Topic: Robot Cell Layouts, Multiple Robots And
Machine Interface ,Consideration In Work Cell
Design
Presented by Subject staff
Rampragash.R
Dr. T. Senthilvelan
Contents:
Robot Cell Layouts
Multiple Robots and Machine Interface
Consideration in Work Cell Design
Introduction:
Steps of a company to implement a robotics program in its operation:
Initial familiarization with the technology
Plant survey to identical potential applications
Selection of application
Selection of the robot
Detailed economic analysis & capital authorization
Robot work cell layout
Robot- centered work cell
In-line robot work cell
Mobile work cell
Robot-centered work cell
Robot is fixed at center of work cell
High utilization of robot
Method of work part delivery (e.g.: conveyor, part-feeders, pallets)
Install for single robot servicing one or more production machines
Cell layout:
In-line robot work cell
One or more robots located along in-line conveyor
Work is organized so each robot performs assembly operation on each part
(e.g.: welding line)
Types of transport systems In an In-Line
robot work cell:
A.)Intermittent Transfer
B.)Continuous Transfer
C.)Non-synchronous Transfer
A.)Intermittent transfer system
In this type the parts are moved in a start-stop motion from one station to
another along the line. It is also called as synchronous transfer since all
parts are moved simultaneously to next stop
The advantage is that the parts are registered in a fixed location and
orientation with respect to the robot during the robot work cycle.
B.)Continuous transfer system:
Work parts are moved continuously along the line at constant speed, the robot(s)
has to perform the tasks as the parts move along.
The position and orientation the parts with respect to any fixed location along the
line are continuously changing .
This results in a tracking problem i.e. the robot must maintain the relative position
and orientation of its tool with respect to the work part
This tracking problem can be partly solved by: the moving baseline tracking
system by moving the robot parallel to the conveyor at the same speed or by
stationary baseline tracking system i.e. by computing and adjusting the robot tool
to maintain the position and orientation with respect to the moving part.
Non-synchronous Transfer System
This is a "power and free system". Each work part moves independently of other
parts. in a stop-and-go manner.
When a work station has finished working on a work part, that part then proceeds
to the next work station. Hence, some parts are being processed on the line at the
same time that others are being transported or located between stations. Here. the
timing varies according to the cycle time requirements of each station.
The design and operation of this type of transfer system is more complicated than
the other two because each part must be provided with its own independently
operated moving cart.
However, the problem of designing and controlling the robot system used in the
power-and-free method is less complicated than for the continuous transfer method.
Non-synchronous Transfer System
For the irregular timing of arrivals, sensors must be provided to indicate to the
robot when to begin its work cycle. The more complex problem of part registration
with respect to the robot that must be solved in the continuously moving conveyor
systems are not encountered on either the intermittent transfer or the non-
synchronous transfer.
Mobile work cell
In this arrangement, the robot is provided with a means of transport, such
as a mobile base, within the work cell to perform various tasks at different
locations.
The transport mechanism can be floor mounted tracks or overhead railing
system that allows the robot to be moved along linear paths.Note: Mobile robot work cells are suitable for installations where one robot must service more than one
station (production machine) that has long processing cycles, and the stations cannot be arranged around
the robot in a robot-centred cell arrangement.
Mobile work cell
Transport mechanism: floor mounted or overhead railing system
Service for more than one station
Problem: to find optimum number of station to service
Multiple Robots and Machine Interface
Physical Interference of Robots
Machine Interference
Physical Interference of Robots:
Here the work volumes of the robots in the cell are overlapping, posing
dangers of collision. Collisions can be prevented by separating the robots so
that their work volumes are not overlapping.
However, there are cases where the robots work on the same component
piece or where the robots in turns, work on the component. Here the
programmed work cycles of the robots must be coordinated so that they will not
be near enough to risk a collision.
Machine Interference
This occurs when two or more machines are being serviced by one robot.
The machine cycles are timed in such a way that idle time is experienced by
one or more machines, while one machine is being serviced by the robot.
Machine interference can be measured as the total idle time of all the
machines in the cell as compared to the operator (or robot) cycle time. The
measure is commonly expressed as a percent..
Calculation of Machine Interference
Example 2.1: A three-machine cell in which a robot is used to load and
unload the machines. Each of the three machines are identical with
identical cycles times of 50 s. This cycle time is divided between run
time (30 s) and service time (load/unload) by the robot (20 s). The
organization of the cycle time is shown in the robot and machine
process chart given below.
It can be seen that each machine has idle time during its cycle of
10 s while the robot is fully occupied throughout its work cycle.
Ans:
Total idle time of all three machines is 3 x 10 = 30 s
The cycle time of the robot is 3 x 20 = 60 s
Therefore, machine interference is 30 s / 60 s = 50%
Machine Interference
In the example above. when the robot cycle time is greater than the machine
cycle time. there will be resulting machine interference. If the machine cycle time
is greater than the robot cycle time. there will no machine interference, but the
robot will be idle for part of the cycle.
In cases where the service and run times of the machines are different. the
above relationships become complicated by the problem of determining the best
sequence of servicing times for the machines into the robot cycle time
Consideration in Work Cell Design
Modification to other equipment in the cell
Part position and orientation
Part identification problem
Protect of robot from its environment
Utilities
Control of work cell
Safety
I)Modifications to other equipment in the work cell:
Modifications need to be done in order to interface robots to equipment in the
cell. Special fixtures and control devices must be devised for integrated
operation.
For example, the work holding nests. conveyor stops to position and orientate
parts for robots.
Changes has to be done in machines to allow by robots and use of limit
switches and other devices to interface components
ii) Part Position and Orientation
When parts are being delivered into the work cell, precise pick up locations
along conveyors must be established.
Parts must be in a known position and orientation for the robot to grasp
accurately. As the parts are being processed, the orientation must not be lost .
A way of achieving the above must be designed. For automated feeder
systems, the design of the way parts are being presented to the work cell must
be provided for.
iii) Part Identification problem
It there are more than one type of parts, there will be a necessity to identify
various parts by automated means, such as optical techniques, magnetic
techniques or limit switches that sense different sizes or geometry.
Electronic tagging may also be used with pallets so that the parts are identified by
the information carried by the information card.
iv)Protection of robot from its environment
In applications such as spray painting. hot metal working conditions. abrasive
applications, adhesive sealant applications, the robot has to be protected from
possible adverse environment. (e.g. use of sleeves. long grippers).
V) Utilities
Requirements for electricity. air and hydraulic pressures, Gas for furnaces has
to be considered and provided for .
vi) Control of the work cell
The activities of the robot must be coordinated with those of the other
equipment in the work cell .
vii) Safety
Human protection measures such as fences, barriers, safety interrupt system
with sensors in and around the work cell must be provided.
This must be considered even at the early stages of the design of the work
Thank you

