Erotic Meerut Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class Call Girl Servi...
New Solutions for Sustainable Mobility in Leipzig
1. New Solutions for Sustainable
Mobility in Leipzig
Cebu City, 01.04.2016
Dipl.-Ing. Torben Heinemann
City of Leipzig
Office for Traffic Planning and Road Construction
2. Stadt Leipzig -
Leipzig – city of culture, trade and traffic
Office for Traffic Planning and Road Construction 2
3. Stadt Leipzig - 3Office for Traffic Planning and Road Construction
Leipzig - city of culture
working site of Johann Sebastian Bach
home of the world famous Thomanerchor
a place for modern art and architecture
4. Stadt Leipzig - 4Office for Traffic Planning and Road Construction
Leipzig trade fair international
investment: 800 Million €
start planning: 1992
opening: 1996
vistors per year: 1.4 Million
5. Stadt Leipzig - Office for Traffic Planning and Road Construction
inhabitants 568.000
(in 2011 plus ca. 9.000 people
in 2012 plus ca. 10.000 p.
in 2013 plus ca. 11.000 p. plus 2,06 %
in 2014 plus ca. 13.000 p. plus 2,12 %
in 2015 plus ca. 16.000 p. plus 2,90 %)
area 29.760 ha
road network 1.765 km
tram network 148 km
tram lines 13
bicycle network 442 km
Leipzig – numbers and facts
Leipzig
Bundesrepublik
Deutschland
Berlin
Dresden
5
6. Stadt Leipzig - 6Office for Traffic Planning and Road Construction
Region Leipzig-Halle
Dresden
PragueChemnitzFrankfurt/
Munich
BerlinHannover
• Leipzig-Halle: region with
1.8 mio. inhabitants
• very good transport
infrastructure
• motorways in all directions
• rail service to Berlin 1 hour
7. Stadt Leipzig -
Leipzig: A growing City
new population more than
60,000 over the past 12
years
more than 95 % of
inhabitants enjoy living in
Leipzig
particularly attractive to
young people
registered employees in
2011: 216,189
Source: Statistisches Landesamt Sachsen
493.052 502.651 510.512 518.862 522.883 523.815
2001 2005 2007 2009 2010 2011
Office for Traffic Planning and Road Construction 7
8. Stadt Leipzig - 8
Leipzig city structure
North: New fields of employment
South: Leipziger Neuseenland
Office for Traffic Planning and Road Construction
9. Stadt Leipzig -
airport Leipzig/Halle
2 new runways (1996-2000 and 2005-2008)
New terminal + ICE-train station (2001-2003)
DHL (2005-2008)
Office for Traffic Planning and Road Construction 9
11. Stadt Leipzig -
area around the new BMW factory
planning started: July 2001 - start of production: April 2005,
investment 1,5 billion €
Office for Traffic Planning and Road Construction 11
12. Stadt Leipzig -
the new BMW factory
Office for Traffic Planning and Road Construction 12
electric cars - start of production: 2013
13. Stadt Leipzig -
the new BMW factory
electric cars - start of production: 2013
Office for Traffic Planning and Road Construction 13
14. Stadt Leipzig -
the new PORSCHE factory
planning started: 1998/1999, building: 2000-2002
Office for Traffic Planning and Road Construction 14
15. Stadt Leipzig -
the new PORSCHE factory
Porsche Cayenne
Office for Traffic Planning and Road Construction 15
16. Stadt Leipzig -
the new PORSCHE factory
Porsche Panamera
Office for Traffic Planning and Road Construction 16
17. Stadt Leipzig -
the new PORSCHE factory
Porsche Macan started in 2013
Office for Traffic Planning and Road Construction 17
18. Stadt Leipzig - Office for Traffic Planning and Road Construction
Expected Modal Split in Leipzig for 2020
39,5 38,2
31,5
26,3 27,3 25,0
5,8 5,8
13,2
12,4
14,4 18,0
23,2 27,5 27,3
34,1 28,6 25,0
8,7
8,4 8,7 9,9
11,0
9,0
22,8 20,1 19,3 17,3 18,8
23,0
36,0
5,2
17,8
5,9
35,1
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7
Percent
By public
transport
By car, go
with
By Car
By bicycle
By foot
1987 1991 1994 1998 2003 20202008
18
19. Stadt Leipzig -
New goals for the Modal Split 2025
19
44.0% 39.6% 32.0% 30.0%
17.3% 18.8%
23.0% 23.0%
12.4% 14.4% 17.0% 20.0%
26.3% 27.3% 28.0% 27.0%
SrV 2003 SrV 2008 Ziel 2015 Ziel 2025
Modal Split
MIV ÖV Rad Fuß
• SrV = Survey of travel behaviour of TU Dresden for the City of
