES ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 47 9. SUAI PROPOSED SOLUTION
  • 48. ALTIMETRY SCHEME ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 48 9. SUAI PROPOSED SOLUTION
  • 49. HYDRAULIC FLOW SCHEME Water Distribution Network Pressure Zone Water Tank/BPT Water Treatment Plant Water Resources (m3/day) () Wemasei 3715 (43) Elev.917m Naes 2765 (32) Elev.935m Wekbotuk 2765 (32) Elev.680m Total 9245 m/day (107 ) (m3/day) () WTP Bereloik 9245 (107 ) Water Tank 2000 m3 Elev.211m BPT Baulela Elev.150m BackUp/Resilience Aquifer, Boreholes Depth 80m (m3/day) () BH Sukabi Laran 634 (11) Elev. 21m BH Sukabi Laran II 691 (12) Elev. 15m Ladi 691 (12) Elev. 26m Total 2016 (35) WT Sta.Rosa 2000m3 Elev.105m WT Tabacolot 1000m3 Elev.75m BPT Tabacolot Elev. 65m WT Matai 500m3 Elev.65m WT Bonuc 2000m3 Elev. 105m WT Dais 1000m3 Elev.65m Pressure Zone 1 Pressure Zone 4 Pressure Zone 5 Pressure Zone 2 Pressure Zone 3 ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 49 9. SUAI PROPOSED SOLUTION
  • 50. RAW WATER TRANSMISSION, WATER SOURCES-WTP Material DN PN Length (-) (mm) (bar) (m) HPDE 250 12.5 12009 HPDE 250 16 2066 DIP 250 25 4612 HPDE 315 12.5 6457 HPDE 315 20 662 DIP 300 25 1750 DIP 300 30 760 Total 28316 DISTRIBUTION NETWORK HDPE.PN12.5 AINARO DN (mm) Length (m) 63 48485 110 13326 125 4754 160 19177 200 8047 250 5031 315 26 Total 98846 WATER TANKS CAPACITY (m3) Water Tank Bereloik 2000 Water Tank St. Rosa 2000 Water Tank Tabacolot 1000 Water Tank Bonuc 2000 Water Tank Matai 500 Water Tank Dais 1000 Total 8500 BPTs 6 Service Connections Quantity (un.) Domestic, Institutional, Commercial and Industrial 8748 TRANSMISSION MAINS HDPE.PN12.5 Length DN (mm) (m) 160 28725 200 5319 225 4408 250 2766 315 3646 400 3480 Total 48345 area (km2) Current Water supply area 11.1 Proposed Solution área 54.1 Increased area 390% ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 50 9. SUAI PROPOSED SOLUTION
  • 51. 51 10. WATER CYCLE ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 52. 52 We, humans with numerous of our actions affect directly the water cycle, and other human activities have indirect effects. - Climate change is causing numerous changes to the water cycle. Sea levels are rising in some areas and dropping in others, glaciers are retreating and disappearing affecting rivers, more frequent droughts and floods, coastlines some islands are disappearing, the polar ice cap is melting, and so forth. - Deforestation, for timber, coal or to clear land for agriculture or development, increases runoff. And land sliding. Certain emissions from industry cause acid rain . - Chemicals used by humans pesticides, herbicides, and nitrogen for farming runs off into rivers and streams and pollutes groundwater. 10. WATER CYCLE ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 53. 53 10. WATER CYCLE ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 54. 54 10. WATER CYCLE Land use is a main issue for water resources, the trees (forests) avoid erosion, promote infiltration and ensure water sources productivity. Deforestation promotes erosion as it can be seen in the pictures. Reforestation is complex, difficult. If possible, prevent deforestation. ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA
  • 55. 11. WATER SOURCES PROTECTION • What: Watershed reforestation and Aquifers; • Why: Minimizing landslide, promoting water infiltration and therefore future sustainability for the water sources, including aquifers; • Who: Min.Agriculture(operation), Min.Education(schools-education), Church’s, NGO’s, ANAS, local communities; • How: Involvement and commitment of local communities; • Where: Wemasei, Naes, Wekbotuk catchment areas; Boreholes survey and water consumption control in Covalima; • Coordination & supervision: BTL Engineer & infrastructures Department; ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 55
