Summer Training Presentation
on Bitumen Road Work
SUBMITTED BY
Ritik Raj
1513200175
CONTENTS
 Introduction
 Equipment of Bitumen Plant
 Extra Widening
 Water Bound Macadam
 Operations
 Tests
PROJECT DETAILs
S.NO. PROJECT DETAIL DESCRIPTION
1. Project Name Extra widening & U-
Turn in NH-58
2. Site Location Raj Nagar Extension
3. Project Cost 4-5cr.
4. Project Head Er. C.P. Singh
5. Area Covered by Project 1 km
AGGREGATE MIXER AND BINS
Cleaning of aggregate
Bins having size 20mm 10mm
6mm and dust
AGGREGATE AND MIXING TANK
Aggregate of size 20mm, 10mm,
6mm
IT CONSIST OF TWO PARTS IN FIRST
HALF AGGREGTE MIXES AND IN
ANOTHER HALF HEAT IS
GENERATED
CONVEYER BELT AND L.D.O
IT IS USED TRANSFER THE
AGGREGATE INTO MIXING TANK
IT IS USED TO GENERATE THE
HEAT FOR MIXING TANK
TEMPERETURE METER AND CONTROL ROOM
IN WINTER-155˚C
IN SUMMER-150˚C
IT IS USED TO CONTROL THE
ALL PARTS OF PLANTS
On horizontal curves, especially when they are not of very large
radius it is a common practice to widen the pavement slightly more
than the normal width, the object of providing extra widening on
horizontal surface because of two reason-
1. An automobile such as car, bus or truck has a rigid wheel base
and only the front wheels can be turned. when the vehicle
takes a turn to negotiate a horizontal curve, the rear wheels do
not follow the same path as that of the front wheels. This
phenomenon is called off tracking.
2. At more than design speed if super elevation and lateral
friction jointly can not counteract the centrifugal force.
3. At a start of curves.
WATER BOUND MACADAM
 According to IRC
 The pavement base coarse made of crushed or broken aggregate
mechanically interlocked by rolling and voids filled by screening
and binding material with assistance of water.
 Aggregates are placed one over the other and binded them in
presence of water so it is called water bound macadam.
Layers Size
Sub base coarse 40-90mm
Base coarse 40-63mm
Surface 20-50mm
BITUMINOUS ROAD LAYER
PROCEDURE
 Preparation of sub grade
 Pavement construction
 Dry rolling (6ft, 10 tonne)
 Wet rolling
 Screening
 Filler material
 Surface finishing
Seal Coat: It is a thin surface treatment used to water
proof the surface and to provide skid resistance.
Tack Coat: It is a very light application of asphalt,
usually asphalt emulsion diluted with water. It provides
proper bonding between two layers of binder course and
must be thin, uniform cover the entire surface, and set
very fast.
Prime Coat: It is an application of low viscous cutback
bitumen to an absorbent surface like granular bases on
which binder layer is placed. Unlike tack coat, prime coat
penetrates into the layer below, plugs the voids, and forms
a water tight surface.
Objective-: To determine the binder content in the asphalt mix
Procedure -:
Heat the sample of core cutter until it become slurry
Weight the sample approx 700-1000gm
Weight the filler paper(3.5gm)
Wash the sample with benzene by putting inside bitumen extractor.
Placed the filter paper over the bowl of extraction apparatus.
Rotate the sample inside the extractor for few minutes and repeat the procedure one more time.
Dry the sample and weight it.
Calculation-:
Wt. of sample (w1)= 720 gm
Wt. of filter paper = 3.5 gm
Wt. of aggregate(w2)= 685 gm
After extraction wt. of filter paper=4.5 gm
Percentage of bitumen = 4.72%
Apparatus-:
Container, Needle, Water bath, Penetration apparatus
Time measuring device
Procedure-:
Preparation of test specimen
Pour into water bath tub
Cleaning of needle
Adjusting of needle
Release the needle
Adjust the penetration machine to measure the distance penetrated
Make at least 3 reading for accuracy
Reading-:
Test 1 65.4 mm
Test 2 69.8 mm
Test 3 66.5 mm
THANK YOU

