Future-proof Antenna Systems
NAB Broadcast Engineering Conference 2016
Nick Wymant, CTO – Radio Frequency Systems
RADIO FREQUENCY SYSTEMS
© Radio Frequency Systems 2016 All rights reserved2
Agenda:
• Introduction.
• Repack observations.
• Advanced antenna systems to facilitate the repack: Scenario 1.
• Future proof antenna systems for the repack and beyond: Scenario 2.
• Advanced master antenna systems to facilitate the repack: Scenario 3.
• Real World case studies.
© Radio Frequency Systems 2016 All rights reserved3
RFS at a Glance
*
Revenues: 500 million
2100
Employees
7
Manufacturing centers
+250
Active patents
6
R&D centres
35
Sales and Technical
Support Offices
© Radio Frequency Systems 2016 All rights reserved4
RFS Broadcast Production Sites
Meriden
U.S.A.
Shanghai
China
São Paulo
Brazil
Melbourne
Australia
Hannover
Germany
Haddenham
United Kingdom
© Radio Frequency Systems 2016 All rights reserved5
Broadcast Systems – Meriden Connecticut
• Located in Meriden, CT
• 20,000 ft2 indoor production space
allocated to broadcast.
• 76,000 ft2 outdoor broadcast test area.
• Engineering teams located on site.
• Sales team located on site.
• Far and near field test ranges on site.
© Radio Frequency Systems 2016 All rights reserved6
Activities: Broadcast, Meriden Connecticut
• Pylon antenna design and manufacturing.
• Broadband slot antenna design and
manufacturing .
• Rigid line systems design and
manufacturing.
• Semi flexible cable manufacturing.
• Panel antennas integration and test .
• RF systems, mask filters and channel
combiners integration and test.
© Radio Frequency Systems 2016 All rights reserved7
• 39 Month window.
• Coordinated effort or free-for-all?
• Number of qualified tower crews.
• Finite number of high power RF and
Structural Engineers.
• Limited coverage during operation on
interim antenna that can extend for a long
period of time.
© Radio Frequency Systems 2016 All rights reserved8
• Delays to antenna work caused by weather are generally underestimated.
• Delay by one station can cause a domino effect, delaying multiple stations.
• The period of operation on an interim antenna was considerable in many
instances. 6-18 months in some cases. For this reason high performance
interim antenna solutions were adopted.
• The cost savings of re-using interim antenna systems was found to be
questionable when the removal and refurbishment costs are considered.
• Shared, broadband transmission capabilities were shown to provide for a
smooth transition, particularly when replicated at two sites.
© Radio Frequency Systems 2016 All rights reserved9
Repack Scenario 1: Pylon Antenna Swap out
RADIO FREQUENCY SYSTEMS
© Radio Frequency Systems 2016 All rights reserved10
This scenario is similar to Case #1 in the Widelity and Digital Tech Consulting reports.
© Radio Frequency Systems 2016 All rights reserved11
© Radio Frequency Systems 2016 All rights reserved12
Use a high performance interim antenna
• You could be on interim antenna for a
long time. Try to maximize interim ERP
• Eligible for re-imbursement.
Use a fully broadband Interim antenna
• Availability (off the shelf).
• Permanent standby on new channel.
• Use on final channel at cut-over date if
new main antenna install is delayed.
Purchase Interim antenna rather than rent.
• Availability ( not waiting rental returns).
• Reliability ( not worn / damaged).
Do not remove the interim antenna.
• Tall tower crews scarce, better utilized
getting others on air by the deadline.
Use a re-tunable mask filter.
• Wasteful of taxpayers money to throw
filter away after the channel change.
© Radio Frequency Systems 2016 All rights reserved13
Original scenario 1 Improved interim solution
Original ERP:
1000 kW
Interim ERP:
95 kW
Original ERP:
1000 kW
Interim ERP:
1000 kW
© Radio Frequency Systems 2016 All rights reserved14
• Antennas that provide full band operation: 470-698 MHz.
• Low wind load: same or less than side mount pylon.
• Power handling to allow up to 2 x 1MW ERP’s.
• Elevation gain to allow full ERP with existing transmitters.
• Standard azimuth patterns to simplify FCC filing:
C-170, S-180, Ominoid.
• Re-tuneable high power mask filters, to allow re-use on post
repack channel.
• Mask filters that don’t require a specialist crew to re-tune.
© Radio Frequency Systems 2016 All rights reserved15
Outcome: SBB Broadband Pylon Antenna
SBB-8 Broad-Band
Slot Antenna
Model SBB-8 SBB-16 SBB-24 SBB-32
Gain (C-170) 17 30 43 59
Max input power (kW)* 18 36 54 72
Typical ERP’s 340 kW 1 x 1MW 2 x 1MW 3 x 1MW
* Higher power option available
© Radio Frequency Systems 2016 All rights reserved16
Production testing of SBB broadband pylons
SBB-8 measured VSWR
© Radio Frequency Systems 2016 All rights reserved17
Production testing of SBB broadband pylons
SBB-8 measured radiation pattern C-170
© Radio Frequency Systems 2016 All rights reserved18
6PPXX325E – 50 kW re-tunable UHF TV filter 1)
1) RFS tunable TE-101 mode resonator high-power filters first patented in 2014
© Radio Frequency Systems 2016 All rights reserved19
Mask filter tuning software simplifies retune
S-parameters
BCAT
Tuning Actions
Visualization of
tuning errors
Filter Library
© Radio Frequency Systems 2016 All rights reserved20
Repack Scenario 2: Future proof equipment
RADIO FREQUENCY SYSTEMS
© Radio Frequency Systems 2016 All rights reserved21
© Radio Frequency Systems 2016 All rights reserved22
• Broadband antenna. Full UHF band operation: 470-698 MHz.
• Low wind load antenna: similar to top mount pylon and less than
stacked pylons.
