SlideShare a Scribd company logo
1 of 8
NAME: ETIM, PETER UKO.
DATE OF BIRTH: 11th
November, 1971
STATE OF ORIGIN: Akwa Ibom State
NATIONALITY: Nigerian
SEX: Male
MARITAL STATUS: Married
ADDRESS: 34 Owolewa Street,
Off Orile Road,
By National Bus stop,
Agege Local Government Area,
Lagos State.
Nigeria
TELEPHONE: 234-80554-48085, 2347-0343-84096
OFFICE 234-(0)1-4618508, 7221981 Ext. 2551
Email ADDRESS: petim2006@yahoo.com
Peter.Etim@deltaafrik.com
AVAILABILITY PERIOD: One month
CURRENT LOCATION: Lagos -Nigeria
INSTITUTION ATTENDED
Federal University of Technology ,
Akure –Ondo State
QUALIFICATION
PGD(Mechanical
Engineering Technology)
PERIOD
2007-2010
The Polytechnic of Calabar
P.M.B 111O,
Cross River State
HND.(Mechanical
Engineering Technology)
1995-2000
Ukpum Okon Comprehensive Secondary School
Ikot Abasi Local Govt.Area,
Akwa Ibom State
SSCE 1987-1993
Primary School ,
Ikot Abia,
Mkpat Enin Local Govt. Area
Akwa Ibom State
FSLC 1978-1984
National Engineering And Technical Company Ltd,
(Subsidiary of NNPC),146 B Ligali Ayorinde Street ,
Victoria Island, Lagos
NYSC 2002
PROFESSIONAL CERTIFICATE COREN R.00629ET
Supervising Piping Designer:
Fourteen years of experience in the oil and gas industries ,specifically in the design sector including
Seven years with DeltaAfrik Engineering Limited .The design experience include PDMS modelling
of Equipment, Piping, Auto generation of Piping Isometrics , MTO’s ,detection and modification of
clashes between piping ,equipment and structural members, modelling of support using 3D PDMS
software .Design experience also include extraction of 2D draft drawings from PDMS, Piping
Equipment Layout drawings, Piping General Arrangement drawings, Elevations drawings and Iso
draft drawings. Drafting experience in design includes the use of Auto cad in drafting, also the use of
Excel spread sheet in the preparation of Preliminary and Bulk MTO’s.
2008 - Present Supervising Piping Designer, Delta Afrik Engineering, Lagos/Worley Parsons
Experiences on Projects
1. ASSA NORTH-OHAJI SOUTH PROJECT.
Feed-Project
Client: Shell Petroleum Development Company of Nigeria Ltd.
(Oct.2015-Till date)
• PDMS Design of 3D Piping and Equipment
• Production of Draft Equipment Layout Drawings from PDMS.
• Production of Draft Piping General Arrangement Drawing and Piping Elevation
Drawings from PDMS.
2. SATELLITE FIELDS DEVELOPMENT PROJECT PHASE 2
Detail Engineering Design-Project
CLIENT: Mobil Producing Nigeria, Ultd.(Construction team)
(March. 2015 –Sept.2015)
Parts of my responsibilities are:
• PDMS Design of 3D Piping and Equipment
• Production of Piping Isometrics drawing using Iso draft
• Production of Draft Equipment Layout Drawings from PDMS.
• Production of Draft Piping General Arrangement Drawing and Piping Elevation
Drawings from PDMS.
• Modelling of support using PDMS.
• The use of clash manager to generate clash report.
Clashes detection between Structures, Pipes, Equipment’s
Experiences on Projects
3. ASSA NORTH-OHAJI SOUTH PROJECT.
Pre-Feed-Project
Client: Shell Petroleum Development Company of Nigeria Ltd.
(Oct.2014-December2014)
• Production of General Plot Plan
• Production of Piping Equipment Layout.
4. SATELLITE FIELDS DEVELOPMENT PROJECT PHASE 2
Detail Engineering Design-Project
CLIENT: Mobil Producing Nigeria, Ultd.(Construction team)
(Jan. 2014 –Sept.2014)
• Constructability review using PDMS.
• Generation and review of Piping MTOs.
• In cooperate comment as the case may be.
• Running of clash managers’ report and resolving of clashes.
5. MULTIPHASE FLOW METER INSTALLATION PROJECT
Detail Engineering Design-Project
CLIENT: SEPLAT NIG.LTD.(October. 2013-December 2013)
Responsibilities
 Production of Piping General Arrangement drawings
6. FUNIWA ONSHORE GAS PROJECT
Pre-Feed-Project
CLIENT: CHEVRON NIG.LTD.(June 2013-October,2013)
Responsibilities
 Production of Equipment layout drawings
 Production of Plot Plan
7. SATELLITE FIELDS DEVELOPMENT PROJECT PHASE 2
Detail Engineering Design-Project
CLIENT: Mobil Producing Nigeria, Ultd.(June 2011 –May 2013)
Parts of my responsibilities are:
• PDMS Design of 3D Piping and Equipment
• Production of Piping Isometrics drawing using Iso draft
• Production of Draft Equipment Layout Drawings from PDMS.
• Production of Draft Piping General Arrangement Drawing and Piping Elevation
Drawings from PDMS.
• Modelling of support using PDMS.
• The use of clash manager to generate clash report.
• Clashes detection between Structures, Pipes, Equipment’s and cable trays .
• The use of the clash report to correct clashes in the models.
• Extensive site visit survey with DA multidiscipline team to identify Tie-ins
