Founded by Jerry Campbell in 1978, Trendsetter Construction, Inc. is a family owned business that
has continued to grow and thrive over the past thirty-five years. Our sustainability can be attributed to
our ability to adapt and respond to the changing market demands while retaining our reputation as an
honest and dependable company.
Trendsetter Construction, Inc. provides a vast array of services and solutions for the Oil and Gas
industry, Petrochemical, including pipeline construction and excavation. Trendsetter also serves the
general public through excavation contracting and recycling green waste into mulch products. With a
vast array of services, Trendsetter has the knowledge and experience to handle almost any project.
Trendsetter believes that our employees are one of the key components to providing superior
services. We are committed to promoting and investing in safety, education and advanced training to
further our personnel and create the best construction crews in the industry.
➢ 1978- Jerry Campbell Construction was formed
○ Primarily worked in Residential and Commercial Construction
➢ 1987-Name Changed to Trendsetter Construction
➢ 1998-Entered into Oilfield Industry
○ Primarily in well site construction
➢ 2002-Starting into Specialty Grading
○ Highly technical grading applications for sports field industry
➢ 2005-Started into the Pipeline Industry
➢ 2007-Started into the Recycling Industry
➢ 2010-Started providing services in PSM Facilities
➢ 2010-Started into the Surveying Industry
➢ 2012-Added Southern Survey to the Team
➢ 2014-Added CAD Drafting Services for Piping-P&ID
200+ FULL TIME
EXPERIENCED EMPLOYEES
•Joel Campbell, President
•Robert Campbell, Vice-President
•Shirley Campbell, Secretary
•Dodie Harris, Operation’s Supervisor
•Stephen Noble, Supervisor
•David Cruce- Safety Coordinator
GLADEWATER,TX
• Roger Davidson, Supervisor
• Luis Esqueda, Supervisor
• Justin Furqueron, Supervisor
• Jeff McCurry, Supervisor
• Dale Hively-Safety Coordinator
CARTHAGE,TX
• Joe Glover, Supervisor
• Safety and Recycling DirectorTYLER, TEXAS
• Danny Kees, Supervisor
• Justan Olsteen, Safety Coordinator
CRYSTAL CITY,
TEXAS
OFFICE LOCATIONS AND
SUPERVISORS
Labor Operators Drivers
Supervisor-
Project
Manager
SafetySafety
Upper
Management
Foreman Foreman
Organizational Chart
Plant Services Excavation Services
Pipeline Services Recycling ServicesSafety
Southern Survey
Safety Record Safety Incentives
Safety Equipment Safety Manual
Employee Training
END
Main
• Custom Written Safety Manual
• Implementation
• Admin Support
• Continuously Updated
Safety ManualThe Safety Policy of Trendsetter Construction, Inc. is designed to comply with
the Standards of OSHA and endeavor to maintain a safe and injury / illness
free workplace.
The Safety Policy supports six fundamental means of maximum employee
involvement:
1. Management commitment to Safety
2. Daily, weekly, monthly safety meetings
3. Effective job safety training for all categories of employees
4. Job Safety Analysis (JSA’s) provided to all employees
5. Audio and/or Visual Safety presentations given at jobsites by Director,
Coordinator, and/or Supervisors
6. Various incentive awards for exemplary safety performance
Employee handbook provided
Employee EHS Handbook provided
Subcontractors EHS Handbook provided
Subcontractor's Qualification and Evaluation performed
Qualified Drivers MVR’s biannually on ALL Trendsetter Drivers (Fleet Alert)
Drug Testing Pre-Employment, Reasonable Suspicion, Random, Post Accident ENDMainSafety
Employee Training
• ISN
• PEC
• Cannon Safety
• Southland Safety
• VeriForce
• NCCER
• EWeb OQ
Along with our internal training policies and procedures, Trendsetter Construction Inc.
utilizes many outside third party training providers as needed.
Trendsetters safety staff includes:
Joe Glover - Safety Director
David Cruce - Safety Coordinator
Dale Hively - Safety Coordinator
Two in-house Safeland instructors (Joe Glover and David Cruce)
One in-house CPR First Aid instructor (David Cruce)
New Hire Safety Orientation
SSE Program
PEC Basic Orientation (Safeland)
PPE Hazard Assessment (As Needed)
Supervisor and Person In Charge CPR First Aid and DOT Substance Abuse Awareness
Training
Monthly Company Wide Safety Meetings
JSA’s Completed Daily and updated prior to each MOC
Hot Work, Confined Space, Excavation, General Work Permits completed as needed
H2S Training
Axiom Medical Consultants
ENDMainSafety
Safety Equipment (PPE)
• FRC’s Provided
• PPE Training
• Proper use
• Fit tests
• Z87+ lenses
• Inspection and replacement
Trendsetter Construction provides all employees with the necessary PPE to
safely conduct employees tasks and to mitigate any known hazards.
While engineering controls shall be the primary methods used to eliminate or
minimize hazard exposure in the workplace, PPE shall be employed to reduce
or eliminate personnel exposure to hazards when such engineering controls
are not practical or applicable.