• Power handling capability to allow at least to 2 full power stations
with elliptical or circular polarization.
• Ability to change polarization ratio in the future (VPT).
• Ability to add a second channel with independent polarization ratio.
• Re-tuneable / Broadband RF systems (mask, switch) - up to 100 kW.
• Re-tuneable channel combiners when a second channel is added. Broadband Cylinder
Antenna
© Radio Frequency Systems 2016 All rights reserved23
Outcomes:
Range test of PEPL-28 antenna for
Dallas TX (half antenna under test)
© Radio Frequency Systems 2016 All rights reserved24
Real World Example, Dallas TX:
Preparing PEPL-28 antenna for installation at Dallas site.
© Radio Frequency Systems 2016 All rights reserved25
Dallas TX: Tunable 80kW + 80kW VPT Combiner
1)Patents granted
© Radio Frequency Systems 2016 All rights reserved26
Repack Scenario 3: Master Antenna System
RADIO FREQUENCY SYSTEMS
© Radio Frequency Systems 2016 All rights reserved27
© Radio Frequency Systems 2016 All rights reserved28
• Full UHF band operation: 470-698 MHz.
• Power handling to allow multiple full power stations
with elliptical or circular polarization.
• Low wind load: less than existing panel antennas.
• Independent polarization ratio setting.
• Maintainable without removing antenna from the tower.
• Superior radiation pattern performance.
© Radio Frequency Systems 2016 All rights reserved29
• Must be re-tuneable for repack and future channel changes.
• Must be adjacent channel capable.
• Must allow independent polarization control for each tenant.
• Power handling up to 100kW per input and up to 320kW total combined power.
• Compact and modular to minimize footprint and installation time.
© Radio Frequency Systems 2016 All rights reserved30
Resulting products:
Example of a high power wrap
around antenna
© Radio Frequency Systems 2016 All rights reserved31
VPT: How do we vary the polarization ratio ?
-450
Input
+450
Input
Broadband
pylon
+450feeder
Power splitter
in TX room
TX
Cpol or Epol
-450feeder
A single channel VPT system.
• VPT utilizes dual input antennas.
• By changing the phase between inputs, the
desired polarization ratio can be achieved.
© Radio Frequency Systems 2016 All rights reserved32
Multi-channel VPT systems
A channel combiner is used on each input.
TX’s have independent power splitters with phase
control => Independent polarization for each TX.
Future configuration: TX2 upgrades to a future
transmission standard that incorporates MIMO/MISO.
TX1 remains on the current standard.
-450 Combiner
+450 Combiner
TX1 TX2
-450
Feeder
+450
Feeder
Adjust
Phase
Broadband
pylon
-450
Antenna
Input
+450
Antenna
Input
-450 Combiner
+450 Combiner
TX1
TX2 data stream 1
-450
Feeder
+450
Feeder
Broadband
pylon
-450
Antenna
Input
+450
Antenna
Input
TX1:
ATSC
E-pol
TX2 data stream 2
TX2:
Future standard
MIMO/MISO
© Radio Frequency Systems 2016 All rights reserved33
Real World Case Study,
One World Trade, NYC
© Radio Frequency Systems 2016 All rights reserved34
Case Study, One World Trade Center, NYC
UHF Upper Antenna
40 VPT panels.
VHF Antenna
16 VPT panels.
UHF Lower Antenna
96 VPT panels.
© Radio Frequency Systems 2016 All rights reserved35
One World Trade Center, Trial antennas
* We wish to acknowledge the valuable assistance
of Dr Oded Bendov, Doug Lung and S. Merrill Weiss
during the antenna elevation pattern optimization
process.
© Radio Frequency Systems 2016 All rights reserved36
Range Testing – One World Trade UHF Antenna 1
A section of the upper One World Trade UHF antenna
about to be lifted onto RFS far field test range A.
RFS far field test range A, one of
four broadcast outdoor antenna
ranges.
Disconnecting the lifting
equipment.
© Radio Frequency Systems 2016 All rights reserved37
Range Testing – One World Trade VHF Antenna
© Radio Frequency Systems 2016 All rights reserved38
VPT combiner design for
One World Trade Center
5-channel tunable TE-101 mode WG combiner
1)Patents granted
VPT combiner module ready for test
© Radio Frequency Systems 2016 All rights reserved39
Tuneable Combiner Module with Waveguide Output
1)Patents granted and pending
© Radio Frequency Systems 2016 All rights reserved40
Antennas and combiners were
designed with consideration of the
increased peak power requirement.
Ability to increase vertical polarization
component in the future to enhance
reception on hand held devices.
Mask filters designed with upgrade to
ATSC3 in mind.
Antennas ready for MIMO.
© Radio Frequency Systems 2016 All rights reserved41
Conclusions
• Based on our experience with the UK and Australian repacks, RFS believe that broadband
frequency agile equipment provides the easiest path to a successful outcome.
• Weather and tower crew availability could delay installation of the main antenna. A high
performance broadband interim/reserve antenna that operates on pre and post restack
channels provides some insurance against operating at reduced ERP for a significant period of
time, or missing the switch-over date.
• Consider a re-tuneable interim mask filter that can be reused on the new channel allocation.
• Consider frequency agile and polarization agile solutions that provide a future upgrade path.
• Ensure that ATSC 3.0 operation has been considered during the design of any new equipment.
• Operation from a shared master site may prove to be the easiest way forward for many.
© Radio Frequency Systems 2016 All rights reserved42
Thank You
Nick Wymant
CTO, RFS Broadcast
nick.wymant@rfsworld.com
+1 (203) 707-8929
© Radio Frequency Systems 2016 All rights reserved43
Follow us !
www.rfsworld.com

