PES: Why are temporary living quarter
rental companies critical to the offshore
wind supply chain?
Brad Hirst: At various stages of an offshore
wind project’s life cycle there will be varying
workforce needs: i.e. during the engineering
and construction phase, throughout the life
of the wind farm to operation, maintenance
and upgrade of key components and
infrastructure. Our niche in the market is to
provide temporary offshore
accommodation – in the form of what we
call temporary living quarters (TLQ) – that
are custom designed and engineered to
specific project requirements. We use
standard design modules that can be linked
together and stacked to create multi-tiered
living quarter complexes, which are
installed on vessels, jack-ups and platforms
– wherever there is space for the temporary
accommodation.
Offshore accommodation rentals are ideal
for short term needs. In an industry that is
continuously seeking to reduce costs to be
more competitive with traditional sources of
power generation, having the opportunity to
rent temporary living quarters reduces the
total project cost by helping developers
avoid a CAPEX investment for which there
might be a low return. Rental equipment
fulfils the need for short term work.
In any industry, utilisation rates for assets
are a strong indicator of operating
efficiency. Offshore wind projects, just like
offshore oil and gas, will have a mix of both
permanent and temporary living quarters to
support the variability in offshore worker
accommodation requirements. For
permanent living quarters a Project
Manager doesn’t want to overbuild in
capacity and conversely they don’t want to
under build either. You select an optimal
workforce accommodation capacity and
supplement your living quarter needs with a
rental product for the required period.
PES: What type of offshore work
necessitates temporary accommodation
and for what duration?
BH: The most notable opportunities for
offshore wind rental accommodation lie in
the hook-up and commissioning phase of
the HVDC converter platforms, as these tend
to be large, technologically advanced
structures located further offshore than their
smaller, less complicated, near-shore AC
platform counterparts. Once the platforms
are commissioned, they are handed over to
the client, i.e. electrical transmission and
utilities companies and there may then be
further TLQ requirements as part of ongoing
operations, albeit on a smaller scale than the
initial hook-up. There will of course always
be repair and maintenance requirements for
these platforms, as well as the subsea
cabling and turbines. Some of the original
European wind-farms are now at this phase.
As an industry, Offshore Wind is still in its
infancy and operators are continuously
learning and adapting based on project
experience. Since they compete against
other sources of power generation and rely
heavily upon government subsidies, there is
an ever-increasing demand to be more
innovative, increase efficiency, add value
Brad Hirst, Sales & Marketing Manager,
talks in more depth to PES about the value
of temporary accommodation rentals…
Short stay
PES Wind1
ASK THE EXPERTS
and save costs at every stage of the
project. It’s a very dynamic and rapidly
evolving industry.
Our assessment is that some of the
opportunities we’ve been involved with in
the past will become less as living quarter
requirements and become better known
during the project life-cycle, these
platforms will be designed and
manufactured accordingly to incorporate
sufficient living quarters. As with all
industries, efficiency is gained through
greater experience and subsequent
innovation and Offshore Wind will be no
different. We’ll continue to focus on the
evolving needs of the industry especially
as the wind turbines age creating new
opportunities in service and maintenance.
PES: In your accommodation module
product design what drives your
guidance for product attributes?
BH: As we design offshore accommodation
modules, we have to consider numerous
factors to ensure that our equipment meets
a broad range of regulatory compliance and
certifying authority requirements. With
worker safety and comfort at the forefront,
some of the primary drivers include UK
HSE (Health and Safety Executive)
guidelines, DNV 2.7-1 certification, SOLAS/
IMO regulations and most recently, the ABS
Guide for Portable Accommodation
Modules. This enables us to supply
equipment for a multitude of applications
and configurations from standalone
bedroom modules to large, multi-level
accommodation complexes complete with
welfare facilities and auxiliary services.
Other variables taken into account when
designing TLQ modules include the type of
host installation e.g. vessel or platform,
which industries they will be used in and
also the environmental conditions that they
will operate in around the world.
Adaptability is crucial.
PES: Describe HB Rentals ability to
technically execute on a TLQ complex
installation.
BH: HB Rentals has a defined process for
supporting an offshore accommodation
project. Since each project is a custom
engineered solution, we adhere to a
methodical approach in qualifying our
clients’ requirements which is very similar
to a FEED (Front End Engineering Design)
study. It is essential that we maintain
rigorous QA through the entire process
from requirements definition to engineering
design, fabrication, shipping to site (usually
a port) and installation.
