SlideShare a Scribd company logo
1 of 5
CURRICULUM VITEA
Name. Ramar Karuppiah
Date of Birth. 08.04.1955
Qualification. B.E
Pass port No: L 1179695
Mail I.D ramarkaruppaiah404@gmail.com
Contact phone no. +91 431 281783
Mobile. +91 9940869767
Sir,
Seeking a challenging position in a progressive company in the field of mechanical/Piping
engineering, which encourage and recognizes hard works, where in I will have as
opportunity to constructively contribute toward organization goal, thus enhancing my
personal and career growth. Possess willpower for hard work combine with high sense of
responsibility and total dedication to the task undertaken to tactfully handle assignment
under pressure, perform task highest degree of accuracy Able to maintain day-to-day
maintenance of all operation and troubleshooting. Capable and open to learn new skills,
system, procedures to implements.
Objectives
Developed Management of construction and completions pre commissioning, commissioning
Mechanical completion and performance testing. Support Construction and Project
Managements. Supervision of Construction activities to achieve project objective, safety,
quality. Solve the technical problem get information from engineerig
Projects Involved:
1. Central Processing Facility zone-61 at Oman from Aug-2015 to still
2. Barzan onshore gas Project Qatar from 28 May 2013 to June 2014, with
Ras Gas, JGC and C.C.I.C
3. Ethylene Unit-3 at Abu Dhabi Ruwaise with Borouge,Lynde &
Consolidated Construction International company (current project)
4. Ethylene Unit-2 at Abu Dhabi Ruwaise with Borough, Lynde &
Consolidated construction international company
5. Ethylene Unit-2 at Kuwait with K.N.P.C, Fluor, Technip, and consolidated
construction international company
6. Gas booster station (B.S 131) at Kuwait with K.O.C, Snamprogetty &
Consolidated construction international company
7. Water injection with gathering center up grade at Kuwait with K.O.C,
Snamprogetty & Consolidated construction international company.
8. New Gathering center Facility at Kuwait with K.O.C, Consolidated
construction international company.
9. Demolition with up grading of Gathering facility at Kuwait with
K.O.C & Consolidated construction international company
10.Ethylene unit-1 at Kuwait with K.N.P.C, Kellogg brown & root &
Consolidated construction international company
11.Commissioning and Maintenance of Ethylene unit-1 at Kuwait K.N.P.C,
Brown & root and Consolidated construction international company
12.Fabrication of Thermal, Nuclear Power Boilers and its accessories at
India Bharath Heavy Electricals India Limited
Responsibilities
1. Lead production discipline engineering support for piping fabrication. Understand
the full scope of work, contract type and milestone schedules.
2. Co-ordinate requirements for construction engineering and technical support with
the engineering and piping design and layout teams and the MCS group from
design stage to work pack compilation and execution.
3. Review designs and supervise onsite commissioning activities. Prepare and
maintain commission records of site observations, testing processes and
checklists. Supervise operational reviews in association with functional staff.
4. Take part in design and constructability reviews to ensure adequate planning,
material identification and input at design stage through to hook up.
5. Solve problems and initiate site queries to ensure fabrication productivity including
onshore pre commissioning, and mechanical completion hook up.
6. Co-ordinate material issue, report fabrication progress and issue notices for critical
actions. Review scope changes, additional works or reworks and initiate revision
orders / change orders.
7. Review project scope of work and Task Listing, schedules, specifications and
understand the requirements and deliverables.
8. Review design model / drawings for constructability and identify any special items
/ subcontract requirements.
9. Raises site queries , technical queries to implement revisions to assist build
sequencing and improve productivity.-
10.Review vendor data for interdisciplinary interfaces as required.
11.Monitor work pack issue and advises priorities to the lead designer and discipline
manager based on material availability and scheduled deliveries etc.
12.Raise Site Queries to utilize available material (substitutions) or deviations as
required.
13.Prepare production procedures. Attend production meetings and report concerns.
Monitor the scope changes and issue of revision orders.
14.Prepare and issues activity notice to the client / all concerned people. Report
weekly fabrication progress and monitors production man-hours and productivity.
15.Review 4 week look ahead plans and identify the constraints (material / drawings).
16.Co-ordinate with construction engineer to ensure procedures are issued timely / all
parties understand any change.
17.Preparation of piping master punch lists and loads out sent loose items. Track
record of closing the punch list
Covering Letter
Apr 15, 2013
Dear Ms.
I am applying for the position of Piping with ----------and I have the experience
your company is searching for in an applicant.
While working as a Site Superintendent Construction sites, I attended a trade
school to become certified as a piping engineer. My training and job
experience qualify me for this job. I am familiar with the different types of
piping. I have the skills to measure the piping, cut it to size and to make
installations.
I have I also have the skills to Fabrication, erection, testing, pre
commissioning, commissioning, mechanical completion including start up. I
also have experience making repairs and updating existing piping facilities.
I have the ability to travel to different job sites and to work the hours required
to meet deadlines. I have the physical strength and stamina to perform the
duties associated with this position and I always pay close attention to details
to avoid making mistakes. I have excellent communication skills, the ability to
work as a team and the knowledge and self-motivation to work independently.
I can also help teach others skills they have not acquired yet.
I hope that you will consider me for this position and you can reach me for an
interview by calling 00968 94324833
Respectfully,
Ramar Karuppiah
Tina Mcloughlin
Resume Attached as MS Word Document

