Observations and
recommendations for a
safe and reduced risk
strategy
Orenco Podium
Plaza Loop Road
Opening/Use
• Our Safety Mission Statement:
• To create a safe work environment that influences the attitudes of all who enter our jobsites and send
a message of intolerance to taking risks that could lead to workplace injury. Our Company is
passionate about leading the industry by providing consistent leadership that changes the way
people look at their relationship to safety.
• We are dedicated to elevating safety standards beyond what the industry mandates by creating an
attitude of elevated awareness with regard to safety. Unnecessary risks are not tolerated; they are
identified and eliminated.
• Employees at every level are responsible and accountable for the success of the overall Project safety
program. Complete and active participation by everyone is necessary to achieve excellence in safety.
We promote an alert and competent state of awareness for all who step onto our jobsites.
• Our proactive collaborative approach provides our employees and subcontractors with the tools,
knowledge and resources they need to increase safety awareness and reduce risk on every project we
manage.
• There is nothing we do that is more important than safety. Safety is a journey we cannot travel alone.
We are all in this together and must work as a team to truly promote safety for all who work on and
visit our jobsites.
Company Safety Mission Statement
Basic Safety Rules
Everyone is responsible for safety on the project
and is empowered and required to take action to
eliminate a safety hazard. If you are unable to
correct the hazard yourself, report it to your
supervisor and Project Management.
• Original plans stated opening of the loop road prior to
actual knowledge of the logistical realities of the Orenco
Podium Construction…
• With the experience obtained through the construction
process at Central and East Podiums; the reality is that
buildings of this size require adequate room to facilitate
work and logistics.
• Based on recently completed projects, the amount of
working room required by the construction crews has been
established. Allowing public traffic and buses through this
construction zone is not prudent and is a departure from
stated corporate Company Safety Mission Statement.
Today’s Situation
• Original assumptions concerning the reality of
building logistics and access are no longer valid.
• Podium apartment buildings of this size and
scope require a considerable amount of room to
facilitate the construction process.
• The Construction Management Team evaluation
of size and scope of work was overly optimistic
and made worse by some unforeseen issues.
How Did We Get Here?
East Podium is scheduled for delivery middle of July, about
2.5 months and still has a hectic amount of activity on its
perimeter.
Building logistics, stocking & delivery items that require access to the side of
buildings based on our experience at Central and East Podium Canopies,
Drywall and Metal studs.
Drywall deliveries – double and triple trucks these are semi length trucks
that show up for full days at a time and require a considerable amount of
room for the outriggers on the boom truck and flatbeds.
Metal stud deliveries – same story but usually do not take a full day to
unload.
Actual Realities/Day to Day Logistics roofing Siding terra cotta, cabinets/
casework, appliances, windows / doors, pool foam and supplies, Gypcrete,
dehumidifying equipment, concrete pumping for pool, landscaping, tile and
stone, glazing/ window walls, don’t forget Murphy.
Pool & Roof foam arrives on a 53’semi truck and is loaded with
a forklift, Honey bucket services units can take 45 minutes &
neighborhood has imposed time restrictions.
Actual Realities/Day to Day Logistics
Loop Road constricts at both ends.
Actual Realities/Day to Day Logistics these are
photos of just how tight the West Podium site is.
Grease duct install requires flatbed trucks and crane
and take up large amount of room. They are about 45’
(feet) long.
Crane de-mobilization can take 2 days
and enormous amount of room.
City buses require both lanes for turn radius, lifts require
entire sidewalk, public is unaware of most dangers and
often will walk thru work zones.
"Damn the torpedoes! Four bells. Captain
Drayton, go ahead! Jouett, full speed!".
IS IT WORTH THE RISK OR SHOULD WE
REEVALUATE THE SITUATION
EXISTING SITE LOGISTICS PLAN
EFFECTIVE 07/01/2015
PROPOSED SITE LOGISTICS PLAN
EFFECTIVE 07/01/2015
• Assume nothing will go wrong, continue with the original plan and perilously expose
the public, Trimet and The Company to unnecessary risk.
• Change only the pedestrian route and leave the Trimet bus stop the same. The busing
pickup and drop off point on Cherry Drive is still working as it has for the past 6
months.
• The public and the drivers have become used to the new bus stops.
• Routing public through the center of the project along the east side of Central Podium
and across the Plaza to the Trimet Orenco Station Platform is a reasonable and
considerable improvement to the current route.
• There will be minimal cost incurred to route the traffic this way.
• Trimet holds public safety as its number one objective and certainly be understanding
the Company intent to maintain a high level of public safety.
• Orenco Podiums have had no major instance of public injury thus far, the altered plan
would ensure that remained so.
Available Options
Our Mission:
To create a safe work environment that influences the attitudes of all who enter our jobsites and send a
message of intolerance to taking risks that could lead to workplace injury. Our Company is passionate
about leading the industry by providing consistent leadership that changes the way people look at their
relationship to safety.
We are dedicated to elevating safety standards beyond what the industry mandates by creating an attitude
of elevated awareness with regard to safety. Unnecessary risks are not tolerated; they are identified and
eliminated.
Employees at every level are responsible and accountable for the success of the overall Company safety
program. Complete and active participation by everyone is necessary to achieve excellence in safety. We
promote an alert and competent state of awareness for all who step onto our jobsites.
Our proactive collaborative approach provides our employees and subcontractors with the tools,
knowledge and resources they need to increase safety awareness and reduce risk on every project we
manage.
There is nothing we do that is more important than safety. Safety is a journey we cannot travel alone. We
are all in this together and must work as a team to truly promote safety for all who work on and visit our
jobsites.
Company Safety Mission Statement
• Proceed with allowing pedestrian access through the project on the
east side of Central Podium only.
• Trimet bus stop remains the same until the work on the east elevation
is completed. Loop Road opens to Trimet bus traffic Dec. 01 2015.
• This allows a gradual public access improvement on July 01 2015.
• This dramatically reduces the risk exposure to The Company and
allows Trimet to show gradual improvement of conditions
culminating with the eventual Trimet park and ride parking inside of
West Podium June 2016.
Rick Sommerfeld
Project Superintendent
Recommendation

