SlideShare a Scribd company logo
1 of 3
84 Turner Avenue
Whiteleas
SouthShields
NE34 8JG
Tel:07584664109
Email:grobson_123@hotmail.co.uk
Gavin Robson
Personalprofile
A time served confident Plater trained in all aspects of heavy and light plate work. I am self-
motivated and have outstanding attendance and timekeeping and always looking to advance my
skills and knowledge further to precede myself and employer. I have the skills and knowledge to
work independently or as part of a team. Strong back ground of Oil and Gas, Ship Repair, Ship
Building and Heavy Fabrication.
Qualifications
 City & Guilds Level 3 Certificated in Engineering (Fabrication and Welding)
 NVQ Level 2 Performing Engineering Operations
 NVQ Level 3 Fabrication and Welding
 RUK/GWO sea survival and employment package
Training
 Slinging
 Abrasive wheels
 Manual Handling
 Working at height
 Confined space
 Dumpy level
 Asbestos Awareness Category A
 Brake press
 Rolls
 Guillotine
 Oxy propane/acetylene burning
Experience
OGN North Sea ltd January 2014-april 2015
I worked in the shed when I first started working at OGN on the caisson for a jacket they had in
Talisman. I was transferred from there to the Enquest Producer FPSO project. I was working to
permit to work systems and confined space when working on the Enquest Producer. I done a lot
of repair work in the tanks and added a lot of extra stiffening to the tank tops. I was then
transferred to the build of the jacket fitting caissons and tubular. I then worked on the shell
Kvaerner project which was an expansion for a Norwegian oil and gas plant.
A and P Tyne august 2013- January 2014
Worked on the aircraft carrier project fitting bulkhead, stiffing bars deck inserts. Also worked on
the panel line fitting stiffing bars to decks and bulkheads.
Global energy resources June 2013 – august 2013
I worked at nigg bay on these dates for the Bryn hill project which was a bluewater FPSO which
was overseen by AMEC. On this project I was stripping the old deck down ready for a new
manifold system to be installed to acidometer a new oil pipe line.
Global energy resources march 2013 – may 2013
I got a start at nigg bay working for global energy resources on the 704 Rig. On this rig I was
taking the old steel out that was inadequate and replacing it with new steel on different sections
of the rig. I was also involved in replacing the lift shafts in the legs of the rig.
2008 - 2012 A&P Group Hebburn yard
I started my apprenticeship at 16 and finished it when I was 20. I have done a bit of everything
throughout my time there. I was working in the shed for a few months at a time then getting
moved onto the ship for a further few month and this went on all through my time at A&P Tyne.
References:
Steve Harrison
Technical training & education manager
07872 870 274
gavins cv (1)

More Related Content

Viewers also liked

Actividad de aprendizaje. evaluacion de desempeño
Actividad de aprendizaje. evaluacion de desempeñoActividad de aprendizaje. evaluacion de desempeño
Actividad de aprendizaje. evaluacion de desempeñoYoland Mc
 
компьютер 5
компьютер 5компьютер 5
компьютер 5vampir3424
 
Solutions to 13 biggest finance problems vie
Solutions to 13 biggest finance problems  vie Solutions to 13 biggest finance problems  vie
Solutions to 13 biggest finance problems vie hoangvanhoa
 
Data structure output 1
Data structure output 1Data structure output 1
Data structure output 1Balaji Thala
 
Skuad juve
Skuad juveSkuad juve
Skuad juvedaddhy04
 
Apache Kylin Introduction
Apache Kylin IntroductionApache Kylin Introduction
Apache Kylin IntroductionLuke Han
 
Manhattan research knowledge bite
Manhattan research knowledge biteManhattan research knowledge bite
Manhattan research knowledge biteIlya Kupriyanov
 

Viewers also liked (10)

Actividad de aprendizaje. evaluacion de desempeño
Actividad de aprendizaje. evaluacion de desempeñoActividad de aprendizaje. evaluacion de desempeño
Actividad de aprendizaje. evaluacion de desempeño
 