Trendsetter utilizes many vendors to provide specialized PPE when needed but
for the more common everyday items all employees have access to our PPE
vending machines provided by HAGEMEYER NORTH AMERICA.
PPE Hazard assessments performed to identify specific PPE needed
Training on use, storage, inspection, cleaning, and limitations of specific PPE
ENDMainSafety
Safety Incentives
• Goal-Oriented
• Zero Incidents
• Recognition for Safe
Behaviors
It is company policy that accident prevention be a prime concern of all
employees.
This includes the safety and well being of our employees, subcontractors, and
customers, as well as the prevention of wasteful, inefficient operations, and
damage to property and equipment.
Trendsetter offers their employees a safety incentive program to reward and
encourage safe acts and behaviors.
Past Programs - Incident driven
Pressure to not report incidents from Managers and Employees
Fault Finding vs. Fact Finding Missions
Missed opportunities to introduce preventative measures
Revised programs - Leading Indicators
Rewarded for reporting safety violations
Making Safety Suggestions
Taking steps to remedy unsafe situations
Turning in safety observation cards
Volunteering for Safety Committee ENDMainSafety
Safety Record
• Stop Work Authority
• ‘Accurate Record Keeping
• Full Time Safety Staff
• Safety Training
• Management Intervention
“There is not a task to be performed, a job to be completed, or a situation so
urgent that the proper safety procedures cannot be followed to maintain the
Health, Safety, and well being of the people and environment we serve that well
exceed the value of the dollar.”
Trendsetter Construction, Inc. manages its operations in a manner consistent with
our core values to protect the Health and Safety of our employees and maintain
compliance with all applicable Environmental, Health, and Safety laws, regulations
and internal standards.
At TCI we are committed and more importantly engaged in all aspects of
employee, contractor, and public safety. It’s not always easy to find the proper
balance to run a profitable business, meet customer/consumer demands, operate
facilities safely, and protect the public and environment, but it can be
accomplished. Our team at TCI accomplishes this by not only creating a safety
culture but by encouraging and demanding management intervention.
Trendsetter Construction is committed and engaged in the process of conducting
its business lawfully, ethically, and in an environmentally responsible manner. We
believe that maintaining the highest expectations and fulfilling these
responsibilities will assist us in reaching not only our business goals, but our moral
obligation to our customers and the communities we serve as well. ENDMainSafety
Safety Record
• Stop Work Authority
• ‘Accurate Record Keeping
• Full Time Safety Staff
• Safety Training
• Management Intervention
Trendsetter Construction takes great pride providing a safe, drug free
environment for its employees and the companies we serve.
Safety Record to date:
3 year average # of employees - 191
Safe Work Hours - 522,842
Safe Work Days - 347
Vehicle Incident Rate 3 year - 0.75
Lost Workday Rate 3 year - 2.95
Lost Time Day Rate 3 year - 0.14
Last 4 Quarters and 2 year TRIR - 0.77
Current 3 year TRIR (Total Recordable Incident Rate) - 0.70
ENDMainSafety
MaintenanceNew Construction
Retrofitting Decommissioning
END
Main
New Construction
• Planning and Logistics
• Civil Construction
• Fabrication & Hot Work
• Testing
• Commissioning
• Utilities
TCI Facility Services can provide the personnel and equipment to build a one
off storage or piping addition to a complex facility. Each New Construction
project is approached from a Safety standpoint and is key through our
building process from site preparation to hand off.
TCI recognizes communication to be a crucial part of planning new
construction within existing facilities. TCI effectively collaborates and develops
planning to meet construction deadlines with utmost care for safety.
ENDMainPlant
Maintenance
• Aid in Inspection
• Emergency or Planned Repairs
• Blasting and Coating Services
• Bolt Up and Torque Services
• Valve and Spool Replacement
• Plant Shut-Downs
Trendsetter Construction employees are experienced and disciplined
personnel ready to aid with the daily requirements of maintaining a PSM
facility safely.
TCI can provide a rapid response to planned or emergency repairs of process
piping and utilities.
TCI has taken part of 50+ shutdowns in the past 7 years and has not had a
single safety incident.
Through proper planning of shut down activities, our crews work seamlessly
through the shutdown.
ENDMainPlant
Retrofit
• As-is Data Collection
• 3D Scans/Existing
• Collision detection w/ Plans
• Fabricating with Existing
Adding new technology or features to older systems can provide their own
challenges in building and integrating safely with existing systems. TCI can
provide the technology and experience to implement engineered designs with
existing plant infrastructure.
ENDMainPlant
Decommissioning
• Isolating
• Cleaning
• Dismantling
• Mobilization and Logistics
TCI can provide safe and reliable Plant Decommissioning in the scope of a full
plant decommission to sections or individual pieces/equipment. Great care is
taken with surrounding infrastructure to provide technical Decommissioning
services. Maintaining our own heavy equipment fleet which includes: cranes,
dozers, trackhoes, loaders and other various equipment.