locations
In four of the Mobil platform; Idoho BP, Ubit GW, Ubit GY and Yoho YP Platform.
5. IKIKE FIELD DEVELOPMENT PROJECT
Detail Engineering Design-Project
OML-99 TOTAL - AMP1 & AMP2 Platform
Client: Total Nigeria Ltd, (August 2010 –April 2011)
Parts of my responsibilities are:
• PDMS Design of 3D Piping and Equipment model using Project P&ID drawings.
• Production of Draft Equipment Layout Drawings from PDMS.
• Production of Draft Piping General Arrangement Drawings, Piping Elevation Drawings and Iso
draft from PDMS.
• Extensive site survey with DA multidiscipline team to identify Tie-ins locations
Off shore Amenam Okpono –AMP1, AMD1, AMD2 & AMD3 Platform
6. OML 99[Amenam / Kpono] Oily Water Treatment upgrade-PH.1
Detail Engineering Design-Project
Client: Total E&P Nigeria ltd, (August 2009 – April 2010)
Responsibilities:
• PDMS Design of 3D Piping and Equipment model using Project P&ID drawings.
• Production of Draft Equipment Layout Drawings from PDMS.
• Production of Draft Piping General Arrangement Drawing and Piping Elevation Drawings from
PDMS.
• Production of Piping Isometrics drawing using Iso draft
• Extensive site survey with DA multidiscipline team to identify Tie-ins locations.
• Attending Model review and implementing comment
7. MIPS. EI-Concept Re-evaluation Study
Client: Mobil Producing Nigeria ltd, (March 2009 – June 2009)
• Production of Draft Equipment Layout Drawings from PDMS
• The Production of Piping Equipment General Arrangement Drawings.
• The production Long lead and bulk Piping Material Take off (MTOs) for Etim LP Platform
• The production of the Idoho North Satellite Pig traps option and the converting of the Idoho
Production platform to a Riser Platform.
• Also work in Pipeline Replacement project, drafting and implementing of client comment
8. MIPs. EIU Field Re-development Project
Client: Mobil Producing Nigeria ltd, (July 2008 – February 2009)
• PDMS Design of 3D Pipes and Equipment .
• Production of Draft Equipment Layout Drawings from PDMS
• The extraction of drafts Piping General Arrangement Drawings
• The extraction of draft Piping and Equipment Elevations Drawings for Utue KR and Etim LP
Platform.
2002 - 2008 Piping Engineer, NETCO(Subsidiary of NNPC) Lagos
Detail Engineering Design-Project
9. NLNG Condensate Stabilization unit Train 6 Project
Client: NLNG-Bonny, Nigeria
Responsibilities:
• Modelling of Equipment and Pipes with the 3D PDMS Software.
• Extraction of draft Piping and Equipment Elevations Drawings.
• The Extraction of draft Piping General Arrangement Drawings.
• The extraction of draft Piping Isometrics Drawings from PDMS model.
• The reviewing and updating of Vendor and Client comments
10. NAOC-NLNG GAS Supply Train 6 Project
Detail Engineering Design-Project
Client: Agip-Nigeria
Responsibilities:
• The Production of unit Plot Plan
• Production of As-Built Piping General Arrangement Drawings.
• Preparation of Long lead and Bulk Piping Material Take off (MTOs).
11. Mobil ERHA FPSO Project
Detail Engineering Design-Project
Client: Mobil Producing Nig.Ltd.
Responsibilities:
• PDMS Design of 3D Equipment and Pipes.
• Extraction of 2D drafts Piping and Equipment Arrangement Drawings
• Extraction of draft Piping and Equipment Elevations Drawings.
• Extraction of 2D Draft of Piping General Arrangement Drawings
• Extraction of 2D Piping Isometrics Drawings from PDMS model.
• The reviewing and updating of Vendor and Client comments
12. Chevron EGP 3A Escravos Gas Plant Project.
Client: Chevron Nig.Ltd.
Detail Engineering Design-Project
Responsibilities:
• Generation of 2D Piping Isometrics Auto Plant.
• Generation of Piping Material Take off from Auto Plant.
• Drafting of Pipe support drawings using Auto CAD software.
EDUCATION
PGD, Federal University Technology Akure, 2010
HND, The Polytechnic of Calabar, Cross River State, Nigeria, 2000
REGISTRATIONS/AFFILIATIONS
COREN – R.00629ET
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
• AutoCAD Training
• Basic Piping Training
• PDMS Training Course
• Support Training
• ISO 9001-2000 Awareness Training (Quality Management System)
• ISO 14001 Awareness Training (Environmental Management Systems)
• In-house Training on General Corrosion Engineering
• In-house Helicopter Underwater Escape Training(HUET)
Referees:
1. Engr.Amusa Olalere,
Deltaafrik Engr.Ltd.
Bay Atlantic Tower,
No. 4 Freedom Road,
3rd Round about Lekki Expressway
Ikate Lekki Phase 1.
Lagos.
Phone no: 2348-03334-2973.
2. Engr. Satish Musale,
Deltaafrik Engr.Ltd.
Bay Atlantic Tower,
No. 4 Freedom Road,
3rd Round about Lekki Expressway
Ikate Lekki Phase 1.
Lagos.
Phone no: 2348-07478-9449

