SlideShare a Scribd company logo
1 of 34
1
GOODWILL INDUSTRIES OF
WESTERN NEW YORK
IE – 409/509
SIX SIGMA QUALITY PROJECT
Department of Industrial And Systems
Engineering
2
Founded by three local businessmen: Allen Hamling,
Edward Read and Dr. Harvey Ott, under the auspices of
Grace Methodist Episcopal Church in 1919.
Vision: We will develop a resource base that maximizes the
services we provide in the communities we serve. Our
services will be united by a vocational emphasis and
characterized by relevance, excellence and cost
effectiveness.
Mission: We help individuals and families in our
community achieve a better life through work and
independence.
3
HOW DO THEY WORK?
Accept donations from people in the form of
clothes, furniture, electronics, toys, shoes, etc.
Collected goods are put through different quality
checks.
Quality-checked goods are sold at extremely
nominal rates at different Goodwill stores located
in Western New York.
Scrap gathered from non-sellable items – sold by
weight.
4
PROBLEMS FACED!
At Goodwill Industries, from floor planning and material
handling to inventory control, there is no standardization.
Some of the problems were:
The process floor layout was not optimally designed, flow
of materials showed high redundancy.
Lack of process standardization in different departments.
Lack of proper documentation and historical data made it
difficult to establish baseline.
5
AIM AND OBJECTIVES
Based on these, we decided to work and improve the following:
 Process planning and optimization of wares sorting section.
 Overall plant layout optimization
 Comparing cost of rags and soft toys for selling as waste so
as to release the floor space occupied by the soft toys.
 Sorting time reduction by sort station redesign.
D M A I C
As per the Six – Sigma method, we followed the
 D – Define
 M – Measure
 A – Analyze
 I – Improve
 C – Control
rule. The following were our observations and actions.
DMAIC TOOLS USED
PHASES SIX SIGMA TOOLS
DEFINE i. Project Selection Matrix
ii. Project Charter
iii. Process Flow Chart
MEASURE i. X- Bar& R-Bar Charts
ii. Spaghetti Chart
ANALYZE i. Why-Why Diagram
ii. Brainstorming
iii. Cause and Effect Chart
IMPROVE i. Optimized Flow Chart
ii. Optimized Shop floor Layout
iii. Cycle Time Reduction
CONTROL i. Guidelines
SIPOC
 SIPOC is a high-level picture of the process that depicts
how the given process is servicing the customer.
 Can be seen as a high-level process map.
 Typically used during the define phase of a process
improvement project - helps clearly understand the purpose
and the scope of a process.
We could relate to the 8 diseases as follows:
 Overproduction
 Inventory: Due to insufficient of fixed labor force and
specialized workers
 Transportation: The truck scheduling was not under our
control.
 Defects: not measurable due to lack of a standard to relate to.
 Motion (Operations): Material handling problems
 Over-processing
 Waiting: Again the problem of material handling
 Non-Utilization of Resources: Real Estate wastage
EIGHT WASTES
WE WORK ON?
 Overproduction
 Inventory: Due to insufficient of fixed labor force and
specialized workers
 Transportation: The truck scheduling was not under our
control.
 Defects: not measurable due to lack of a standard to relate to.
 Motion (Operations): Material handling problems
 Over-processing
 Waiting: Again the problem of material handling
 Non-Utilization of Resources: Real Estate wastage
CAUSE AND EFFECT
PROCESS FLOW CHART
Current Layout
Optimized Flow Chart
REQUIREMENT OF NEW
LAYOUT
 Relevant from the process flow diagram.
 Ideal situation of automation is not possible due to budget
limitations.
 The new layout provides an optimal solution within the
given constraints.
16
CURRENT PLANT LAYOUT
17
OBSERVATIONS
 Staging areas far away from processing areas.
 Distance of Textiles and wares sorting section from entry
and exit is more
 Distance of bales from entry and exit is less
 Waste generation area far from entry and exit door
18
REVISED PLANT LAYOUT
19
ADVANTAGES
 Textile and wares sorting area closer to entry and exit
doors
 Staging areas are closer to processing area
 Material Handling reduced
 Increasing speed of Flow
20
WARES SORTING SECTION
21
DEFINE
22
CURRENT LAYOUT FOR
WARES SECTION
23
MEASURE
X- BAR & R-BAR CHARTS
20 19 20 18 17 19
20 19 16 18 22 20
18 20 22 23 19 17
17 21 20 21 23 19
21 19 21 20 16 17
54321
22.5
21.0
19.5
18.0
Sample
SampleMean
__
X=19.4
UCL=21.841
LCL=16.959
54321
10.0
7.5
5.0
2.5
0.0
Sample
SampleRange
_
R=5.05
UCL=10.12
LCL=0
Xbar-R Chart of C1, ..., C6
SPAGHETTI DIAGRAM
Original
Spaghetti
26
ANALYZE
27
 Why-Why?
 Rejection rate
 Brainstorming
28
IMPROVE
29
REVISED LAYOUT
30
CONTROL
LABOR TRAINING ACCORDING TO
GUIDELINES FORMULATED
31
TO PROCESSORS:
1) There will be two levels of sorting, light skimming and
thorough sorting.
2) Stand in front of the cage and skim through the items one
by one. This level need not be thorough.
3) Reject most, keep aside what looks really good.
4) If the item looks acceptable place on the table, otherwise,
dump in the dustbin.
5) After the table is full, shift focus on the table to thorough
check all items on table.
6) What is acceptable after this stage, place in the respective
basket.
7) After the cage is empty, push the empty cage aside and
replace it with full cage.
32
TO HANDLERS:
There are the following primary tasks for the handlers:
1) Replace empty cages with filled ones
2) Replace full baskets of “electronics”, “books”, “shoes” and
“wares” with empty ones.
3) Replace the full “bins” with empty ones.
33
CONCLUSION
 Reduction of material Handling
 Reduction of human effort for handler
 Possibility to free up resource
 Reduction of steps of process
34

