SlideShare a Scribd company logo
1 of 6
Download to read offline
CURRICULUM VITAE 
Employment  Consultant Project Control and Planning – Owner of Project Consulting AS 
 
 
Name  GUNDERSEN, Rolf Henry           
 
Born  1955 
 
National  Norwegian 
 
Character References  Character references are available on request 
 
Contact 
 
Postbox 15, 
N‐7338 Meldal, Norway 
Phone.: (Mob.) +47 993 27 485 
 
Language 
 
Norwegian, English, (German) 
Summary 
 
 Lead Offshore Planner in ABB Offshore Wind Connections – Installation, HV Energizing and final 
commissioning of the HVDC platform DolWin Beta. 
 Senior Planner in Siemens Energy ‐ Subsea. Cost and schedule follow up and monitoring in an 
internal development project – Power Grid Development 
 Planning responsible at Aker Solutions MMO Concept & Technology – Trondheim. Study‐
planning; A, B, C and D Class 
 Project Management – Integration between the ERP system SAP and Primavera P6. Project 
Management – Development of supplementary software module (reporting; S‐Curves, etc.) to 
Primavera P6. Improvement of internal processes in the planning and management of projects 
in Aker Solutions ‐ Subsea 
 Experience from large EPC contracts & projects within complete subsea systems in different 
projects in the oil and gas industry. Role as Planning Lead – SPS projects 
 Experience from modular design, procurement, construction, installation and commissioning 
within pharmaceutical process workshop. Role as Planning Lead 
 Experience from larger projects within construction (St. Olav’s Hospital), operational planning 
of oil/gas operations ‐ FPSO, EPC Contract in environmental gas handling, EPCI Contract – 
Modification project of oil and gas platform (Statoil Heidrun – Sulphate Removal). Role as 
Project Planner 
 Experience from use of PM tool in many types of business; oil and gas, engineering, process 
industry, mechanical industry and within shipbuilding  
 Custom based PM tool documentation  
 Training of end users in use of Primavera Project Planner and Primavera  P6 
 Continuous experience with the Planning and Control System – Primavera since 1990. This also 
includes Primavera P6 in EPC and EPCI Contracts 
 Long time experience from scheduling and monitoring projects, advisement and 
implementation of PM tool (Primavera), establishing methods and routines, and finally 
establish and incorporate both project structures and industrial standards in client projects 
 Maintenance of Primavera P6 database content 
 Establishing project control and planning procedures 
 Planning Manager – Shipbuilding 
 Project Management – Shipbuilding (hull) and other Mechanical Industry 
 Experience from system programming, implementation and integration of IT/IS maintenance 
system within Norwegian heavy process industry 
 
CV_201503_ENG_short.docx Page 2 of 6
Key Qualifications 
 Key expertise in Primavera scheduling system 
 Qualified and high level of expertise on the project control process 
 More than 10 years’ experience in oil and gas related projects with aspects to project 
scheduling and monitoring 
 Long experience from also other related (construction projects) projects  
 Commitment and will to carry out the planning process for the approved policies and best 
practice of the company 
 Contribute to innovation and improvement of internal processes and propose value‐adding 
changes in the project execution 
 Ideas and visions for the presentation of the company's portfolio of projects in a 
standardized and recognizable format (brand) for management and clients 
 Highly focused on the organization and structuring of all plan‐related information in 
projects 
 Open, honest, clear and direct communication. As early as possible a dialogue with the 
project team and the client when challenges occur  
 Transparently maintain good overview and proactively (Hands‐On), contributing to solutions 
and ideas when challenges occur in the project execution 
 Quality and reliability to all plan‐related information is highly prioritized 
 Relationship‐building and team player to the project team and the client 
 
Education   
01/1984 ‐ 06/1984  Supplementary education at Møre and Romsdal Academy (MRIH) (1/2 years training within 
Industry Economy, Project M., QA/QC, economy control, training IT/IS (10 – weight points) 
08/1981 ‐ 06/1983  Engineer Education ‐ Operational Machinery at Gjøvik Academy (GIH). 
08/1980 ‐ 06/1981  Technical Vocational School ‐ at Gjøvik Technical High School (GTF) 
08/1977 ‐ 06/1978  Technical College ‐ Machinery and Mechanical at Borgund College – 1 year 
08/1971 ‐ 06/1974  High School – 3 years 
08/1969 ‐ 06/1970  Secondary Modern School – 1 year 
08/1962 ‐ 06/1969  Primary School – 7 years 
Attended courses   
08/2007 ‐ 10/2007  Applied Project Planning and Control – Metier Academy E‐Learning (5 ‐ weight points) 
06/2007 ‐ 08/2007  Essential Project Management – Metier Academy E‐Learning (5 ‐ weight points) 
09/2005  SAP Project Module / Document Module 
01/2002  Training document control – ProArc 
01/1985 ‐ 03/2003  Different kind of training within PM, system programming and other 
   