Given the nature of short term rental
projects – that they tend to support specific
work of a short term duration, we are
frequently contacted in the latter stages of
the project’s development and
subsequently have less time to plan and
respond. It’s not uncommon to receive
RFQs and project requests in which a
“The most notable opportunities for offshore wind rental
accommodation lie in the hook-up and commissioning
phase of the HVDC converter platforms”
Brad Hirst
www.peswind.com 2
ASK THE EXPERTS
custom TLQ complex needs to be
designed, engineered, delivered and
installed within weeks of initial contact. Due
to these demands of the industry we set up
our internal processes and operations such
that we can quickly respond to the
opportunity with internal engineering,
design, regulatory, fabrication, logistics,
installation and commissioning expertise.
We maintain tight control over these
resources to ensure our ability to respond
to client needs based on their schedule –
not ours.
PES: How is HB Rentals helping to drive
down the cost for windfarm
development and ongoing operations /
maintenance support?
BH: The ability to rent offshore
accommodation modules is an attractive
alternative to investing in permanent living
quarters, depending on the need. It’s all
about financing and return on investment
– rental accommodation suppliers offer a
financing alternative to purchase and
avoiding CAPEX investment. We also offer
flexibility in how to provision the temporary
living quarters. They can be custom
designed for installation on a vessel or a
platform and in both cases require DNV
2.7-1 certification if performing an offshore
lift e.g... to or from a supply vessel to
platform and vice-versa. By being able to
outfit a particular vessel with temporary
accommodation they will be able to
perform specialized short term work. It is all
about creating flexibility and using current
assets more effectively, or designing new
assets to do the work more efficiently.
PES: How do you see the Offshore Wind
market evolving – especially globally?
BH: While we expect to see continued
development in the North Sea we believe
that slowly but steadily we’ll start seeing
projects in other markets around the world.
It’s slow and gradual and the industry is
competing against lower cost fossil fuels,
but for the companies already invested in
the European renewables market we
expect to see global growth given the
depth of expertise the industry leaders
have developed in the North Sea and
the capital investments they’ve already
made – especially in special purpose
vessels. Expertise and vessels can go to
any market – and that’s what we expect
to see.
Case in point is with two of our higher
profile projects – with Siemens and Jack-up
Barge (J-UB) in the German North Sea. We
supported Siemens with a 20 POB
(personnel on board) accommodation
complex with the BorWin Beta HVDC
Converter Platform during the physical
platform installation. Located North West of
Borkum Island in the German Bight, the
BorWin HVDC Converter Platform is a
groundbreaking implementation of power
engineering given the long distance involved
from the Veja Mate and Global Tech 1 wind
parks to the onshore grid connection.
Concurrent with the HVDC Converter
Platform TLQ installation, HB had 96 POB
installed on the JB117 jack-up barge
operated by J-UB supporting the hook-up
and commissioning phase of work. At this
time HB had a total of 69 rental
accommodation modules installed across
multiple offshore wind farm projects in the
North Sea. We have the design, engineering,
regulatory expertise, fabrication, project
management, logistics, installation hook-up
and commissioning, and service capabilities
to support our projects wherever they might
be used on offshore wind developments
across the world.
The European offshore wind industry’s
cumulative experience to-date and its
effectiveness in driving cost reduction
places it ahead of potential global
competitors. As renewable energy gains
acceptance across other developed
countries such as the US and in developing
countries, like India and China, where there
is an increase in wind energy capacity, the
European industry has a strong head start
and we hope that it will be able to take
advantage of this opportunity.
For more information go to
www.hbrentals.com
Company Profile
HB Rentals Limited is a Superior Energy
Services company, which specialises in
the design, manufacture, sale and rental
of DNV & ABS certified temporary
offshore accommodation solutions,
Zone I / Zone II hazardous area service
modules and workshop and refrigeration
containers.
HB Rentals is a global organisation,
headquartered in Broussard, Louisiana,
USA with key operating and service
facilities located in strategic markets
around the world.
The company has been based in
Aberdeen for over 25 years, servicing oil
& gas, offshore wind and maritime
customers with a hire fleet in excess of
300+ DNV & ABS certified, A60 rated
modules and providing customised
solutions according to their specific
requirements.
The UK & Middle East facilities are
accredited to ISO 9001, ISO 14001 and
OHSAS 18001 quality, environmental,
and health & safety management
systems respectively, and strive to
maintain the highest industry standards
and certification available in the market.
“The ability to rent offshore accommodation
modules is an attractive alternative to investing
in permanent living quarters”
Brad Hirst
PES Wind3
ASK THE EXPERTS

