SlideShare a Scribd company logo
1 of 30
Download to read offline
1
VALUE THROUGH GOLD
BMO GLOBAL METALS & MINING CONFERENCE
February 28, 2017
2
CAUTIONARY STATEMENT
Forward-Looking Information
This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States
securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future
periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral
reserves and resources including the 2016 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of
development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates,
capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of
approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and
committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”,
“scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results
“may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been
used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute
forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any
statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or
performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and
unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking
information, including, without limitation, those risks identified in our Offering Memorandum dated February 7, 2017 filed on SEDAR at www.sedar.com and
in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and
opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered
reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result
of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place
undue reliance on forward-looking information.
National Instrument 43-101
Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical
reports (“Reports”), “Measured, Indicated, and Inferred Mineral Resource Update” dated July 21, 2016, “Feasibility Study and Technical Report on the
Brucejack Project, Stewart, BC” dated June 19, 2014, “Mineral Reserve Update” dated December 15, 2016, “capital cost update” dated February 3, 2017, and .
We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the
Projects have been prepared under the supervision of Mr. Ivor W.O. Jones, M.S.c., FAusIMM, Cpgeo, Mr. Kenneth C. McNaughton, P.Eng., Ian Chang, P.Eng.,
Mr. Russell Pennel, B.A.S.c., P.Eng., and Mr. Lyle Morgenthaler, B.A.S.c., P.Eng. each of whom is an independent “qualified person” under NI 43-101.
This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized
and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources
which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental,
permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be
converted into mineral reserves.
In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or
any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not
form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are
cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
Currency
Unless otherwise indicated, all dollar values herein are in Canadian $.
3
V A L U E T H R O U G H G O L D
 High-grade underground gold
mine in British Columbia, Canada
 Construction nearing completion;
commissioning targeted for early
2017
 Fully funded
 Low All-in-Sustaining Cost
 District potential: deposit remains
open in all directions
4
BRUCEJACK LOCATION
5
HIGH-GRADE GOLD RESERVES(1,2)
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 1.4 7.2 383 0.3 17.4
Probable 1.5 6.5 181 0.3 8.6
Total P&P 2.9 6.9 279 0.6 26.0
Valley of the Kings
West Zone
(1) Source: Mineral Reserve Update, see news release dated December 15, 2016
(2) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 3.3 14.5 12.9 1.6 1.4
Probable 12.3 16.5 11.3 6.5 4.5
Total P&P 15.6 16.1 11.1 8.1 5.9
Mineral Reserve Estimate – Dec 2016
West Zone
Valley of the Kings
6
BRUCEJACK PROJECT PRODUCTION
Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014;
Mineral Reserve Update, see news release dated Dec. 15, 2016.
Mine Life 18 years
Feasibility Study Gold
Production
7.27 million oz
Average Annual Gold
Production
504,000 oz (years 1-8)
404,000 oz (life of mine)
Gold and Silver
Recoveries
96.7% and 90.0%
Processing Rate 2,700 tonnes per day
7
OPEN IN ALL DIRECTIONS
N
250 m
1Outline of Measured, Indicated, and Inferred Mineral Resource as at 21 July 2016.
2Outline of Proven and Probable Mineral Reserve, based on 19 June 2014 Updated Feasibility Study.