ENDMainPlant
Mass Haul Water Pumping/Land Farming
Machine Control Excavation
Road & Maintenance
Soil Stabilization
END
Main
Mass Haul
• Preliminary Topo Surveys
• Site Quantity Verification-Site Balance
• GPS Machine Controlled Equipment
• Construction Stakeout
• Accurate Grading Capabilities
• Experienced Leadership
Using most up to date equipment and technology, project times are decreased
by operating at maximum efficiency with the synergy of other TCI
departments. With our diverse equipment fleet, we have the equipment to
perform projects small to large. We have the machinery and personnel to fit
the job. Each project is analyzed to qualify the most productive equipment for
the project prior to starting a project. Our skilled leadership also qualifies
each piece of equipment for site safety. With our skilled leadership, our
projects are properly planned and executed. Mass haul projects are managed
daily using the earth quantities per day to maximize productivity and ensure
project schedules are meet. Mass haul services coupled with our design team,
can drastically lower excavation costs. Design reviews prior to construction
highlight potential problem areas before the start of the project. This
minimizes downtime and increases efficiencies prior to start of construction.
In the event of a design change, Trendsetter has the ability to make real time
changes in the field without losing production.
ENDMainExcavation
Machine Control Excavation
GPS enabled Equipment
• D-4, D-6, D-7, and D-8 Dozers
• Excavators
• Motorgraders
• Push to Grade More Efficient
• Site Balance with Existing Dirt
With the addition of GPS Machine Control in 2010, it increased our production
on projects 30% and revolutionized our excavation service. Our experienced
operators can save time and money by quickly uploading project designs on
the equipment. This allows the operator from the cab to see the project. The
operator from his station, on his screen, can see buried lines, obstructions,
etc. due to the fact the machine models are loaded with the potential
obstructions. In addition, the design grading plan is uploaded as a .tin file and
machine automatically grades to the design elevations. This reduces the
potential for buried line strikes and increases productivity.
ENDMainExcavation
Water Pumping/Reclamation
• Lagoon Pumps
• Water Pumps
• Land Farming Mud
Trendsetter has the experience and equipment to perform lagoon/mud pit
closures. Specialty equipment is used to mix and remove heavier solids from
the pit and further remove the heavier materials. Those solids can be
distributed via pumps and land farmed onsite.
ENDMainExcavation
Road & Maintenance
• Road Construction
• Road Maintenance
• Dust Suppression
• Aggregate Supplier
Trendsetter has the ability to construct and maintain roads of any caliber.
Using GPS machine controlled equipment, project designs are put on the
ground with near perfect accuracy. Extensive experience with road
construction, TCI can aid designing a roadway to handle any payload
imageable. We have extensive experience at installing emulsions, aggregates,
road oil and many other topical products. With TCI’s buying power,
aggregates, road oils and asphalt are delivered to our customers at lower
prices than our competition.
ENDMainExcavation
Soil Stabilization
• Stabilizers
• Compactors
• Soil Testing
Trendsetter Construction has extensive experience in soil stabilization
technologies. Lime, soil cement, CKD, and Cem-Lime are a few of the
materials that are installed regularly by TCI. We have the necessary
equipment to perform any size project needed to give your project a firm
foundation.
ENDMainExcavation
Spatial Solutions Database Collection
Professional Survey ServicesConstruction Layout
3D Applications
UAV Applications
END
Main
Spatial Solutions
• Preliminary Topo Surveys
• As-is Data Collection
• Improved Concept Exhibits
• Workflow Consulting
Our clients depend on Southern Survey
and Design’s professional input to create
solutions in the form of feasibility
surveys and increased spatial analysis.
ENDMainSouthern
Database Collection
• Schema Adaptation
• Survey Grade Precision
• Subsurface Location
• Increased Attribution
• Data Quality Improvement
• Verify Legacy Data
• GIS Consulting and Applications
ENDMainSouthern
3D Applications
• Terrestrial LiDAR Collection
• Point Cloud Modeling
• Digital and Exhibit Deliverables
• As-Is Design Flow
ENDMainSouthern
Unmanned Aerial Vehicle
(UAV) Applications
• Remote Data Capture
integrate with GIS, CAD and
other formats
• Project Phase Imagery
• 4K resolution Video/Image
• Inspection Applications
ENDMainSouthern
Professional Survey Services
• Property Acquisition
• Easement Preparation
• Alignment Sheets
• CAD Drafting
Southern Survey and Design is
a Texas Registered Survey Firm
License No. 10177000 with two
full time RPLS on staff.
ENDMainSouthern
Construction Layout
• Local Area Control
• Site Calibration
• Applied Measurement and
Positioning
• Structural Demand Accuracy
• Preliminary Cut/Fill Stakeout
• “Blue Top” Grade Staking
• Pre-Pour Inspections
ENDMainSouthern
Pipeline Construction Pipeline Maintenance
END
Main
Pipeline Construction
• Pipeline construction up to
24”
• Horizontal Directional
Drilling
• Pipe Fabrication
• Filling and Dewatering
• Hydro-Testing
• Meter Stations
• Right-of-way clearing
• Civil
Trendsetter construction has over two decades of pipeline construction
experience. Our team of experienced trusted professionals will deliver your
project safely, on budget and on time.