More Related Content

What's hot (20)

Robots one day presentation
Robots one day presentationRobots one day presentation
Robots one day presentation
 
Robotics ch 4 robot dynamics
Robotics ch 4 robot dynamicsRobotics ch 4 robot dynamics
Robotics ch 4 robot dynamics
 
Textual Robot programming
Textual Robot programmingTextual Robot programming
Textual Robot programming
 
Robo unit4- Robot Programming.pptx
Robo unit4- Robot Programming.pptxRobo unit4- Robot Programming.pptx
Robo unit4- Robot Programming.pptx
 
Robotics and automation _ power sources and sensors
Robotics and automation _  power sources and sensorsRobotics and automation _  power sources and sensors
Robotics and automation _ power sources and sensors
 
Robot Configuration - 1
Robot Configuration - 1Robot Configuration - 1
Robot Configuration - 1
 
Robot Path Control
Robot Path ControlRobot Path Control
Robot Path Control
 
COBOTS.ppt
COBOTS.pptCOBOTS.ppt
COBOTS.ppt
 
Trajectory
TrajectoryTrajectory
Trajectory
 
Robotic arm
Robotic armRobotic arm
Robotic arm
 
Robot joints PDF
Robot joints PDFRobot joints PDF
Robot joints PDF
 
Cognition in robotics
Cognition in roboticsCognition in robotics
Cognition in robotics
 