Leipzig every 5 years
• Ziel 2015 according to STEP 2003
• Ziel 2025 according to STEP 2015 (draft version)
Office for Traffic Planning and Road Construction
by foot
by bike
by pt
by car
20. Stadt Leipzig -
Principles of sustainability
Leipzig won the national German price for sustainability
for the criteria:
- quality of life and
- structure of the city
2012
Office for Traffic Planning and Road Construction 20
21. Stadt Leipzig - 21
Public Space
Marktgalerie
Office for Traffic Planning and Road Construction
22. Stadt Leipzig - 22
Living at the water front
Office for Traffic Planning and Road Construction
23. Stadt Leipzig - 23
Living at the water front?
Office for Traffic Planning and Road Construction
24. Stadt Leipzig - 24
Living at the water front?
Office for Traffic Planning and Road Construction
25. Stadt Leipzig -
Leipzig – compact city center
Office for Traffic Planning and Road Construction 25
26. Leipzig - downtown
ca. 900 m
ca. 700 m
Stadt Leipzig - Office for Traffic Planning and Road Construction 26
27. Cebu City – Colon Street Quarter
Stadt Leipzig - Office for Traffic Planning and Road Construction 27
29. Passages in the city
There are more
than 30 covered
walkways
29Stadt Leipzig - Office for Traffic Planning and Road Construction
30. Stadt Leipzig - 30
City Centre – strenghening functional mix
Office for Traffic Planning and Road Construction
31. Stadt Leipzig -
Car reduced city center
Office for Traffic Planning and Road Construction 31
32. Parking in the city center
P
P
P
P
P
P
P
500 m
P
P
P
P
5.900 parking places
in public parking
garages underground
and above ground
Parking in the
City center:
10.400 parking places
totally in the inner city
32
33. Stadt Leipzig - 33
Parking in the city center
Raising the parking fee by 200 % in 2011, new: 2,- €/h
Reduction parking lots on street in the
city center from 870 to 250 in 10 years
Office for Traffic Planning and Road Construction
34. Stadt Leipzig -
Revitalizing public spaces: Richard-Wagner-Platz
a former parking lot for 120 cars
34Foto: punktum Bertram KoberOffice for Traffic Planning and Road Construction
40. Stadt Leipzig - Office for Traffic Planning and Road Construction
Cycling in Leipzig
good conditions for
cycling:
plain landscape
compact city principle
as part of city
development
number of bicycles:
approx. 515,000
length of bicycle net
bicycle lanes: 99 km
bicycle advisory
lanes: 18 km
bicycle paths: 225 km
others: 93 km
overall: 436 km
40
41. Stadt Leipzig - 41
Cycling in Leipzig
1998
ca. 236,000 bicycles for 437,000 inhabitants
= ca. 540 bicycles per 1,000 inhabitants
2015
ca. 515,000 bicycles for 568,000 inhabitants
= ca. 907 bicycles per 1,000 inhabitants
growth from 1998 to 2015
ca. 279,000 bicycles
= ca. 367 bicycles per 1,000 inhabitants
or ca. 170 %
Office for Traffic Planning and Road Construction
42. Stadt Leipzig - 42
Cycling in Leipzig
Cycling share of Modal Split:
– SrV 1990: 5.2 %
– SrV 1994: 5.8 %
– SrV 1998: 13.2 %
– SrV 2003: 12.4 %
– SrV 2008: 14.4 %
– SrV 2013: 15.6 %
– SrV 2015: 17.3 %
SrV = Survey of representative transport behaviour in Leipzig since 1972
(German: System representativer Verkehrsbefragungen)
growth > 250 %
growth ca. 333 %
Office for Traffic Planning and Road Construction
43. Stadt Leipzig - 43
Cycling in Leipzig
trips in 1994 86,500 trips by bike per day
trips in 2015 353,750 trips by bike per day
km per day 1994 259,500 km per day
km per day 2015 1,415,000 km per day
number of bicycles 1994 215,000 bicycles
number of bicycles 2015 515,000 bicycles
growth ca. 400 %
growth ca. 240 %
growth ca. 540 %
Office for Traffic Planning and Road Construction
44. Stadt Leipzig - 44
bicycle parking downtown
bicycle racks for two bicycles each:
– 2008: ca. 630 bicycle racks
– 2009: ca. 730 “
– 2010: ca. 830 “
– 2011: ca. 880 “
– 2012: ca. 1,030 “
– 2013: ca. 1,200 “
( April 2013)
Additional bicycle parking at
private bicyle racks (some with
advertising), on privat grounds or
in garages.