More Related Content

What's hot

HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...
HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...
HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...Teleste Corporation
 
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100Passion Radio Amateur
 
HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020
 HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020 HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020
HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020Teleste Corporation
 
Extended spectrum DOCSIS: A much different RF spectrum upgrade
Extended spectrum DOCSIS: A  much different  RF spectrum upgradeExtended spectrum DOCSIS: A  much different  RF spectrum upgrade
Extended spectrum DOCSIS: A much different RF spectrum upgradeTeleste Corporation
 
Vsat day-2008-shiron
Vsat day-2008-shironVsat day-2008-shiron
Vsat day-2008-shironSSPI Brasil
 
Teleste ACE8 - Updated March 2020
Teleste ACE8 - Updated March 2020Teleste ACE8 - Updated March 2020
Teleste ACE8 - Updated March 2020Teleste Corporation
 
ECE 24 Final Report 052209
ECE 24 Final Report 052209ECE 24 Final Report 052209
ECE 24 Final Report 052209crh342
 
IT-ISS 7711 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7711 Controller - Intellisystem - Integrated Satellite SolutionsIT-ISS 7711 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7711 Controller - Intellisystem - Integrated Satellite SolutionsCristian Randieri PhD
 
An Introduction to RF Design, Live presentation at EELive 2014
An Introduction to RF Design, Live presentation at EELive 2014An Introduction to RF Design, Live presentation at EELive 2014
An Introduction to RF Design, Live presentation at EELive 2014Rohde & Schwarz North America
 
product_data_sheet0900aecd806c5ad4
product_data_sheet0900aecd806c5ad4product_data_sheet0900aecd806c5ad4
product_data_sheet0900aecd806c5ad4Dave Graves, PMP
 
Air tight 11ac webinar series session 2 - 11ac feature deep dive - june 2014
Air tight 11ac webinar series   session 2 - 11ac feature deep dive - june 2014Air tight 11ac webinar series   session 2 - 11ac feature deep dive - june 2014
Air tight 11ac webinar series session 2 - 11ac feature deep dive - june 2014AirTight Networks
 
Technical Proposal - IPTV - Channel Management
Technical Proposal - IPTV - Channel ManagementTechnical Proposal - IPTV - Channel Management
Technical Proposal - IPTV - Channel Managementwolfthrone
 
IT-ISS 7710 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7710 Controller - Intellisystem - Integrated Satellite SolutionsIT-ISS 7710 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7710 Controller - Intellisystem - Integrated Satellite SolutionsCristian Randieri PhD
 
802.11n Tutorial
802.11n Tutorial802.11n Tutorial
802.11n Tutorialgopinathkn
 

What's hot (20)

HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...
HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...
HFC passives - Ready for DOCSIS 4.0? #TelesteLive webinar presentation May 19...
 