More Related Content

What's hot (19)

Shilpesh CV
Shilpesh CVShilpesh CV
Shilpesh CV
 
RESUME_sushil__latest_
RESUME_sushil__latest_RESUME_sushil__latest_
RESUME_sushil__latest_
 
GOPAL
GOPALGOPAL
GOPAL
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
walid abou lhaf CV
walid abou lhaf  CVwalid abou lhaf  CV
walid abou lhaf CV
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15
 
Scbj 070618-cv
Scbj 070618-cvScbj 070618-cv
Scbj 070618-cv
 
Arul Jose
Arul JoseArul Jose
Arul Jose
 
anil resume
anil resumeanil resume
anil resume
 
Profile Krishnaraja
Profile KrishnarajaProfile Krishnaraja
Profile Krishnaraja
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Resume
ResumeResume
Resume
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
Linkedin alipke 01-31-2016
Linkedin alipke 01-31-2016Linkedin alipke 01-31-2016
Linkedin alipke 01-31-2016
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 

Viewers also liked

Técnicas de estudio Social Unit 1
Técnicas de estudio Social Unit 1Técnicas de estudio Social Unit 1
Técnicas de estudio Social Unit 1Laurasclass
 
Proyecto inf grupo5
Proyecto inf grupo5Proyecto inf grupo5
Proyecto inf grupo5carola033
 
Capítulo 7 - Libro Azúl
Capítulo 7 - Libro AzúlCapítulo 7 - Libro Azúl
Capítulo 7 - Libro Azúlfredur
 
Técnicas de estudio
Técnicas de estudioTécnicas de estudio
Técnicas de estudioLaurasclass
 
Actividad 2 tema 4
Actividad 2 tema 4Actividad 2 tema 4
Actividad 2 tema 4inma
 
MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16MAHESH PANDIT
 
CIPS - Advance Diploma Guide
CIPS - Advance Diploma GuideCIPS - Advance Diploma Guide
CIPS - Advance Diploma GuideZdenek Kompanek
 
Bestiario imagen 2010
Bestiario imagen 2010Bestiario imagen 2010
Bestiario imagen 2010ESTER ALONSO
 

Viewers also liked (12)