Office for Traffic Planning and Road Construction
45. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle parking
bicycle parking concept for
city center
use of parking rack
„Leipziger Anlehnbügel“
approx. 4.500 parking racks
placed in Leipzig
Best practice for bicycle infrastructure
4545
46. Stadt Leipzig - 46
bicycle garage in the university
opening of bicycle garages:
in 2009: ca. 600 parking lots
in 2012: ca. 1,100 additional
parking lots
total: ca. 1,700 parking lots
Office for Traffic Planning and Road Construction
47. Stadt Leipzig - 47Office for Traffic Planning and Road Construction
bicycle underground parking at the university
Best practice for bicycle infrastructure
48. Stadt Leipzig - 48Office for Traffic Planning and Road Construction
Examples for bicycle infrastructure
49. Stadt Leipzig - 49Office for Traffic Planning and Road Construction
bicycle parking at the zoological garden
Examples for bicycle infrastructure
50. Stadt Leipzig - 50Office for Traffic Planning and Road Construction
bicycle parking at the German National Library
Examples for bicycle infrastructure
51. Stadt Leipzig - 51Office for Traffic Planning and Road Construction
bicycle parking at the main train station
Examples for bicycle infrastructure
52. Stadt Leipzig - 52Office for Traffic Planning and Road Construction
bicycle parking in the pedestrian zone
Examples for bicycle infrastructure
53. Stadt Leipzig - 53Office for Traffic Planning and Road Construction
bicycle parking next to mobility center
Examples for bicycle infrastructure
54. Stadt Leipzig - 54Office for Traffic Planning and Road Construction
bicycle parking in the city centre
Examples for bicycle infrastructure
55. Stadt Leipzig - 55
Bicycle parking in the city center near the university
approx. 300 bicycles on this picture
56. Stadt Leipzig - Office for Traffic Planning and Road Construction
Best practice for bicycle infrastructure
bicycle lanes
An der Tabaksmühle Dresdner Straße Karl-Liebknecht-Straße
width of bicycle lanes: mostly 1.85 m
length: 99 km of 436 km bicycle net
56
57. Stadt Leipzig - 57Office for Traffic Planning and Road Construction
Examples for bicycle infrastructure
bicycle lanes in intersections
Dresdner Straße K.-Liebknecht-Straße
for improved recognizability:
red colouring of bicycle lanes
Dresdner Straße
Karl-Liebknecht-Straße
Dresdner Straße
58. Stadt Leipzig - 58Office for Traffic Planning and Road Construction
bicycle marking in intersections (for indirect left turns)
Karl-Tauchnitz-StraßeDresdner Straße
RödelstraßeRödelstraße
Rödelstraße
K.-Tauchnitz-Str.Example for a bicycle lane
between two car lanes
Examples for bicycle infrastructure
Karl-Tauchnitz-Straße
59. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle lanes alongside to parking
Dresdner Straße K.-Liebknecht-Straße
An der Tabaksmühle Dresdner Straße
marking of the bicycle lanes on both sides
marking with 0.50 m next to parking, for protection
against car doors opening
Best practice for bicycle infrastructure
59
60. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle advisory lane (alongside parking)
K.-Liebknecht-Straße
Dresdner Straße
width of the bicycle advisory lane: 1.5 m (minimum: 1.25 m)
interrupted white line, with 0.50 m distance to parking cars
William-Zipperer-StraßeWilliam-Zipperer-Straße
Best practice for bicycle infrastructure
60
61. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle paths
Richard-Wagner-PlatzGeorgiring
Johannisplatz Waldstraße
Best practice for bicycle infrastructure
61
62. Stadt Leipzig - Office for Traffic Planning and Road Construction
Georgiring
Best practice for bicycle infrastructure
62
63. Stadt Leipzig - Office for Traffic Planning and Road Construction
Richard-Wagner-Platz
Best practice for bicycle infrastructure
63
64. Stadt Leipzig - Office for Traffic Planning and Road Construction
Johannisplatz
Best practice for bicycle infrastructure
64
65. Stadt Leipzig - Office for Traffic Planning and Road Construction
Waldstraße
Best practice for bicycle infrastructure
65
66. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle path against the direction of one way roads (50 km/h)
Dresdner Straße K.-Liebknecht-Straße
Dresdner Straße
bicycles moving in direction of the one way road use the
car lane
Best practice for bicycle infrastructure
66
67. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle path against the direction of one way roads (50 km/h)
Dresdner Straße K.-Liebknecht-Straße
Dresdner Straße seperate traffic light for
bicycles
Best practice for bicycle infrastructure
67
68. Stadt Leipzig - Office for Traffic Planning and Road Construction
bicycle marking in intersections
Richard-Wagner-Platz
Johannisallee
Karl-Tauchnitz-Straße
advanced stop line for bicycles
3 m – 5 m ahead of the car
stop line
for improved recognizability,
to avoid blind spot problems
widened stop area for bicycles
advanced stop line, 5 m
ahead of all car stop lines
to secure left turning bicycle
traffic
Best practice for bicycle infrastructure
6868
69. Stadt Leipzig - 6969
„Leipziger Kombispur“ – „combination lane“
cars turn right, bicycles are allowed to go straight as well
Georg-Schumann-Straße/Lindenthaler Straße
Office for Traffic Planning and Road Construction
70. Stadt Leipzig - 7070
„Leipziger Kombispur“ – „combination lane“
K.-Tauchnitz-Str.Georg-Schumann-Straße/Lindenthaler Straße
cars turn right,
bicycles are
allowed to go
straight as well
Office for Traffic Planning and Road Construction
71. Leipziger Hauptbahnhof – main train station
Source: Freistaat Sachsen
Stadt Leipzig - Office for Traffic Planning and Road Construction 71
73. Stadt Leipzig -
Rationalizing jeepney routes
Jeepneys will not be allowed along Colon Street. These will be rerouted so
that they cross can cross Colon Street and thus provide access to jeep
riders.
73Office for Traffic Planning and Road Construction
74. Stadt Leipzig -
Rationalizing jeepney stops
Designated jeep stops along strategic points in streets perpendicular to
Colon Street to serve jeepney riders.