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
 
HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020
 HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020 HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020
HFC actives towards 1.8 GHz? - #TelesteLive webinar presentation May 19, 2020
 
Extended spectrum DOCSIS: A much different RF spectrum upgrade
Extended spectrum DOCSIS: A  much different  RF spectrum upgradeExtended spectrum DOCSIS: A  much different  RF spectrum upgrade
Extended spectrum DOCSIS: A much different RF spectrum upgrade
 
Vsat day-2008-shiron
Vsat day-2008-shironVsat day-2008-shiron
Vsat day-2008-shiron
 
Qtrack
QtrackQtrack
Qtrack
 
Spaun
SpaunSpaun
Spaun
 
Telecom seminar
Telecom seminarTelecom seminar
Telecom seminar
 
Msr300
Msr300Msr300
Msr300
 
Teleste ACE8 - Updated March 2020
Teleste ACE8 - Updated March 2020Teleste ACE8 - Updated March 2020
Teleste ACE8 - Updated March 2020
 
ECE 24 Final Report 052209
ECE 24 Final Report 052209ECE 24 Final Report 052209
ECE 24 Final Report 052209
 
IT-ISS 7711 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7711 Controller - Intellisystem - Integrated Satellite SolutionsIT-ISS 7711 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7711 Controller - Intellisystem - Integrated Satellite Solutions
 
Vo ip
Vo ipVo ip
Vo ip
 
An Introduction to RF Design, Live presentation at EELive 2014
An Introduction to RF Design, Live presentation at EELive 2014An Introduction to RF Design, Live presentation at EELive 2014
An Introduction to RF Design, Live presentation at EELive 2014
 
Hfc n test equip for hfc
Hfc n test equip for hfcHfc n test equip for hfc
Hfc n test equip for hfc
 
product_data_sheet0900aecd806c5ad4
product_data_sheet0900aecd806c5ad4product_data_sheet0900aecd806c5ad4
product_data_sheet0900aecd806c5ad4
 
Air tight 11ac webinar series session 2 - 11ac feature deep dive - june 2014
Air tight 11ac webinar series   session 2 - 11ac feature deep dive - june 2014Air tight 11ac webinar series   session 2 - 11ac feature deep dive - june 2014
Air tight 11ac webinar series session 2 - 11ac feature deep dive - june 2014
 
Technical Proposal - IPTV - Channel Management
Technical Proposal - IPTV - Channel ManagementTechnical Proposal - IPTV - Channel Management
Technical Proposal - IPTV - Channel Management
 
IT-ISS 7710 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7710 Controller - Intellisystem - Integrated Satellite SolutionsIT-ISS 7710 Controller - Intellisystem - Integrated Satellite Solutions
IT-ISS 7710 Controller - Intellisystem - Integrated Satellite Solutions
 
802.11n Tutorial
802.11n Tutorial802.11n Tutorial
802.11n Tutorial
 

Viewers also liked

IDnova - RFID Vs. MRO. SNAM RETE GAS case study
IDnova - RFID Vs. MRO. SNAM RETE GAS case studyIDnova - RFID Vs. MRO. SNAM RETE GAS case study
IDnova - RFID Vs. MRO. SNAM RETE GAS case studyMario Beltrami
 
Winning Email Practices In Retail Marketing
Winning Email Practices In Retail MarketingWinning Email Practices In Retail Marketing
Winning Email Practices In Retail MarketingRichard Evans
 
Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...
Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...
Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...Canada Mining Innovation Council
 
Observatorio colegios El Mundo 2013
Observatorio colegios El Mundo 2013Observatorio colegios El Mundo 2013
Observatorio colegios El Mundo 2013Caxton College
 
Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...
Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...
Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...José Joaquín Machí Ribes
 
Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...
Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...
Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...Joao Galdino Mello de Souza
 
IP Networking at HSBC
IP Networking at HSBCIP Networking at HSBC
IP Networking at HSBCeircom
 
Despido Carmen Aristegui y Casa Blanca EPN
Despido Carmen Aristegui y Casa Blanca EPNDespido Carmen Aristegui y Casa Blanca EPN
Despido Carmen Aristegui y Casa Blanca EPNChristian Pino Lanata
 
Gaceta COAAT Malaga
Gaceta COAAT MalagaGaceta COAAT Malaga
Gaceta COAAT Malagajosearnaiz
 
Almas y cuerpo en una tradición indigena tzeltal pedro pitarch
Almas y cuerpo en una tradición indigena tzeltal pedro pitarchAlmas y cuerpo en una tradición indigena tzeltal pedro pitarch
Almas y cuerpo en una tradición indigena tzeltal pedro pitarchEliandro Kienteca
 
Presentacion corporativa udapi
Presentacion corporativa udapiPresentacion corporativa udapi
Presentacion corporativa udapiUdapi
 

Viewers also liked (19)

IDnova - RFID Vs. MRO. SNAM RETE GAS case study
IDnova - RFID Vs. MRO. SNAM RETE GAS case studyIDnova - RFID Vs. MRO. SNAM RETE GAS case study
IDnova - RFID Vs. MRO. SNAM RETE GAS case study
 