More Related Content

What's hot

Ian Powell CV 27:04:16
Ian Powell CV 27:04:16 Ian Powell CV 27:04:16
Ian Powell CV 27:04:16
Ian Powell
 
Douglas Field Resume Mechanical Engineer 2016
Douglas Field Resume Mechanical Engineer 2016Douglas Field Resume Mechanical Engineer 2016
Douglas Field Resume Mechanical Engineer 2016
Douglas Field
 
Noel C De Jesus_CV 30-12-15
Noel C  De Jesus_CV 30-12-15Noel C  De Jesus_CV 30-12-15
Noel C De Jesus_CV 30-12-15
Noel de Jesus
 
kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01
KAMLESH JOSHI
 
Ami_Technical_resume
Ami_Technical_resumeAmi_Technical_resume
Ami_Technical_resume
Ami Kapasi
 
CV_Mehul Surti_OM_Gas
CV_Mehul Surti_OM_GasCV_Mehul Surti_OM_Gas
CV_Mehul Surti_OM_Gas
Mehul Surti
 
New CV Faisal Rauf
New CV Faisal RaufNew CV Faisal Rauf
New CV Faisal Rauf
awrish94
 
Ch V Pavan kumar
Ch V Pavan kumar  Ch V Pavan kumar
Ch V Pavan kumar
Pavan kumar
 

What's hot (20)

BIO DATA
BIO DATABIO DATA
BIO DATA
 
Resume-10
Resume-10Resume-10
Resume-10
 
Ian Powell CV 27:04:16
Ian Powell CV 27:04:16 Ian Powell CV 27:04:16
Ian Powell CV 27:04:16
 
Resume_chemical-2
Resume_chemical-2Resume_chemical-2
Resume_chemical-2
 
sudhir rusume
sudhir rusumesudhir rusume
sudhir rusume
 
updated CV
updated CVupdated CV
updated CV
 
hesham cv2015
hesham  cv2015hesham  cv2015
hesham cv2015
 
Douglas Field Resume Mechanical Engineer 2016
Douglas Field Resume Mechanical Engineer 2016Douglas Field Resume Mechanical Engineer 2016
Douglas Field Resume Mechanical Engineer 2016
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
Bills resume
Bills resumeBills resume
Bills resume
 
Aashish
AashishAashish
Aashish
 
Ready Mix Concrete Supplier in Hyderabad
Ready Mix Concrete Supplier in HyderabadReady Mix Concrete Supplier in Hyderabad
Ready Mix Concrete Supplier in Hyderabad
 
Noel C De Jesus_CV 30-12-15
Noel C  De Jesus_CV 30-12-15Noel C  De Jesus_CV 30-12-15
Noel C De Jesus_CV 30-12-15
 
kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01
 
Ami_Technical_resume
Ami_Technical_resumeAmi_Technical_resume
Ami_Technical_resume
 
