SlideShare a Scribd company logo
1 of 5
Download to read offline
1977 Corrosion
Inhibitor
Petrochemical
Plants
Steel mills
Worked with
the laboratory
technician
developing &
evaluating
formulae
Ran field trails
at the BHP
blast furnace
Port Kembla
Developed the
IP strategy
Sent formula to
Company
headquarters
Completed
supply
agreements in
Australia and
Indonesia
Worldwide best seller
1978 Industrial
scale
inhibitor
Petrochemical
plants
Steel mills
Oil field water
injection
systems
Worked with
the laboratory
technician
developing &
evaluating
formulae
Ran field trails
at the BHP
blast furnace
Port Kembla
Developed the
IP strategy
Sent formula to
Company
headquarters
Completed
supply
agreements in
Australia
Worldwide best seller
1982 Power
station boiler
scale
inhibitor
Power stations Led 1st product
trial on a
Power Station
in Saudi Arabia
Proved
Low technical
risk and
increased ROI
Completed
supply
agreements
for this and
further Power
stations
Worldwide success
1986 Liquid
Flocculants
Zinc ore
mineral
processing
Prepared
technical
proposal
Led plant 3
day trial in
Thailand
Could not prove ROI was
outside the normal
statistical variation of the
plant
1989 Gas drying
Chemical
Offshore gas
production
Led the team
to install an
innovative
“real time”
supply chain
from field
demand in
Western
Australia to
chemical
production
scheduling in
Sydney to
transport
logistics
Recognised an a Gas
production and chemical
supply1st and best
practise
1990 Pour Point
Depressant
Oil field
production
Led
commercial &
technical
team to China
Prepared
evaluation
and
commercial
analysis
ROI was of value when oil
price reached USD 90 per
barrel
1991 Flocculants Mineral
processing
Led
commercial
evaluation
Proved ROI
Commercial success
Developed IP
strategy &
patent filing
Advised on
field trials
Completed
long term
supply
agreement
1992 Acid
Corrosion
inhibitor
Steel rolling
mills
Conducted
due diligent on
the patent &
the laboratory
evaluations
Led field trial
at AIS Port
Kembla
Could not prove ROI
outside the normal
statistical variation of the
rolling mill
1993 Solvent
Extraction
Copper ore
processing
Supervised the
preparation of
the technical
presentations
Supervised the
field trials
Completed
the
commercial
negotiations
Commercial success
1994 Starch based
packaging
material
Packaging
industry
Conducted
market
evaluation for
the
introduction of
starch based
filling material
to replace
polystyrene
Recommended licencing
of technology as
company ROI was below
the hurdle rates required
1995 Tapioca
based starch
Paper
machines
Conducted
technology
evaluation vs.
wheat &
potato
starches
Conducted
presentation
to Amcor
Proved ROI
Maryvale copy paper
machine commissioned
on tapioca starch
Led trials on
Amcor paper
machines in
Fairfield &
Maryvale
Completed
commercial
agreements
1996 Box board
adhesives
Paper
corrugating
machines
Evaluated
product vs.
industry leader
Prepared and
presented
technical
proposals
Led trial at
Carter Holt
Harvey site in
New Zealand
Gained supply
contract
Gained corrugating
machine market
1997 Coating resin Textile industry Reviewed
formulae &
technical
evaluation
Reviewed field
trials
Completed
supply
negotiation
A new soft fabric resin
2000
to
date
Innovation
fund raising
and
mentoring
Manufacturing
industries; IT;
medical
instruments;
Incubators –
Market Entry
workshops
RMIT Business
Planning
Competition
GMAA (Vic)
mentoring
Technology
Evaluated
projects worth
over $70
million
&
won grants /
investment for
+ $32 million
84% success rate for
Robert Weller & Associates
www.rwainnovate.com.au
fund audit for
the Federal
government
Water Fund
audit for the
industry
Links nalco.com nationalstarch.
com
akzonobel.com orica.com.au
unilever.com

More Related Content

What's hot

Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee ProjectsTales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Marco Silva
 

What's hot (15)

Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
 
Nuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate BrochureNuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate Brochure
 
Nuberg Company Profile
Nuberg Company ProfileNuberg Company Profile
Nuberg Company Profile
 
EPC LSTK Projects Portfolio
EPC LSTK Projects PortfolioEPC LSTK Projects Portfolio
EPC LSTK Projects Portfolio
 
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
 
Hydrogen Peroxide Plant Project -EXPERSON
Hydrogen Peroxide Plant Project -EXPERSON Hydrogen Peroxide Plant Project -EXPERSON
Hydrogen Peroxide Plant Project -EXPERSON
 
Hydrogen Peroxide Plants
Hydrogen Peroxide PlantsHydrogen Peroxide Plants
Hydrogen Peroxide Plants
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & Services
 
Loader
LoaderLoader
Loader
 
Mast Technology New Product Development Specialists
Mast Technology New Product Development SpecialistsMast Technology New Product Development Specialists
Mast Technology New Product Development Specialists
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
 
gavins cv (1)
gavins cv (1)gavins cv (1)
gavins cv (1)
 
Doing more with less - Duncan Whitfield, Smart desalination
Doing more with less - Duncan Whitfield, Smart desalinationDoing more with less - Duncan Whitfield, Smart desalination
Doing more with less - Duncan Whitfield, Smart desalination
 
Nuberg Engineering Corporate Overview
Nuberg Engineering Corporate OverviewNuberg Engineering Corporate Overview
Nuberg Engineering Corporate Overview
 
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee ProjectsTales from the Trenches – Leveraging Agile on Fixed Fee Projects
Tales from the Trenches – Leveraging Agile on Fixed Fee Projects
 