More Related Content

Viewers also liked

herzliyan-spring2016 (dragged)
herzliyan-spring2016 (dragged)herzliyan-spring2016 (dragged)
herzliyan-spring2016 (dragged)Carole Dwek
 
JABATAN FUNGSIONAL Perkenalan
JABATAN FUNGSIONAL PerkenalanJABATAN FUNGSIONAL Perkenalan
JABATAN FUNGSIONAL PerkenalanLuziana Tanjung
 
persengketaan wilayah
persengketaan wilayahpersengketaan wilayah
persengketaan wilayahAyu Aliyatun
 
Measuring adblockers impact on site performance
Measuring adblockers impact on site performanceMeasuring adblockers impact on site performance
Measuring adblockers impact on site performanceKaran Kumar
 
2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...
2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...
2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...Lutfi Arya
 
COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...
COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...
COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...AM Publications
 
Online Intelligent Semantic Performance Based Solution: The Milestone towards...
Online Intelligent Semantic Performance Based Solution: The Milestone towards...Online Intelligent Semantic Performance Based Solution: The Milestone towards...
Online Intelligent Semantic Performance Based Solution: The Milestone towards...AM Publications
 
Minibus userguide
Minibus userguideMinibus userguide
Minibus userguideppolportal
 
Matt Kapral Resume
Matt Kapral ResumeMatt Kapral Resume
Matt Kapral ResumeMatt Kapral
 
34444_M._Video_CSP.PDF
34444_M._Video_CSP.PDF34444_M._Video_CSP.PDF
34444_M._Video_CSP.PDFMark Eccles
 
SBA 8(a) Certification for Veteran & Minority Businesses
SBA 8(a) Certification for Veteran & Minority BusinessesSBA 8(a) Certification for Veteran & Minority Businesses
SBA 8(a) Certification for Veteran & Minority BusinessesMaria Asuelimen, MBA
 
Design, Modelling & Analysis of Safety Impact Guard for Heavy Duty Vehicle
Design, Modelling & Analysis of Safety Impact Guard for Heavy Duty VehicleDesign, Modelling & Analysis of Safety Impact Guard for Heavy Duty Vehicle
Design, Modelling & Analysis of Safety Impact Guard for Heavy Duty VehicleAM Publications
 
A Review on Analysis on Codes using Different Algorithms
A Review on Analysis on Codes using Different AlgorithmsA Review on Analysis on Codes using Different Algorithms
A Review on Analysis on Codes using Different AlgorithmsAM Publications
 
S0033291798006667a
S0033291798006667aS0033291798006667a
S0033291798006667aMapsy Psydz
 