Industrial robots
Industrial robotsIndustrial robots
Industrial robots
 
robot classification
robot classificationrobot classification
robot classification
 
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMINGROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
ROBOTICS-ROBOT KINEMATICS AND ROBOT PROGRAMMING
 
Automation and robotics
Automation and roboticsAutomation and robotics
Automation and robotics
 
Robot manipulator
Robot manipulatorRobot manipulator
Robot manipulator
 
Unit-I Robotics
Unit-I RoboticsUnit-I Robotics
Unit-I Robotics
 
Inverse Kinematics
Inverse KinematicsInverse Kinematics
Inverse Kinematics
 
sensors in robotics
sensors in roboticssensors in robotics
sensors in robotics
 

Similar to Robotworkcelllayout 180401112215

02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf
02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf
02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdfRahbiMalek
 
Robot programming , accuracy ,repeatability and application
Robot programming , accuracy ,repeatability  and applicationRobot programming , accuracy ,repeatability  and application
Robot programming , accuracy ,repeatability and applicationvishaldattKohir1
 
robot-pplication-200916054307.pptx
robot-pplication-200916054307.pptxrobot-pplication-200916054307.pptx
robot-pplication-200916054307.pptxDSelvamarilakshmiAss
 
Industrial Robotics Chap 01 Fundamentals
Industrial  Robotics  Chap 01  FundamentalsIndustrial  Robotics  Chap 01  Fundamentals
Industrial Robotics Chap 01 FundamentalsKevin Carvalho
 
Qavane_211068691__IEEE_Paper-1
Qavane_211068691__IEEE_Paper-1Qavane_211068691__IEEE_Paper-1
Qavane_211068691__IEEE_Paper-1Mandilakhe Qavane
 
Industrial Automated Robots Working and explanation
Industrial Automated Robots Working and explanationIndustrial Automated Robots Working and explanation
Industrial Automated Robots Working and explanationSarmadFarooq5
 
06. industrial robotics
06. industrial robotics06. industrial robotics
06. industrial roboticsrichard visey
 
Dek3223 chapter 2 robotic
Dek3223 chapter 2 roboticDek3223 chapter 2 robotic
Dek3223 chapter 2 roboticmkazree
 
Automation and Robotics 20ME51I WEEK 8 Theory notes.pdf
Automation and Robotics 20ME51I WEEK 8 Theory notes.pdfAutomation and Robotics 20ME51I WEEK 8 Theory notes.pdf
Automation and Robotics 20ME51I WEEK 8 Theory notes.pdfGandhibabu8
 
Robot applications
Robot applicationsRobot applications
Robot applicationsanand hd
 

Similar to Robotworkcelllayout 180401112215 (20)

Robot work cell layout.pptx
Robot work cell layout.pptxRobot work cell layout.pptx
Robot work cell layout.pptx
 
02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf
02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf
02-Chapter_2_Robot_Work_Cell_Design_and_Control_Final.pdf
 
Robot programming , accuracy ,repeatability and application
Robot programming , accuracy ,repeatability  and applicationRobot programming , accuracy ,repeatability  and application
Robot programming , accuracy ,repeatability and application
 
robot-pplication-200916054307.pptx
robot-pplication-200916054307.pptxrobot-pplication-200916054307.pptx
robot-pplication-200916054307.pptx
 
Industrial Robotics Chap 01 Fundamentals
Industrial  Robotics  Chap 01  FundamentalsIndustrial  Robotics  Chap 01  Fundamentals
Industrial Robotics Chap 01 Fundamentals
 
Qavane_211068691__IEEE_Paper-1
Qavane_211068691__IEEE_Paper-1Qavane_211068691__IEEE_Paper-1
Qavane_211068691__IEEE_Paper-1
 
Industrial robotics.pptx
Industrial robotics.pptxIndustrial robotics.pptx
Industrial robotics.pptx
 
ROBOTICS.pdf
ROBOTICS.pdfROBOTICS.pdf
ROBOTICS.pdf
 
Industrial Automated Robots Working and explanation
Industrial Automated Robots Working and explanationIndustrial Automated Robots Working and explanation
Industrial Automated Robots Working and explanation
 