JEEP STOPS
LEGENDS:
74Office for Traffic Planning and Road Construction
75. BRT – Bus Rapid Transit in Bogotá
Stadt Leipzig - Office for Traffic Planning and Road Construction 75
76. BRT – Bus Rapid Transit in Bogotá
Stadt Leipzig - Office for Traffic Planning and Road Construction 76
77. BRT – Trolleybus instead of Diesel
Stadt Leipzig - Office for Traffic Planning and Road Construction 77
79. 7979Stadt Leipzig - Office for Traffic Planning and Road Construction
The electric bus
80. Stadt Leipzig -
history - local and regional rail service
1. Line (1968)
Wurzen (1974)
Grünau (1977-84)
Halle (2004)
2002 stoped
Plagwitz- Gaschwitz
New City-Tunnel (2013)
Office for Traffic Planning and Road Construction 80
81. Stadt Leipzig -
The new local and regional rail service
Grünau – Stötteritz - Wurzen
Halle – Stötteritz - Wurzen
Borna - Eilenburg
Halle – Flughafen - Altenburg
Bitterfeld - Gaschwitz
Office for Traffic Planning and Road Construction 81
90. Stadt Leipzig - 96
Urban development area Bavarian Station
Office for Traffic Planning and Road Construction
91. Stadt Leipzig -
Tram line 15
Office for Traffic Planning and Road Construction 99
92. Stadt Leipzig -
The tram improvement program
line 11
(1999 – 2025)
line 16
(1994 – 2005)
line 7
(2010 – 2020)
line 15
(1998 – 2016)
Office for Traffic Planning and Road Construction 100
93. Stadt Leipzig -
Tram stop Goerdelerring
Office for Traffic Planning and Road Construction 101
94. Stadt Leipzig -
Tram stop Phillip-Rosenthal-Straße
Office for Traffic Planning and Road Construction 102
95. Stadt Leipzig -
Tram stop Coppiplatz
Office for Traffic Planning and Road Construction 103
96. Stadt Leipzig -
Tram stop Lindenau bus depot
Office for Traffic Planning and Road Construction 104
97. Stadt Leipzig -
Tram stop Main Station
Office for Traffic Planning and Road Construction 105
98. Stadt Leipzig -
Tram stop New fairground
Office for Traffic Planning and Road Construction 106
99. Stadt Leipzig -
Tram stop New Fairground
Office for Traffic Planning and Road Construction 107
100. Stadt Leipzig -
Bike & Ride
108Office for Traffic Planning and Road Construction
101. Stadt Leipzig -
Tram linie 16
109Office for Traffic Planning and Road Construction
106. Stadt Leipzig - 114
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
107. Stadt Leipzig - 115
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
108. Stadt Leipzig - 116
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
109. Stadt Leipzig - 117
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
110. Stadt Leipzig - 118
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
111. Stadt Leipzig - 119
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
112. Stadt Leipzig - 120
Georg-Schumann-Straße
Office for Traffic Planning and Road Construction
113. Stadt Leipzig - Office for Traffic Planning and Road Construction
Public relations for cycling
overview:
activities for bicycle promotion:
ITF Active Transportation Tour
information material:
leaflets for bicycle parking
leaflets for car reduced
city-centre
homepage: „
www.Leipzig.de/Fahrrad“
bicycle maps for commuters and tourists
public participation during planning process:
bicycle traffic development concept
working group bicycle traffic promotion
133
114. Stadt Leipzig - Office for Traffic Planning and Road Construction
New Mobility-Stations in Leipzig in 2015
The Idea:
The public transport company
provides all modes of transport
out of one hand.
These are:
tram, bus, rail-service
carsharing
bike sharing
electric car charging
information to all modes
one bill for all
134
115. Stadt Leipzig - Office for Traffic Planning and Road Construction
Intermodality with “Leipzig mobil”
Easy use of different modes of transport for one trip
135
Information about the
ticket sale and trip to the
mobility station on your
smart phone
Get
information
for carsharing
or bike
sharing
116. Stadt Leipzig - Office for Traffic Planning and Road Construction
A network of mobility stations
Easy access to a dense net of mobility station
136
3
1
4
19
22
16
12
9
15
42
46
24
30
6
18
11
8
13
17
20
47
25
5
39
7
117. Stadt Leipzig - 137Office for Traffic Planning and Road Construction
Public relations for cycling
International Transportforum (ITF) Active Transportation Tour
118. Stadt Leipzig - 138Office for Traffic Planning and Road Construction
International Transportforum (ITF) Active Transportation Tour
Public relations for cycling
119. Stadt Leipzig - 139Office for Traffic Planning and Road Construction
Citizen-consultation-hour of the Lord Mayor on bike
Public relations for cycling
120. Stadt Leipzig - 140Office for Traffic Planning and Road Construction
Public relations for cycling
Citizen-consultation-hour of the Lord Mayor on bike
121. Stadt Leipzig - 141Office for Traffic Planning and Road Construction
Public relations for cycling
Citizen-consultation-hour of the Lord Mayor on bike
122. Cebu City – Colon Street Quarter
Stadt Leipzig - Office for Traffic Planning and Road Construction 142
123. Stadt Leipzig -
Leipzig – compact city center
Office for Traffic Planning and Road Construction 143
128. Stadt Leipzig -
Why support walking?