SU-658
SU-661
SU-654
SU-668
2.05m @ 2,100 g/t Au
(Includes 0.5m @ 8,600 g/t Au)
1.18m @ 10.75 g/t Au
9.0m @ 21.87 g/t Au
(Includes 0.5m @ 203 g/t Au)
1.5m @ 16.9 g/t Au
0.5m @ 137 g/t Au
Mineral Resource1
Mineral Reserve2
Exploration Potential
Drill Intercepts
8
BRUCEJACK - ROBUST ECONOMICS
(1) Based on updated forecast of capital cost (see News Release dated February 3, 2017) and operating cost assumptions from the Feasibility Study and
Technical Report Update on the Brucejack Project, with an effective date of June 19, 2014
(2) NPV is discounted to Dec 31, 2015.
Economic Results by Metal Price (1)
Low Case Base Case High Case
Gold Price (US$/oz) $800 $1,100 $1,400
Silver Price (US$/oz) $10 $14 $18
NPV(2) (5% US$M) Pre-Tax $1,050 $2,340 $3,620
After Tax $690 $1,530 $2,360
Internal Rate of Return Pre-Tax 19.9% 34.4% 47.5%
After-Tax 16.5% 28.5% 39.1%
Net Cash Flow (US$M) Pre-Tax $2,110 $4,220 $6,320
After-Tax $1,470 $2,820 $4,170
Payback Pre-Tax 5.0 3.3 2.5
After-Tax 5.2 3.5 2.7
Capex (US$M) $811.1 $811.1 $811.1
Exchange Rate (US$:C$) 0.75 0.75 0.75
9
2015 2016 2017
KEY MILESTONES TO PRODUCTION
2014
10
START OF CONSTRUCTION
- OCTOBER 2015
11
CONSTRUCTION ADVANCES
– MARCH 2016
12
CONSTRUCTION ADVANCES
– JULY 2016
13
CONSTRUCTION ADVANCES
– OCTOBER 2016
14
CONSTRUCTION ADVANCES
– FEBRUARY 2017
15
PROCESSING FLOW SHEET
55%
FROM CONCENTRATE
45%
FROM GRAVITY
(1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014.
96.7% GOLD RECOVERY (LOM)
16
MILL BUILDING
– GRINDING AREA
17
MILL BUILDING
– PIPING & INTERNAL STEEL
18
Process and fire water tanks
MILL BUILDING
– FLOTATION CELLS
19
MILL BUILDING
– TAILINGS STOCK TANK & THICKENER
20
PORTAL BUILDING
21
UNDERGROUND DEVELOPMENT
– TRANSFER TOWER
22
ORE FLOW
Isometric view facing North West
West Zone
Portal
Valley of the
Kings Portal
Transfer
Station
Truck Dump
to Crusher
Ventilation
Raise
Ventilation
Raise
Ventilation
Raise
As Built Jan 2017
Test Stope
1320L Stope
Ore Flow Direction
1230L Stope
23
INITIAL STOPES
Isometric view facing North West
West Zone
Portal
Valley of the
Kings Portal
Transfer
Station
As Built Jan 2017
Test Stope
1320L Stope
Ore Flow Direction
1230L Stope
24
TRANSMISSION LINE
25
DIESEL POWER STATION
26
DEVELOPMENT STATUS
 All major components
delivered to site, installation
and assembly underway
 Commissioning April 2017
 Over 130,000 tonnes of ore
stockpiled on surface and
underground
 Underground development
advanced with 11 stopes
crosscut in preparation for
long-hole drilling
27
OPERATIONS READINESS
 All senior & supervisor
positions have been filled
 Continued success recruiting
locally for operations
 Over 75% of mill operations
and metallurgy positions
filled
 Contract mining for initial
production
28
SHAREHOLDING & ANALYST COVERAGE
(1) As of Feb 22, 2017; ownership calculated on an undiluted basis.
(2) Does not include the US$200 million drawn from the US$540 million construction financing closed Sept 21, 2015 or the US$100 million available from the Notes
Offering closed Feb 14, 2017. See News Releases dated Sept 21, 2015 & Feb 14, 2017
(3) As of Feb 15, 2017. Source: IPREO & SEDI
Analyst Coverage
BMO Andrew Kaip
Canaccord Genuity Eric Zaunscherb
CIBC Jeff Killeen
Cormark Securities Richard Gray
H.C. Wainwright Heiko F. Ihle
Numis Jonathan Guy
Pareto Securities Rhys Bradley
RBC Dan Rollins
Roth Capital Partners Joseph Reagor
Scotiabank Ovais Habib
Top Shareholders(3)
(% S/O)
Black Rock Asset Management 10.6
Van Eck Associates 10.4
Silver Standard Resources 9.4
Zijin Mining 5.0
Orion Mine Finance 2.6
Pretivm Management 1.9
Capital Structure(1)
(shares in millions)
Issued & Outstanding 180.7
Fully Diluted 188.1
Market Cap US$2.10 B
(Feb 23, 2017)
Working Capital(2)
C$153.2 M
(at Sept 30, 2016)
1-Year % Change PVG and Gold (Feb 23, 2017)
129%
3%
PVG Price % Change
Gold Price % Change
29
Advancing the high-grade Brucejack gold mine
PVG : TSX/NYSEpretivm.com
30
30
CONTACT:
Phone: 604-558-1784
Fax: 604-558-4784
Toll-free: 1-877-558-1784
invest@pretivm.com
www.pretivm.com
HEAD OFFICE:
Pretium Resources Inc.
Suite 2300 – 1055 Dunsmuir St.
Four Bentall Centre
PO Box 49334
Vancouver, BC
Canada V7X 1L4
Advancing a major high-grade gold project in Canada
COMMON SHARES:
TSX/NYSE: PVG
Issued: 180.7 M
Fully diluted: 188.1 M
52-week hi/low: US$12.53/$4.43
Market cap: US$2.10 B
(at Feb 23, 2017)