CV_201503_ENG_short.docx Page 3 of 6
Work experience 
01/2015 – present 
 
 
ABB AB Offshore Wind Connections 
Consultant Project Control – Self‐employed Project  
 
The assignment as Lead Offshore Planner in ABB OWC was signed ultimo November 2014. The 
commencement date for the assignment was early January 2015. Urgent nature of content is 
the responsibility for all related activities of planning and scheduling for the tow‐out, set‐down, 
installation, HV Energizing and commissioning of the HVDC platform DolWin Beta. ABB’s 
contractual client is the Dutch/German company TenneT Offshore GmbH. 
Principal contractor – Navartis Ltd on behalf of ABB AB Offshore Wind Connections. 
 
The assignment at ABB OWC includes responsibility for the planning and monitoring of all 
offshore operations, in connection with the installation, hook‐up and completion of the DolWin 
Beta HVDC platform. In addition to the offshore operations, the assignment includes 
management and control of personnel on board (POB), as well as coordination of vessels in 
connection with cable pull‐in and other vessel‐related operations until trial test periods and 
final handover to the customer – TenneT Offshore GmbH. Primavera P6 is used as the planning 
tool at ABB OWC. 
  
01/2013 – 09/2014 
 
Siemens Oil & Gas ‐ Subsea 
Consultant Project Control – Self‐employed Project  
 
The assignment as Senior Planner in the Siemens Energy ‐ Subsea was signed 1st
 of January 
2013. Urgent nature of content is the responsibility for all related activities of planning and 
scheduling, monitoring and control of cost, time and resources in an internal development 
project – Power Grid Development. 
Principal contractor ‐ Metier Project Resources AS on behalf of Siemens. 
 
The assignment in Siemens includes planning, monitoring and control of cost, time and 
resources in an internal development project. The mission includes the improvement of 
internal procedures for change orders, baseline revisions/audits, reporting, transactions of 
hours and costs between SAP and Primavera P6. The mission also includes participation in the 
improvement of Siemens’ procedures and routines for the execution of projects. The tasks 
further includes consultancy through creation of global standard reporting, integration of the 
Siemens project execution model in master plans, as well as contributing to improved structure 
and organization by the creation of global standards (calendars, activity codes, resource 
organization and more in Primavera P6). 
 
10/2012 – 12/2012 
 
Aker Solutions ‐ MMO 
Consultant Project Control – Self‐employed 
 
The assignment as Planning Responsible in Aker Solutions MMO ‐ Concept & Technology in 
Trondheim was signed 1st
 of October 2012. Urgent nature of content was planning support in 
studies mostly aimed at offshore installations on the Norwegian continental shelf. Principal 
contractor – Aker Advantage AS on behalf of Aker Solutions. 
 
Established portfolio control in the planning system SAFRAN Project Planner for Concept & 
Technology in Trondheim. Implementation of improved routines and default planning 
templates and planning reports for internal projects. Planning and monitoring of study projects 
classified as either A, B, C, or D. Establishment of standard plan templates for completion of 
study projects. Integration of Aker Solutions project execution model – PEM in plan templates. 
Support to study leaders in the plan and plan preparation. Reporting to the study leaders and 
management in Concept & Technology. 
 
CV_201503_ENG_short.docx Page 4 of 6
08/2005 – 09/2012 
 
Aker Solutions ‐ Subsea 
Consultant Project Control – Self‐employed 
 
The assignment as Senior planning engineer in Aker Solutions – Subsea Lysaker/Fornebu was 
signed in august 2005. The contract has since been renewed on several occasions during the 
period 2005‐2012. Urgent nature of content was the role as Planning Lead in the execution of 
Subsea customer projects. Principal contractors – Albatross Prosjektledelse, Westsoft 
AS/Metier AS on behalf of Aker Solutions. 
 
The assignment in Aker Solutions – Subsea has included assistance to planners as super user in 
Primavera P6's preferred counseling, the use and exploitation of the planning system Primavera 
P6. The Mission has also included the position as project planner in the Tie‐In department’s 
individual projects. The commitment also included the creation of plan templates and 
improvement of practices and procedures for the execution of client projects. In addition, I 
have had the role as project planner in several projects in which plans the tender (quotation) 
phase. Common to all the planning has been different planning positions in EPC contracts in 
which Aker Solutions – Subsea supplies subsea systems to clients in the oil/gas sector. 
 