Our team is dedicated to pipeline construction, and have installed various
pipelines up to 24” without damaging the integrity of the pipe. Trendsetter
has made this accomplishment possible by the experience of our team as well
as having the right equipment in place on each aspect of the pipeline.
Our team also includes qualified welders who are accurate and precise on
fabrication. They are able to build the fabrication to the exact specs that are
delivered.
Trendsetter provides an environmentally safe filling and dewatering process,
which includes using filter bags, testing water before filling and before
dewatering, and have the ability to dewater into frac tanks. When
hydrotesting we have a very safe and adequate procedure to protect the
integrity of the pipe and keep everyone safe.
ENDMainPipeline
Pipeline Maintenance
• Maintenance Pigging
• Painting and sandblasting
• Anomaly digs
• Right-of-way mowing
In- line inspection support
• Make-Ready and Fabrication
of launchers and receivers.
• Pipeline reconditioning
• Contract pipeline locators
• composite wraps and steel
sleeve installation.
Trendsetter Construction offers extensive menu of pipeline integrity services.
Let us show you how our experienced and efficient team members can help
deliver your next integrity project on budget, on time in a safe manner.
Trendsetter currently provides integrity services for several large midstream,
transmission companies. We are the trusted choice for all your integrity
projects.
Our team of trusted and respected employees stay up to date on current laws
regarding pipeline integrity repair methods. Trendsetter owns triplex pumps
for hydro-testing applications. We are your one stop shop for all integrity
projects.
ENDMainPipeline
Wood Waste Grinding
Material Screening Custom MulchLand Clearing
Material HandlingEnvironmental Stewardship
END
Main
Environmental Stewardship
Environmental stewardship and conservation have long been the focus of
Trendsetter Construction Inc. Since its conception in the mid 1970’s TCI has
always took full advantage of ways to reduce waste, increase efficiencies, and
sustain the natural beauty of the environment. Thanks in large part to our
Recycling Division we can fulfill our promise to create a natural environment
by grinding all green waste produced during our operations and incorporate
the mulch produced back into our operations as natural soil additives, natural
erosion control, even biomass fuel. Trendsetter Construction Inc. is focused
on meeting the demands of our customers in an environmentally responsible
manner. We know that today’s operations affect tomorrow’s environment. We
will go above and beyond state, local, and customer requirements to maintain
compliance and limit our operational footprint.
Green Waste Yards
Trendsetter owns and operates two green waste facilities permitted by the
TCEQ in east Texas. One in Tyer, opened in 2007, and most recently a new
facility in Longview opened in 2015.
• Waste Reduction
• Environmentally Friendly
• Go Green
ENDMainRecycle
Wood Waste Grinding
• Hogzilla Tub Grinders
• Grapple Excavators
• Grapple Rake Wheel
Loaders
• High Tip Wheel Loaders
Trendsetter Recycling Services can offer our customers a clean alternative to
burning and or hauling by utilizing our Hogzilla Tub Grinders to safely grind
and dispose of your on site green waste material.
1050 HP engines
Highest output in the industry
Skilled Operators
ENDMainRecycle
Material Handling
• Large Capacity Trucks
• Speedy Removal of ground
debris
Material produced from our operations are segregated according to size,
species or customer specifications. Some are sent straight to the mills for
biomass fuel, others are routed to one of our two facilities for further
processing.
100 yard Live Floor Trailers
40 yard box trucks
ENDMainRecycle
Material Screening
• 621 McCloskey Trommel
• Reduce Waste
• Minimize import and export
Screening materials on site can reduce export and import if required. Sizing
your spoil piles to as low as half inch minus can leave clean topsoil, mulch, or
sized aggregate for use on site as your job progresses.
Trommels are most effective on:
Yard Waste Compost — Usually dry enough for a Trommel;
Mulch — Can screen most any size;
Topsoil — Works very well for this as long as it is dry;.
Rock and Gravel --Can screen fines and unwanted soil
ENDMainRecycle
Land Clearing
• One Calls Cleared
• Clearing Limits Defined
• Overhead and Other Hazards
Recognized
• Experienced Operators
Trendsetter Recycling is a leader in the land clearing industry. While the
competition is still clearing and hauling and/or burning and burying, our
customers can rest assured that Trendsetter is handling and disposing of your
green waste material in a manner that not only complies with TCEQ standards
but is the most environmentally friendly manner possible.
ENDMainRecycle
Trendsetter Recycling offers a wide variety of quality custom mulches and
soils.
