Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
14
Lean Construction
Institute - Ireland
Community of Practice
(CoP)
Launch Survey Summary Notes April 16th
2014
Survey, Report & Analysis carried out by:
Lynn Tolan, Dr Arlene Egan & Paul Ebbs
(PhathomHQ)
paul@phathomhq.com
+353 87 9209969
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
www.phathomhq.com
©
Table of Contents
Introduction .....................................................................................................................................1
Job Title/position within organisation?.............................................................................................2
Which sector(s) does your organisation fit(s) into? ..........................................................................2
Indicate your current level of understanding of Lean? .....................................................................2
Indicate your current level of experience using Lean?.....................................................................3
Which Lean tools have you/ organisation used?..............................................................................4
Comments on which lean tools have you and your organisation used?...........................................5
In relation to the last CoP event; what was GOOD about this event? ..............................................6
In relation to the last CoP event; what would you CHANGE? ..........................................................6
Would you be willing to share your experience of Lean with this CoP? ...........................................7
In which contexts would you be willing to share your experiences, learnings or insights on Lean?..7
Can you offer ideas for speakers, examples, stories etc., that could be used in future CoP events?
........................................................................................................................................................8
What topics should be addressed in CoP events over the next 12 months?....................................8
Other comments or ideas: ...............................................................................................................9
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
1 | P a g e
www.phathomhq.com
©
Introduction
This survey was carried out at the launch of Lean Construction Ireland’s Community of Practice
(CoP). All responses are anonymous although 99 out of 116 people supplied their name (85%) and
76 out of 116 people supplied email addresses (66%). Approximately 48 organisations were
represented in this survey and their sizes are represented in Figure 1. Respondents’ professions are
illustrated in Figure 2 and industry sector in Figure 3. The average years’ experience of the
respondents was circa 21 years with 109 out of 116 people completing this box.
This survey outlines some thoughts and comments from a wide range of construction industry
stakeholders on their understanding and experience of Lean Principles & Tools. The results are very
subjective and only high level analysis was carried for this report and suggests people have a better
understanding of Lean over experience with it. Last Planner; Just-in-Time; Daily Huddle; and BIM
were the most popular Lean Tools. Respondents indicated that the introduction, overview,
presentations and format of the event were good points (plus) from the event while comments
regarding the format and practical implementation of Lean were suggested changes (delta). Ideas
and suggestions for future events and over the next 12 months included more real life examples of
Lean implementation; training requirements & how to change behaviours; and collaboration.
Finally, any other comments or ideas gathered from the survey are included at the end of this report.
Figure 1: Size of Respondents Organisation
12, 12% 4, 4%
5, 5%
82, 79%
01 - 10
11 - 51
51-200
200+
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
2 | P a g e
www.phathomhq.com
©
Job Title/position within organisation?
Figure 2: Respondents Professions
Which sector(s) does your organisation fit(s) into?
Figure 3: Sectors of Respondents
Indicate your current level of understanding of Lean?
23
15%
43
28%
45
29%
12
8%
3
2%
7
4%
21
14%
Owner
Designer
Contractor
Trade
Supplier
Consultancy/Training
Other
35 (30%)
39 (34%)
8 (7%)
4 (3%)
6 (5%)
24 (21%)
Directors (Managing;
Project; Operations; Regional)
Managers (Commercial;
Contract; Construction; ESHQ)
Engineers (Lead;
Construction; Design, Electrical)
QS
Education (Academic;
Student)
Other (Consultants; Trainers)
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
3 | P a g e
www.phathomhq.com
©
Figure 4: Current level of understanding of Lean
Indicate your current level of experience using Lean?
Figure 5: Current level of understanding of Lean
3%
6%
15%
9%
13%
16%
21%
12%
4%
1%
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10
16%
12% 12%
15%
14%
16%
6%
5%
3%
1%
0
2
4
6
8
10
12
14
16
18
20
1 2 3 4 5 6 7 8 9 10
The results from this question are very subjective. The respondents were asked to indicate their
own level of understanding of Lean with no real foundations to scale from other than 1 being no
understanding and 10 being a high level of understanding
No of
Respondents
No experience Very experienced
It is interesting and worth noting when comparing Figures 4 & 5 that the respondents understanding
of Lean is greater than their experience. Those with no experience for example (16%) was in
contrast to those with little understanding (3%). Additionally, the attendees on the night cannot be
considered as a true sample of the Irish AEC industry and some of the results may be skewed due