06. industrial robotics
06. industrial robotics06. industrial robotics
06. industrial robotics
 
L010338894
L010338894L010338894
L010338894
 
Industrial_Robots_pptx.pptx
Industrial_Robots_pptx.pptxIndustrial_Robots_pptx.pptx
Industrial_Robots_pptx.pptx
 
Dek3223 chapter 2 robotic
Dek3223 chapter 2 roboticDek3223 chapter 2 robotic
Dek3223 chapter 2 robotic
 
Automated Production Lines
Automated Production LinesAutomated Production Lines
Automated Production Lines
 
robot_program.ppt
robot_program.pptrobot_program.ppt
robot_program.ppt
 
Automation and Robotics 20ME51I WEEK 8 Theory notes.pdf
Automation and Robotics 20ME51I WEEK 8 Theory notes.pdfAutomation and Robotics 20ME51I WEEK 8 Theory notes.pdf
Automation and Robotics 20ME51I WEEK 8 Theory notes.pdf
 
Robots
RobotsRobots
Robots
 
Robot applications
Robot applicationsRobot applications
Robot applications
 
Delta Robot
Delta RobotDelta Robot
Delta Robot
 
about my Robotic design
about my Robotic designabout my Robotic design
about my Robotic design
 

Recently uploaded

Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 

Recently uploaded (20)

Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 

Robotworkcelllayout 180401112215

  • 1. Topic: Robot Cell Layouts, Multiple Robots And Machine Interface ,Consideration In Work Cell Design Presented by Subject staff Rampragash.R Dr. T. Senthilvelan
  • 2. Contents: Robot Cell Layouts Multiple Robots and Machine Interface Consideration in Work Cell Design
  • 3. Introduction: Steps of a company to implement a robotics program in its operation: Initial familiarization with the technology Plant survey to identical potential applications Selection of application Selection of the robot Detailed economic analysis & capital authorization
  • 4. Robot work cell layout Robot- centered work cell In-line robot work cell Mobile work cell
  • 5. Robot-centered work cell Robot is fixed at center of work cell High utilization of robot Method of work part delivery (e.g.: conveyor, part-feeders, pallets) Install for single robot servicing one or more production machines
  • 7. In-line robot work cell One or more robots located along in-line conveyor Work is organized so each robot performs assembly operation on each part (e.g.: welding line)
  • 8. Types of transport systems In an In-Line robot work cell: A.)Intermittent Transfer B.)Continuous Transfer C.)Non-synchronous Transfer
  • 9. A.)Intermittent transfer system In this type the parts are moved in a start-stop motion from one station to another along the line. It is also called as synchronous transfer since all parts are moved simultaneously to next stop The advantage is that the parts are registered in a fixed location and orientation with respect to the robot during the robot work cycle.
  • 10. B.)Continuous transfer system: Work parts are moved continuously along the line at constant speed, the robot(s) has to perform the tasks as the parts move along. The position and orientation the parts with respect to any fixed location along the line are continuously changing . This results in a tracking problem i.e. the robot must maintain the relative position and orientation of its tool with respect to the work part This tracking problem can be partly solved by: the moving baseline tracking system by moving the robot parallel to the conveyor at the same speed or by stationary baseline tracking system i.e. by computing and adjusting the robot tool to maintain the position and orientation with respect to the moving part.
  • 11.
  • 12. Non-synchronous Transfer System This is a "power and free system". Each work part moves independently of other parts. in a stop-and-go manner. When a work station has finished working on a work part, that part then proceeds to the next work station. Hence, some parts are being processed on the line at the same time that others are being transported or located between stations. Here. the timing varies according to the cycle time requirements of each station. The design and operation of this type of transfer system is more complicated than the other two because each part must be provided with its own independently operated moving cart. However, the problem of designing and controlling the robot system used in the power-and-free method is less complicated than for the continuous transfer method.
  • 13. Non-synchronous Transfer System For the irregular timing of arrivals, sensors must be provided to indicate to the robot when to begin its work cycle. The more complex problem of part registration with respect to the robot that must be solved in the continuously moving conveyor systems are not encountered on either the intermittent transfer or the non- synchronous transfer.
  • 14. Mobile work cell In this arrangement, the robot is provided with a means of transport, such as a mobile base, within the work cell to perform various tasks at different locations. The transport mechanism can be floor mounted tracks or overhead railing system that allows the robot to be moved along linear paths.Note: Mobile robot work cells are suitable for installations where one robot must service more than one station (production machine) that has long processing cycles, and the stations cannot be arranged around the robot in a robot-centred cell arrangement.
  • 15. Mobile work cell Transport mechanism: floor mounted or overhead railing system Service for more than one station Problem: to find optimum number of station to service
  • 16. Multiple Robots and Machine Interface Physical Interference of Robots Machine Interference
  • 17. Physical Interference of Robots: Here the work volumes of the robots in the cell are overlapping, posing dangers of collision. Collisions can be prevented by separating the robots so that their work volumes are not overlapping. However, there are cases where the robots work on the same component piece or where the robots in turns, work on the component. Here the programmed work cycles of the robots must be coordinated so that they will not be near enough to risk a collision.
  • 18. Machine Interference This occurs when two or more machines are being serviced by one robot. The machine cycles are timed in such a way that idle time is experienced by one or more machines, while one machine is being serviced by the robot. Machine interference can be measured as the total idle time of all the machines in the cell as compared to the operator (or robot) cycle time. The measure is commonly expressed as a percent..
  • 19. Calculation of Machine Interference Example 2.1: A three-machine cell in which a robot is used to load and unload the machines. Each of the three machines are identical with identical cycles times of 50 s. This cycle time is divided between run time (30 s) and service time (load/unload) by the robot (20 s). The organization of the cycle time is shown in the robot and machine process chart given below. It can be seen that each machine has idle time during its cycle of 10 s while the robot is fully occupied throughout its work cycle. Ans: Total idle time of all three machines is 3 x 10 = 30 s The cycle time of the robot is 3 x 20 = 60 s Therefore, machine interference is 30 s / 60 s = 50%
  • 20. Machine Interference In the example above. when the robot cycle time is greater than the machine cycle time. there will be resulting machine interference. If the machine cycle time is greater than the robot cycle time. there will no machine interference, but the robot will be idle for part of the cycle. In cases where the service and run times of the machines are different. the above relationships become complicated by the problem of determining the best sequence of servicing times for the machines into the robot cycle time
  • 21. Consideration in Work Cell Design Modification to other equipment in the cell Part position and orientation Part identification problem Protect of robot from its environment Utilities Control of work cell Safety
  • 22. I)Modifications to other equipment in the work cell: Modifications need to be done in order to interface robots to equipment in the cell. Special fixtures and control devices must be devised for integrated operation. For example, the work holding nests. conveyor stops to position and orientate parts for robots. Changes has to be done in machines to allow by robots and use of limit switches and other devices to interface components
  • 23. ii) Part Position and Orientation When parts are being delivered into the work cell, precise pick up locations along conveyors must be established. Parts must be in a known position and orientation for the robot to grasp accurately. As the parts are being processed, the orientation must not be lost . A way of achieving the above must be designed. For automated feeder systems, the design of the way parts are being presented to the work cell must be provided for.
  • 24. iii) Part Identification problem It there are more than one type of parts, there will be a necessity to identify various parts by automated means, such as optical techniques, magnetic techniques or limit switches that sense different sizes or geometry. Electronic tagging may also be used with pallets so that the parts are identified by the information carried by the information card. iv)Protection of robot from its environment In applications such as spray painting. hot metal working conditions. abrasive applications, adhesive sealant applications, the robot has to be protected from possible adverse environment. (e.g. use of sleeves. long grippers).
  • 25. V) Utilities Requirements for electricity. air and hydraulic pressures, Gas for furnaces has to be considered and provided for . vi) Control of the work cell The activities of the robot must be coordinated with those of the other equipment in the work cell . vii) Safety Human protection measures such as fences, barriers, safety interrupt system with sensors in and around the work cell must be provided. This must be considered even at the early stages of the design of the work