Our products include:
Hardwood Mulch Pine Bark Mulch Cedar Mulch
Single Grind Mulch Playground Mulch Growers Mix
Black Gold Compost Soil Conditioner Organic Topsoil
Custom Mulch
• Erosion Control
• Solidification Material
• Moisture Retention
• Weed Suppression
• Added Organics
• Growing Media
Raw Topsoil
ENDMainRecycle
WWW.TRENDSETTERCONSTRUCTION.COM
Saving our clients time and money with quality services

TCI PRESENTATION

  • 2.
    Founded by JerryCampbell in 1978, Trendsetter Construction, Inc. is a family owned business that has continued to grow and thrive over the past thirty-five years. Our sustainability can be attributed to our ability to adapt and respond to the changing market demands while retaining our reputation as an honest and dependable company. Trendsetter Construction, Inc. provides a vast array of services and solutions for the Oil and Gas industry, Petrochemical, including pipeline construction and excavation. Trendsetter also serves the general public through excavation contracting and recycling green waste into mulch products. With a vast array of services, Trendsetter has the knowledge and experience to handle almost any project. Trendsetter believes that our employees are one of the key components to providing superior services. We are committed to promoting and investing in safety, education and advanced training to further our personnel and create the best construction crews in the industry.
  • 3.
    ➢ 1978- JerryCampbell Construction was formed ○ Primarily worked in Residential and Commercial Construction ➢ 1987-Name Changed to Trendsetter Construction ➢ 1998-Entered into Oilfield Industry ○ Primarily in well site construction ➢ 2002-Starting into Specialty Grading ○ Highly technical grading applications for sports field industry ➢ 2005-Started into the Pipeline Industry ➢ 2007-Started into the Recycling Industry ➢ 2010-Started providing services in PSM Facilities ➢ 2010-Started into the Surveying Industry ➢ 2012-Added Southern Survey to the Team ➢ 2014-Added CAD Drafting Services for Piping-P&ID
  • 4.
  • 5.
    •Joel Campbell, President •RobertCampbell, Vice-President •Shirley Campbell, Secretary •Dodie Harris, Operation’s Supervisor •Stephen Noble, Supervisor •David Cruce- Safety Coordinator GLADEWATER,TX • Roger Davidson, Supervisor • Luis Esqueda, Supervisor • Justin Furqueron, Supervisor • Jeff McCurry, Supervisor • Dale Hively-Safety Coordinator CARTHAGE,TX • Joe Glover, Supervisor • Safety and Recycling DirectorTYLER, TEXAS • Danny Kees, Supervisor • Justan Olsteen, Safety Coordinator CRYSTAL CITY, TEXAS OFFICE LOCATIONS AND SUPERVISORS
  • 6.
  • 7.
    Plant Services ExcavationServices Pipeline Services Recycling ServicesSafety Southern Survey
  • 8.
    Safety Record SafetyIncentives Safety Equipment Safety Manual Employee Training END Main
  • 9.
    • Custom WrittenSafety Manual • Implementation • Admin Support • Continuously Updated Safety ManualThe Safety Policy of Trendsetter Construction, Inc. is designed to comply with the Standards of OSHA and endeavor to maintain a safe and injury / illness free workplace. The Safety Policy supports six fundamental means of maximum employee involvement: 1. Management commitment to Safety 2. Daily, weekly, monthly safety meetings 3. Effective job safety training for all categories of employees 4. Job Safety Analysis (JSA’s) provided to all employees 5. Audio and/or Visual Safety presentations given at jobsites by Director, Coordinator, and/or Supervisors 6. Various incentive awards for exemplary safety performance Employee handbook provided Employee EHS Handbook provided Subcontractors EHS Handbook provided Subcontractor's Qualification and Evaluation performed Qualified Drivers MVR’s biannually on ALL Trendsetter Drivers (Fleet Alert) Drug Testing Pre-Employment, Reasonable Suspicion, Random, Post Accident ENDMainSafety
  • 10.
    Employee Training • ISN •PEC • Cannon Safety • Southland Safety • VeriForce • NCCER • EWeb OQ Along with our internal training policies and procedures, Trendsetter Construction Inc. utilizes many outside third party training providers as needed. Trendsetters safety staff includes: Joe Glover - Safety Director David Cruce - Safety Coordinator Dale Hively - Safety Coordinator Two in-house Safeland instructors (Joe Glover and David Cruce) One in-house CPR First Aid instructor (David Cruce) New Hire Safety Orientation SSE Program PEC Basic Orientation (Safeland) PPE Hazard Assessment (As Needed) Supervisor and Person In Charge CPR First Aid and DOT Substance Abuse Awareness Training Monthly Company Wide Safety Meetings JSA’s Completed Daily and updated prior to each MOC Hot Work, Confined Space, Excavation, General Work Permits completed as needed H2S Training Axiom Medical Consultants ENDMainSafety
  • 11.