CV_Mehul Surti_OM_Gas
CV_Mehul Surti_OM_GasCV_Mehul Surti_OM_Gas
CV_Mehul Surti_OM_Gas
 
Resume RVM 2015
Resume RVM 2015Resume RVM 2015
Resume RVM 2015
 
New CV Faisal Rauf
New CV Faisal RaufNew CV Faisal Rauf
New CV Faisal Rauf
 
Ch V Pavan kumar
Ch V Pavan kumar  Ch V Pavan kumar
Ch V Pavan kumar
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 

Similar to CURRICULUM VITEA

Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
Al Obaidi Abdullah
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATED
ahmedlajhar
 
resumeprint.docx
resumeprint.docxresumeprint.docx
resumeprint.docx
Tyler Beck
 
Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)
Michael Valenzuela
 
Nayan Dave CV for Suitable with Cover letter
Nayan Dave CV for Suitable with Cover letterNayan Dave CV for Suitable with Cover letter
Nayan Dave CV for Suitable with Cover letter
Nayan Dave
 

Similar to CURRICULUM VITEA (20)

D.Manning CV
D.Manning CVD.Manning CV
D.Manning CV
 
MostafaFahimHamdy25.7.2016
MostafaFahimHamdy25.7.2016MostafaFahimHamdy25.7.2016
MostafaFahimHamdy25.7.2016
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
Anil Kumar
Anil KumarAnil Kumar
Anil Kumar
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Akashkore Ravi
Akashkore RaviAkashkore Ravi
Akashkore Ravi
 
CV-SHEIK UNDERGOING
CV-SHEIK UNDERGOINGCV-SHEIK UNDERGOING
CV-SHEIK UNDERGOING
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATED
 
resumeprint.docx
resumeprint.docxresumeprint.docx
resumeprint.docx
 
standard
standardstandard
standard
 
RhoveeFider-CV
RhoveeFider-CVRhoveeFider-CV
RhoveeFider-CV
 
my_new_CV (1)
my_new_CV (1)my_new_CV (1)
my_new_CV (1)
 
Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)
 
Rohit Jain Resume
Rohit Jain ResumeRohit Jain Resume
Rohit Jain Resume
 
AKC- CV@5-16
AKC- CV@5-16AKC- CV@5-16
AKC- CV@5-16
 
Maintenance Engineer having 9 years experience
Maintenance  Engineer having 9 years experienceMaintenance  Engineer having 9 years experience
Maintenance Engineer having 9 years experience
 
Nayan Dave CV for Suitable with Cover letter
Nayan Dave CV for Suitable with Cover letterNayan Dave CV for Suitable with Cover letter
Nayan Dave CV for Suitable with Cover letter
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 