ArsonPoster_KC
ArsonPoster_KCArsonPoster_KC
ArsonPoster_KC
 
Técnicas de estudio Social Unit 1
Técnicas de estudio Social Unit 1Técnicas de estudio Social Unit 1
Técnicas de estudio Social Unit 1
 
Proyecto inf grupo5
Proyecto inf grupo5Proyecto inf grupo5
Proyecto inf grupo5
 
Capítulo 7 - Libro Azúl
Capítulo 7 - Libro AzúlCapítulo 7 - Libro Azúl
Capítulo 7 - Libro Azúl
 
Presentación1
Presentación1Presentación1
Presentación1
 
Técnicas de estudio
Técnicas de estudioTécnicas de estudio
Técnicas de estudio
 
Actividad 2 tema 4
Actividad 2 tema 4Actividad 2 tema 4
Actividad 2 tema 4
 
Presentación1
Presentación1Presentación1
Presentación1
 
MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16
 
CIPS - Advance Diploma Guide
CIPS - Advance Diploma GuideCIPS - Advance Diploma Guide
CIPS - Advance Diploma Guide
 
Company Report
Company ReportCompany Report
Company Report
 
Bestiario imagen 2010
Bestiario imagen 2010Bestiario imagen 2010
Bestiario imagen 2010
 

Similar to Experienced Nigerian Piping Designer Seeks New Opportunity

Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CVTods Almeron
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv pipingMohamedZidan85
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay Gupta
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineerashwin mahale
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani PortfolioRONIEE Sparks
 
Mayank Kumar (Updated CV)
Mayank Kumar (Updated CV)Mayank Kumar (Updated CV)
Mayank Kumar (Updated CV)Mayank Sharma
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEloisa Zuniga-Bonavente
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr Bhavana Deshpande
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERkeshav rao
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr. Pramod Deshpande
 

Similar to Experienced Nigerian Piping Designer Seeks New Opportunity (20)

Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 
Resume_VPrabu
Resume_VPrabuResume_VPrabu
Resume_VPrabu
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Burgasneftoproekt
BurgasneftoproektBurgasneftoproekt
Burgasneftoproekt
 
Chetan_Patil
Chetan_PatilChetan_Patil
Chetan_Patil
 
Mayank Kumar (Updated CV)
Mayank Kumar (Updated CV)Mayank Kumar (Updated CV)
Mayank Kumar (Updated CV)
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
MVTatel
MVTatelMVTatel
MVTatel
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEER
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5
 