Presentation 7
Presentation 7Presentation 7
Presentation 7
 
Iptv
Iptv Iptv
Iptv
 
Fibre broadband futures
Fibre broadband futuresFibre broadband futures
Fibre broadband futures
 
Launching A Succesful IPTV Service
Launching A Succesful IPTV ServiceLaunching A Succesful IPTV Service
Launching A Succesful IPTV Service
 
Winning Email Practices In Retail Marketing
Winning Email Practices In Retail MarketingWinning Email Practices In Retail Marketing
Winning Email Practices In Retail Marketing
 
True Move iPhone Care Center
True Move iPhone Care Center True Move iPhone Care Center
True Move iPhone Care Center
 
Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...
Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...
Metal Price Outlook 2013-14, presented by Patricia Mohr at 2013 CMIC Signatur...
 
Abc redes sociales
Abc redes socialesAbc redes sociales
Abc redes sociales
 
Tic Americas Yabt : Jornada
Tic Americas Yabt : JornadaTic Americas Yabt : Jornada
Tic Americas Yabt : Jornada
 
Aborto xi$@r
Aborto xi$@rAborto xi$@r
Aborto xi$@r
 
Observatorio colegios El Mundo 2013
Observatorio colegios El Mundo 2013Observatorio colegios El Mundo 2013
Observatorio colegios El Mundo 2013
 
Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...
Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...
Pharmaceutical interventions in metabolic and nutritional follow-up of surgic...
 
Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...
Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...
Desmystifying Extended Distance FICON (aka Persistent IU Pacing), por Dr. Ste...
 
IP Networking at HSBC
IP Networking at HSBCIP Networking at HSBC
IP Networking at HSBC
 
Despido Carmen Aristegui y Casa Blanca EPN
Despido Carmen Aristegui y Casa Blanca EPNDespido Carmen Aristegui y Casa Blanca EPN
Despido Carmen Aristegui y Casa Blanca EPN
 
Gaceta COAAT Malaga
Gaceta COAAT MalagaGaceta COAAT Malaga
Gaceta COAAT Malaga
 
Almas y cuerpo en una tradición indigena tzeltal pedro pitarch
Almas y cuerpo en una tradición indigena tzeltal pedro pitarchAlmas y cuerpo en una tradición indigena tzeltal pedro pitarch
Almas y cuerpo en una tradición indigena tzeltal pedro pitarch
 
Presentacion corporativa udapi
Presentacion corporativa udapiPresentacion corporativa udapi
Presentacion corporativa udapi
 

Similar to How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spectrum Repack

Broadcast day 2011_ses
Broadcast day 2011_sesBroadcast day 2011_ses
Broadcast day 2011_sesSSPI Brasil
 
RF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdfRF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdfatsnoida3
 
TV Repack & ATSC 3.0: SFN & Future proofing antennas
TV Repack & ATSC 3.0:  SFN & Future proofing antennasTV Repack & ATSC 3.0:  SFN & Future proofing antennas
TV Repack & ATSC 3.0: SFN & Future proofing antennaskmsavage
 
Broadcast day-2007-advantech
Broadcast day-2007-advantechBroadcast day-2007-advantech
Broadcast day-2007-advantechSSPI Brasil
 
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum ReallocationAdvanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum ReallocationRadioFrequencySystems
 
Beyond Consumer and Ka-Band: The Future of Traditional VSAT
Beyond Consumer and Ka-Band: The Future of Traditional VSATBeyond Consumer and Ka-Band: The Future of Traditional VSAT
Beyond Consumer and Ka-Band: The Future of Traditional VSATNewtec
 
Smart antenna technology overview
Smart antenna  technology overview Smart antenna  technology overview
Smart antenna technology overview Peter Curnow-Ford
 
UHF/VHFEnergy Harvesting Radio System Physical and MAC Layer Consideration
UHF/VHFEnergy Harvesting Radio System Physical and MAC Layer ConsiderationUHF/VHFEnergy Harvesting Radio System Physical and MAC Layer Consideration
UHF/VHFEnergy Harvesting Radio System Physical and MAC Layer Considerationxiaohuzhang
 
Sspi day 13 maio-2014 - advantech wireless
Sspi day 13 maio-2014 - advantech wirelessSspi day 13 maio-2014 - advantech wireless
Sspi day 13 maio-2014 - advantech wirelessSSPI Brasil
 
Ppt on training
Ppt on trainingPpt on training
Ppt on training9982198262
 
2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...
2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...
2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...Xtera Communications
 
Public Policy Challenges in the Internet Video Age
Public Policy Challenges in the Internet Video AgePublic Policy Challenges in the Internet Video Age
Public Policy Challenges in the Internet Video AgeNYC Media Lab
 

Similar to How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spectrum Repack (20)

Shanghai Breakout: 802.11ac Wi-Fi Fundamentals
Shanghai Breakout: 802.11ac Wi-Fi FundamentalsShanghai Breakout: 802.11ac Wi-Fi Fundamentals
Shanghai Breakout: 802.11ac Wi-Fi Fundamentals
 