    Safety Equipment (PPE) •FRC’s Provided • PPE Training • Proper use • Fit tests • Z87+ lenses • Inspection and replacement Trendsetter Construction provides all employees with the necessary PPE to safely conduct employees tasks and to mitigate any known hazards. While engineering controls shall be the primary methods used to eliminate or minimize hazard exposure in the workplace, PPE shall be employed to reduce or eliminate personnel exposure to hazards when such engineering controls are not practical or applicable. Trendsetter utilizes many vendors to provide specialized PPE when needed but for the more common everyday items all employees have access to our PPE vending machines provided by HAGEMEYER NORTH AMERICA. PPE Hazard assessments performed to identify specific PPE needed Training on use, storage, inspection, cleaning, and limitations of specific PPE ENDMainSafety
  • 12.
    Safety Incentives • Goal-Oriented •Zero Incidents • Recognition for Safe Behaviors It is company policy that accident prevention be a prime concern of all employees. This includes the safety and well being of our employees, subcontractors, and customers, as well as the prevention of wasteful, inefficient operations, and damage to property and equipment. Trendsetter offers their employees a safety incentive program to reward and encourage safe acts and behaviors. Past Programs - Incident driven Pressure to not report incidents from Managers and Employees Fault Finding vs. Fact Finding Missions Missed opportunities to introduce preventative measures Revised programs - Leading Indicators Rewarded for reporting safety violations Making Safety Suggestions Taking steps to remedy unsafe situations Turning in safety observation cards Volunteering for Safety Committee ENDMainSafety
  • 13.
    Safety Record • StopWork Authority • ‘Accurate Record Keeping • Full Time Safety Staff • Safety Training • Management Intervention “There is not a task to be performed, a job to be completed, or a situation so urgent that the proper safety procedures cannot be followed to maintain the Health, Safety, and well being of the people and environment we serve that well exceed the value of the dollar.” Trendsetter Construction, Inc. manages its operations in a manner consistent with our core values to protect the Health and Safety of our employees and maintain compliance with all applicable Environmental, Health, and Safety laws, regulations and internal standards. At TCI we are committed and more importantly engaged in all aspects of employee, contractor, and public safety. It’s not always easy to find the proper balance to run a profitable business, meet customer/consumer demands, operate facilities safely, and protect the public and environment, but it can be accomplished. Our team at TCI accomplishes this by not only creating a safety culture but by encouraging and demanding management intervention. Trendsetter Construction is committed and engaged in the process of conducting its business lawfully, ethically, and in an environmentally responsible manner. We believe that maintaining the highest expectations and fulfilling these responsibilities will assist us in reaching not only our business goals, but our moral obligation to our customers and the communities we serve as well. ENDMainSafety
  • 14.
    Safety Record • StopWork Authority • ‘Accurate Record Keeping • Full Time Safety Staff • Safety Training • Management Intervention Trendsetter Construction takes great pride providing a safe, drug free environment for its employees and the companies we serve. Safety Record to date: 3 year average # of employees - 191 Safe Work Hours - 522,842 Safe Work Days - 347 Vehicle Incident Rate 3 year - 0.75 Lost Workday Rate 3 year - 2.95 Lost Time Day Rate 3 year - 0.14 Last 4 Quarters and 2 year TRIR - 0.77 Current 3 year TRIR (Total Recordable Incident Rate) - 0.70 ENDMainSafety
  • 15.
  • 16.
    New Construction • Planningand Logistics • Civil Construction • Fabrication & Hot Work • Testing • Commissioning • Utilities TCI Facility Services can provide the personnel and equipment to build a one off storage or piping addition to a complex facility. Each New Construction project is approached from a Safety standpoint and is key through our building process from site preparation to hand off. TCI recognizes communication to be a crucial part of planning new construction within existing facilities. TCI effectively collaborates and develops planning to meet construction deadlines with utmost care for safety. ENDMainPlant
  • 17.
    Maintenance • Aid inInspection • Emergency or Planned Repairs • Blasting and Coating Services • Bolt Up and Torque Services • Valve and Spool Replacement • Plant Shut-Downs Trendsetter Construction employees are experienced and disciplined personnel ready to aid with the daily requirements of maintaining a PSM facility safely. TCI can provide a rapid response to planned or emergency repairs of process piping and utilities. TCI has taken part of 50+ shutdowns in the past 7 years and has not had a single safety incident. Through proper planning of shut down activities, our crews work seamlessly through the shutdown. ENDMainPlant
  • 18.
    Retrofit • As-is DataCollection • 3D Scans/Existing • Collision detection w/ Plans • Fabricating with Existing Adding new technology or features to older systems can provide their own challenges in building and integrating safely with existing systems. TCI can provide the technology and experience to implement engineered designs with existing plant infrastructure. ENDMainPlant
  • 19.
    Decommissioning • Isolating • Cleaning •Dismantling • Mobilization and Logistics TCI can provide safe and reliable Plant Decommissioning in the scope of a full plant decommission to sections or individual pieces/equipment. Great care is taken with surrounding infrastructure to provide technical Decommissioning services. Maintaining our own heavy equipment fleet which includes: cranes, dozers, trackhoes, loaders and other various equipment. ENDMainPlant
  • 20.