More Related Content

What's hot

Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015PretiumR
 
2017 PDAC Convention
2017 PDAC Convention 2017 PDAC Convention
2017 PDAC Convention NOVAGOLD
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)PretiumR
 
Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014PretiumR
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014PretiumR
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...PretiumR
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretiumR
 
Ssri corp. pres._-_051517
Ssri corp. pres._-_051517Ssri corp. pres._-_051517
Ssri corp. pres._-_051517SilverStandard
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014PretiumR
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferencePretiumR
 
Corp Presentation October 2014
Corp Presentation October 2014Corp Presentation October 2014
Corp Presentation October 2014PretiumR
 
Ssr mining corp. pres. 081717
Ssr mining corp. pres.   081717Ssr mining corp. pres.   081717
Ssr mining corp. pres. 081717SilverStandard
 
Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017NOVAGOLD
 
NOVAGOLD Third Quarter 2014 Conference Call and Webcast
NOVAGOLD Third Quarter 2014 Conference Call and Webcast NOVAGOLD Third Quarter 2014 Conference Call and Webcast
NOVAGOLD Third Quarter 2014 Conference Call and Webcast NOVAGOLD
 

What's hot (15)

Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015
 
2017 PDAC Convention
2017 PDAC Convention 2017 PDAC Convention
2017 PDAC Convention
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)
 
Scotiabank dec42017
Scotiabank dec42017Scotiabank dec42017
Scotiabank dec42017
 
Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014Corporate Presentation Sept 5, 2014
Corporate Presentation Sept 5, 2014
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Ssri corp. pres._-_051517
Ssri corp. pres._-_051517Ssri corp. pres._-_051517
Ssri corp. pres._-_051517
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
Corp Presentation October 2014
Corp Presentation October 2014Corp Presentation October 2014
Corp Presentation October 2014
 
Ssr mining corp. pres. 081717
Ssr mining corp. pres.   081717Ssr mining corp. pres.   081717
Ssr mining corp. pres. 081717
 
Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017Vancouver Investment Resource Conference 2017
Vancouver Investment Resource Conference 2017
 
NOVAGOLD Third Quarter 2014 Conference Call and Webcast
NOVAGOLD Third Quarter 2014 Conference Call and Webcast NOVAGOLD Third Quarter 2014 Conference Call and Webcast
NOVAGOLD Third Quarter 2014 Conference Call and Webcast
 

Viewers also liked

Отчёт профсоюза ГБОУ Лицей №1568 за 2016 год
Отчёт профсоюза ГБОУ Лицей №1568 за 2016 годОтчёт профсоюза ГБОУ Лицей №1568 за 2016 год
Отчёт профсоюза ГБОУ Лицей №1568 за 2016 годlicey1568
 
Fundamentos del desarrollo cognitivo
Fundamentos del desarrollo cognitivoFundamentos del desarrollo cognitivo
Fundamentos del desarrollo cognitivoJorge Toledo Treviño
 
Penjadwalan proyek
Penjadwalan proyekPenjadwalan proyek
Penjadwalan proyekFenny Yulius
 
Amnesia global transitoria
Amnesia global transitoria Amnesia global transitoria
Amnesia global transitoria Manuel Sanchez
 
Continuous Performance Testing and Monitoring in Agile Development
Continuous Performance Testing and Monitoring in Agile DevelopmentContinuous Performance Testing and Monitoring in Agile Development
Continuous Performance Testing and Monitoring in Agile DevelopmentDynatrace
 
OpenACC Highlights - February
OpenACC Highlights - FebruaryOpenACC Highlights - February
OpenACC Highlights - FebruaryNVIDIA
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceCarling Gaze
 
Calibre Mining Corporate Presentation
Calibre Mining Corporate PresentationCalibre Mining Corporate Presentation
Calibre Mining Corporate PresentationAdnet Communications
 
021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcastKinrossGold
 
ca-mining-reporting-survey-2016
ca-mining-reporting-survey-2016ca-mining-reporting-survey-2016
ca-mining-reporting-survey-2016Kris Bennatti
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016Agnico Eagle Mines
 