Broadcast day 2011_ses
Broadcast day 2011_sesBroadcast day 2011_ses
Broadcast day 2011_ses
 
RF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdfRF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdf
 
Bandwidth optimization
Bandwidth optimizationBandwidth optimization
Bandwidth optimization
 
TV Repack & ATSC 3.0: SFN & Future proofing antennas
TV Repack & ATSC 3.0:  SFN & Future proofing antennasTV Repack & ATSC 3.0:  SFN & Future proofing antennas
TV Repack & ATSC 3.0: SFN & Future proofing antennas
 
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
 
Broadcast day-2007-advantech
Broadcast day-2007-advantechBroadcast day-2007-advantech
Broadcast day-2007-advantech
 
Clase 5 (1) (1).pdf
Clase 5 (1) (1).pdfClase 5 (1) (1).pdf
Clase 5 (1) (1).pdf
 
AT-5888UV-Manual (2).pdf
AT-5888UV-Manual (2).pdfAT-5888UV-Manual (2).pdf
AT-5888UV-Manual (2).pdf
 
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum ReallocationAdvanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
 
Beyond Consumer and Ka-Band: The Future of Traditional VSAT
Beyond Consumer and Ka-Band: The Future of Traditional VSATBeyond Consumer and Ka-Band: The Future of Traditional VSAT
Beyond Consumer and Ka-Band: The Future of Traditional VSAT
 
Smart antenna technology overview
Smart antenna  technology overview Smart antenna  technology overview
Smart antenna technology overview
 
WWOR Fox Ch38D
WWOR Fox Ch38DWWOR Fox Ch38D
WWOR Fox Ch38D
 
WWOR Fox Ch9
WWOR Fox Ch9WWOR Fox Ch9
WWOR Fox Ch9
 
UHF/VHFEnergy Harvesting Radio System Physical and MAC Layer Consideration
UHF/VHFEnergy Harvesting Radio System Physical and MAC Layer ConsiderationUHF/VHFEnergy Harvesting Radio System Physical and MAC Layer Consideration
UHF/VHFEnergy Harvesting Radio System Physical and MAC Layer Consideration
 
Sspi day 13 maio-2014 - advantech wireless
Sspi day 13 maio-2014 - advantech wirelessSspi day 13 maio-2014 - advantech wireless
Sspi day 13 maio-2014 - advantech wireless
 
Ppt on training
Ppt on trainingPpt on training
Ppt on training
 
2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...
2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...
2014 11 13-advanced-technologies-for-unrepeatered-transmission-systems-and-th...
 
Public Policy Challenges in the Internet Video Age
Public Policy Challenges in the Internet Video AgePublic Policy Challenges in the Internet Video Age
Public Policy Challenges in the Internet Video Age
 
Intro to-matv
Intro to-matvIntro to-matv
Intro to-matv
 

Recently uploaded

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 

Recently uploaded (20)