компьютер 5
компьютер 5компьютер 5
компьютер 5
 
Solutions to 13 biggest finance problems vie
Solutions to 13 biggest finance problems  vie Solutions to 13 biggest finance problems  vie
Solutions to 13 biggest finance problems vie
 
Data structure output 1
Data structure output 1Data structure output 1
Data structure output 1
 
Tema 5a. franquisme
Tema 5a. franquismeTema 5a. franquisme
Tema 5a. franquisme
 
Skuad juve
Skuad juveSkuad juve
Skuad juve
 
визитка.2
визитка.2визитка.2
визитка.2
 
Apache Kylin Introduction
Apache Kylin IntroductionApache Kylin Introduction
Apache Kylin Introduction
 
Lee mens jackets aw-2010
Lee mens jackets aw-2010Lee mens jackets aw-2010
Lee mens jackets aw-2010
 
Manhattan research knowledge bite
Manhattan research knowledge biteManhattan research knowledge bite
Manhattan research knowledge bite
 

Similar to gavins cv (1)

Graham craig new.CV
Graham craig new.CVGraham craig new.CV
Graham craig new.CVGraham Craig
 
Dean_Lee_Spellman_CV.
Dean_Lee_Spellman_CV.Dean_Lee_Spellman_CV.
Dean_Lee_Spellman_CV.Dean Spellman
 
HARETHS NEW CV
HARETHS NEW CVHARETHS NEW CV
HARETHS NEW CVh haizan
 
Resume-L-van-Vegten-linkedin
Resume-L-van-Vegten-linkedinResume-L-van-Vegten-linkedin
Resume-L-van-Vegten-linkedinLucien van Vegten
 
Davie Milligan CV Feb 17
Davie Milligan CV Feb 17Davie Milligan CV Feb 17
Davie Milligan CV Feb 17Davie Milligan
 
Profile hads cv final
Profile hads cv finalProfile hads cv final
Profile hads cv finalhadleecap
 
Christopher Percival CV compatable
Christopher Percival CV compatableChristopher Percival CV compatable
Christopher Percival CV compatableChris Percival
 
Dean Smith CV.18-05-16
Dean Smith CV.18-05-16Dean Smith CV.18-05-16
Dean Smith CV.18-05-16Dean Smith
 
Anthony Hughes CV word
Anthony Hughes CV wordAnthony Hughes CV word
Anthony Hughes CV wordAnthony Hughes
 
Anthony Hughes CV word
Anthony Hughes CV wordAnthony Hughes CV word
Anthony Hughes CV wordAnthony Hughes
 
wally's july 2015 CV
wally's july 2015 CVwally's july 2015 CV
wally's july 2015 CVwally peel
 
Graham Hall cv 2015
Graham Hall cv 2015Graham Hall cv 2015
Graham Hall cv 2015Graham Hall
 
Stewart-Ryan-CV and Covering letter
Stewart-Ryan-CV and Covering letterStewart-Ryan-CV and Covering letter
Stewart-Ryan-CV and Covering letterstewart ryan
 

Similar to gavins cv (1) (20)

Graham craig new.CV
Graham craig new.CVGraham craig new.CV
Graham craig new.CV
 
Dean_Lee_Spellman_CV.
Dean_Lee_Spellman_CV.Dean_Lee_Spellman_CV.
Dean_Lee_Spellman_CV.
 
HARETHS NEW CV
HARETHS NEW CVHARETHS NEW CV
HARETHS NEW CV
 
Resume-L-van-Vegten-linkedin
Resume-L-van-Vegten-linkedinResume-L-van-Vegten-linkedin
Resume-L-van-Vegten-linkedin
 
2016 CV2.doc 2
2016 CV2.doc 22016 CV2.doc 2
2016 CV2.doc 2
 
Davie Milligan CV Feb 17
Davie Milligan CV Feb 17Davie Milligan CV Feb 17
Davie Milligan CV Feb 17
 
Profile hads cv final
Profile hads cv finalProfile hads cv final
Profile hads cv final
 