More Related Content

Viewers also liked

major project report Property Management
 major project report Property Management major project report Property Management
major project report Property Managementankonline
 
Agile Technology Delivery Process Mr
Agile Technology Delivery Process   MrAgile Technology Delivery Process   Mr
Agile Technology Delivery Process MrMurray Robinson
 
Six Sigma Application on Rivet Production
Six Sigma Application on Rivet ProductionSix Sigma Application on Rivet Production
Six Sigma Application on Rivet ProductionApoorva Apoorva
 
Internship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryInternship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryAkshay Mistri
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Juan Paolo Somorostro - Aranas, MPA, BSOSM
 
Six Sigma Executive Overview
Six Sigma Executive OverviewSix Sigma Executive Overview
Six Sigma Executive OverviewDoctorKakish
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandAkshay Anand
 
Six sigma for beginner
Six sigma for beginnerSix sigma for beginner
Six sigma for beginnerYusar Cahyadi
 
Oil & gas sector presentation
Oil & gas sector presentationOil & gas sector presentation
Oil & gas sector presentationInfraline Energy
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 

Viewers also liked (17)

major project report Property Management
 major project report Property Management major project report Property Management
major project report Property Management
 
Report
ReportReport
Report
 
Agile Technology Delivery Process Mr
Agile Technology Delivery Process   MrAgile Technology Delivery Process   Mr
Agile Technology Delivery Process Mr
 
Six Sigma Project- GB
Six Sigma Project- GBSix Sigma Project- GB
Six Sigma Project- GB
 
Six Sigma Application on Rivet Production
Six Sigma Application on Rivet ProductionSix Sigma Application on Rivet Production
Six Sigma Application on Rivet Production
 
Internship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryInternship Report on Material Handling and Machinery
Internship Report on Material Handling and Machinery
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
IP Valuation
IP ValuationIP Valuation
IP Valuation
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
 
Six Sigma Executive Overview
Six Sigma Executive OverviewSix Sigma Executive Overview
Six Sigma Executive Overview
 
Six Sigma Yellow Belt
Six Sigma Yellow BeltSix Sigma Yellow Belt
Six Sigma Yellow Belt
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay Anand
 
Six sigma for beginner
Six sigma for beginnerSix sigma for beginner
Six sigma for beginner
 
Six Sigma For Managers
Six Sigma For Managers   Six Sigma For Managers
Six Sigma For Managers
 
Oil & gas sector presentation
Oil & gas sector presentationOil & gas sector presentation
Oil & gas sector presentation
 
six sigma ppt
six sigma pptsix sigma ppt
six sigma ppt
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 