    Mass Haul WaterPumping/Land Farming Machine Control Excavation Road & Maintenance Soil Stabilization END Main
  • 21.
    Mass Haul • PreliminaryTopo Surveys • Site Quantity Verification-Site Balance • GPS Machine Controlled Equipment • Construction Stakeout • Accurate Grading Capabilities • Experienced Leadership Using most up to date equipment and technology, project times are decreased by operating at maximum efficiency with the synergy of other TCI departments. With our diverse equipment fleet, we have the equipment to perform projects small to large. We have the machinery and personnel to fit the job. Each project is analyzed to qualify the most productive equipment for the project prior to starting a project. Our skilled leadership also qualifies each piece of equipment for site safety. With our skilled leadership, our projects are properly planned and executed. Mass haul projects are managed daily using the earth quantities per day to maximize productivity and ensure project schedules are meet. Mass haul services coupled with our design team, can drastically lower excavation costs. Design reviews prior to construction highlight potential problem areas before the start of the project. This minimizes downtime and increases efficiencies prior to start of construction. In the event of a design change, Trendsetter has the ability to make real time changes in the field without losing production. ENDMainExcavation
  • 22.
    Machine Control Excavation GPSenabled Equipment • D-4, D-6, D-7, and D-8 Dozers • Excavators • Motorgraders • Push to Grade More Efficient • Site Balance with Existing Dirt With the addition of GPS Machine Control in 2010, it increased our production on projects 30% and revolutionized our excavation service. Our experienced operators can save time and money by quickly uploading project designs on the equipment. This allows the operator from the cab to see the project. The operator from his station, on his screen, can see buried lines, obstructions, etc. due to the fact the machine models are loaded with the potential obstructions. In addition, the design grading plan is uploaded as a .tin file and machine automatically grades to the design elevations. This reduces the potential for buried line strikes and increases productivity. ENDMainExcavation
  • 23.
    Water Pumping/Reclamation • LagoonPumps • Water Pumps • Land Farming Mud Trendsetter has the experience and equipment to perform lagoon/mud pit closures. Specialty equipment is used to mix and remove heavier solids from the pit and further remove the heavier materials. Those solids can be distributed via pumps and land farmed onsite. ENDMainExcavation
  • 24.
    Road & Maintenance •Road Construction • Road Maintenance • Dust Suppression • Aggregate Supplier Trendsetter has the ability to construct and maintain roads of any caliber. Using GPS machine controlled equipment, project designs are put on the ground with near perfect accuracy. Extensive experience with road construction, TCI can aid designing a roadway to handle any payload imageable. We have extensive experience at installing emulsions, aggregates, road oil and many other topical products. With TCI’s buying power, aggregates, road oils and asphalt are delivered to our customers at lower prices than our competition. ENDMainExcavation
  • 25.
    Soil Stabilization • Stabilizers •Compactors • Soil Testing Trendsetter Construction has extensive experience in soil stabilization technologies. Lime, soil cement, CKD, and Cem-Lime are a few of the materials that are installed regularly by TCI. We have the necessary equipment to perform any size project needed to give your project a firm foundation. ENDMainExcavation
  • 26.
    Spatial Solutions DatabaseCollection Professional Survey ServicesConstruction Layout 3D Applications UAV Applications END Main
  • 27.
    Spatial Solutions • PreliminaryTopo Surveys • As-is Data Collection • Improved Concept Exhibits • Workflow Consulting Our clients depend on Southern Survey and Design’s professional input to create solutions in the form of feasibility surveys and increased spatial analysis. ENDMainSouthern
  • 28.
    Database Collection • SchemaAdaptation • Survey Grade Precision • Subsurface Location • Increased Attribution • Data Quality Improvement • Verify Legacy Data • GIS Consulting and Applications ENDMainSouthern
  • 29.
    3D Applications • TerrestrialLiDAR Collection • Point Cloud Modeling • Digital and Exhibit Deliverables • As-Is Design Flow ENDMainSouthern
  • 30.
    Unmanned Aerial Vehicle (UAV)Applications • Remote Data Capture integrate with GIS, CAD and other formats • Project Phase Imagery • 4K resolution Video/Image • Inspection Applications ENDMainSouthern
  • 31.
    Professional Survey Services •Property Acquisition • Easement Preparation • Alignment Sheets • CAD Drafting Southern Survey and Design is a Texas Registered Survey Firm License No. 10177000 with two full time RPLS on staff. ENDMainSouthern
  • 32.
    Construction Layout • LocalArea Control • Site Calibration • Applied Measurement and Positioning • Structural Demand Accuracy • Preliminary Cut/Fill Stakeout • “Blue Top” Grade Staking • Pre-Pour Inspections ENDMainSouthern
  • 33.
    Pipeline Construction PipelineMaintenance END Main
  • 34.
