Wastewater Engineering
DESIGN OF SEWERAGE SYSTEMS
1
General Consideration
SEWER LINES
Designed to carry the maximum quantity of
sanitary sewage likely to be produced from the area
contributing to the particular sewer.
laid at steeper gradients falling towards the outfall
point with circular pipe cross section.
STORM WATER LINES
Designed to carry the maximum storm runoff that
is likely to be produced by the contributing
catchment area from a rain of design frequency and
of duration equal to the time of concentration
constructed as surface drains at suitable gradient,
either rectangular or trapezoidal section.
.
2
Requirements of Design and Planning
of Sewerage System
oAdequate in size - avoid overflow and possible health hazards.
oCorrect estimation of sewage discharge - proper diameter
oFLOW VELOCITY
o NOT BE large as to require heavy excavation and high lift pumping
o NOT BE VERY SMALL small causing deposition of the solid in the sewers.
oLaid - 2 to 3 m deep
oFlow under gravity i.e. at the maximum estimated discharge.
oConveyed - lying area, where the treatment plant is located.
oQuality of raw sewage to be taken into consideration
3
Manningโ€™s Formula
4
VELOCITY IN SEWERS
SEWER MATERIAL NON SCOURING/
LIMTING
VELOCITY(m/s)
Vitrified Tiles 4.5 - 5.5
Cast iron sewers 3.5 - 4.5
Stoneware sewers 3.0 - 4.0
Cement Concrete Sewers 2.5 โ€“ 3.0
Ordinary Brick lined
Sewers
1.5 โ€“ 2.5
Earthen Channels 0.6 โ€“ 1.2
TYPES OF VELOCITY
๏‚ง MINIMUM VELOCITY โ€“ SELF CLEANSING
๏‚ง MAXIMUM VELOCITY โ€“ NON SCOURING
5
6
EFFECT OF VARIATION OF FLOW
OF SEWAGE ON VELOCITY
PRESENT PEAK
FLOW(l/s)
SLOPE PER 1000
2 6.0
3 4.0
5 3.1
10 2.0
15 1.3
20 1.2
25 1.0
RECOMMENDED SLOPES FOR MINIMUM VELOCITY
7
DESIGN OF SEWERS:
Calculate the discharge and grade of a sewer running at full depth having a of 300 mm diameter and
a self cleansing velocity of 0.90 m/sec. Assume Manning's constant as 0.013.
1. Velocity(V) =
1
๐‘
โˆ— ๐‘…
2
3 * ๐‘†
1
2
2. Diameter (D) = 300 mm = 0.3 m
3. Hydraulic Mean Depth ยฎ=
๐ท
4
=
0.3
4
= 0.075 m
4. Velocity(V) =
1
๐‘
โˆ— ๐‘…
2
3 *
5. ๐‘†
1
2 =
0.90 โˆ— 0.013
0.178
6. S = 0.004 = 4.3% (Slope is considered as 1 in 1000)
7. Discharge Q = A*V =
3.14 โˆ—0.32
4
โˆ— 0.90 = 0.064 ๐‘š3
/sec
8
9
10
11

More Related Content

Similar to L6 - DESIGN OF SEWERGAE SYSTEMS.pptx

Rohin verma 142
Rohin verma 142Rohin verma 142
Rohin verma 142
Avinash Thakur
ย 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
Tulsiram Bhattarai
ย 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
Sourabh Kulkarni
ย 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
kalyanmaji
ย 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
Anshuman Tyagi
ย 

Similar to L6 - DESIGN OF SEWERGAE SYSTEMS.pptx (20)

Rohin verma 142
Rohin verma 142Rohin verma 142
Rohin verma 142
ย 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
ย 
Sewer appertunces
Sewer appertuncesSewer appertunces
Sewer appertunces
ย 
Drainage system
Drainage systemDrainage system
Drainage system
ย 
Mine dewatering technology data sheet
Mine dewatering technology data sheetMine dewatering technology data sheet
Mine dewatering technology data sheet
ย 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
ย 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
ย 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
ย 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
ย 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
ย 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
ย 
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSDEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
ย 
Septic tank
Septic tankSeptic tank
Septic tank
ย 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
ย 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
ย 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
ย 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
ย 
Physical Unit Operations
Physical Unit OperationsPhysical Unit Operations
Physical Unit Operations
ย 
Planning & design of water conservation (water harvesting) structures by nave...
Planning & design of water conservation (water harvesting) structures by nave...Planning & design of water conservation (water harvesting) structures by nave...
Planning & design of water conservation (water harvesting) structures by nave...
ย 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
ย 

More from PRACHI DESSAI

More from PRACHI DESSAI (20)