  • 56. SANITATION MAIN STRATEGY LINES: -> A faecal sludge treatment plant (FSTP); -> Desludging truck with skilled operation team; -> a septic tank desludging WorkPlan, at least each septic tank once a year; -> "Public Toilets“, in markets, bus terminals, and good conditions for public use (O&M); -> Technical guidelines and technical support for construction of (communal) septic septic tanks to avoid contamination, sewage household connections, a first step for a possible centralized sewage system (WWTP); -> Education, Information, Communication (EIC), Action Plan; -> A “symbolic” sanitation tariff is very important, the proposed fix tariff 2$ per month; 12. SANITATION ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 56
  • 57. 12. SANITATION • Who: Municipal Delegation of BTL supported by BTL engineering department, together with municipal authorities and local authorities (chefe posto administrativo, chefe suco, chefe aldeia,focalpoint); • How: BTL will design solutions and technical drawings. Will provide construction materials for (communal) septic tanks and pipes for household connections; • What: Desludging truck for Septic Tanks and Plan. Team of 2 O&M operators for the desludging truck and FSTP operation. FSTP (faecal sludge treatment plant). Public Toilets in the urban area, strategic places, like markets, churches and for rural areas, one per village / local community. O&M by local communities with Focal Point / BTL supervision; • Coordination & supervision: BTL Sanitation Department & BTL Engineering Department; • Remarks: O&M by local communities with Focal Point/ BTL coordination, orientation, supervision. • - The desludge team will be responsible for septic tanks survey, identification of areas which need infrastructures improvement; ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 57
  • 58. 12. SANITATION FAECAL SLUDGE TREATMENT PLANT (FSTP) – STANDARD DRAWING Legend: A. Inlet Structure B. Primary (Sludge) Facultative Lagoon C. Flow Distribution Chamber D. Secondary Aerobic Lagoon E. Treated Efluent / Irrigation Storage F. Irrigation / Tree Cropping Area G. Control Room ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 58
  • 59. 12. SANITATION PUBLIC TOILET– STANDARD DRAWING Front Elevation Layout Plan Segregated Toilets for Man, Women and elderly and people with reduced mobility ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 59
  • 60. 13. NEXT STEPS SUPERVISION, REPORT, “GUIDANCE” AND TECHNICAL SUPPORT a) Tendering process DED Consultant Selection (6 months) b) DED (12 months) • Review the project Lifetime from 2040 to 2050; • Review hydraulic sizing/pressure zones according to the latest Urban Development Plans; • Water resources investigation, ground water (including drilling) & Surface water, Water quality monitoring & Water flow measurements; • Topographic Survey (Classical and Drone); • Geotechnical investigation; • Environment Assessment and Licensing and Social Safeguards; c) Tendering process for Building Contractor Selection (6 months) d) BUILDING,CONSTRUCTION PHASE & COMMISSIONING Construction and Commissioning (O&M), 3 years; ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 60
  • 61. 14. COMMENTS, SUGGESTIONS, CONCLUSIONS Time for Comments, Suggestions and Conclusions ENGINEERING PROCESS FOR PREPARATION OF WATER SUPPLY AND SANITATION MASTER PLAN FOR SUAI , MUNICIPAL CAPITAL OF COVALIMA 61

Editor's Notes

  1. Adicionar data automatica dia/mês/ano
  2. What is a water supply and sanitation master plan Why we need a water supply and sanitation master plan
  3. The main structure of a process for develop a Water supply and sanitation Master Plan
  4. Field work, water sources, existing infrastructures, water supply service, water quality, sanitation situation
  5. Meetings, site visits, water sources, water supply and sanitation service
  6. Meetings, site visits, water sources, water supply and sanitation service
  7. Meetings with local communities, chefe aldeia, chefe suco, about water sources and sharing water sources (social and environmental challenges)