From January 2011 to December 2012, I have been responsible (Project Manager) for an 
internal (improvement) development project. The objective of this project has been to reduce 
costs and streamline the planning processes through system integration between the ERP 
system SAP and Primavera P6. This project also aims to achieve an efficiency of data flows and 
ensure reliability of project information in both SAP and Primavera P6. In this development 
project, I have also been responsible for the development of an additional software 
module/application to Primavera P6. This software application was designed to be able to 
present reports in Primavera P6 based on periodical past cumulated data (S‐curves, tabular 
reports, etc.) according to standards in projects for the oil and gas industry. 
 
In the period June 2010 – December 2010 I have been responsible for the establishing of the 
schedule, and following up on a guarantee project for BP. During the same period, I have also 
established a number of standard templates, and documentation (manual) for improved 
project planning and management of projects globally in Aker Solutions – Subsea. 
 
In the period March 2010 – June 2010 I have been holding the role as Lead Planner in two other 
EPC contracts; Trym and Oselvar for Dong Energy. 
 
In the period March 2007 ‐ March 2010 I have been holding the role as Lead Planner in charge 
of planning, tracking, and reporting in two EPC contracts (Morvin and Lavrans) for Statoil. 
 
 10/2004 ‐ 07/2005 
 
FMC Technologies 
Consultant Project Control – Self‐employed 
 
Assignment as project planner in projects where the customer (s) required Primavera as 
planning system. The contract was signed in October 2004. Principal Contractor – Ingeniør 
Compagniet AS on behalf of FMC Technologies. 
 
The assignment by FMC Technologies has been as super user on the planning system Primavera 
Project Planner on several of FMC's subsea projects. In addition there have been established 
new and improved practices for planning and monitoring using Primavera as PM tool in the 
company. 
Primavera is selected as the governing planning system for many of FMC's clients, like British BP 
and French Total. In this context, I have been involved in both of the mentioned companies' 
projects with assistance of consulting, planning and follow‐up of these under the direction of 
FMC's deliveries to these. The projects have been typical EPC contracts which FMC has provided 
complete subsea systems for exploration of oil/gas. 
My involvement in FMC has included creating project templates for new projects and creating 
new project plans in the quotation phase. 
 
CV_201503_ENG_short.docx Page 5 of 6
07/2003 ‐ 09/2004 
 
Pharmadule Emtunga AB 
Consultant Project Control – Self‐employed 
 
In July 2003 I established my own business (Project Consulting). I have since August 2003 been 
engaged within a contract with a Swedish company in Gothenburg Sweden – Pharmadule 
Emtunga AB. My role in this contract has been the responsible planner within project control 
and management as Main Scheduler in project IE1030 – Clean Manufacturing Facility. 
 
The project is based on modular construction and installation of a factory within 
pharmaceutical industry placed in Cork – Ireland. The project is a typical   EPCI contract. The 
client is Eli Lilly S.A. – an American pharmaceutical company. My contract range from planning 
and scheduling the whole project throughout all project phases form detail design throughout 
commissioning and turnover. The planning tool in this project is Primavera Project Planner. MS 
Office is used as support tools to produce add on graphs and other documentation required in 
the project.  
 
01/1995 ‐ 06/2003  Metier AS (Formerly West Soft AS) 
Senior Consultant Project Control 
 
Employment in West Soft AS ‐ Senior consultant Project management. During this period in 
West Soft AS, I have been engaged in many types of projects and within many different kind of 
companies in Norway and Scandinavia. 
My work experience as consultant in West Soft AS has been many and different in a wide range 
aspect within project control as; senior planner, planner, advisor and consultant within the 
whole business area ‐ project control. I have worked with and implemented project structures 
and project management systems (Primavera®). I have been responsible for making training 
manuals and trained end users both external and internal. I have also worked with customer 
support in Norway on Primavera®. I have also made customer manuals for project operating 
(planning and monitoring projects ‐ methods/rules). 
 
Some engagement to mention here is; Complete schedules for a new Paper Plant (Turn Key) in 
Asia. Early project analysis, consulting and implementation of complete project management 
system (methods/routines) within many engineering companies (shipbuilding, environmental 
gas handling and modification project ‐ oil/gas). Implementation of enterprise‐based project 
management, established structures and developed a method for the feasibility analysis and 
after estimate based on industry standards by several Norwegian shipyards. Consulting, project 
structures, and planning for larger land‐based development project. Operational planning 
(FPSO) of oil and gas extraction/& exploration drilling for Norwegian oil company. Experience 
from larger modification project (Statoil ‐ Heidrun) as senior planner by Halliburton/VM 
Alliansen in Stavanger – Norway. 
Engagement in the following companies; 
Kværner Pulping AB, Kværner Oil & Gas, DSND Subsea AS, Rolls Royce (Vickers Marine AS), 
Academy i Ålesund, Academy i Agder, Jernbaneverket (NSB), Norsk Hydro AS (Rafnes), SAGA 
Petroleum ASA, Sør Trøndelag Fylkeskommune (St. Olavs Hospital – New Regional Hospital in 
Trondheim), Kværner Florø AS, Halsnøy Verft, Myklebust Mek.Verksted, A/S Stålprodukter – 
(Crane and Lifting Equipment), ALSTOM Power Norway AS (earlier ABB Miljø – Industrial 
Division), Halliburton / VM Alliansen, Other Mechanical Industries 
 