the desire to spend time in public
spaces is a sign of urban quality
– spaces without people are vast
and empty
the presence of people brings
social security
walking is healthy and leads to
well being
walking gives urban quality
Spaces for pedestrians are
attractive for tourists
Am Markt
Photo: Andreas SchmitzThomaskirche
Photo: Andreas Schmitz
148Office for Traffic Planning and Road Construction
129. Stadt Leipzig -
Walking = Thinking of Tourism
149Office for Traffic Planning and Road Construction
130. Stadt Leipzig -
Why support walking?
for an attractive public transport there
is a need for an attractive net for
walking
ecological mode of transport
walking does not cause any
environmental
economical aspects
cost for infrastructure are much
smaller than for any other form of
transport
supporting walking increases the
possibilities for handycapped people
to be independently mobile
walking is not discriminating age or sex
attractive public spaces
attractive situation for local economies
Am Markt Photo: Andreas Schmitz
150Office for Traffic Planning and Road Construction
131. Stadt Leipzig -
Walking = Desing for all
151Office for Traffic Planning and Road Construction
132. Stadt Leipzig -
What is needed to attract pedestrians?
high level of safety
reducing spaces that might feel
unsafe for people
reducing barriers through other
uses on sidewalks
Source: Beitrag zur Stadtentwicklung
40; S. 57
Underpass Wilhelm-Leuschner-
Platz
EmilienstraßeKarl-Liebknecht-Straße Photo: Andreas SchmitzPhoto: Andreas Schmitz
152Office for Traffic Planning and Road Construction
133. Stadt Leipzig -
What is needed to attract pedestrians?
153Office for Traffic Planning and Road Construction
134. Stadt Leipzig -
What is needed to attract pedestrians?
direct connections
narrow network
easy walking with no
obsticles
Willmar-Schwabe-Straße
Passage am Neumarkt
Goerdelerring Photo: Andreas Schmitz
Photo:AndreasSchmitz Photo: Andreas Schmitz
154Office for Traffic Planning and Road Construction
135. Stadt Leipzig -
What is needed to attract pedestrians
good orientation, easy to
understand
attractive design of
sidewalks, good quality
of material
Willy-Brandt-PlatzBrühl
Richard-Wagner-Platz Photo: Andreas Schmitz
Photo: Andreas SchmitzPhoto: Andreas Schmitz
155Office for Traffic Planning and Road Construction
140. Stadt Leipzig -
new city cars in Leipzig, 2010
164Office for Traffic Planning and Road Construction
141. Stadt Leipzig -
urban street life in Leipzig, 2011
165Office for Traffic Planning and Road Construction
142. Stadt Leipzig -
urban street life in Leipzig, 2011
166Office for Traffic Planning and Road Construction
143. Stadt Leipzig -
urban street life in Leipzig, 2011
167Office for Traffic Planning and Road Construction
144. Stadt Leipzig -
urban street life in Leipzig, 2011
168Office for Traffic Planning and Road Construction
145. Cebu City – Colon Street Quarter – Step 1
Stadt Leipzig - Office for Traffic Planning and Road Construction 169
146. Cebu City – Colon Street Quarter – Step 2
Stadt Leipzig - Office for Traffic Planning and Road Construction 170
147. Cebu City – Colon Street Quarter – Step 3
Stadt Leipzig - Office for Traffic Planning and Road Construction 171
BRT stop
148. Stadt Leipzig - 172
Thank you for your attention
Office for Traffic Planning and Road Construction
149. Stadt Leipzig - 174
Department of City Development and Construction
Office for Transport Planning and Road Construction
04092 Leipzig
phone: +49 (341) 123 - 34 41
fax: +49 (341) 123 - 34 55
www.Leipzig.de
City of Leipzig
174
150. Stadt Leipzig - 175Verkehrs- und Tiefbauamt