  8. Meetings with stakeholders to collect information and data and their perspective, consultant team was supervised and supported by MPW /BTL focal point and project management unit (PMU)
  9. Meetings with stakeholders to collect information and data and their perspective, consultant team was supervised and supported by MPW /BTL focal point and project management unit (PMU)
  10. DATA COLLECTION
  11. Documents and reports to develop and submit, to be comment by MPW/BTL Focal Point and PMU Consult then revise documents and reports accordingly
  12. WorkPlan, activities
  13. WorkPlan, activities
  14. WorkPlan, activities
  15. WorkPlan, activities
  16. WorkPlan, activities
  17. WorkPlan, activities
  18. WorkPlan, activities
  19. WorkPlan, activities
  20. WorkPlan, activities
  21. WorkPlan, activities
  22. WorkPlan, activities
  23. WorkPlan, activities
  24. WorkPlan, activities
  25. Main Tasks Chefes Suco interviews of the studied areas, 20, and local stakeholders, school directors, health units and hospitals directors, February and March 2021; House hold Survey August 2021, 112 questionnaires in Ainaro, Maliana 150, Suai, 205; Hydraulic Modelling with EPANET; Water Flow Measurement (WFM), September 2021; Water Quality Analysis Campaign (WQA), September 2021; Focus Discussion Groups (FDG) for Gender, October 2021; The Preliminary Ressetlement Action Plan (PRAP), January 2022.
  26. Municipal capital information
  27. Elevation Data (Nasa + Google Earth) Tool : Global Mapper Output: Digital Terrain Model (DTM) QGIS + Civil 3D + Autocad -> Longitudinal profiles Hydraulic calculations - Excel
  28. From D3 Presentation Wemasei (Dato Rua), water flow measured, 60 , planned for intake, maximum 45 (75%); Naes (Lactos), water flow measured, 40 , planned for intake, maximum 31 (78%); Wekbotuk (Dato Tolu), water flow measured, 35 , planned for intake, maximum 31 (89%); Aquifer, three boreholes: Sukabi Laran I; Sukabi Laran II; Ladi, a total of 35 production; Boreholes for backup and increase service resilience; Water Quality and Treatment: Calgon injection (Naes - Lactos); Filtration, Chlorine injection (Bereloik);
  29. From D3 Presentation Totally new infrastructures: Leakage rate 20%; Only possible with totally new infrastructures; Water Tank capacity 8500m3 (1 day consumption);
  30. Water per year taken from each water source Wemasei, 36 up to 43 Lps Naes, 27 up to 32 Lps Wekbotuk, 27 up to 32 Lps
  31. General Layout, D3 Presentation
  32. Pressure Zones, from D3 Presentation
  33. Altimetry Scheme, D3 Presentation
  34. a less technical way of presenting the hydraulic flow scheme of the proposed solution
  35. Proposed Solution Infrastructures Summary Current water supply área – 11ha Proposed solution área 54 ha Increase área 390% Better service, no public taps, adequate pressure and flow, 24h/7days
  36. Water Sources Protection
  37. SANITATION MAIN STRATEGY LINES: -> A faecal sludge treatment plant (FSTP); -> Desludging truck with skilled operation team; -> a septic tank desludging WorkPlan, at least each septic tank once a year; -> "Public Toilets“, in markets, bus terminals, and good conditions for public use (O&M); -> Technical guidelines and technical support for construction of (communal) septic tanks to avoid contamination, sewage household connections, a first step for a possible centralized sewage system (WWTP); -> Education, Information, Communication (EIC), Action Plan; -> A “symbolic” sanitation tariff is very important, the proposed fix tariff 2$ per month;
  38. FSTP Standard Drawing
  39. Public Toilet Standard Drawing Segregated Toilets for Man, Women and elderly and people with reduced mobility
  40. WorkPlan 1. SUPERVISION, REPORT, “GUIDANCE” AND TECHNICAL SUPPORT Tendering process DED Consultant Selection (6 months) DED (12 months) Tendering process for Building Contractor Selection (6 months) BUILDING,CONSTRUCTION PHASE & COMMISSIONING Construction and Commissioning (O&M), 3 years;