CV_201503_ENG_short.docx Page 6 of 6
11/1992 ‐ 12/1994  Nordfjord Skipsindustri A/S 
Planning Manager 
 
Employment in Nordfjord Skipsindustri A/S as Planning Manager. Responsible for planning, 
monitoring and complete reports in all projects (hull construction – shipbuilding). Responsible 
for public reports to National Bureau of Statistics in Norway. Preparation of manufacturing 
budgets and general budget work according to production capacities and new projects. Also 
responsible for implementation of new methods and routines for PM including methods for 
earned value according to public industrial standards. Responsible for complete and approved 
work drawings (archiving and issues) and monitoring of all variances 
Follow up of all steel weights used by the hull and monitoring all variances according to this. 
Also Project Management in some projects including contacts with authorities, shipping 
company, clarification authorities, other shipyards and sub suppliers. 
At last to mention is the complete responsible to implement Primavera Project Planner as a PM 
tool in the company. According to Primavera Project Planner I also had to establish methods for 
planning and monitoring all projects. Responsible for all project reports to the management 
board and finances/banks. 
 
10/1990 ‐ 11/1992  Bismo Industrier A/S. 
Project Manager 
03/1988 ‐ 08/1990 
 
Freelance 
 
05/1985 ‐ 03/1988  TDP A/S 
Maintenance Consultant 
08/1984 ‐ 05/1985  Moelven Gruppen A/S 
Detail Planner 
06/1978 ‐ 06/1980  A.M. Liaaen A/S 
Steelworker /Machinery Worker 
 

More Related Content

What's hot

Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_updateAriel Almes
 
What Programme do you need, when and why
What Programme do you need, when and whyWhat Programme do you need, when and why
What Programme do you need, when and whyDeclan Sherry
 
Procurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineeringProcurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineeringPrizztech
 

What's hot (6)

Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_update
 
What Programme do you need, when and why
What Programme do you need, when and whyWhat Programme do you need, when and why
What Programme do you need, when and why
 
4
44
4
 
Presentationlinkin
PresentationlinkinPresentationlinkin
Presentationlinkin
 
Procurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineeringProcurement of equipment_packages_at_aker_engineering
Procurement of equipment_packages_at_aker_engineering
 
Sats Ganesh_
Sats Ganesh_Sats Ganesh_
Sats Ganesh_
 

Similar to Offshore Project Planner CV

Terry Blacker Curriculum Vitae March 2015
Terry Blacker Curriculum Vitae March 2015Terry Blacker Curriculum Vitae March 2015
Terry Blacker Curriculum Vitae March 2015Terry Blacker
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund
 
HVAC Discipline Engineer - China - Subshore
HVAC Discipline Engineer - China - SubshoreHVAC Discipline Engineer - China - Subshore
HVAC Discipline Engineer - China - SubshoreSubshore.no AS
 
T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsTero Luoma
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14Trevor Lucas
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot
 
Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016Tor Johan Brobak
 
Chris dixon cv met nl overzicht
Chris dixon cv met nl overzichtChris dixon cv met nl overzicht
Chris dixon cv met nl overzichtChris Dixon
 
Lars Norrman 2015 CV EN
Lars Norrman 2015 CV EN Lars Norrman 2015 CV EN
Lars Norrman 2015 CV EN Lars Norrman
 
Patty Gorchynski CV Oct 2016
Patty Gorchynski CV Oct 2016Patty Gorchynski CV Oct 2016
Patty Gorchynski CV Oct 2016Patty Gorchynski
 

Similar to Offshore Project Planner CV (20)

Terry Blacker Curriculum Vitae March 2015
Terry Blacker Curriculum Vitae March 2015Terry Blacker Curriculum Vitae March 2015
Terry Blacker Curriculum Vitae March 2015
 
Detailed resume
Detailed resumeDetailed resume
Detailed resume
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - General
 
JJC-CV - April-2016
JJC-CV - April-2016JJC-CV - April-2016
JJC-CV - April-2016
 
HVAC Discipline Engineer - China - Subshore
HVAC Discipline Engineer - China - SubshoreHVAC Discipline Engineer - China - Subshore
HVAC Discipline Engineer - China - Subshore
 
CV Bernt GE 2015
CV Bernt GE 2015CV Bernt GE 2015
CV Bernt GE 2015
 
T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controls
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01
 
Resume_Neander Alessandro da Silva PaulaRev1
Resume_Neander Alessandro da Silva PaulaRev1Resume_Neander Alessandro da Silva PaulaRev1
Resume_Neander Alessandro da Silva PaulaRev1
 