CURRICULUM VITEA

  • 1. CURRICULUM VITEA Name. Ramar Karuppiah Date of Birth. 08.04.1955 Qualification. B.E Pass port No: L 1179695 Mail I.D ramarkaruppaiah404@gmail.com Contact phone no. +91 431 281783 Mobile. +91 9940869767 Sir, Seeking a challenging position in a progressive company in the field of mechanical/Piping engineering, which encourage and recognizes hard works, where in I will have as opportunity to constructively contribute toward organization goal, thus enhancing my personal and career growth. Possess willpower for hard work combine with high sense of responsibility and total dedication to the task undertaken to tactfully handle assignment under pressure, perform task highest degree of accuracy Able to maintain day-to-day maintenance of all operation and troubleshooting. Capable and open to learn new skills, system, procedures to implements. Objectives Developed Management of construction and completions pre commissioning, commissioning Mechanical completion and performance testing. Support Construction and Project Managements. Supervision of Construction activities to achieve project objective, safety, quality. Solve the technical problem get information from engineerig
  • 2. Projects Involved: 1. Central Processing Facility zone-61 at Oman from Aug-2015 to still 2. Barzan onshore gas Project Qatar from 28 May 2013 to June 2014, with Ras Gas, JGC and C.C.I.C 3. Ethylene Unit-3 at Abu Dhabi Ruwaise with Borouge,Lynde & Consolidated Construction International company (current project) 4. Ethylene Unit-2 at Abu Dhabi Ruwaise with Borough, Lynde & Consolidated construction international company 5. Ethylene Unit-2 at Kuwait with K.N.P.C, Fluor, Technip, and consolidated construction international company 6. Gas booster station (B.S 131) at Kuwait with K.O.C, Snamprogetty & Consolidated construction international company 7. Water injection with gathering center up grade at Kuwait with K.O.C, Snamprogetty & Consolidated construction international company. 8. New Gathering center Facility at Kuwait with K.O.C, Consolidated construction international company. 9. Demolition with up grading of Gathering facility at Kuwait with K.O.C & Consolidated construction international company 10.Ethylene unit-1 at Kuwait with K.N.P.C, Kellogg brown & root & Consolidated construction international company 11.Commissioning and Maintenance of Ethylene unit-1 at Kuwait K.N.P.C, Brown & root and Consolidated construction international company 12.Fabrication of Thermal, Nuclear Power Boilers and its accessories at India Bharath Heavy Electricals India Limited Responsibilities 1. Lead production discipline engineering support for piping fabrication. Understand the full scope of work, contract type and milestone schedules. 2. Co-ordinate requirements for construction engineering and technical support with the engineering and piping design and layout teams and the MCS group from design stage to work pack compilation and execution.
  • 3. 3. Review designs and supervise onsite commissioning activities. Prepare and maintain commission records of site observations, testing processes and checklists. Supervise operational reviews in association with functional staff. 4. Take part in design and constructability reviews to ensure adequate planning, material identification and input at design stage through to hook up. 5. Solve problems and initiate site queries to ensure fabrication productivity including onshore pre commissioning, and mechanical completion hook up. 6. Co-ordinate material issue, report fabrication progress and issue notices for critical actions. Review scope changes, additional works or reworks and initiate revision orders / change orders. 7. Review project scope of work and Task Listing, schedules, specifications and understand the requirements and deliverables. 8. Review design model / drawings for constructability and identify any special items / subcontract requirements. 9. Raises site queries , technical queries to implement revisions to assist build sequencing and improve productivity.- 10.Review vendor data for interdisciplinary interfaces as required. 11.Monitor work pack issue and advises priorities to the lead designer and discipline manager based on material availability and scheduled deliveries etc. 12.Raise Site Queries to utilize available material (substitutions) or deviations as required. 13.Prepare production procedures. Attend production meetings and report concerns. Monitor the scope changes and issue of revision orders. 14.Prepare and issues activity notice to the client / all concerned people. Report weekly fabrication progress and monitors production man-hours and productivity. 15.Review 4 week look ahead plans and identify the constraints (material / drawings). 16.Co-ordinate with construction engineer to ensure procedures are issued timely / all parties understand any change. 17.Preparation of piping master punch lists and loads out sent loose items. Track record of closing the punch list
  • 4. Covering Letter Apr 15, 2013 Dear Ms. I am applying for the position of Piping with ----------and I have the experience your company is searching for in an applicant. While working as a Site Superintendent Construction sites, I attended a trade school to become certified as a piping engineer. My training and job experience qualify me for this job. I am familiar with the different types of piping. I have the skills to measure the piping, cut it to size and to make installations. I have I also have the skills to Fabrication, erection, testing, pre commissioning, commissioning, mechanical completion including start up. I also have experience making repairs and updating existing piping facilities. I have the ability to travel to different job sites and to work the hours required to meet deadlines. I have the physical strength and stamina to perform the duties associated with this position and I always pay close attention to details to avoid making mistakes. I have excellent communication skills, the ability to work as a team and the knowledge and self-motivation to work independently. I can also help teach others skills they have not acquired yet. I hope that you will consider me for this position and you can reach me for an interview by calling 00968 94324833 Respectfully, Ramar Karuppiah
  • 5. Tina Mcloughlin Resume Attached as MS Word Document