Haltestelle mit angehobener Kfz-Fahrbahn
Prinzipskizze einer angehobenen Fahrbahn
(nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)
151. Stadt Leipzig - 176Verkehrs- und Tiefbauamt
Haltestelle mit angehobener Fahrbahn –
am Beispiel Leipzig
Pfaffendorfer Straße (Haltestelle Zoo - stadteinwärts)
152. Stadt Leipzig - 177Verkehrs- und Tiefbauamt
Haltestellenkap mit Fahrbahneinengung
am Beispiel Leipzig
Zschochersche Straße (Haltepunkt Elster Passage)
153. Stadt Leipzig - 178Verkehrs- und Tiefbauamt
Haltestellenkap mit Fahrbahneinengung
am Beispiel Leipzig
Pfaffendorfer Straße (Haltepunkt Zoo - stadtauswärts)
154. Stadt Leipzig - 179Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts)
155. Stadt Leipzig - 180Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts)
156. Stadt Leipzig - 181Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobenem Radweg
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts)
157. Stadt Leipzig - 182Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobenem Radweg
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Holbeinstraße - stadteinwärts
158. Stadt Leipzig - 183Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadteinwärts)
159. Stadt Leipzig - 184Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadteinwärts)
160. Stadt Leipzig - 185Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadteinwärts)
161. Stadt Leipzig - 186Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)
162. Stadt Leipzig - 187Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)
163. Stadt Leipzig - 188Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)
164. Stadt Leipzig - 189Verkehrs- und Tiefbauamt
Haltestellenkap mit angehobener Radfahrbahn
am Beispiel Leipzig
Könneritzstraße (Haltepunkt Rödelstraße - stadtauswärts)
165. Stadt Leipzig - 190Verkehrs- und Tiefbauamt
Haltestellenkap mit verschwenktem Radweg
am Beispiel Leipzig
Eisenbahnstraße (Haltepunkt Einertstraße - stadteinwärts)
166. Stadt Leipzig - 191Verkehrs- und Tiefbauamt
Haltestellenkap mit verschwenktem Radweg
am Beispiel Leipzig
Eisenbahnstraße (Haltepunkt Einertstraße - stadteinwärts)
167. Stadt Leipzig - 192Verkehrs- und Tiefbauamt
Haltepunkt S-Bahnhof Gohlis
Haltestellenkap mit verschwenkter Radverkehrsführung
am Beispiel Leipzig
168. Stadt Leipzig - 193Verkehrs- und Tiefbauamt
Haltepunkt S-Bahnhof Gohlis
Haltestellenkap mit verschwenkter Radverkehrsführung
am Beispiel Leipzig
169. Stadt Leipzig - 194Verkehrs- und Tiefbauamt
Haltepunkt S-Bahnhof Gohlis
Haltestellenkap mit verschwenkter Radverkehrsführung
am Beispiel Leipzig
170. Stadt Leipzig - 195Verkehrs- und Tiefbauamt
Radverkehrsführung an Haltestellenkaps
bei ausreichender Flächenverfügbarkeit
Lösungsvarianten für die Seitenräume analog Bushaltestellenkap
(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)
171. Stadt Leipzig - 196Verkehrs- und Tiefbauamt
Radverkehrsführung an Haltestellenkaps
bei hoher Flächenverfügbarkeit (≥ 7,00 m)
Lösungsvarianten für die Seitenräume analog Bushaltestellenkap
(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)
172. Stadt Leipzig - 197Verkehrs- und Tiefbauamt
bei geringer Flächenverfügbarkeit (≥ 4,50 m)
Radverkehrsführung an Haltestellenkaps
Lösungsvarianten für die Seitenräume analog Bushaltestellenkap
(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)
173. Stadt Leipzig - 198Verkehrs- und Tiefbauamt
Radverkehrsführung an Haltestellenkaps
bei sehr geringer Flächenverfügbarkeit (≥ 3,50 m) Führung als Rad-/Gehweg
Lösungsvarianten für die Seitenräume analog Bushaltestellenkap
(analog Bushaltestellenkap, nach ERA-Entwurf 01/09, FGSV, Köln 19.01.2009)