More Related Content

Similar to PES Article

RSL Corporate Presentation
RSL Corporate PresentationRSL Corporate Presentation
RSL Corporate PresentationDave Pallas
 
Offshore substation design in Ramboll
Offshore substation design in RambollOffshore substation design in Ramboll
Offshore substation design in Rambollpbnrambollcom
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity SolutionsMatthew Bates
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docxFairFASST
 
Power Projects
Power ProjectsPower Projects
Power ProjectsPer Lyager
 
Fem consultants, computational fluid dynamics
Fem consultants, computational fluid dynamicsFem consultants, computational fluid dynamics
Fem consultants, computational fluid dynamicsSimfwd
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_externalKen Loh
 
The Carbon Trust, DONG Energy and Statkraft in a joint presentation
The Carbon Trust, DONG Energy and Statkraft in a joint presentationThe Carbon Trust, DONG Energy and Statkraft in a joint presentation
The Carbon Trust, DONG Energy and Statkraft in a joint presentationTorben Haagh
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_cSteveCummings20
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Amin
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_enDenis Cremin
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project DevelopmentWalter Lee
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineerAlfred Joe
 

Similar to PES Article (20)

MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
RSL Corporate Presentation
RSL Corporate PresentationRSL Corporate Presentation
RSL Corporate Presentation
 
Offshore substation design in Ramboll
Offshore substation design in RambollOffshore substation design in Ramboll
Offshore substation design in Ramboll
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity Solutions
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
 
Power Projects
Power ProjectsPower Projects
Power Projects
 
Fem consultants, computational fluid dynamics
Fem consultants, computational fluid dynamicsFem consultants, computational fluid dynamics
Fem consultants, computational fluid dynamics
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
Final-Interview
Final-InterviewFinal-Interview
Final-Interview
 
The Carbon Trust, DONG Energy and Statkraft in a joint presentation
The Carbon Trust, DONG Energy and Statkraft in a joint presentationThe Carbon Trust, DONG Energy and Statkraft in a joint presentation
The Carbon Trust, DONG Energy and Statkraft in a joint presentation
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_c
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
 
OSL Brochure
OSL BrochureOSL Brochure
OSL Brochure
 
Ahmer salahudin resume
Ahmer salahudin resumeAhmer salahudin resume
Ahmer salahudin resume
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
Krishnan Ramu PM
Krishnan Ramu PM Krishnan Ramu PM
Krishnan Ramu PM
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineer
 

More from Peter Armstrong

More from Peter Armstrong (20)

ADIPEC Ad Full Size-PrintReady
ADIPEC Ad Full Size-PrintReadyADIPEC Ad Full Size-PrintReady
ADIPEC Ad Full Size-PrintReady
 
ADIPEC_Panels_new size_lorez
ADIPEC_Panels_new size_lorezADIPEC_Panels_new size_lorez
ADIPEC_Panels_new size_lorez
 
Jack-Up Barge Case Study
Jack-Up Barge Case StudyJack-Up Barge Case Study
Jack-Up Barge Case Study
 
HBR - WP01 - Understanding Client Needs
HBR - WP01 - Understanding Client NeedsHBR - WP01 - Understanding Client Needs
HBR - WP01 - Understanding Client Needs
 
Mexico Oil and Gas Review 2016 Ad
Mexico Oil and Gas Review 2016 AdMexico Oil and Gas Review 2016 Ad
Mexico Oil and Gas Review 2016 Ad
 
Mexico Oil Gas Review
Mexico Oil Gas ReviewMexico Oil Gas Review
Mexico Oil Gas Review
 
MEE Reaching The Peak
MEE Reaching The PeakMEE Reaching The Peak
MEE Reaching The Peak
 
GulfConst-Performance
GulfConst-PerformanceGulfConst-Performance
GulfConst-Performance
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency Management
 
Sunday
SundaySunday
Sunday
 
Saturday
SaturdaySaturday
Saturday
 
Thursday
ThursdayThursday
Thursday
 
Friday
FridayFriday
Friday
 
Wednesday
WednesdayWednesday
Wednesday
 
Is Your Profit Leaking
Is Your Profit LeakingIs Your Profit Leaking
Is Your Profit Leaking
 