Survey: Elliptic Curve Cryptography using Scalar Multiplication Algorithms
Survey: Elliptic Curve Cryptography using Scalar Multiplication AlgorithmsSurvey: Elliptic Curve Cryptography using Scalar Multiplication Algorithms
Survey: Elliptic Curve Cryptography using Scalar Multiplication AlgorithmsAM Publications
 

Viewers also liked (19)

HS letter of rec
HS letter of recHS letter of rec
HS letter of rec
 
herzliyan-spring2016 (dragged)
herzliyan-spring2016 (dragged)herzliyan-spring2016 (dragged)
herzliyan-spring2016 (dragged)
 
Genetic disesase
Genetic disesaseGenetic disesase
Genetic disesase
 
JABATAN FUNGSIONAL Perkenalan
JABATAN FUNGSIONAL PerkenalanJABATAN FUNGSIONAL Perkenalan
JABATAN FUNGSIONAL Perkenalan
 
persengketaan wilayah
persengketaan wilayahpersengketaan wilayah
persengketaan wilayah
 
Measuring adblockers impact on site performance
Measuring adblockers impact on site performanceMeasuring adblockers impact on site performance
Measuring adblockers impact on site performance
 
2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...
2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...
2. model pembelajaran tematik berbasis kelautan dan kemaritiman pada anak usi...
 
Ceylon tea industry
Ceylon tea industryCeylon tea industry
Ceylon tea industry
 
COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...
COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...
COMPARATIVE STUDY OF PAPR REDUCTION ON SPECTRUM AND ENERGY EFFICIENCIES USING...
 
Online Intelligent Semantic Performance Based Solution: The Milestone towards...
Online Intelligent Semantic Performance Based Solution: The Milestone towards...Online Intelligent Semantic Performance Based Solution: The Milestone towards...
Online Intelligent Semantic Performance Based Solution: The Milestone towards...
 
Minibus userguide
Minibus userguideMinibus userguide
Minibus userguide
 
Matt Kapral Resume
Matt Kapral ResumeMatt Kapral Resume
Matt Kapral Resume
 
34444_M._Video_CSP.PDF
34444_M._Video_CSP.PDF34444_M._Video_CSP.PDF
34444_M._Video_CSP.PDF
 
SBA 8(a) Certification for Veteran & Minority Businesses
SBA 8(a) Certification for Veteran & Minority BusinessesSBA 8(a) Certification for Veteran & Minority Businesses
SBA 8(a) Certification for Veteran & Minority Businesses
 
Design, Modelling & Analysis of Safety Impact Guard for Heavy Duty Vehicle
Design, Modelling & Analysis of Safety Impact Guard for Heavy Duty VehicleDesign, Modelling & Analysis of Safety Impact Guard for Heavy Duty Vehicle
Design, Modelling & Analysis of Safety Impact Guard for Heavy Duty Vehicle
 
Conflict management
Conflict managementConflict management
Conflict management
 
A Review on Analysis on Codes using Different Algorithms
A Review on Analysis on Codes using Different AlgorithmsA Review on Analysis on Codes using Different Algorithms
A Review on Analysis on Codes using Different Algorithms
 
S0033291798006667a
S0033291798006667aS0033291798006667a
S0033291798006667a
 
Survey: Elliptic Curve Cryptography using Scalar Multiplication Algorithms
Survey: Elliptic Curve Cryptography using Scalar Multiplication AlgorithmsSurvey: Elliptic Curve Cryptography using Scalar Multiplication Algorithms
Survey: Elliptic Curve Cryptography using Scalar Multiplication Algorithms
 

Similar to Orenco Podium Loop Road Safety Analysis

Mouchel Highways and Transportation - Careers
Mouchel Highways and Transportation - CareersMouchel Highways and Transportation - Careers
Mouchel Highways and Transportation - CareersNathan Taylor
 
Tri-Core Projects Statement of Qualifications
Tri-Core Projects Statement of QualificationsTri-Core Projects Statement of Qualifications
Tri-Core Projects Statement of QualificationsPaul Finnbogason
 
Tri-Core Projects - Statement of Qualifications
Tri-Core Projects - Statement of QualificationsTri-Core Projects - Statement of Qualifications
Tri-Core Projects - Statement of QualificationsPaul Finnbogason
 
Getting to know_total
Getting to know_totalGetting to know_total
Getting to know_totalElin Lim
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_VishakVishak Nambiar
 
