4. Make to Stock
From menu bar click select goto – costs—analysis
Activity confirmation T.code CO11N
Give order no click enter
5. Make to Stock
Maintain yield Quantity
Machine hours
Labour hours
Save
Observe production order cost
T.code:CO03
Give po order
Click enter
6. Make to Stock
From menu bar select goto – costs – analysis
Activity cost loaded on PO
Calculation of WIP
T.code KKAX
7. Make to Stock
Click enter
Compare WIP balance with Production order total actual cost
Balance is match than select back arrow
Remove test run and execute
8. Make to Stock
Partial GR from production order
t.code MIGO
Give Production order no
Execute
9. Make to Stock
Give the quantity 5
Check and save
T.code:CO03
Give po order
Click enter
From menu bar select goto – costs – analysis
10. Make to Stock
GR happened with planned value
Complete GR from production order (remaining 5 pc)
t.code MIGO
Give Production order no
Execute
11. Make to Stock
Check and save
Observe production order cost
T.code:CO03
Give po order
Click enter
From menu bar select goto – costs – analysis
12. Make to Stock
To make production order technically complete (TECO)
Path0: Logistics –Production–shop floor control –Order –Change (T-code is CO02)
Give the order no.800046
Enter
From the menu select Functions –Restrict processing –Technically complete
Save
Calculation of variance ERROR In Variance Calculation
Path :Accounting –Controlling-Product cost controlling –Cost object controlling –Product cost by
order - period ending closing –single functions- Variances –Individual processing (T-code is KKS2)
Give the order no.800046
Select execute button
13. Make to Stock
Select back arrow
Deselect test run check box
Execute
Double click on variance amount
Variance not calculated