E&C Profilep123
E&C Profilep123E&C Profilep123
E&C Profilep123
 
Feb 2010 Hydrocarbon Processing
Feb 2010 Hydrocarbon ProcessingFeb 2010 Hydrocarbon Processing
Feb 2010 Hydrocarbon Processing
 
HP FHS Spring 2011
HP FHS Spring 2011HP FHS Spring 2011
HP FHS Spring 2011
 
HydrocarbonProcessingFHS
HydrocarbonProcessingFHSHydrocarbonProcessingFHS
HydrocarbonProcessingFHS
 
Refomer Ad 2010
Refomer Ad 2010Refomer Ad 2010
Refomer Ad 2010
 

PES Article

  • 1. PES: Why are temporary living quarter rental companies critical to the offshore wind supply chain? Brad Hirst: At various stages of an offshore wind project’s life cycle there will be varying workforce needs: i.e. during the engineering and construction phase, throughout the life of the wind farm to operation, maintenance and upgrade of key components and infrastructure. Our niche in the market is to provide temporary offshore accommodation – in the form of what we call temporary living quarters (TLQ) – that are custom designed and engineered to specific project requirements. We use standard design modules that can be linked together and stacked to create multi-tiered living quarter complexes, which are installed on vessels, jack-ups and platforms – wherever there is space for the temporary accommodation. Offshore accommodation rentals are ideal for short term needs. In an industry that is continuously seeking to reduce costs to be more competitive with traditional sources of power generation, having the opportunity to rent temporary living quarters reduces the total project cost by helping developers avoid a CAPEX investment for which there might be a low return. Rental equipment fulfils the need for short term work. In any industry, utilisation rates for assets are a strong indicator of operating efficiency. Offshore wind projects, just like offshore oil and gas, will have a mix of both permanent and temporary living quarters to support the variability in offshore worker accommodation requirements. For permanent living quarters a Project Manager doesn’t want to overbuild in capacity and conversely they don’t want to under build either. You select an optimal workforce accommodation capacity and supplement your living quarter needs with a rental product for the required period. PES: What type of offshore work necessitates temporary accommodation and for what duration? BH: The most notable opportunities for offshore wind rental accommodation lie in the hook-up and commissioning phase of the HVDC converter platforms, as these tend to be large, technologically advanced structures located further offshore than their smaller, less complicated, near-shore AC platform counterparts. Once the platforms are commissioned, they are handed over to the client, i.e. electrical transmission and utilities companies and there may then be further TLQ requirements as part of ongoing operations, albeit on a smaller scale than the initial hook-up. There will of course always be repair and maintenance requirements for these platforms, as well as the subsea cabling and turbines. Some of the original European wind-farms are now at this phase. As an industry, Offshore Wind is still in its infancy and operators are continuously learning and adapting based on project experience. Since they compete against other sources of power generation and rely heavily upon government subsidies, there is an ever-increasing demand to be more innovative, increase efficiency, add value Brad Hirst, Sales & Marketing Manager, talks in more depth to PES about the value of temporary accommodation rentals… Short stay PES Wind1 ASK THE EXPERTS
  • 2. and save costs at every stage of the project. It’s a very dynamic and rapidly evolving industry. Our assessment is that some of the opportunities we’ve been involved with in the past will become less as living quarter requirements and become better known during the project life-cycle, these platforms will be designed and manufactured accordingly to incorporate sufficient living quarters. As with all industries, efficiency is gained through greater experience and subsequent innovation and Offshore Wind will be no different. We’ll continue to focus on the evolving needs of the industry especially as the wind turbines age creating new opportunities in service and maintenance. PES: In your accommodation module product design what drives your guidance for product attributes? BH: As we design offshore accommodation modules, we have to consider numerous factors to ensure that our equipment meets a broad range of regulatory compliance and certifying authority requirements. With worker safety and comfort at the forefront, some of the primary drivers include UK HSE (Health and Safety Executive) guidelines, DNV 2.7-1 certification, SOLAS/ IMO regulations and most recently, the ABS Guide for Portable Accommodation Modules. This enables us to supply equipment for a multitude of applications and configurations from standalone bedroom modules to large, multi-level accommodation complexes complete with welfare facilities and auxiliary services. Other variables taken into account when designing TLQ modules include the type of host installation e.g. vessel or platform, which industries they will be used in and also the environmental conditions that they will operate in around the world. Adaptability is crucial. PES: Describe HB Rentals ability to technically execute on a TLQ complex installation. BH: HB Rentals has a defined process for supporting an offshore accommodation project. Since each project is a custom engineered solution, we adhere to a methodical approach in qualifying our clients’ requirements which is very similar to a FEED (Front End Engineering Design) study. It is essential that we maintain rigorous QA through the entire process from requirements definition to engineering design, fabrication, shipping to site (usually a port) and installation. Given the nature of short term rental projects – that they tend to support specific work of a short term duration, we are frequently contacted in the latter stages of the project’s development and subsequently have less time to plan and respond. It’s not uncommon to receive RFQs and project requests in which a “The most notable opportunities for offshore wind rental accommodation lie in the hook-up and commissioning phase of the HVDC converter platforms” Brad Hirst www.peswind.com 2 ASK THE EXPERTS