Corporate Summary - January 2017
Corporate Summary - January 2017Corporate Summary - January 2017
Corporate Summary - January 2017yamanagold2016
 
Clase 1 estadistica descriptiva modificada prof norkis
Clase 1 estadistica descriptiva modificada prof norkisClase 1 estadistica descriptiva modificada prof norkis
Clase 1 estadistica descriptiva modificada prof norkisNorkis30
 

Viewers also liked (20)

Отчёт профсоюза ГБОУ Лицей №1568 за 2016 год
Отчёт профсоюза ГБОУ Лицей №1568 за 2016 годОтчёт профсоюза ГБОУ Лицей №1568 за 2016 год
Отчёт профсоюза ГБОУ Лицей №1568 за 2016 год
 
Fundamentos del desarrollo cognitivo
Fundamentos del desarrollo cognitivoFundamentos del desarrollo cognitivo
Fundamentos del desarrollo cognitivo
 
Penjadwalan proyek
Penjadwalan proyekPenjadwalan proyek
Penjadwalan proyek
 
Amnesia global transitoria
Amnesia global transitoria Amnesia global transitoria
Amnesia global transitoria
 
Continuous Performance Testing and Monitoring in Agile Development
Continuous Performance Testing and Monitoring in Agile DevelopmentContinuous Performance Testing and Monitoring in Agile Development
Continuous Performance Testing and Monitoring in Agile Development
 
Presentación wiki4
Presentación wiki4Presentación wiki4
Presentación wiki4
 
S pert cpm
S pert cpmS pert cpm
S pert cpm
 
Extraction pooja
Extraction poojaExtraction pooja
Extraction pooja
 
OpenACC Highlights - February
OpenACC Highlights - FebruaryOpenACC Highlights - February
OpenACC Highlights - February
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
ΠΟΛ. 1025/17
ΠΟΛ. 1025/17ΠΟΛ. 1025/17
ΠΟΛ. 1025/17
 
Calibre Mining Corporate Presentation
Calibre Mining Corporate PresentationCalibre Mining Corporate Presentation
Calibre Mining Corporate Presentation
 
021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast021617 q4 fy 2017 webcast
021617 q4 fy 2017 webcast
 
ca-mining-reporting-survey-2016
ca-mining-reporting-survey-2016ca-mining-reporting-survey-2016
ca-mining-reporting-survey-2016
 
S postpurchase
S postpurchaseS postpurchase
S postpurchase
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016
 
Metodos anticonceptivos
Metodos anticonceptivosMetodos anticonceptivos
Metodos anticonceptivos
 
Corporate Summary - January 2017
Corporate Summary - January 2017Corporate Summary - January 2017
Corporate Summary - January 2017
 
Toronto’s attractions!
Toronto’s attractions!Toronto’s attractions!
Toronto’s attractions!
 
Clase 1 estadistica descriptiva modificada prof norkis
Clase 1 estadistica descriptiva modificada prof norkisClase 1 estadistica descriptiva modificada prof norkis
Clase 1 estadistica descriptiva modificada prof norkis
 

Similar to BMO Capital Markets 26th Global Metals & Mining Conference

Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPretiumR
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017PretiumR
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretiumR
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015PretiumR
 
Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015PretiumR
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014PretiumR
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationPretiumR
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014PretiumR
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014PretiumR
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014PretiumR
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016PretiumR
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015PretiumR
 
Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015PretiumR
 
Sprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource SymposiumSprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource SymposiumPretiumR
 
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015PretiumR
 
CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015PretiumR
 
Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015PretiumR
 
Pretivm european gold forum apr 2016
Pretivm   european gold forum apr 2016Pretivm   european gold forum apr 2016
Pretivm european gold forum apr 2016PretiumR
 
European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015PretiumR
 
European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015PretiumR
 

Similar to BMO Capital Markets 26th Global Metals & Mining Conference (20)

Pvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentationPvg presentation-roth-march-13-2017-presentation
Pvg presentation-roth-march-13-2017-presentation
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-web
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015
 
Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015Casey Research Summit Oct 16-17, 2015
Casey Research Summit Oct 16-17, 2015
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
 
Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015
 
Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015
 
Sprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource SymposiumSprott-Stansberry 2015 Natural Resource Symposium
Sprott-Stansberry 2015 Natural Resource Symposium
 