to the subjective nature of the questions and also to the fact that many of the respondents were
from large companies employing 200+ people and are using some Lean Tools themselves or within
their organisations.
No of
Respondents
No understanding High level of understanding
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
4 | P a g e
www.phathomhq.com
©
Which Lean tools have you/ organisation used?
You Org
Choosing by advantages 9 2% 9 2%
The Last Planner System® 43 8% 57 10%
Stretch and Flex meetings 35 6% 35 6%
Value Stream Mapping 40 7% 36 7%
Just in Time 50 9% 42 8%
Corporate Performance Management 15 3% 19 3%
Multi-Party Contracts 24 4% 27 5%
Target Value Design 16 3% 24 4%
Daily Huddle 59 11% 51 9%
A3 Report 18 3% 18 3%
Pull Planning 38 7% 37 7%
Toyota Way 16 3% 10 2%
Building Information Modelling 67 12% 62 11%
5S 23 4% 24 4%
Six Sigma 27 5% 31 6%
Big Room 19 3% 22 4%
Enterprise Resource Planning System 15 3% 13 2%
None of the above 13 2% 21 4%
Other 16 3% 6 1%
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
5 | P a g e
www.phathomhq.com
©
Comments on which lean tools have you and your organisation used?
The list above was not exhaustive and some of the respondents indicated use of more tools. Others
argued if some of the options should not be listed as tools and that lack of
communication/understanding attitudes was a barrier to successfully implementing these tools.
This section of the survey also highlighted how different parts of some companies apply some Lean
tools while other parts use other tools. The amount of tools being used does suggest that there are a
lot of lessons learnt to be shared with the CoP.
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
6 | P a g e
www.phathomhq.com
©
In relation to the last CoP event; what was GOOD about this event?
There were 111 comments regarding the good points of the CoP Launch. A high level coding
framework was developed to analyse the comments and were broken down and summarised broadly
as follows;
1. Introduction & Overview (12 comments, or 11%) - relating to the introduction; overview;
kick-off; and objectives.
2. Quality of speakers & presentations (71 or 64%) – knowledge of subject matter; their
enthusiasm for Lean & mindset change; topics covered; diversity of speakers; Intel video;
explanations of Lean and respect for people and mindset change; concise and to the point
3. Format (28 or 25%) - Cross industry representation & mix of people; number of attendees;
time-keeping & organisation; Q&A session
In relation to the last CoP event; what would you CHANGE?
There were 48 comments on what changes should be considered. Again a high level coding
framework was developed to analyse the comments and were broken down and summarised broadly
as follows;
1. Format (34 comments or 66%) – volume & screen issues; engage with more stakeholders
(Owners, Contractors, Trades etc); define strategic ideas/objectives next meeting; timing;
promotion of future events; outline structure for engagement, sharing & audience interaction
2. Practical Implementation (17 or 33%) – specific examples including photos, real data,
tangible results and how to start; demonstrate the benefits of Lean more; more case studies;
more access to practitioners; perhaps too aspirational
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
7 | P a g e
www.phathomhq.com
©
Would you be willing to share your experience of Lean with this CoP?
Figure 6: Respondents willingness to share with the CoP
In which contexts would you be willing to share your experiences,
learnings or insights on Lean?
Figure 7: Contexts for sharing at future CoP meetings
77, 85%
7, 8%
6, 7%
Yes
No
Other
39, 42%
4, 4%
44, 48%
5, 6%
Small Group (1-10)
Large Group
Both
Neither
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
8 | P a g e
www.phathomhq.com
©
Can you offer ideas for speakers, examples, stories etc., that could be
used in future CoP events?
There were 76 ideas for speakers, examples etc. A high level coding framework was developed to
analyse the comments and were broken down and summarised broadly as follows;
 Real life examples (43 comments or 57%) – practical examples & case studies and lessons
learnt from other regions/practitioners’ including big wins; what went wrong?;address real
concerns for participation; technology in construction; stories from the worker’s on the ground;
Last Planner, IPD; offsite construction & TIM WOOD examples
 Training & Behavioural Change (17 or 22%) – structured training modules & links to 3rd
level courses; applying Lean to construction; employee development – top down & bottom up
strategies
 Collaboration (16 or21%) – Rules & MoU for engagement and discussions; linkages to other
groups and organisations including CITA; brainstorming collectively to see where we need to
go
What topics should be addressed in CoP events over the next 12
months?
There were 67comments regarding what topics should be addressed over the next 12 months. Again
a high level coding framework was developed to analyse the comments and were broken down and
summarised broadly as follows;
 Real life examples (35 comments or 52%) – showing real US and Irish data with real
examples of success showing real wins; workforce buy-in; how construction can learn from
manufacturing & aviation; explain quality philosophies’ and tools; how to embed lessons
learnt, build trust & develop suitable contracts
 Training & Behavioural Change (23 or 34%) – how to change behaviours, communicate &
measure lean; Last Planner training & philosophy/psychology of lean; motivation & education
of the workforce at the coalface
 Collaboration (9 or 14%) – protocols for engagement and establishment of working task
groups
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
9 | P a g e