G_Mclennan_cv_2013
G_Mclennan_cv_2013G_Mclennan_cv_2013
G_Mclennan_cv_2013
 
Christopher Percival CV compatable
Christopher Percival CV compatableChristopher Percival CV compatable
Christopher Percival CV compatable
 
Paul Britton CV
Paul Britton CVPaul Britton CV
Paul Britton CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Mikes Updated CV 2015
Mikes Updated CV 2015Mikes Updated CV 2015
Mikes Updated CV 2015
 
Dean Smith CV.18-05-16
Dean Smith CV.18-05-16Dean Smith CV.18-05-16
Dean Smith CV.18-05-16
 
andrews c.v
andrews c.vandrews c.v
andrews c.v
 
Anthony Hughes CV word
Anthony Hughes CV wordAnthony Hughes CV word
Anthony Hughes CV word
 
Anthony Hughes CV word
Anthony Hughes CV wordAnthony Hughes CV word
Anthony Hughes CV word
 
wally's july 2015 CV
wally's july 2015 CVwally's july 2015 CV
wally's july 2015 CV
 
Graham Hall cv 2015
Graham Hall cv 2015Graham Hall cv 2015
Graham Hall cv 2015
 
CV final draft
CV final draftCV final draft
CV final draft
 
Stewart-Ryan-CV and Covering letter
Stewart-Ryan-CV and Covering letterStewart-Ryan-CV and Covering letter
Stewart-Ryan-CV and Covering letter
 

gavins cv (1)

  • 1. 84 Turner Avenue Whiteleas SouthShields NE34 8JG Tel:07584664109 Email:grobson_123@hotmail.co.uk Gavin Robson Personalprofile A time served confident Plater trained in all aspects of heavy and light plate work. I am self- motivated and have outstanding attendance and timekeeping and always looking to advance my skills and knowledge further to precede myself and employer. I have the skills and knowledge to work independently or as part of a team. Strong back ground of Oil and Gas, Ship Repair, Ship Building and Heavy Fabrication. Qualifications  City & Guilds Level 3 Certificated in Engineering (Fabrication and Welding)  NVQ Level 2 Performing Engineering Operations  NVQ Level 3 Fabrication and Welding  RUK/GWO sea survival and employment package Training  Slinging  Abrasive wheels  Manual Handling  Working at height  Confined space  Dumpy level  Asbestos Awareness Category A  Brake press  Rolls  Guillotine  Oxy propane/acetylene burning
  • 2. Experience OGN North Sea ltd January 2014-april 2015 I worked in the shed when I first started working at OGN on the caisson for a jacket they had in Talisman. I was transferred from there to the Enquest Producer FPSO project. I was working to permit to work systems and confined space when working on the Enquest Producer. I done a lot of repair work in the tanks and added a lot of extra stiffening to the tank tops. I was then transferred to the build of the jacket fitting caissons and tubular. I then worked on the shell Kvaerner project which was an expansion for a Norwegian oil and gas plant. A and P Tyne august 2013- January 2014 Worked on the aircraft carrier project fitting bulkhead, stiffing bars deck inserts. Also worked on the panel line fitting stiffing bars to decks and bulkheads. Global energy resources June 2013 – august 2013 I worked at nigg bay on these dates for the Bryn hill project which was a bluewater FPSO which was overseen by AMEC. On this project I was stripping the old deck down ready for a new manifold system to be installed to acidometer a new oil pipe line. Global energy resources march 2013 – may 2013 I got a start at nigg bay working for global energy resources on the 704 Rig. On this rig I was taking the old steel out that was inadequate and replacing it with new steel on different sections of the rig. I was also involved in replacing the lift shafts in the legs of the rig. 2008 - 2012 A&P Group Hebburn yard I started my apprenticeship at 16 and finished it when I was 20. I have done a bit of everything throughout my time there. I was working in the shed for a few months at a time then getting moved onto the ship for a further few month and this went on all through my time at A&P Tyne. References: Steve Harrison Technical training & education manager 07872 870 274