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
Pretivm - Sprott Stansberry Natural Resource Symposium - july 2015
 
CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015CIBC Whistler Conference Presentation Jan 23, 2015
CIBC Whistler Conference Presentation Jan 23, 2015
 
Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015
 
Pretivm european gold forum apr 2016
Pretivm   european gold forum apr 2016Pretivm   european gold forum apr 2016
Pretivm european gold forum apr 2016
 
European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015
 
European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015European Gold Forum Apr14-15, 2015
European Gold Forum Apr14-15, 2015
 

Recently uploaded

OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 

Recently uploaded (20)

OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 

BMO Capital Markets 26th Global Metals & Mining Conference

  • 1. 1 VALUE THROUGH GOLD BMO GLOBAL METALS & MINING CONFERENCE February 28, 2017
  • 2. 2 CAUTIONARY STATEMENT Forward-Looking Information This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, the anticipated production and developments in our operations in future periods, information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral reserves and resources including the 2016 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of our Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees and adequacy of financial resources. Wherever possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”, “scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in our Offering Memorandum dated February 7, 2017 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC’s website at www.sec.gov. Forward-looking information is based on the expectations and opinions of our management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101 Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”), “Measured, Indicated, and Inferred Mineral Resource Update” dated July 21, 2016, “Feasibility Study and Technical Report on the Brucejack Project, Stewart, BC” dated June 19, 2014, “Mineral Reserve Update” dated December 15, 2016, “capital cost update” dated February 3, 2017, and . We have filed the Reports and Update under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Ivor W.O. Jones, M.S.c., FAusIMM, Cpgeo, Mr. Kenneth C. McNaughton, P.Eng., Ian Chang, P.Eng., Mr. Russell Pennel, B.A.S.c., P.Eng., and Mr. Lyle Morgenthaler, B.A.S.c., P.Eng. each of whom is an independent “qualified person” under NI 43-101. This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Currency Unless otherwise indicated, all dollar values herein are in Canadian $.
  • 3. 3 V A L U E T H R O U G H G O L D  High-grade underground gold mine in British Columbia, Canada  Construction nearing completion; commissioning targeted for early 2017  Fully funded  Low All-in-Sustaining Cost  District potential: deposit remains open in all directions
  • 5. 5 HIGH-GRADE GOLD RESERVES(1,2) Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 1.4 7.2 383 0.3 17.4 Probable 1.5 6.5 181 0.3 8.6 Total P&P 2.9 6.9 279 0.6 26.0 Valley of the Kings West Zone (1) Source: Mineral Reserve Update, see news release dated December 15, 2016 (2) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014 Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 3.3 14.5 12.9 1.6 1.4 Probable 12.3 16.5 11.3 6.5 4.5 Total P&P 15.6 16.1 11.1 8.1 5.9 Mineral Reserve Estimate – Dec 2016 West Zone Valley of the Kings
  • 6. 6 BRUCEJACK PROJECT PRODUCTION Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014; Mineral Reserve Update, see news release dated Dec. 15, 2016. Mine Life 18 years Feasibility Study Gold Production 7.27 million oz Average Annual Gold Production 504,000 oz (years 1-8) 404,000 oz (life of mine) Gold and Silver Recoveries 96.7% and 90.0% Processing Rate 2,700 tonnes per day