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spectrum Repack

  • 1. © Radio Frequency Systems 2016 All rights reserved1 Future-proof Antenna Systems NAB Broadcast Engineering Conference 2016 Nick Wymant, CTO – Radio Frequency Systems RADIO FREQUENCY SYSTEMS
  • 2. © Radio Frequency Systems 2016 All rights reserved2 Agenda: • Introduction. • Repack observations. • Advanced antenna systems to facilitate the repack: Scenario 1. • Future proof antenna systems for the repack and beyond: Scenario 2. • Advanced master antenna systems to facilitate the repack: Scenario 3. • Real World case studies.
  • 3. © Radio Frequency Systems 2016 All rights reserved3 RFS at a Glance * Revenues: 500 million 2100 Employees 7 Manufacturing centers +250 Active patents 6 R&D centres 35 Sales and Technical Support Offices
  • 4. © Radio Frequency Systems 2016 All rights reserved4 RFS Broadcast Production Sites Meriden U.S.A. Shanghai China São Paulo Brazil Melbourne Australia Hannover Germany Haddenham United Kingdom
  • 5. © Radio Frequency Systems 2016 All rights reserved5 Broadcast Systems – Meriden Connecticut • Located in Meriden, CT • 20,000 ft2 indoor production space allocated to broadcast. • 76,000 ft2 outdoor broadcast test area. • Engineering teams located on site. • Sales team located on site. • Far and near field test ranges on site.
  • 6. © Radio Frequency Systems 2016 All rights reserved6 Activities: Broadcast, Meriden Connecticut • Pylon antenna design and manufacturing. • Broadband slot antenna design and manufacturing . • Rigid line systems design and manufacturing. • Semi flexible cable manufacturing. • Panel antennas integration and test . • RF systems, mask filters and channel combiners integration and test.
  • 7. © Radio Frequency Systems 2016 All rights reserved7 • 39 Month window. • Coordinated effort or free-for-all? • Number of qualified tower crews. • Finite number of high power RF and Structural Engineers. • Limited coverage during operation on interim antenna that can extend for a long period of time.
  • 8. © Radio Frequency Systems 2016 All rights reserved8 • Delays to antenna work caused by weather are generally underestimated. • Delay by one station can cause a domino effect, delaying multiple stations. • The period of operation on an interim antenna was considerable in many instances. 6-18 months in some cases. For this reason high performance interim antenna solutions were adopted. • The cost savings of re-using interim antenna systems was found to be questionable when the removal and refurbishment costs are considered. • Shared, broadband transmission capabilities were shown to provide for a smooth transition, particularly when replicated at two sites.
  • 9. © Radio Frequency Systems 2016 All rights reserved9 Repack Scenario 1: Pylon Antenna Swap out RADIO FREQUENCY SYSTEMS
  • 10. © Radio Frequency Systems 2016 All rights reserved10 This scenario is similar to Case #1 in the Widelity and Digital Tech Consulting reports.
  • 11. © Radio Frequency Systems 2016 All rights reserved11
  • 12. © Radio Frequency Systems 2016 All rights reserved12 Use a high performance interim antenna • You could be on interim antenna for a long time. Try to maximize interim ERP • Eligible for re-imbursement. Use a fully broadband Interim antenna • Availability (off the shelf). • Permanent standby on new channel. • Use on final channel at cut-over date if new main antenna install is delayed. Purchase Interim antenna rather than rent. • Availability ( not waiting rental returns). • Reliability ( not worn / damaged). Do not remove the interim antenna. • Tall tower crews scarce, better utilized getting others on air by the deadline. Use a re-tunable mask filter. • Wasteful of taxpayers money to throw filter away after the channel change.
  • 13. © Radio Frequency Systems 2016 All rights reserved13 Original scenario 1 Improved interim solution Original ERP: 1000 kW Interim ERP: 95 kW Original ERP: 1000 kW Interim ERP: 1000 kW
  • 14. © Radio Frequency Systems 2016 All rights reserved14 • Antennas that provide full band operation: 470-698 MHz. • Low wind load: same or less than side mount pylon. • Power handling to allow up to 2 x 1MW ERP’s. • Elevation gain to allow full ERP with existing transmitters. • Standard azimuth patterns to simplify FCC filing: C-170, S-180, Ominoid. • Re-tuneable high power mask filters, to allow re-use on post repack channel. • Mask filters that don’t require a specialist crew to re-tune.
  • 15. © Radio Frequency Systems 2016 All rights reserved15 Outcome: SBB Broadband Pylon Antenna SBB-8 Broad-Band Slot Antenna Model SBB-8 SBB-16 SBB-24 SBB-32 Gain (C-170) 17 30 43 59 Max input power (kW)* 18 36 54 72 Typical ERP’s 340 kW 1 x 1MW 2 x 1MW 3 x 1MW * Higher power option available
  • 16. © Radio Frequency Systems 2016 All rights reserved16 Production testing of SBB broadband pylons SBB-8 measured VSWR
  • 17. © Radio Frequency Systems 2016 All rights reserved17 Production testing of SBB broadband pylons SBB-8 measured radiation pattern C-170
  • 18. © Radio Frequency Systems 2016 All rights reserved18 6PPXX325E – 50 kW re-tunable UHF TV filter 1) 1) RFS tunable TE-101 mode resonator high-power filters first patented in 2014
  • 19. © Radio Frequency Systems 2016 All rights reserved19 Mask filter tuning software simplifies retune S-parameters BCAT Tuning Actions Visualization of tuning errors Filter Library
  • 20. © Radio Frequency Systems 2016 All rights reserved20 Repack Scenario 2: Future proof equipment RADIO FREQUENCY SYSTEMS
  • 21. © Radio Frequency Systems 2016 All rights reserved21