  • 3. custom TLQ complex needs to be designed, engineered, delivered and installed within weeks of initial contact. Due to these demands of the industry we set up our internal processes and operations such that we can quickly respond to the opportunity with internal engineering, design, regulatory, fabrication, logistics, installation and commissioning expertise. We maintain tight control over these resources to ensure our ability to respond to client needs based on their schedule – not ours. PES: How is HB Rentals helping to drive down the cost for windfarm development and ongoing operations / maintenance support? BH: The ability to rent offshore accommodation modules is an attractive alternative to investing in permanent living quarters, depending on the need. It’s all about financing and return on investment – rental accommodation suppliers offer a financing alternative to purchase and avoiding CAPEX investment. We also offer flexibility in how to provision the temporary living quarters. They can be custom designed for installation on a vessel or a platform and in both cases require DNV 2.7-1 certification if performing an offshore lift e.g... to or from a supply vessel to platform and vice-versa. By being able to outfit a particular vessel with temporary accommodation they will be able to perform specialized short term work. It is all about creating flexibility and using current assets more effectively, or designing new assets to do the work more efficiently. PES: How do you see the Offshore Wind market evolving – especially globally? BH: While we expect to see continued development in the North Sea we believe that slowly but steadily we’ll start seeing projects in other markets around the world. It’s slow and gradual and the industry is competing against lower cost fossil fuels, but for the companies already invested in the European renewables market we expect to see global growth given the depth of expertise the industry leaders have developed in the North Sea and the capital investments they’ve already made – especially in special purpose vessels. Expertise and vessels can go to any market – and that’s what we expect to see. Case in point is with two of our higher profile projects – with Siemens and Jack-up Barge (J-UB) in the German North Sea. We supported Siemens with a 20 POB (personnel on board) accommodation complex with the BorWin Beta HVDC Converter Platform during the physical platform installation. Located North West of Borkum Island in the German Bight, the BorWin HVDC Converter Platform is a groundbreaking implementation of power engineering given the long distance involved from the Veja Mate and Global Tech 1 wind parks to the onshore grid connection. Concurrent with the HVDC Converter Platform TLQ installation, HB had 96 POB installed on the JB117 jack-up barge operated by J-UB supporting the hook-up and commissioning phase of work. At this time HB had a total of 69 rental accommodation modules installed across multiple offshore wind farm projects in the North Sea. We have the design, engineering, regulatory expertise, fabrication, project management, logistics, installation hook-up and commissioning, and service capabilities to support our projects wherever they might be used on offshore wind developments across the world. The European offshore wind industry’s cumulative experience to-date and its effectiveness in driving cost reduction places it ahead of potential global competitors. As renewable energy gains acceptance across other developed countries such as the US and in developing countries, like India and China, where there is an increase in wind energy capacity, the European industry has a strong head start and we hope that it will be able to take advantage of this opportunity. For more information go to www.hbrentals.com Company Profile HB Rentals Limited is a Superior Energy Services company, which specialises in the design, manufacture, sale and rental of DNV & ABS certified temporary offshore accommodation solutions, Zone I / Zone II hazardous area service modules and workshop and refrigeration containers. HB Rentals is a global organisation, headquartered in Broussard, Louisiana, USA with key operating and service facilities located in strategic markets around the world. The company has been based in Aberdeen for over 25 years, servicing oil & gas, offshore wind and maritime customers with a hire fleet in excess of 300+ DNV & ABS certified, A60 rated modules and providing customised solutions according to their specific requirements. The UK & Middle East facilities are accredited to ISO 9001, ISO 14001 and OHSAS 18001 quality, environmental, and health & safety management systems respectively, and strive to maintain the highest industry standards and certification available in the market. “The ability to rent offshore accommodation modules is an attractive alternative to investing in permanent living quarters” Brad Hirst PES Wind3 ASK THE EXPERTS