More Related Content

What's hot

Process of manufacture of concrete
Process of manufacture of  concreteProcess of manufacture of  concrete
Process of manufacture of concreteManpreet Singh
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen Abhijeet Bhosale
 
Manufacturing of concrete
Manufacturing of concreteManufacturing of concrete
Manufacturing of concreteNarendra Yeruva
 
Presentation on Ready mix concrete production process
Presentation on Ready mix concrete production processPresentation on Ready mix concrete production process
Presentation on Ready mix concrete production processPRATYUS KUMAR
 
Pavement materials and testing
Pavement materials and testingPavement materials and testing
Pavement materials and testingArchana Shagoti
 
Crumb Rubber Modified Bitumen (CRMB)
Crumb Rubber Modified Bitumen (CRMB)Crumb Rubber Modified Bitumen (CRMB)
Crumb Rubber Modified Bitumen (CRMB)Ashwani Kumar
 
Manufacturing Process Of Fly Ash Bricks
Manufacturing Process Of Fly Ash BricksManufacturing Process Of Fly Ash Bricks
Manufacturing Process Of Fly Ash BricksNitendra Kumar Singh
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICEFresher Thinking
 
Cold mix bituminous plant
Cold mix bituminous plantCold mix bituminous plant
Cold mix bituminous plantpradip dangar
 
Process of manufacturing of concrete
Process of manufacturing of concreteProcess of manufacturing of concrete
Process of manufacturing of concreteFayaz Ahamed A P
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumensrinivas2036
 
Lab 2 preparation of drilling mud of desired density.
Lab 2 preparation of drilling mud of desired density.Lab 2 preparation of drilling mud of desired density.
Lab 2 preparation of drilling mud of desired density.Awais Qureshi
 
Determining the ductility of bitumen
Determining the ductility of bitumenDetermining the ductility of bitumen
Determining the ductility of bitumenpradeep tiwari
 
Min and Max Density of soil
Min and Max Density of soilMin and Max Density of soil
Min and Max Density of soilAbhinav Kumar
 

What's hot (20)

Process of manufacture of concrete
Process of manufacture of  concreteProcess of manufacture of  concrete
Process of manufacture of concrete
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
 
Manufacturing of concrete
Manufacturing of concreteManufacturing of concrete
Manufacturing of concrete
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
 
Presentation on Ready mix concrete production process
Presentation on Ready mix concrete production processPresentation on Ready mix concrete production process
Presentation on Ready mix concrete production process
 
Bitumen
BitumenBitumen
Bitumen
 
Pavement materials and testing
Pavement materials and testingPavement materials and testing
Pavement materials and testing
 
Crumb Rubber Modified Bitumen (CRMB)
Crumb Rubber Modified Bitumen (CRMB)Crumb Rubber Modified Bitumen (CRMB)
Crumb Rubber Modified Bitumen (CRMB)
 
Manufacturing Process Of Fly Ash Bricks
Manufacturing Process Of Fly Ash BricksManufacturing Process Of Fly Ash Bricks
Manufacturing Process Of Fly Ash Bricks
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
 
Cold mix bituminous plant
Cold mix bituminous plantCold mix bituminous plant
Cold mix bituminous plant
 
Process of manufacturing of concrete
Process of manufacturing of concreteProcess of manufacturing of concrete
Process of manufacturing of concrete
 
Cmwm ppt
Cmwm pptCmwm ppt
Cmwm ppt
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 
Lab 2 preparation of drilling mud of desired density.
Lab 2 preparation of drilling mud of desired density.Lab 2 preparation of drilling mud of desired density.
Lab 2 preparation of drilling mud of desired density.
 