  • 7. 7 OPEN IN ALL DIRECTIONS N 250 m 1Outline of Measured, Indicated, and Inferred Mineral Resource as at 21 July 2016. 2Outline of Proven and Probable Mineral Reserve, based on 19 June 2014 Updated Feasibility Study. SU-658 SU-661 SU-654 SU-668 2.05m @ 2,100 g/t Au (Includes 0.5m @ 8,600 g/t Au) 1.18m @ 10.75 g/t Au 9.0m @ 21.87 g/t Au (Includes 0.5m @ 203 g/t Au) 1.5m @ 16.9 g/t Au 0.5m @ 137 g/t Au Mineral Resource1 Mineral Reserve2 Exploration Potential Drill Intercepts
  • 8. 8 BRUCEJACK - ROBUST ECONOMICS (1) Based on updated forecast of capital cost (see News Release dated February 3, 2017) and operating cost assumptions from the Feasibility Study and Technical Report Update on the Brucejack Project, with an effective date of June 19, 2014 (2) NPV is discounted to Dec 31, 2015. Economic Results by Metal Price (1) Low Case Base Case High Case Gold Price (US$/oz) $800 $1,100 $1,400 Silver Price (US$/oz) $10 $14 $18 NPV(2) (5% US$M) Pre-Tax $1,050 $2,340 $3,620 After Tax $690 $1,530 $2,360 Internal Rate of Return Pre-Tax 19.9% 34.4% 47.5% After-Tax 16.5% 28.5% 39.1% Net Cash Flow (US$M) Pre-Tax $2,110 $4,220 $6,320 After-Tax $1,470 $2,820 $4,170 Payback Pre-Tax 5.0 3.3 2.5 After-Tax 5.2 3.5 2.7 Capex (US$M) $811.1 $811.1 $811.1 Exchange Rate (US$:C$) 0.75 0.75 0.75
  • 9. 9 2015 2016 2017 KEY MILESTONES TO PRODUCTION 2014
  • 15. 15 PROCESSING FLOW SHEET 55% FROM CONCENTRATE 45% FROM GRAVITY (1) Source: Feasibility Study and Technical Report Update on the Brucejack Project, dated June 19, 2014. 96.7% GOLD RECOVERY (LOM)
  • 17. 17 MILL BUILDING – PIPING & INTERNAL STEEL
  • 18. 18 Process and fire water tanks MILL BUILDING – FLOTATION CELLS
  • 19. 19 MILL BUILDING – TAILINGS STOCK TANK & THICKENER
  • 22. 22 ORE FLOW Isometric view facing North West West Zone Portal Valley of the Kings Portal Transfer Station Truck Dump to Crusher Ventilation Raise Ventilation Raise Ventilation Raise As Built Jan 2017 Test Stope 1320L Stope Ore Flow Direction 1230L Stope
  • 23. 23 INITIAL STOPES Isometric view facing North West West Zone Portal Valley of the Kings Portal Transfer Station As Built Jan 2017 Test Stope 1320L Stope Ore Flow Direction 1230L Stope
  • 26. 26 DEVELOPMENT STATUS  All major components delivered to site, installation and assembly underway  Commissioning April 2017  Over 130,000 tonnes of ore stockpiled on surface and underground  Underground development advanced with 11 stopes crosscut in preparation for long-hole drilling
  • 27. 27 OPERATIONS READINESS  All senior & supervisor positions have been filled  Continued success recruiting locally for operations  Over 75% of mill operations and metallurgy positions filled  Contract mining for initial production
  • 28. 28 SHAREHOLDING & ANALYST COVERAGE (1) As of Feb 22, 2017; ownership calculated on an undiluted basis. (2) Does not include the US$200 million drawn from the US$540 million construction financing closed Sept 21, 2015 or the US$100 million available from the Notes Offering closed Feb 14, 2017. See News Releases dated Sept 21, 2015 & Feb 14, 2017 (3) As of Feb 15, 2017. Source: IPREO & SEDI Analyst Coverage BMO Andrew Kaip Canaccord Genuity Eric Zaunscherb CIBC Jeff Killeen Cormark Securities Richard Gray H.C. Wainwright Heiko F. Ihle Numis Jonathan Guy Pareto Securities Rhys Bradley RBC Dan Rollins Roth Capital Partners Joseph Reagor Scotiabank Ovais Habib Top Shareholders(3) (% S/O) Black Rock Asset Management 10.6 Van Eck Associates 10.4 Silver Standard Resources 9.4 Zijin Mining 5.0 Orion Mine Finance 2.6 Pretivm Management 1.9 Capital Structure(1) (shares in millions) Issued & Outstanding 180.7 Fully Diluted 188.1 Market Cap US$2.10 B (Feb 23, 2017) Working Capital(2) C$153.2 M (at Sept 30, 2016) 1-Year % Change PVG and Gold (Feb 23, 2017) 129% 3% PVG Price % Change Gold Price % Change
  • 29. 29 Advancing the high-grade Brucejack gold mine PVG : TSX/NYSEpretivm.com
  • 30. 30 30 CONTACT: Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE: Pretium Resources Inc. Suite 2300 – 1055 Dunsmuir St. Four Bentall Centre PO Box 49334 Vancouver, BC Canada V7X 1L4 Advancing a major high-grade gold project in Canada COMMON SHARES: TSX/NYSE: PVG Issued: 180.7 M Fully diluted: 188.1 M 52-week hi/low: US$12.53/$4.43 Market cap: US$2.10 B (at Feb 23, 2017)