Similar to Rob Weller Innovation Timeline

CV SHAW Allan B. 2013_04 (1)
CV SHAW Allan B. 2013_04 (1)CV SHAW Allan B. 2013_04 (1)
CV SHAW Allan B. 2013_04 (1)
Allan Shaw
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
timmy o'donoghue
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
Rashid Iqbal
 
resume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressresume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adress
Michael Bartlett
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
Manoj Patel
 
Stuart Smith CV @ 2016
Stuart Smith CV @ 2016Stuart Smith CV @ 2016
Stuart Smith CV @ 2016
Stuart Smith
 
Cv Asa May 2008 Compl
Cv Asa May 2008 ComplCv Asa May 2008 Compl
Cv Asa May 2008 Compl
anwarsansari
 
HDO Corporate Presentation
HDO Corporate PresentationHDO Corporate Presentation
HDO Corporate Presentation
ranjit89
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
Mark Crame
 

Similar to Rob Weller Innovation Timeline (20)

CV SHAW Allan B. 2013_04 (1)
CV SHAW Allan B. 2013_04 (1)CV SHAW Allan B. 2013_04 (1)
CV SHAW Allan B. 2013_04 (1)
 
Trebble CV 2016
Trebble CV 2016Trebble CV 2016
Trebble CV 2016
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 
PARRY William
PARRY WilliamPARRY William
PARRY William
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
CV
CVCV
CV
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
Execution of Copper Rod Plant
Execution of  Copper Rod PlantExecution of  Copper Rod Plant
Execution of Copper Rod Plant
 
resume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressresume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adress
 
khaled-2
khaled-2khaled-2
khaled-2
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
 
Bairavan resume 2014 ds
Bairavan resume 2014 dsBairavan resume 2014 ds
Bairavan resume 2014 ds
 
Bairavan resume 2014 ds
Bairavan resume 2014 dsBairavan resume 2014 ds
Bairavan resume 2014 ds
 
Stuart Smith CV @ 2016
Stuart Smith CV @ 2016Stuart Smith CV @ 2016
Stuart Smith CV @ 2016
 
Cv Asa May 2008 Compl
Cv Asa May 2008 ComplCv Asa May 2008 Compl
Cv Asa May 2008 Compl
 
Iocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_reportIocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_report
 
HDO Corporate Presentation
HDO Corporate PresentationHDO Corporate Presentation
HDO Corporate Presentation
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 

Rob Weller Innovation Timeline

  • 1. 1977 Corrosion Inhibitor Petrochemical Plants Steel mills Worked with the laboratory technician developing & evaluating formulae Ran field trails at the BHP blast furnace Port Kembla Developed the IP strategy Sent formula to Company headquarters Completed supply agreements in Australia and Indonesia Worldwide best seller 1978 Industrial scale inhibitor Petrochemical plants Steel mills Oil field water injection systems Worked with the laboratory technician developing & evaluating formulae Ran field trails at the BHP blast furnace Port Kembla Developed the IP strategy Sent formula to Company headquarters Completed supply agreements in Australia Worldwide best seller
  • 2. 1982 Power station boiler scale inhibitor Power stations Led 1st product trial on a Power Station in Saudi Arabia Proved Low technical risk and increased ROI Completed supply agreements for this and further Power stations Worldwide success 1986 Liquid Flocculants Zinc ore mineral processing Prepared technical proposal Led plant 3 day trial in Thailand Could not prove ROI was outside the normal statistical variation of the plant 1989 Gas drying Chemical Offshore gas production Led the team to install an innovative “real time” supply chain from field demand in Western Australia to chemical production scheduling in Sydney to transport logistics Recognised an a Gas production and chemical supply1st and best practise 1990 Pour Point Depressant Oil field production Led commercial & technical team to China Prepared evaluation and commercial analysis ROI was of value when oil price reached USD 90 per barrel 1991 Flocculants Mineral processing Led commercial evaluation Proved ROI Commercial success
  • 3. Developed IP strategy & patent filing Advised on field trials Completed long term supply agreement 1992 Acid Corrosion inhibitor Steel rolling mills Conducted due diligent on the patent & the laboratory evaluations Led field trial at AIS Port Kembla Could not prove ROI outside the normal statistical variation of the rolling mill 1993 Solvent Extraction Copper ore processing Supervised the preparation of the technical presentations Supervised the field trials Completed the commercial negotiations Commercial success 1994 Starch based packaging material Packaging industry Conducted market evaluation for the introduction of starch based filling material to replace polystyrene Recommended licencing of technology as company ROI was below the hurdle rates required 1995 Tapioca based starch Paper machines Conducted technology evaluation vs. wheat & potato starches Conducted presentation to Amcor Proved ROI Maryvale copy paper machine commissioned on tapioca starch
  • 4. Led trials on Amcor paper machines in Fairfield & Maryvale Completed commercial agreements 1996 Box board adhesives Paper corrugating machines Evaluated product vs. industry leader Prepared and presented technical proposals Led trial at Carter Holt Harvey site in New Zealand Gained supply contract Gained corrugating machine market 1997 Coating resin Textile industry Reviewed formulae & technical evaluation Reviewed field trials Completed supply negotiation A new soft fabric resin 2000 to date Innovation fund raising and mentoring Manufacturing industries; IT; medical instruments; Incubators – Market Entry workshops RMIT Business Planning Competition GMAA (Vic) mentoring Technology Evaluated projects worth over $70 million & won grants / investment for + $32 million 84% success rate for Robert Weller & Associates www.rwainnovate.com.au
  • 5. fund audit for the Federal government Water Fund audit for the industry Links nalco.com nationalstarch. com akzonobel.com orica.com.au unilever.com