L3- PERMISSIBLE THRESHOLD LIMITS.pptx
L3- PERMISSIBLE THRESHOLD LIMITS.pptxL3- PERMISSIBLE THRESHOLD LIMITS.pptx
L3- PERMISSIBLE THRESHOLD LIMITS.pptx
ย 
L2- OCCUPATIONAL HAZARDS.pptx
L2- OCCUPATIONAL HAZARDS.pptxL2- OCCUPATIONAL HAZARDS.pptx
L2- OCCUPATIONAL HAZARDS.pptx
ย 
L1- INTRODUCTION TO OSHA.pptx
L1- INTRODUCTION TO OSHA.pptxL1- INTRODUCTION TO OSHA.pptx
L1- INTRODUCTION TO OSHA.pptx
ย 
L3- FIRE HAZARDS.pptx
L3- FIRE HAZARDS.pptxL3- FIRE HAZARDS.pptx
L3- FIRE HAZARDS.pptx
ย 
2. Environmental Mangement Plan.pptx
2. Environmental Mangement Plan.pptx2. Environmental Mangement Plan.pptx
2. Environmental Mangement Plan.pptx
ย 
1. Introduction to EIA.pptx
1. Introduction to EIA.pptx1. Introduction to EIA.pptx
1. Introduction to EIA.pptx
ย 
L7- Sedimentation.pptx
L7- Sedimentation.pptxL7- Sedimentation.pptx
L7- Sedimentation.pptx
ย 
L2 - Sources of water.ppt
L2 - Sources of water.pptL2 - Sources of water.ppt
L2 - Sources of water.ppt
ย 
L15- Distribution Reserviors.pptx
L15- Distribution Reserviors.pptxL15- Distribution Reserviors.pptx
L15- Distribution Reserviors.pptx
ย 
L6- Screening & Aeration Systems.pptx
L6- Screening & Aeration Systems.pptxL6- Screening & Aeration Systems.pptx
L6- Screening & Aeration Systems.pptx
ย 
L14- Fluoridation & Defluoridation.pptx
L14- Fluoridation & Defluoridation.pptxL14- Fluoridation & Defluoridation.pptx
L14- Fluoridation & Defluoridation.pptx
ย 
L12- Softening of Water.pptx
L12- Softening of Water.pptxL12- Softening of Water.pptx
L12- Softening of Water.pptx
ย 
L10-Chlorination.pptx
L10-Chlorination.pptxL10-Chlorination.pptx
L10-Chlorination.pptx
ย 
L17 -Water Supply Plumbing Systems.pptx
L17 -Water Supply Plumbing Systems.pptxL17 -Water Supply Plumbing Systems.pptx
L17 -Water Supply Plumbing Systems.pptx
ย 
L16- Distribution Systems.pptx
L16- Distribution Systems.pptxL16- Distribution Systems.pptx
L16- Distribution Systems.pptx
ย 
L11-Disinfection.pptx
L11-Disinfection.pptxL11-Disinfection.pptx
L11-Disinfection.pptx
ย 
L9 -Filtration of Water.pptx
L9 -Filtration of Water.pptxL9 -Filtration of Water.pptx
L9 -Filtration of Water.pptx
ย 
L1 - Introduction.ppt
L1 - Introduction.pptL1 - Introduction.ppt
L1 - Introduction.ppt
ย 
L3 -Intake Structures.ppt
L3 -Intake Structures.pptL3 -Intake Structures.ppt
L3 -Intake Structures.ppt
ย 
L5 -Water Quality Criteria and Paremeters.pptx
L5 -Water Quality Criteria and Paremeters.pptxL5 -Water Quality Criteria and Paremeters.pptx
L5 -Water Quality Criteria and Paremeters.pptx
ย 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
ย 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
ย 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 

L6 - DESIGN OF SEWERGAE SYSTEMS.pptx

  • 1. Wastewater Engineering DESIGN OF SEWERAGE SYSTEMS 1
  • 2. General Consideration SEWER LINES Designed to carry the maximum quantity of sanitary sewage likely to be produced from the area contributing to the particular sewer. laid at steeper gradients falling towards the outfall point with circular pipe cross section. STORM WATER LINES Designed to carry the maximum storm runoff that is likely to be produced by the contributing catchment area from a rain of design frequency and of duration equal to the time of concentration constructed as surface drains at suitable gradient, either rectangular or trapezoidal section. . 2
  • 3. Requirements of Design and Planning of Sewerage System oAdequate in size - avoid overflow and possible health hazards. oCorrect estimation of sewage discharge - proper diameter oFLOW VELOCITY o NOT BE large as to require heavy excavation and high lift pumping o NOT BE VERY SMALL small causing deposition of the solid in the sewers. oLaid - 2 to 3 m deep oFlow under gravity i.e. at the maximum estimated discharge. oConveyed - lying area, where the treatment plant is located. oQuality of raw sewage to be taken into consideration 3
  • 5. VELOCITY IN SEWERS SEWER MATERIAL NON SCOURING/ LIMTING VELOCITY(m/s) Vitrified Tiles 4.5 - 5.5 Cast iron sewers 3.5 - 4.5 Stoneware sewers 3.0 - 4.0 Cement Concrete Sewers 2.5 โ€“ 3.0 Ordinary Brick lined Sewers 1.5 โ€“ 2.5 Earthen Channels 0.6 โ€“ 1.2 TYPES OF VELOCITY ๏‚ง MINIMUM VELOCITY โ€“ SELF CLEANSING ๏‚ง MAXIMUM VELOCITY โ€“ NON SCOURING 5
  • 6. 6
  • 7. EFFECT OF VARIATION OF FLOW OF SEWAGE ON VELOCITY PRESENT PEAK FLOW(l/s) SLOPE PER 1000 2 6.0 3 4.0 5 3.1 10 2.0 15 1.3 20 1.2 25 1.0 RECOMMENDED SLOPES FOR MINIMUM VELOCITY 7
  • 8. DESIGN OF SEWERS: Calculate the discharge and grade of a sewer running at full depth having a of 300 mm diameter and a self cleansing velocity of 0.90 m/sec. Assume Manning's constant as 0.013. 1. Velocity(V) = 1 ๐‘ โˆ— ๐‘… 2 3 * ๐‘† 1 2 2. Diameter (D) = 300 mm = 0.3 m 3. Hydraulic Mean Depth ยฎ= ๐ท 4 = 0.3 4 = 0.075 m 4. Velocity(V) = 1 ๐‘ โˆ— ๐‘… 2 3 * 5. ๐‘† 1 2 = 0.90 โˆ— 0.013 0.178 6. S = 0.004 = 4.3% (Slope is considered as 1 in 1000) 7. Discharge Q = A*V = 3.14 โˆ—0.32 4 โˆ— 0.90 = 0.064 ๐‘š3 /sec 8
  • 9. 9
  • 10. 10
  • 11. 11