Julia_Billington_Summary
Julia_Billington_SummaryJulia_Billington_Summary
Julia_Billington_Summary
 
Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016
 
Zeugnis_escad
Zeugnis_escadZeugnis_escad
Zeugnis_escad
 
Chris dixon cv met nl overzicht
Chris dixon cv met nl overzichtChris dixon cv met nl overzicht
Chris dixon cv met nl overzicht
 
Lars Norrman 2015 CV EN
Lars Norrman 2015 CV EN Lars Norrman 2015 CV EN
Lars Norrman 2015 CV EN
 
Patty Gorchynski CV Oct 2016
Patty Gorchynski CV Oct 2016Patty Gorchynski CV Oct 2016
Patty Gorchynski CV Oct 2016
 
curriculum11-10-2015
curriculum11-10-2015curriculum11-10-2015
curriculum11-10-2015
 
CV_FK_20161208_en
CV_FK_20161208_enCV_FK_20161208_en
CV_FK_20161208_en
 
HK_RESUME_DESIGN
HK_RESUME_DESIGNHK_RESUME_DESIGN
HK_RESUME_DESIGN
 
CV - Andreas Andersson
CV - Andreas AnderssonCV - Andreas Andersson
CV - Andreas Andersson
 

Recently uploaded

Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024Dan Medlin
 
Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.ShrayasiRoy
 
Cleared Job Fair Handbook | May 2, 2024
Cleared Job Fair Handbook  |  May 2, 2024Cleared Job Fair Handbook  |  May 2, 2024
Cleared Job Fair Handbook | May 2, 2024ClearedJobs.Net
 
Intern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdfIntern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdfmarketing659039
 
Intern Exit Interview Questions and Answers
Intern Exit Interview Questions and AnswersIntern Exit Interview Questions and Answers
Intern Exit Interview Questions and AnswersHireQuotient
 
Creative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for RecruitersCreative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for RecruitersHireQuotient
 
Situational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample AnswersSituational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample AnswersHireQuotient
 
Copy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdfCopy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdfmarketing659039
 
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Ways to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time JobsWays to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time JobsSnapJob
 
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...PayScale, Inc.
 
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Employee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational SuccessEmployee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational SuccessHireQuotient
 
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...makika9823
 
Mastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership ManagementMastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership ManagementBoundless HQ
 
How Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsHow Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsDavid Green
 
Advantages of Human Resource Management System
Advantages of Human Resource Management SystemAdvantages of Human Resource Management System
Advantages of Human Resource Management SystemHireQuotient
 
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 GurgaonDelhi Call girls
 

Recently uploaded (20)

Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024
 
Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.
 
Cleared Job Fair Handbook | May 2, 2024
Cleared Job Fair Handbook  |  May 2, 2024Cleared Job Fair Handbook  |  May 2, 2024
Cleared Job Fair Handbook | May 2, 2024
 
Intern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdfIntern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdf
 
Intern Exit Interview Questions and Answers
Intern Exit Interview Questions and AnswersIntern Exit Interview Questions and Answers
Intern Exit Interview Questions and Answers
 
Creative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for RecruitersCreative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for Recruiters
 
Situational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample AnswersSituational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample Answers
 
9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR
9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR
9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR
 
Copy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdfCopy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdf
 
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
 
Ways to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time JobsWays to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time Jobs
 
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
 
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
 
Employee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational SuccessEmployee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational Success
 
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
 
Mastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership ManagementMastering Vendor Selection and Partnership Management
Mastering Vendor Selection and Partnership Management
 
How Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsHow Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People Analytics
 
escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974
 
Advantages of Human Resource Management System
Advantages of Human Resource Management SystemAdvantages of Human Resource Management System
Advantages of Human Resource Management System
 