Experienced Nigerian Piping Designer Seeks New Opportunity

  • 1. NAME: ETIM, PETER UKO. DATE OF BIRTH: 11th November, 1971 STATE OF ORIGIN: Akwa Ibom State NATIONALITY: Nigerian SEX: Male MARITAL STATUS: Married ADDRESS: 34 Owolewa Street, Off Orile Road, By National Bus stop, Agege Local Government Area, Lagos State. Nigeria TELEPHONE: 234-80554-48085, 2347-0343-84096 OFFICE 234-(0)1-4618508, 7221981 Ext. 2551 Email ADDRESS: petim2006@yahoo.com Peter.Etim@deltaafrik.com AVAILABILITY PERIOD: One month CURRENT LOCATION: Lagos -Nigeria INSTITUTION ATTENDED Federal University of Technology , Akure –Ondo State QUALIFICATION PGD(Mechanical Engineering Technology) PERIOD 2007-2010 The Polytechnic of Calabar P.M.B 111O, Cross River State HND.(Mechanical Engineering Technology) 1995-2000 Ukpum Okon Comprehensive Secondary School Ikot Abasi Local Govt.Area, Akwa Ibom State SSCE 1987-1993 Primary School , Ikot Abia, Mkpat Enin Local Govt. Area Akwa Ibom State FSLC 1978-1984 National Engineering And Technical Company Ltd, (Subsidiary of NNPC),146 B Ligali Ayorinde Street , Victoria Island, Lagos NYSC 2002 PROFESSIONAL CERTIFICATE COREN R.00629ET
  • 2. Supervising Piping Designer: Fourteen years of experience in the oil and gas industries ,specifically in the design sector including Seven years with DeltaAfrik Engineering Limited .The design experience include PDMS modelling of Equipment, Piping, Auto generation of Piping Isometrics , MTO’s ,detection and modification of clashes between piping ,equipment and structural members, modelling of support using 3D PDMS software .Design experience also include extraction of 2D draft drawings from PDMS, Piping Equipment Layout drawings, Piping General Arrangement drawings, Elevations drawings and Iso draft drawings. Drafting experience in design includes the use of Auto cad in drafting, also the use of Excel spread sheet in the preparation of Preliminary and Bulk MTO’s. 2008 - Present Supervising Piping Designer, Delta Afrik Engineering, Lagos/Worley Parsons Experiences on Projects 1. ASSA NORTH-OHAJI SOUTH PROJECT. Feed-Project Client: Shell Petroleum Development Company of Nigeria Ltd. (Oct.2015-Till date) • PDMS Design of 3D Piping and Equipment • Production of Draft Equipment Layout Drawings from PDMS. • Production of Draft Piping General Arrangement Drawing and Piping Elevation Drawings from PDMS. 2. SATELLITE FIELDS DEVELOPMENT PROJECT PHASE 2 Detail Engineering Design-Project CLIENT: Mobil Producing Nigeria, Ultd.(Construction team) (March. 2015 –Sept.2015) Parts of my responsibilities are: • PDMS Design of 3D Piping and Equipment • Production of Piping Isometrics drawing using Iso draft • Production of Draft Equipment Layout Drawings from PDMS. • Production of Draft Piping General Arrangement Drawing and Piping Elevation Drawings from PDMS. • Modelling of support using PDMS. • The use of clash manager to generate clash report. Clashes detection between Structures, Pipes, Equipment’s
  • 3. Experiences on Projects 3. ASSA NORTH-OHAJI SOUTH PROJECT. Pre-Feed-Project Client: Shell Petroleum Development Company of Nigeria Ltd. (Oct.2014-December2014) • Production of General Plot Plan • Production of Piping Equipment Layout. 4. SATELLITE FIELDS DEVELOPMENT PROJECT PHASE 2 Detail Engineering Design-Project CLIENT: Mobil Producing Nigeria, Ultd.(Construction team) (Jan. 2014 –Sept.2014) • Constructability review using PDMS. • Generation and review of Piping MTOs. • In cooperate comment as the case may be. • Running of clash managers’ report and resolving of clashes. 5. MULTIPHASE FLOW METER INSTALLATION PROJECT Detail Engineering Design-Project CLIENT: SEPLAT NIG.LTD.(October. 2013-December 2013) Responsibilities  Production of Piping General Arrangement drawings 6. FUNIWA ONSHORE GAS PROJECT Pre-Feed-Project CLIENT: CHEVRON NIG.LTD.(June 2013-October,2013) Responsibilities  Production of Equipment layout drawings  Production of Plot Plan
  • 4. 7. SATELLITE FIELDS DEVELOPMENT PROJECT PHASE 2 Detail Engineering Design-Project CLIENT: Mobil Producing Nigeria, Ultd.(June 2011 –May 2013) Parts of my responsibilities are: • PDMS Design of 3D Piping and Equipment • Production of Piping Isometrics drawing using Iso draft • Production of Draft Equipment Layout Drawings from PDMS. • Production of Draft Piping General Arrangement Drawing and Piping Elevation Drawings from PDMS. • Modelling of support using PDMS. • The use of clash manager to generate clash report. • Clashes detection between Structures, Pipes, Equipment’s and cable trays . • The use of the clash report to correct clashes in the models. • Extensive site visit survey with DA multidiscipline team to identify Tie-ins locations In four of the Mobil platform; Idoho BP, Ubit GW, Ubit GY and Yoho YP Platform. 