Asphalt Rubber Blend, Interaction, Properties and Test Methods
Asphalt Rubber Blend, Interaction, Properties and Test MethodsAsphalt Rubber Blend, Interaction, Properties and Test Methods
Asphalt Rubber Blend, Interaction, Properties and Test Methods
 
Viscosity test 3
Viscosity test 3Viscosity test 3
Viscosity test 3
 
Determining the ductility of bitumen
Determining the ductility of bitumenDetermining the ductility of bitumen
Determining the ductility of bitumen
 
Penetration test
Penetration testPenetration test
Penetration test
 
Min and Max Density of soil
Min and Max Density of soilMin and Max Density of soil
Min and Max Density of soil
 

Similar to Flexible Pavement

SUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTINGSUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTINGraish ansari
 
Construction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackConstruction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackNikhil Kumar
 
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...IRJET Journal
 
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITA presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITRiteshmani Tripathi
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxLaxmiNarayanGurung
 
Ground improvement techniques
Ground improvement techniquesGround improvement techniques
Ground improvement techniquesSravan Muguda
 
GRAPHENE OXIDE REINFORCED PORTLAND CEMENT
GRAPHENE OXIDE REINFORCED PORTLAND CEMENTGRAPHENE OXIDE REINFORCED PORTLAND CEMENT
GRAPHENE OXIDE REINFORCED PORTLAND CEMENTAniket Pateriya
 
USE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURING
USE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURINGUSE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURING
USE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURINGijiert bestjournal
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...chourasiya12345
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)y Sahaja
 
Concrete Technology
Concrete TechnologyConcrete Technology
Concrete TechnologyLove Sharma
 
Summer training report on soil testing experiments
Summer training report on soil testing experimentsSummer training report on soil testing experiments
Summer training report on soil testing experimentsashishcivil098
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxRipanJena
 
Drilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal AwlDrilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal AwlMuhammed Fuad Al-Barznji
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
Sizing in fabric manufacturing
Sizing in fabric manufacturingSizing in fabric manufacturing
Sizing in fabric manufacturingAman Pandey
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019David H Moloney
 
Miraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground ImprovementMiraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground ImprovementADFIAP
 

Similar to Flexible Pavement (20)

SUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTINGSUMMER TRAINING REPORTS OF SOIL TESTING
SUMMER TRAINING REPORTS OF SOIL TESTING
 
Construction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackConstruction of High Speed Highway and Test track
Construction of High Speed Highway and Test track
 
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
IRJET- Experimental Investigation of Paver Blocks using High Early Strenght C...
 
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITA presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
 
Guniting ppt.pptx
Guniting ppt.pptxGuniting ppt.pptx
Guniting ppt.pptx
 
Practical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptxPractical-of-Construction-Material.pptx
Practical-of-Construction-Material.pptx
 
Ground improvement techniques
Ground improvement techniquesGround improvement techniques
Ground improvement techniques
 
GRAPHENE OXIDE REINFORCED PORTLAND CEMENT
GRAPHENE OXIDE REINFORCED PORTLAND CEMENTGRAPHENE OXIDE REINFORCED PORTLAND CEMENT
GRAPHENE OXIDE REINFORCED PORTLAND CEMENT
 
USE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURING
USE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURINGUSE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURING
USE OF PAPER MILL SLUDGE AND COTTON WASTE IN CLAY BRICKS MANUFACTURING
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
Concrete Technology
Concrete TechnologyConcrete Technology
Concrete Technology
 
Summer training report on soil testing experiments
Summer training report on soil testing experimentsSummer training report on soil testing experiments
Summer training report on soil testing experiments
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
 
Drilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal AwlDrilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal Awl
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
Sizing in fabric manufacturing
Sizing in fabric manufacturingSizing in fabric manufacturing
Sizing in fabric manufacturing
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Miraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground ImprovementMiraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground Improvement
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