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
 

Offshore Project Planner CV

  • 1. CURRICULUM VITAE  Employment  Consultant Project Control and Planning – Owner of Project Consulting AS      Name  GUNDERSEN, Rolf Henry              Born  1955    National  Norwegian    Character References  Character references are available on request    Contact    Postbox 15,  N‐7338 Meldal, Norway  Phone.: (Mob.) +47 993 27 485    Language    Norwegian, English, (German)  Summary     Lead Offshore Planner in ABB Offshore Wind Connections – Installation, HV Energizing and final  commissioning of the HVDC platform DolWin Beta.   Senior Planner in Siemens Energy ‐ Subsea. Cost and schedule follow up and monitoring in an  internal development project – Power Grid Development   Planning responsible at Aker Solutions MMO Concept & Technology – Trondheim. Study‐ planning; A, B, C and D Class   Project Management – Integration between the ERP system SAP and Primavera P6. Project  Management – Development of supplementary software module (reporting; S‐Curves, etc.) to  Primavera P6. Improvement of internal processes in the planning and management of projects  in Aker Solutions ‐ Subsea   Experience from large EPC contracts & projects within complete subsea systems in different  projects in the oil and gas industry. Role as Planning Lead – SPS projects   Experience from modular design, procurement, construction, installation and commissioning  within pharmaceutical process workshop. Role as Planning Lead   Experience from larger projects within construction (St. Olav’s Hospital), operational planning  of oil/gas operations ‐ FPSO, EPC Contract in environmental gas handling, EPCI Contract –  Modification project of oil and gas platform (Statoil Heidrun – Sulphate Removal). Role as  Project Planner   Experience from use of PM tool in many types of business; oil and gas, engineering, process  industry, mechanical industry and within shipbuilding    Custom based PM tool documentation    Training of end users in use of Primavera Project Planner and Primavera  P6   Continuous experience with the Planning and Control System – Primavera since 1990. This also  includes Primavera P6 in EPC and EPCI Contracts   Long time experience from scheduling and monitoring projects, advisement and  implementation of PM tool (Primavera), establishing methods and routines, and finally  establish and incorporate both project structures and industrial standards in client projects   Maintenance of Primavera P6 database content   Establishing project control and planning procedures   Planning Manager – Shipbuilding   Project Management – Shipbuilding (hull) and other Mechanical Industry   Experience from system programming, implementation and integration of IT/IS maintenance  system within Norwegian heavy process industry   
  • 2. CV_201503_ENG_short.docx Page 2 of 6 Key Qualifications   Key expertise in Primavera scheduling system   Qualified and high level of expertise on the project control process   More than 10 years’ experience in oil and gas related projects with aspects to project  scheduling and monitoring   Long experience from also other related (construction projects) projects    Commitment and will to carry out the planning process for the approved policies and best  practice of the company   Contribute to innovation and improvement of internal processes and propose value‐adding  changes in the project execution   Ideas and visions for the presentation of the company's portfolio of projects in a  standardized and recognizable format (brand) for management and clients   Highly focused on the organization and structuring of all plan‐related information in  projects   Open, honest, clear and direct communication. As early as possible a dialogue with the  project team and the client when challenges occur    Transparently maintain good overview and proactively (Hands‐On), contributing to solutions  and ideas when challenges occur in the project execution   Quality and reliability to all plan‐related information is highly prioritized   Relationship‐building and team player to the project team and the client    Education    01/1984 ‐ 06/1984  Supplementary education at Møre and Romsdal Academy (MRIH) (1/2 years training within  Industry Economy, Project M., QA/QC, economy control, training IT/IS (10 – weight points)  08/1981 ‐ 06/1983  Engineer Education ‐ Operational Machinery at Gjøvik Academy (GIH).  08/1980 ‐ 06/1981  Technical Vocational School ‐ at Gjøvik Technical High School (GTF)  08/1977 ‐ 06/1978  Technical College ‐ Machinery and Mechanical at Borgund College – 1 year  08/1971 ‐ 06/1974  High School – 3 years  08/1969 ‐ 06/1970  Secondary Modern School – 1 year  08/1962 ‐ 06/1969  Primary School – 7 years  Attended courses    08/2007 ‐ 10/2007  Applied Project Planning and Control – Metier Academy E‐Learning (5 ‐ weight points)  06/2007 ‐ 08/2007  Essential Project Management – Metier Academy E‐Learning (5 ‐ weight points)  09/2005  SAP Project Module / Document Module  01/2002  Training document control – ProArc  01/1985 ‐ 03/2003  Different kind of training within PM, system programming and other     