Construction Company Profile template
Construction Company Profile template Construction Company Profile template
Construction Company Profile template jawad malik
 
ajay jain FINAL REPORT
ajay jain FINAL REPORTajay jain FINAL REPORT
ajay jain FINAL REPORTAJAY JAIN
 
Ici final report
Ici final reportIci final report
Ici final reportDevin Wong
 
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case studySafety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case studyManoj Aggarwal
 
Sincrono solutions Traffic and Transportation
Sincrono solutions Traffic and TransportationSincrono solutions Traffic and Transportation
Sincrono solutions Traffic and Transportationjitendra mane
 
APSE Direct News A hole in one
APSE Direct News   A hole in oneAPSE Direct News   A hole in one
APSE Direct News A hole in oneJosh Sweeney
 
The channel tunnel - Safety Management
The channel tunnel - Safety ManagementThe channel tunnel - Safety Management
The channel tunnel - Safety ManagementMilind_jagtap_
 
APM Corporate accreditation - Siemens
APM Corporate accreditation - SiemensAPM Corporate accreditation - Siemens
APM Corporate accreditation - SiemensTerry Heathcote
 

Similar to Orenco Podium Loop Road Safety Analysis (20)

Annexure A1
Annexure A1Annexure A1
Annexure A1
 
Mouchel Highways and Transportation - Careers
Mouchel Highways and Transportation - CareersMouchel Highways and Transportation - Careers
Mouchel Highways and Transportation - Careers
 
Tri-Core Projects Statement of Qualifications
Tri-Core Projects Statement of QualificationsTri-Core Projects Statement of Qualifications
Tri-Core Projects Statement of Qualifications
 
Tri-Core Projects - Statement of Qualifications
Tri-Core Projects - Statement of QualificationsTri-Core Projects - Statement of Qualifications
Tri-Core Projects - Statement of Qualifications
 
Air Energi - Integrated Project Solutions
Air Energi - Integrated Project SolutionsAir Energi - Integrated Project Solutions
Air Energi - Integrated Project Solutions
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
Getting to know_total
Getting to know_totalGetting to know_total
Getting to know_total
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_Vishak
 
TCI PRESENTATION
TCI PRESENTATIONTCI PRESENTATION
TCI PRESENTATION
 
Construction Company Profile template
Construction Company Profile template Construction Company Profile template
Construction Company Profile template
 
ajay jain FINAL REPORT
ajay jain FINAL REPORTajay jain FINAL REPORT
ajay jain FINAL REPORT
 
Ici final report
Ici final reportIci final report
Ici final report
 
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case studySafety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
 
Sincrono solutions Traffic and Transportation
Sincrono solutions Traffic and TransportationSincrono solutions Traffic and Transportation
Sincrono solutions Traffic and Transportation
 
GV Brochure 0716hh
GV Brochure 0716hhGV Brochure 0716hh
GV Brochure 0716hh
 
APSE Direct News A hole in one
APSE Direct News   A hole in oneAPSE Direct News   A hole in one
APSE Direct News A hole in one
 
engineering-africa
engineering-africaengineering-africa
engineering-africa
 
The channel tunnel - Safety Management
The channel tunnel - Safety ManagementThe channel tunnel - Safety Management
The channel tunnel - Safety Management
 
APM Corporate accreditation - Siemens
APM Corporate accreditation - SiemensAPM Corporate accreditation - Siemens
APM Corporate accreditation - Siemens
 
Green line profile
Green line profile Green line profile
Green line profile
 

More from Rick Sommerfeld

West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15Rick Sommerfeld
 
VECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMINGVECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMINGRick Sommerfeld
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRick Sommerfeld
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRick Sommerfeld
 
George Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser CertificateGeorge Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser CertificateRick Sommerfeld
 
OSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWSOSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWSRick Sommerfeld
 
AGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWSAGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWSRick Sommerfeld
 
ITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWSITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWSRick Sommerfeld
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRick Sommerfeld
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRick Sommerfeld
 
West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14Rick Sommerfeld
 
West Podium .2015.05.18 schedule
West Podium .2015.05.18 scheduleWest Podium .2015.05.18 schedule
West Podium .2015.05.18 scheduleRick Sommerfeld
 
West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15Rick Sommerfeld
 
West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savings
West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savingsWest Podium Traffic Barrier and Entry Alternate Recommendation - 30k savings
West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savingsRick Sommerfeld
 