    Pipeline Construction • Pipelineconstruction up to 24” • Horizontal Directional Drilling • Pipe Fabrication • Filling and Dewatering • Hydro-Testing • Meter Stations • Right-of-way clearing • Civil Trendsetter construction has over two decades of pipeline construction experience. Our team of experienced trusted professionals will deliver your project safely, on budget and on time. Our team is dedicated to pipeline construction, and have installed various pipelines up to 24” without damaging the integrity of the pipe. Trendsetter has made this accomplishment possible by the experience of our team as well as having the right equipment in place on each aspect of the pipeline. Our team also includes qualified welders who are accurate and precise on fabrication. They are able to build the fabrication to the exact specs that are delivered. Trendsetter provides an environmentally safe filling and dewatering process, which includes using filter bags, testing water before filling and before dewatering, and have the ability to dewater into frac tanks. When hydrotesting we have a very safe and adequate procedure to protect the integrity of the pipe and keep everyone safe. ENDMainPipeline
  • 35.
    Pipeline Maintenance • MaintenancePigging • Painting and sandblasting • Anomaly digs • Right-of-way mowing In- line inspection support • Make-Ready and Fabrication of launchers and receivers. • Pipeline reconditioning • Contract pipeline locators • composite wraps and steel sleeve installation. Trendsetter Construction offers extensive menu of pipeline integrity services. Let us show you how our experienced and efficient team members can help deliver your next integrity project on budget, on time in a safe manner. Trendsetter currently provides integrity services for several large midstream, transmission companies. We are the trusted choice for all your integrity projects. Our team of trusted and respected employees stay up to date on current laws regarding pipeline integrity repair methods. Trendsetter owns triplex pumps for hydro-testing applications. We are your one stop shop for all integrity projects. ENDMainPipeline
  • 36.
    Wood Waste Grinding MaterialScreening Custom MulchLand Clearing Material HandlingEnvironmental Stewardship END Main
  • 37.
    Environmental Stewardship Environmental stewardshipand conservation have long been the focus of Trendsetter Construction Inc. Since its conception in the mid 1970’s TCI has always took full advantage of ways to reduce waste, increase efficiencies, and sustain the natural beauty of the environment. Thanks in large part to our Recycling Division we can fulfill our promise to create a natural environment by grinding all green waste produced during our operations and incorporate the mulch produced back into our operations as natural soil additives, natural erosion control, even biomass fuel. Trendsetter Construction Inc. is focused on meeting the demands of our customers in an environmentally responsible manner. We know that today’s operations affect tomorrow’s environment. We will go above and beyond state, local, and customer requirements to maintain compliance and limit our operational footprint. Green Waste Yards Trendsetter owns and operates two green waste facilities permitted by the TCEQ in east Texas. One in Tyer, opened in 2007, and most recently a new facility in Longview opened in 2015. • Waste Reduction • Environmentally Friendly • Go Green ENDMainRecycle
  • 38.
    Wood Waste Grinding •Hogzilla Tub Grinders • Grapple Excavators • Grapple Rake Wheel Loaders • High Tip Wheel Loaders Trendsetter Recycling Services can offer our customers a clean alternative to burning and or hauling by utilizing our Hogzilla Tub Grinders to safely grind and dispose of your on site green waste material. 1050 HP engines Highest output in the industry Skilled Operators ENDMainRecycle
  • 39.
    Material Handling • LargeCapacity Trucks • Speedy Removal of ground debris Material produced from our operations are segregated according to size, species or customer specifications. Some are sent straight to the mills for biomass fuel, others are routed to one of our two facilities for further processing. 100 yard Live Floor Trailers 40 yard box trucks ENDMainRecycle
  • 40.
    Material Screening • 621McCloskey Trommel • Reduce Waste • Minimize import and export Screening materials on site can reduce export and import if required. Sizing your spoil piles to as low as half inch minus can leave clean topsoil, mulch, or sized aggregate for use on site as your job progresses. Trommels are most effective on: Yard Waste Compost — Usually dry enough for a Trommel; Mulch — Can screen most any size; Topsoil — Works very well for this as long as it is dry;. Rock and Gravel --Can screen fines and unwanted soil ENDMainRecycle
  • 41.
    Land Clearing • OneCalls Cleared • Clearing Limits Defined • Overhead and Other Hazards Recognized • Experienced Operators Trendsetter Recycling is a leader in the land clearing industry. While the competition is still clearing and hauling and/or burning and burying, our customers can rest assured that Trendsetter is handling and disposing of your green waste material in a manner that not only complies with TCEQ standards but is the most environmentally friendly manner possible. ENDMainRecycle
  • 42.
    Trendsetter Recycling offersa wide variety of quality custom mulches and soils. Our products include: Hardwood Mulch Pine Bark Mulch Cedar Mulch Single Grind Mulch Playground Mulch Growers Mix Black Gold Compost Soil Conditioner Organic Topsoil Custom Mulch • Erosion Control • Solidification Material • Moisture Retention • Weed Suppression • Added Organics • Growing Media Raw Topsoil ENDMainRecycle
  • 43.
    WWW.TRENDSETTERCONSTRUCTION.COM Saving our clientstime and money with quality services