  • 3. CV_201503_ENG_short.docx Page 3 of 6 Work experience  01/2015 – present      ABB AB Offshore Wind Connections  Consultant Project Control – Self‐employed Project     The assignment as Lead Offshore Planner in ABB OWC was signed ultimo November 2014. The  commencement date for the assignment was early January 2015. Urgent nature of content is  the responsibility for all related activities of planning and scheduling for the tow‐out, set‐down,  installation, HV Energizing and commissioning of the HVDC platform DolWin Beta. ABB’s  contractual client is the Dutch/German company TenneT Offshore GmbH.  Principal contractor – Navartis Ltd on behalf of ABB AB Offshore Wind Connections.    The assignment at ABB OWC includes responsibility for the planning and monitoring of all  offshore operations, in connection with the installation, hook‐up and completion of the DolWin  Beta HVDC platform. In addition to the offshore operations, the assignment includes  management and control of personnel on board (POB), as well as coordination of vessels in  connection with cable pull‐in and other vessel‐related operations until trial test periods and  final handover to the customer – TenneT Offshore GmbH. Primavera P6 is used as the planning  tool at ABB OWC.     01/2013 – 09/2014    Siemens Oil & Gas ‐ Subsea  Consultant Project Control – Self‐employed Project     The assignment as Senior Planner in the Siemens Energy ‐ Subsea was signed 1st  of January  2013. Urgent nature of content is the responsibility for all related activities of planning and  scheduling, monitoring and control of cost, time and resources in an internal development  project – Power Grid Development.  Principal contractor ‐ Metier Project Resources AS on behalf of Siemens.    The assignment in Siemens includes planning, monitoring and control of cost, time and  resources in an internal development project. The mission includes the improvement of  internal procedures for change orders, baseline revisions/audits, reporting, transactions of  hours and costs between SAP and Primavera P6. The mission also includes participation in the  improvement of Siemens’ procedures and routines for the execution of projects. The tasks  further includes consultancy through creation of global standard reporting, integration of the  Siemens project execution model in master plans, as well as contributing to improved structure  and organization by the creation of global standards (calendars, activity codes, resource  organization and more in Primavera P6).    10/2012 – 12/2012    Aker Solutions ‐ MMO  Consultant Project Control – Self‐employed    The assignment as Planning Responsible in Aker Solutions MMO ‐ Concept & Technology in  Trondheim was signed 1st  of October 2012. Urgent nature of content was planning support in  studies mostly aimed at offshore installations on the Norwegian continental shelf. Principal  contractor – Aker Advantage AS on behalf of Aker Solutions.    Established portfolio control in the planning system SAFRAN Project Planner for Concept &  Technology in Trondheim. Implementation of improved routines and default planning  templates and planning reports for internal projects. Planning and monitoring of study projects  classified as either A, B, C, or D. Establishment of standard plan templates for completion of  study projects. Integration of Aker Solutions project execution model – PEM in plan templates.  Support to study leaders in the plan and plan preparation. Reporting to the study leaders and  management in Concept & Technology.   
  • 4. CV_201503_ENG_short.docx Page 4 of 6 08/2005 – 09/2012    Aker Solutions ‐ Subsea  Consultant Project Control – Self‐employed    The assignment as Senior planning engineer in Aker Solutions – Subsea Lysaker/Fornebu was  signed in august 2005. The contract has since been renewed on several occasions during the  period 2005‐2012. Urgent nature of content was the role as Planning Lead in the execution of  Subsea customer projects. Principal contractors – Albatross Prosjektledelse, Westsoft  AS/Metier AS on behalf of Aker Solutions.    The assignment in Aker Solutions – Subsea has included assistance to planners as super user in  Primavera P6's preferred counseling, the use and exploitation of the planning system Primavera  P6. The Mission has also included the position as project planner in the Tie‐In department’s  individual projects. The commitment also included the creation of plan templates and  improvement of practices and procedures for the execution of client projects. In addition, I  have had the role as project planner in several projects in which plans the tender (quotation)  phase. Common to all the planning has been different planning positions in EPC contracts in  which Aker Solutions – Subsea supplies subsea systems to clients in the oil/gas sector.    From January 2011 to December 2012, I have been responsible (Project Manager) for an  internal (improvement) development project. The objective of this project has been to reduce  costs and streamline the planning processes through system integration between the ERP  system SAP and Primavera P6. This project also aims to achieve an efficiency of data flows and  ensure reliability of project information in both SAP and Primavera P6. In this development  project, I have also been responsible for the development of an additional software  module/application to Primavera P6. This software application was designed to be able to  present reports in Primavera P6 based on periodical past cumulated data (S‐curves, tabular  reports, etc.) according to standards in projects for the oil and gas industry.    In the period June 2010 – December 2010 I have been responsible for the establishing of the  schedule, and following up on a guarantee project for BP. During the same period, I have also  established a number of standard templates, and documentation (manual) for improved  project planning and management of projects globally in Aker Solutions – Subsea.    In the period March 2010 – June 2010 I have been holding the role as Lead Planner in two other  EPC contracts; Trym and Oselvar for Dong Energy.    In the period March 2007 ‐ March 2010 I have been holding the role as Lead Planner in charge  of planning, tracking, and reporting in two EPC contracts (Morvin and Lavrans) for Statoil.     10/2004 ‐ 07/2005    FMC Technologies  Consultant Project Control – Self‐employed    Assignment as project planner in projects where the customer (s) required Primavera as  planning system. The contract was signed in October 2004. Principal Contractor – Ingeniør  Compagniet AS on behalf of FMC Technologies.    