5. IKIKE FIELD DEVELOPMENT PROJECT Detail Engineering Design-Project OML-99 TOTAL - AMP1 & AMP2 Platform Client: Total Nigeria Ltd, (August 2010 –April 2011) Parts of my responsibilities are: • PDMS Design of 3D Piping and Equipment model using Project P&ID drawings. • Production of Draft Equipment Layout Drawings from PDMS. • Production of Draft Piping General Arrangement Drawings, Piping Elevation Drawings and Iso draft from PDMS. • Extensive site survey with DA multidiscipline team to identify Tie-ins locations Off shore Amenam Okpono –AMP1, AMD1, AMD2 & AMD3 Platform 6. OML 99[Amenam / Kpono] Oily Water Treatment upgrade-PH.1 Detail Engineering Design-Project
  • 5. Client: Total E&P Nigeria ltd, (August 2009 – April 2010) Responsibilities: • PDMS Design of 3D Piping and Equipment model using Project P&ID drawings. • Production of Draft Equipment Layout Drawings from PDMS. • Production of Draft Piping General Arrangement Drawing and Piping Elevation Drawings from PDMS. • Production of Piping Isometrics drawing using Iso draft • Extensive site survey with DA multidiscipline team to identify Tie-ins locations. • Attending Model review and implementing comment 7. MIPS. EI-Concept Re-evaluation Study Client: Mobil Producing Nigeria ltd, (March 2009 – June 2009) • Production of Draft Equipment Layout Drawings from PDMS • The Production of Piping Equipment General Arrangement Drawings. • The production Long lead and bulk Piping Material Take off (MTOs) for Etim LP Platform • The production of the Idoho North Satellite Pig traps option and the converting of the Idoho Production platform to a Riser Platform. • Also work in Pipeline Replacement project, drafting and implementing of client comment 8. MIPs. EIU Field Re-development Project Client: Mobil Producing Nigeria ltd, (July 2008 – February 2009) • PDMS Design of 3D Pipes and Equipment . • Production of Draft Equipment Layout Drawings from PDMS • The extraction of drafts Piping General Arrangement Drawings • The extraction of draft Piping and Equipment Elevations Drawings for Utue KR and Etim LP Platform. 2002 - 2008 Piping Engineer, NETCO(Subsidiary of NNPC) Lagos Detail Engineering Design-Project 9. NLNG Condensate Stabilization unit Train 6 Project Client: NLNG-Bonny, Nigeria Responsibilities: • Modelling of Equipment and Pipes with the 3D PDMS Software. • Extraction of draft Piping and Equipment Elevations Drawings.
  • 6. • The Extraction of draft Piping General Arrangement Drawings. • The extraction of draft Piping Isometrics Drawings from PDMS model. • The reviewing and updating of Vendor and Client comments 10. NAOC-NLNG GAS Supply Train 6 Project Detail Engineering Design-Project Client: Agip-Nigeria Responsibilities: • The Production of unit Plot Plan • Production of As-Built Piping General Arrangement Drawings. • Preparation of Long lead and Bulk Piping Material Take off (MTOs). 11. Mobil ERHA FPSO Project Detail Engineering Design-Project Client: Mobil Producing Nig.Ltd. Responsibilities: • PDMS Design of 3D Equipment and Pipes. • Extraction of 2D drafts Piping and Equipment Arrangement Drawings • Extraction of draft Piping and Equipment Elevations Drawings. • Extraction of 2D Draft of Piping General Arrangement Drawings • Extraction of 2D Piping Isometrics Drawings from PDMS model. • The reviewing and updating of Vendor and Client comments 12. Chevron EGP 3A Escravos Gas Plant Project. Client: Chevron Nig.Ltd. Detail Engineering Design-Project Responsibilities: • Generation of 2D Piping Isometrics Auto Plant. • Generation of Piping Material Take off from Auto Plant. • Drafting of Pipe support drawings using Auto CAD software.
  • 7. EDUCATION PGD, Federal University Technology Akure, 2010 HND, The Polytechnic of Calabar, Cross River State, Nigeria, 2000 REGISTRATIONS/AFFILIATIONS COREN – R.00629ET SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES • AutoCAD Training • Basic Piping Training • PDMS Training Course • Support Training • ISO 9001-2000 Awareness Training (Quality Management System) • ISO 14001 Awareness Training (Environmental Management Systems) • In-house Training on General Corrosion Engineering • In-house Helicopter Underwater Escape Training(HUET)
  • 8. Referees: 1. Engr.Amusa Olalere, Deltaafrik Engr.Ltd. Bay Atlantic Tower, No. 4 Freedom Road, 3rd Round about Lekki Expressway Ikate Lekki Phase 1. Lagos. Phone no: 2348-03334-2973. 2. Engr. Satish Musale, Deltaafrik Engr.Ltd. Bay Atlantic Tower, No. 4 Freedom Road, 3rd Round about Lekki Expressway Ikate Lekki Phase 1. Lagos. Phone no: 2348-07478-9449