  • 22. © Radio Frequency Systems 2016 All rights reserved22 • Broadband antenna. Full UHF band operation: 470-698 MHz. • Low wind load antenna: similar to top mount pylon and less than stacked pylons. • Power handling capability to allow at least to 2 full power stations with elliptical or circular polarization. • Ability to change polarization ratio in the future (VPT). • Ability to add a second channel with independent polarization ratio. • Re-tuneable / Broadband RF systems (mask, switch) - up to 100 kW. • Re-tuneable channel combiners when a second channel is added. Broadband Cylinder Antenna
  • 23. © Radio Frequency Systems 2016 All rights reserved23 Outcomes: Range test of PEPL-28 antenna for Dallas TX (half antenna under test)
  • 24. © Radio Frequency Systems 2016 All rights reserved24 Real World Example, Dallas TX: Preparing PEPL-28 antenna for installation at Dallas site.
  • 25. © Radio Frequency Systems 2016 All rights reserved25 Dallas TX: Tunable 80kW + 80kW VPT Combiner 1)Patents granted
  • 26. © Radio Frequency Systems 2016 All rights reserved26 Repack Scenario 3: Master Antenna System RADIO FREQUENCY SYSTEMS
  • 27. © Radio Frequency Systems 2016 All rights reserved27
  • 28. © Radio Frequency Systems 2016 All rights reserved28 • Full UHF band operation: 470-698 MHz. • Power handling to allow multiple full power stations with elliptical or circular polarization. • Low wind load: less than existing panel antennas. • Independent polarization ratio setting. • Maintainable without removing antenna from the tower. • Superior radiation pattern performance.
  • 29. © Radio Frequency Systems 2016 All rights reserved29 • Must be re-tuneable for repack and future channel changes. • Must be adjacent channel capable. • Must allow independent polarization control for each tenant. • Power handling up to 100kW per input and up to 320kW total combined power. • Compact and modular to minimize footprint and installation time.
  • 30. © Radio Frequency Systems 2016 All rights reserved30 Resulting products: Example of a high power wrap around antenna
  • 31. © Radio Frequency Systems 2016 All rights reserved31 VPT: How do we vary the polarization ratio ? -450 Input +450 Input Broadband pylon +450feeder Power splitter in TX room TX Cpol or Epol -450feeder A single channel VPT system. • VPT utilizes dual input antennas. • By changing the phase between inputs, the desired polarization ratio can be achieved.
  • 32. © Radio Frequency Systems 2016 All rights reserved32 Multi-channel VPT systems A channel combiner is used on each input. TX’s have independent power splitters with phase control => Independent polarization for each TX. Future configuration: TX2 upgrades to a future transmission standard that incorporates MIMO/MISO. TX1 remains on the current standard. -450 Combiner +450 Combiner TX1 TX2 -450 Feeder +450 Feeder Adjust Phase Broadband pylon -450 Antenna Input +450 Antenna Input -450 Combiner +450 Combiner TX1 TX2 data stream 1 -450 Feeder +450 Feeder Broadband pylon -450 Antenna Input +450 Antenna Input TX1: ATSC E-pol TX2 data stream 2 TX2: Future standard MIMO/MISO
  • 33. © Radio Frequency Systems 2016 All rights reserved33 Real World Case Study, One World Trade, NYC
  • 34. © Radio Frequency Systems 2016 All rights reserved34 Case Study, One World Trade Center, NYC UHF Upper Antenna 40 VPT panels. VHF Antenna 16 VPT panels. UHF Lower Antenna 96 VPT panels.
  • 35. © Radio Frequency Systems 2016 All rights reserved35 One World Trade Center, Trial antennas * We wish to acknowledge the valuable assistance of Dr Oded Bendov, Doug Lung and S. Merrill Weiss during the antenna elevation pattern optimization process.
  • 36. © Radio Frequency Systems 2016 All rights reserved36 Range Testing – One World Trade UHF Antenna 1 A section of the upper One World Trade UHF antenna about to be lifted onto RFS far field test range A. RFS far field test range A, one of four broadcast outdoor antenna ranges. Disconnecting the lifting equipment.
  • 37. © Radio Frequency Systems 2016 All rights reserved37 Range Testing – One World Trade VHF Antenna
  • 38. © Radio Frequency Systems 2016 All rights reserved38 VPT combiner design for One World Trade Center 5-channel tunable TE-101 mode WG combiner 1)Patents granted VPT combiner module ready for test
  • 39. © Radio Frequency Systems 2016 All rights reserved39 Tuneable Combiner Module with Waveguide Output 1)Patents granted and pending
  • 40. © Radio Frequency Systems 2016 All rights reserved40 Antennas and combiners were designed with consideration of the increased peak power requirement. Ability to increase vertical polarization component in the future to enhance reception on hand held devices. Mask filters designed with upgrade to ATSC3 in mind. Antennas ready for MIMO.
  • 41. © Radio Frequency Systems 2016 All rights reserved41 Conclusions • Based on our experience with the UK and Australian repacks, RFS believe that broadband frequency agile equipment provides the easiest path to a successful outcome. • Weather and tower crew availability could delay installation of the main antenna. A high performance broadband interim/reserve antenna that operates on pre and post restack channels provides some insurance against operating at reduced ERP for a significant period of time, or missing the switch-over date. • Consider a re-tuneable interim mask filter that can be reused on the new channel allocation. • Consider frequency agile and polarization agile solutions that provide a future upgrade path. • Ensure that ATSC 3.0 operation has been considered during the design of any new equipment. • Operation from a shared master site may prove to be the easiest way forward for many.
  • 42. © Radio Frequency Systems 2016 All rights reserved42 Thank You Nick Wymant CTO, RFS Broadcast nick.wymant@rfsworld.com +1 (203) 707-8929
  • 43. © Radio Frequency Systems 2016 All rights reserved43 Follow us ! www.rfsworld.com