More from Rick Sommerfeld (20)

SCOTIA BANK PLAZA
SCOTIA BANK PLAZASCOTIA BANK PLAZA
SCOTIA BANK PLAZA
 
West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15West Podium EORM Safety Inspection 4-14-15
West Podium EORM Safety Inspection 4-14-15
 
VECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMINGVECTOR APARTMENTS WOOD FRAMING
VECTOR APARTMENTS WOOD FRAMING
 
SW CENTER
SW CENTERSW CENTER
SW CENTER
 
VECTOR APARTMENTS
VECTOR APARTMENTSVECTOR APARTMENTS
VECTOR APARTMENTS
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General Carpenter
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion Certification
 
UBC JOURNEYMAN CERT
UBC JOURNEYMAN CERTUBC JOURNEYMAN CERT
UBC JOURNEYMAN CERT
 
George Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser CertificateGeorge Brown College Transit Level Laser Certificate
George Brown College Transit Level Laser Certificate
 
OSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWSOSHA 500 CERTIFICATE RWS
OSHA 500 CERTIFICATE RWS
 
AGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWSAGC SUPERVISORY TRAINING CERTIFICATED RWS
AGC SUPERVISORY TRAINING CERTIFICATED RWS
 
ITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWSITT Tech Deans List Sept 2015 RWS
ITT Tech Deans List Sept 2015 RWS
 
ASSOCIATES DEGREE ITT
ASSOCIATES DEGREE ITTASSOCIATES DEGREE ITT
ASSOCIATES DEGREE ITT
 
RWS High School DIPLOMA
RWS High School DIPLOMARWS High School DIPLOMA
RWS High School DIPLOMA
 
RWS Qualification Certificate General Carpenter
RWS Qualification Certificate General CarpenterRWS Qualification Certificate General Carpenter
RWS Qualification Certificate General Carpenter
 
RWS Apprenticeship Completion Certification
RWS Apprenticeship Completion CertificationRWS Apprenticeship Completion Certification
RWS Apprenticeship Completion Certification
 
West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14West Podium Staging Plan 09.25.14
West Podium Staging Plan 09.25.14
 
West Podium .2015.05.18 schedule
West Podium .2015.05.18 scheduleWest Podium .2015.05.18 schedule
West Podium .2015.05.18 schedule
 
West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15West Look Ahead Schedule 03.31.15
West Look Ahead Schedule 03.31.15
 
West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savings
West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savingsWest Podium Traffic Barrier and Entry Alternate Recommendation - 30k savings
West Podium Traffic Barrier and Entry Alternate Recommendation - 30k savings
 