The assignment by FMC Technologies has been as super user on the planning system Primavera  Project Planner on several of FMC's subsea projects. In addition there have been established  new and improved practices for planning and monitoring using Primavera as PM tool in the  company.  Primavera is selected as the governing planning system for many of FMC's clients, like British BP  and French Total. In this context, I have been involved in both of the mentioned companies'  projects with assistance of consulting, planning and follow‐up of these under the direction of  FMC's deliveries to these. The projects have been typical EPC contracts which FMC has provided  complete subsea systems for exploration of oil/gas.  My involvement in FMC has included creating project templates for new projects and creating  new project plans in the quotation phase.   
  • 5. CV_201503_ENG_short.docx Page 5 of 6 07/2003 ‐ 09/2004    Pharmadule Emtunga AB  Consultant Project Control – Self‐employed    In July 2003 I established my own business (Project Consulting). I have since August 2003 been  engaged within a contract with a Swedish company in Gothenburg Sweden – Pharmadule  Emtunga AB. My role in this contract has been the responsible planner within project control  and management as Main Scheduler in project IE1030 – Clean Manufacturing Facility.    The project is based on modular construction and installation of a factory within  pharmaceutical industry placed in Cork – Ireland. The project is a typical   EPCI contract. The  client is Eli Lilly S.A. – an American pharmaceutical company. My contract range from planning  and scheduling the whole project throughout all project phases form detail design throughout  commissioning and turnover. The planning tool in this project is Primavera Project Planner. MS  Office is used as support tools to produce add on graphs and other documentation required in  the project.     01/1995 ‐ 06/2003  Metier AS (Formerly West Soft AS)  Senior Consultant Project Control    Employment in West Soft AS ‐ Senior consultant Project management. During this period in  West Soft AS, I have been engaged in many types of projects and within many different kind of  companies in Norway and Scandinavia.  My work experience as consultant in West Soft AS has been many and different in a wide range  aspect within project control as; senior planner, planner, advisor and consultant within the  whole business area ‐ project control. I have worked with and implemented project structures  and project management systems (Primavera®). I have been responsible for making training  manuals and trained end users both external and internal. I have also worked with customer  support in Norway on Primavera®. I have also made customer manuals for project operating  (planning and monitoring projects ‐ methods/rules).    Some engagement to mention here is; Complete schedules for a new Paper Plant (Turn Key) in  Asia. Early project analysis, consulting and implementation of complete project management  system (methods/routines) within many engineering companies (shipbuilding, environmental  gas handling and modification project ‐ oil/gas). Implementation of enterprise‐based project  management, established structures and developed a method for the feasibility analysis and  after estimate based on industry standards by several Norwegian shipyards. Consulting, project  structures, and planning for larger land‐based development project. Operational planning  (FPSO) of oil and gas extraction/& exploration drilling for Norwegian oil company. Experience  from larger modification project (Statoil ‐ Heidrun) as senior planner by Halliburton/VM  Alliansen in Stavanger – Norway.  Engagement in the following companies;  Kværner Pulping AB, Kværner Oil & Gas, DSND Subsea AS, Rolls Royce (Vickers Marine AS),  Academy i Ålesund, Academy i Agder, Jernbaneverket (NSB), Norsk Hydro AS (Rafnes), SAGA  Petroleum ASA, Sør Trøndelag Fylkeskommune (St. Olavs Hospital – New Regional Hospital in  Trondheim), Kværner Florø AS, Halsnøy Verft, Myklebust Mek.Verksted, A/S Stålprodukter –  (Crane and Lifting Equipment), ALSTOM Power Norway AS (earlier ABB Miljø – Industrial  Division), Halliburton / VM Alliansen, Other Mechanical Industries   
  • 6. CV_201503_ENG_short.docx Page 6 of 6 11/1992 ‐ 12/1994  Nordfjord Skipsindustri A/S  Planning Manager    Employment in Nordfjord Skipsindustri A/S as Planning Manager. Responsible for planning,  monitoring and complete reports in all projects (hull construction – shipbuilding). Responsible  for public reports to National Bureau of Statistics in Norway. Preparation of manufacturing  budgets and general budget work according to production capacities and new projects. Also  responsible for implementation of new methods and routines for PM including methods for  earned value according to public industrial standards. Responsible for complete and approved  work drawings (archiving and issues) and monitoring of all variances  Follow up of all steel weights used by the hull and monitoring all variances according to this.  Also Project Management in some projects including contacts with authorities, shipping  company, clarification authorities, other shipyards and sub suppliers.  At last to mention is the complete responsible to implement Primavera Project Planner as a PM  tool in the company. According to Primavera Project Planner I also had to establish methods for  planning and monitoring all projects. Responsible for all project reports to the management  board and finances/banks.    10/1990 ‐ 11/1992  Bismo Industrier A/S.  Project Manager  03/1988 ‐ 08/1990    Freelance    05/1985 ‐ 03/1988  TDP A/S  Maintenance Consultant  08/1984 ‐ 05/1985  Moelven Gruppen A/S  Detail Planner  06/1978 ‐ 06/1980  A.M. Liaaen A/S  Steelworker /Machinery Worker