Similar to 6 sigma final ppt

Supply Chain Management_ Making Supply Meet Demand
Supply Chain Management_ Making Supply Meet Demand Supply Chain Management_ Making Supply Meet Demand
Supply Chain Management_ Making Supply Meet Demand Rojer S Chaudhary
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picshaganone
 
Process selection for manufacturing fms
Process selection for manufacturing fmsProcess selection for manufacturing fms
Process selection for manufacturing fmsKinshook Chaturvedi
 
Process mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaProcess mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaHaris Naved Ahmed
 
Lean implementation guide (1)
Lean implementation guide (1)Lean implementation guide (1)
Lean implementation guide (1)Gustavo Marfia
 
Cost To Serve
Cost To ServeCost To Serve
Cost To ServeSCL HUB
 
OMP presentation
OMP presentationOMP presentation
OMP presentationbuhle keto
 
Lean manufacturing the complete presentation.pdf
Lean manufacturing the complete presentation.pdfLean manufacturing the complete presentation.pdf
Lean manufacturing the complete presentation.pdfbilalmetidja1
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with SimulationProModel Corporation
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSteve Haekler
 
Smu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentsSmu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentssolved_assignments
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introductionPaudzi Abdullah
 
Planning building & operating 3rd party warehousing
Planning building & operating 3rd party warehousingPlanning building & operating 3rd party warehousing
Planning building & operating 3rd party warehousingImdad Logistics
 
Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...IRJET Journal
 

Similar to 6 sigma final ppt (20)

Supply Chain Management_ Making Supply Meet Demand
Supply Chain Management_ Making Supply Meet Demand Supply Chain Management_ Making Supply Meet Demand
Supply Chain Management_ Making Supply Meet Demand
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Process selection for manufacturing fms
Process selection for manufacturing fmsProcess selection for manufacturing fms
Process selection for manufacturing fms
 
Process mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaProcess mapping session final-Lean Six Sigma
Process mapping session final-Lean Six Sigma
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
VSM (Méthode HOSHIN)
VSM (Méthode HOSHIN)VSM (Méthode HOSHIN)
VSM (Méthode HOSHIN)
 
Lean implementation guide (1)
Lean implementation guide (1)Lean implementation guide (1)
Lean implementation guide (1)
 
JIT9.ppt
JIT9.pptJIT9.ppt
JIT9.ppt
 
Cost To Serve
Cost To ServeCost To Serve
Cost To Serve
 
Cost To Serve
Cost To ServeCost To Serve
Cost To Serve
 
OMP presentation
OMP presentationOMP presentation
OMP presentation
 
Scm integrated
Scm integratedScm integrated
Scm integrated
 
Lean manufacturing the complete presentation.pdf
Lean manufacturing the complete presentation.pdfLean manufacturing the complete presentation.pdf
Lean manufacturing the complete presentation.pdf
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with Simulation
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with Simulation
 
Smu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentsSmu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignments
 
Lesson 1 pe - lps introduction
Lesson 1   pe - lps introductionLesson 1   pe - lps introduction
Lesson 1 pe - lps introduction
 
Planning building & operating 3rd party warehousing
Planning building & operating 3rd party warehousingPlanning building & operating 3rd party warehousing
Planning building & operating 3rd party warehousing
 
Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

6 sigma final ppt

  • 1. 1 GOODWILL INDUSTRIES OF WESTERN NEW YORK IE – 409/509 SIX SIGMA QUALITY PROJECT Department of Industrial And Systems Engineering
  • 2. 2 Founded by three local businessmen: Allen Hamling, Edward Read and Dr. Harvey Ott, under the auspices of Grace Methodist Episcopal Church in 1919. Vision: We will develop a resource base that maximizes the services we provide in the communities we serve. Our services will be united by a vocational emphasis and characterized by relevance, excellence and cost effectiveness. Mission: We help individuals and families in our community achieve a better life through work and independence.
  • 3. 3 HOW DO THEY WORK? Accept donations from people in the form of clothes, furniture, electronics, toys, shoes, etc. Collected goods are put through different quality checks. Quality-checked goods are sold at extremely nominal rates at different Goodwill stores located in Western New York. Scrap gathered from non-sellable items – sold by weight.
  • 4. 4 PROBLEMS FACED! At Goodwill Industries, from floor planning and material handling to inventory control, there is no standardization. Some of the problems were: The process floor layout was not optimally designed, flow of materials showed high redundancy. Lack of process standardization in different departments. Lack of proper documentation and historical data made it difficult to establish baseline.
  • 5. 5 AIM AND OBJECTIVES Based on these, we decided to work and improve the following:  Process planning and optimization of wares sorting section.  Overall plant layout optimization  Comparing cost of rags and soft toys for selling as waste so as to release the floor space occupied by the soft toys.  Sorting time reduction by sort station redesign.
  • 6. D M A I C As per the Six – Sigma method, we followed the  D – Define  M – Measure  A – Analyze  I – Improve  C – Control rule. The following were our observations and actions.
  • 7. DMAIC TOOLS USED PHASES SIX SIGMA TOOLS DEFINE i. Project Selection Matrix ii. Project Charter iii. Process Flow Chart MEASURE i. X- Bar& R-Bar Charts ii. Spaghetti Chart ANALYZE i. Why-Why Diagram ii. Brainstorming iii. Cause and Effect Chart IMPROVE i. Optimized Flow Chart ii. Optimized Shop floor Layout iii. Cycle Time Reduction CONTROL i. Guidelines
  • 8. SIPOC  SIPOC is a high-level picture of the process that depicts how the given process is servicing the customer.  Can be seen as a high-level process map.  Typically used during the define phase of a process improvement project - helps clearly understand the purpose and the scope of a process.
  • 9.
  • 10. We could relate to the 8 diseases as follows:  Overproduction  Inventory: Due to insufficient of fixed labor force and specialized workers  Transportation: The truck scheduling was not under our control.  Defects: not measurable due to lack of a standard to relate to.  Motion (Operations): Material handling problems  Over-processing  Waiting: Again the problem of material handling  Non-Utilization of Resources: Real Estate wastage EIGHT WASTES
  • 11. WE WORK ON?  Overproduction  Inventory: Due to insufficient of fixed labor force and specialized workers  Transportation: The truck scheduling was not under our control.  Defects: not measurable due to lack of a standard to relate to.  Motion (Operations): Material handling problems  Over-processing  Waiting: Again the problem of material handling  Non-Utilization of Resources: Real Estate wastage
  • 15. REQUIREMENT OF NEW LAYOUT  Relevant from the process flow diagram.  Ideal situation of automation is not possible due to budget limitations.  The new layout provides an optimal solution within the given constraints.
  • 17. 17 OBSERVATIONS  Staging areas far away from processing areas.  Distance of Textiles and wares sorting section from entry and exit is more  Distance of bales from entry and exit is less  Waste generation area far from entry and exit door
  • 19. 19 ADVANTAGES  Textile and wares sorting area closer to entry and exit doors  Staging areas are closer to processing area  Material Handling reduced  Increasing speed of Flow
  • 24. X- BAR & R-BAR CHARTS 20 19 20 18 17 19 20 19 16 18 22 20 18 20 22 23 19 17 17 21 20 21 23 19 21 19 21 20 16 17 54321 22.5 21.0 19.5 18.0 Sample SampleMean __ X=19.4 UCL=21.841 LCL=16.959 54321 10.0 7.5 5.0 2.5 0.0 Sample SampleRange _ R=5.05 UCL=10.12 LCL=0 Xbar-R Chart of C1, ..., C6
  • 27. 27  Why-Why?  Rejection rate  Brainstorming
  • 30. 30 CONTROL LABOR TRAINING ACCORDING TO GUIDELINES FORMULATED
  • 31. 31 TO PROCESSORS: 1) There will be two levels of sorting, light skimming and thorough sorting. 2) Stand in front of the cage and skim through the items one by one. This level need not be thorough. 3) Reject most, keep aside what looks really good. 4) If the item looks acceptable place on the table, otherwise, dump in the dustbin. 5) After the table is full, shift focus on the table to thorough check all items on table. 6) What is acceptable after this stage, place in the respective basket. 7) After the cage is empty, push the empty cage aside and replace it with full cage.
  • 32. 32 TO HANDLERS: There are the following primary tasks for the handlers: 1) Replace empty cages with filled ones 2) Replace full baskets of “electronics”, “books”, “shoes” and “wares” with empty ones. 3) Replace the full “bins” with empty ones.
  • 33. 33 CONCLUSION  Reduction of material Handling  Reduction of human effort for handler  Possibility to free up resource  Reduction of steps of process
  • 34. 34