Orenco Podium Loop Road Safety Analysis

  • 1. Observations and recommendations for a safe and reduced risk strategy Orenco Podium Plaza Loop Road Opening/Use
  • 2. • Our Safety Mission Statement: • To create a safe work environment that influences the attitudes of all who enter our jobsites and send a message of intolerance to taking risks that could lead to workplace injury. Our Company is passionate about leading the industry by providing consistent leadership that changes the way people look at their relationship to safety. • We are dedicated to elevating safety standards beyond what the industry mandates by creating an attitude of elevated awareness with regard to safety. Unnecessary risks are not tolerated; they are identified and eliminated. • Employees at every level are responsible and accountable for the success of the overall Project safety program. Complete and active participation by everyone is necessary to achieve excellence in safety. We promote an alert and competent state of awareness for all who step onto our jobsites. • Our proactive collaborative approach provides our employees and subcontractors with the tools, knowledge and resources they need to increase safety awareness and reduce risk on every project we manage. • There is nothing we do that is more important than safety. Safety is a journey we cannot travel alone. We are all in this together and must work as a team to truly promote safety for all who work on and visit our jobsites. Company Safety Mission Statement
  • 3. Basic Safety Rules Everyone is responsible for safety on the project and is empowered and required to take action to eliminate a safety hazard. If you are unable to correct the hazard yourself, report it to your supervisor and Project Management.
  • 4. • Original plans stated opening of the loop road prior to actual knowledge of the logistical realities of the Orenco Podium Construction… • With the experience obtained through the construction process at Central and East Podiums; the reality is that buildings of this size require adequate room to facilitate work and logistics. • Based on recently completed projects, the amount of working room required by the construction crews has been established. Allowing public traffic and buses through this construction zone is not prudent and is a departure from stated corporate Company Safety Mission Statement. Today’s Situation
  • 5. • Original assumptions concerning the reality of building logistics and access are no longer valid. • Podium apartment buildings of this size and scope require a considerable amount of room to facilitate the construction process. • The Construction Management Team evaluation of size and scope of work was overly optimistic and made worse by some unforeseen issues. How Did We Get Here?
  • 6. East Podium is scheduled for delivery middle of July, about 2.5 months and still has a hectic amount of activity on its perimeter.
  • 7. Building logistics, stocking & delivery items that require access to the side of buildings based on our experience at Central and East Podium Canopies, Drywall and Metal studs.
  • 8. Drywall deliveries – double and triple trucks these are semi length trucks that show up for full days at a time and require a considerable amount of room for the outriggers on the boom truck and flatbeds. Metal stud deliveries – same story but usually do not take a full day to unload.
  • 9. Actual Realities/Day to Day Logistics roofing Siding terra cotta, cabinets/ casework, appliances, windows / doors, pool foam and supplies, Gypcrete, dehumidifying equipment, concrete pumping for pool, landscaping, tile and stone, glazing/ window walls, don’t forget Murphy.
  • 10. Pool & Roof foam arrives on a 53’semi truck and is loaded with a forklift, Honey bucket services units can take 45 minutes & neighborhood has imposed time restrictions.
  • 11. Actual Realities/Day to Day Logistics Loop Road constricts at both ends.
  • 12. Actual Realities/Day to Day Logistics these are photos of just how tight the West Podium site is.
  • 13. Grease duct install requires flatbed trucks and crane and take up large amount of room. They are about 45’ (feet) long.
  • 14. Crane de-mobilization can take 2 days and enormous amount of room.
  • 15. City buses require both lanes for turn radius, lifts require entire sidewalk, public is unaware of most dangers and often will walk thru work zones.
  • 16. "Damn the torpedoes! Four bells. Captain Drayton, go ahead! Jouett, full speed!".
  • 17. IS IT WORTH THE RISK OR SHOULD WE REEVALUATE THE SITUATION
  • 18. EXISTING SITE LOGISTICS PLAN EFFECTIVE 07/01/2015
  • 19. PROPOSED SITE LOGISTICS PLAN EFFECTIVE 07/01/2015
  • 20. • Assume nothing will go wrong, continue with the original plan and perilously expose the public, Trimet and The Company to unnecessary risk. • Change only the pedestrian route and leave the Trimet bus stop the same. The busing pickup and drop off point on Cherry Drive is still working as it has for the past 6 months. • The public and the drivers have become used to the new bus stops. • Routing public through the center of the project along the east side of Central Podium and across the Plaza to the Trimet Orenco Station Platform is a reasonable and considerable improvement to the current route. • There will be minimal cost incurred to route the traffic this way. • Trimet holds public safety as its number one objective and certainly be understanding the Company intent to maintain a high level of public safety. • Orenco Podiums have had no major instance of public injury thus far, the altered plan would ensure that remained so. Available Options
  • 21. Our Mission: To create a safe work environment that influences the attitudes of all who enter our jobsites and send a message of intolerance to taking risks that could lead to workplace injury. Our Company is passionate about leading the industry by providing consistent leadership that changes the way people look at their relationship to safety. We are dedicated to elevating safety standards beyond what the industry mandates by creating an attitude of elevated awareness with regard to safety. Unnecessary risks are not tolerated; they are identified and eliminated. Employees at every level are responsible and accountable for the success of the overall Company safety program. Complete and active participation by everyone is necessary to achieve excellence in safety. We promote an alert and competent state of awareness for all who step onto our jobsites. Our proactive collaborative approach provides our employees and subcontractors with the tools, knowledge and resources they need to increase safety awareness and reduce risk on every project we manage. There is nothing we do that is more important than safety. Safety is a journey we cannot travel alone. We are all in this together and must work as a team to truly promote safety for all who work on and visit our jobsites. Company Safety Mission Statement
  • 22. • Proceed with allowing pedestrian access through the project on the east side of Central Podium only. • Trimet bus stop remains the same until the work on the east elevation is completed. Loop Road opens to Trimet bus traffic Dec. 01 2015. • This allows a gradual public access improvement on July 01 2015. • This dramatically reduces the risk exposure to The Company and allows Trimet to show gradual improvement of conditions culminating with the eventual Trimet park and ride parking inside of West Podium June 2016. Rick Sommerfeld Project Superintendent Recommendation