Flexible Pavement

  • 1. Summer Training Presentation on Bitumen Road Work SUBMITTED BY Ritik Raj 1513200175
  • 2. CONTENTS  Introduction  Equipment of Bitumen Plant  Extra Widening  Water Bound Macadam  Operations  Tests
  • 3. PROJECT DETAILs S.NO. PROJECT DETAIL DESCRIPTION 1. Project Name Extra widening & U- Turn in NH-58 2. Site Location Raj Nagar Extension 3. Project Cost 4-5cr. 4. Project Head Er. C.P. Singh 5. Area Covered by Project 1 km
  • 4. AGGREGATE MIXER AND BINS Cleaning of aggregate Bins having size 20mm 10mm 6mm and dust
  • 5. AGGREGATE AND MIXING TANK Aggregate of size 20mm, 10mm, 6mm IT CONSIST OF TWO PARTS IN FIRST HALF AGGREGTE MIXES AND IN ANOTHER HALF HEAT IS GENERATED
  • 6. CONVEYER BELT AND L.D.O IT IS USED TRANSFER THE AGGREGATE INTO MIXING TANK IT IS USED TO GENERATE THE HEAT FOR MIXING TANK
  • 7. TEMPERETURE METER AND CONTROL ROOM IN WINTER-155˚C IN SUMMER-150˚C IT IS USED TO CONTROL THE ALL PARTS OF PLANTS
  • 8. On horizontal curves, especially when they are not of very large radius it is a common practice to widen the pavement slightly more than the normal width, the object of providing extra widening on horizontal surface because of two reason- 1. An automobile such as car, bus or truck has a rigid wheel base and only the front wheels can be turned. when the vehicle takes a turn to negotiate a horizontal curve, the rear wheels do not follow the same path as that of the front wheels. This phenomenon is called off tracking. 2. At more than design speed if super elevation and lateral friction jointly can not counteract the centrifugal force. 3. At a start of curves.
  • 9. WATER BOUND MACADAM  According to IRC  The pavement base coarse made of crushed or broken aggregate mechanically interlocked by rolling and voids filled by screening and binding material with assistance of water.  Aggregates are placed one over the other and binded them in presence of water so it is called water bound macadam. Layers Size Sub base coarse 40-90mm Base coarse 40-63mm Surface 20-50mm
  • 11. PROCEDURE  Preparation of sub grade  Pavement construction  Dry rolling (6ft, 10 tonne)  Wet rolling  Screening  Filler material  Surface finishing
  • 12. Seal Coat: It is a thin surface treatment used to water proof the surface and to provide skid resistance. Tack Coat: It is a very light application of asphalt, usually asphalt emulsion diluted with water. It provides proper bonding between two layers of binder course and must be thin, uniform cover the entire surface, and set very fast. Prime Coat: It is an application of low viscous cutback bitumen to an absorbent surface like granular bases on which binder layer is placed. Unlike tack coat, prime coat penetrates into the layer below, plugs the voids, and forms a water tight surface.
  • 13. Objective-: To determine the binder content in the asphalt mix Procedure -: Heat the sample of core cutter until it become slurry Weight the sample approx 700-1000gm Weight the filler paper(3.5gm) Wash the sample with benzene by putting inside bitumen extractor. Placed the filter paper over the bowl of extraction apparatus. Rotate the sample inside the extractor for few minutes and repeat the procedure one more time. Dry the sample and weight it. Calculation-: Wt. of sample (w1)= 720 gm Wt. of filter paper = 3.5 gm Wt. of aggregate(w2)= 685 gm After extraction wt. of filter paper=4.5 gm Percentage of bitumen = 4.72%
  • 14. Apparatus-: Container, Needle, Water bath, Penetration apparatus Time measuring device Procedure-: Preparation of test specimen Pour into water bath tub Cleaning of needle Adjusting of needle Release the needle Adjust the penetration machine to measure the distance penetrated Make at least 3 reading for accuracy Reading-: Test 1 65.4 mm Test 2 69.8 mm Test 3 66.5 mm