www.phathomhq.com
©
Other comments or ideas:
 Very useful 'Spirit of continuous improvement' - Nick Masci
 Please keep me in mind I will like to get involved
 Lean is undoubtedly the way to go... But it needs to be driven by legislation/statutory
requirements & by owner stipulation, otherwise spread will be stifled.
 Stronger link between Lean & BIM movements in Ireland. Ralph Montague Coordinator of
CITA BIM Group
 Create/ set up Pilot Programmes in 'Joint Teams' across Owners, Designers, Contractors,
Trades, Engineers - with defined brief of timelines - all groups come back & present their
approach & successes/learning
 Map out a lean journey with clear goals & objectives (that can be measured) of where Lean in
Ireland needs to go! Issue a list of improvements for people to take away from the introduction
sessions
 There are Lean 'programme' architectures available to show what steps might be taken by an
organisation
 Need to educate at different levels of maturity!
 Please contact me I can help
 Lean is at an early stage so continue to focus on mindset and commitment and PAC or (PAL)
 Leverage work being done by organisations like CITA, DIT etc
 Well done on this initiative (John & Co) I believe that it is necessary to develop a common
language for lean construction.
 There are many options; and assumptions about what lean is. Often this is based upon very
little beyond hearing a buzz phrase. This is the reason behind the suggestion above.
 In future show a real example of a Lean Project and clearly explain how each party benefited
(money, time, quality)
 Is there a plan to provide accreditation for ongoing commitment to Lean Construction
 Great Job!!
 In a company there are some IP issues with sharing too much in the way of tools
 CoP needs supplier involvement company's like Kingspan
 Post some tools on LinkedIn. Share brights
 Need some hands on trades i.e plumber; electricians etc
 Great event/ great potential
 Inspiring
 Need to indicate how to get this on the road
 What’s the roadmap
 Well done
Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014
10 | P a g e
www.phathomhq.com
©
Conclusion
The summary of the survey results herein suggest that there is a strong interest from an industry
wide perspective in adopting Lean Principles into the Irish Architectural, Engineering & Construction
(AEC) Industry. While is report does not maintain this is a clear picture of the current state of the Irish
AEC sector it does suggest that the demand for change is real - demonstrated by the range of
comments.
Eighty two percent of respondents were from large organisations which would account for the
number of Lean tools being used by the respondents or their organisations. Directors made up 30%
of the respondents, while Managers made up another 30% and Engineers 8% with the remaining
mixed between profession (QS, Consultants, Education etc). The attendance on the night was very
balanced (as reflected by some comments) with owners (15%), contractors (28%) and designers
(29%) making up the majority.
The respondents level of understanding was higher than their experience of using Lean, however;
the large number of Lean Tools that the respondents or their organisations used is encouraging.
Building Information Modelling was the most popular tool followed by Last Planner System®; Daily
Huddle; Just-in-Time; and Value Stream Mapping; Stretch & Flex meetings and Six Sigma. The
introduction/overview of Lean Construction, quality of the presentations and format of the event were
noted as good points (plus) from the event (111 comments) while the format and more practical
examples made up the comments regarding future changes (48 comments).
It is interesting that approximately 90% of the survey respondents indicated a willingness to share
their experiences applying Lean with some preferring small groups to large and vice versa. It appears
there is a lot of goodwill to improve the Irish AEC sector collectively and this is something welcomed
by the Core Group of this CoP. Going forward the Respondents suggested future event content
should include real life examples of Lean implementation (57%), training and behavioural change
(22%) and ways to collaborate and make teams work better (21%) – there was 76 comments in this
section. Sixty seven comments were received suggesting what should be addressed over the next 12
months. These were the same as above, however; the percentages’ differed – real life examples
(52%); training and behavioural change (34%); and Collaboration (14%).
Finally, we would welcome any further suggestions/comments/opinions on how we as an industry
and collective group can embed Lean into the Irish AEC sector and we encourage people and
organisations to attend and participate in future event.

More Related Content

What's hot

Gain new visibility in your DevOps team
 Gain new visibility in your DevOps team Gain new visibility in your DevOps team
Gain new visibility in your DevOps teamAbhishek Sood
 
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...University of Wolverhampton
 
Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak Hakan Yılmaz...
Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak  Hakan Yılmaz...Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak  Hakan Yılmaz...
Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak Hakan Yılmaz...Webrazzi
 
2019 Pulse of Engineering | IEEE GlobalSpec
2019 Pulse of Engineering | IEEE GlobalSpec2019 Pulse of Engineering | IEEE GlobalSpec
2019 Pulse of Engineering | IEEE GlobalSpecChristianJHaight
 
Field Service Technician Feedback - 2018 Results
Field Service Technician Feedback - 2018 ResultsField Service Technician Feedback - 2018 Results
Field Service Technician Feedback - 2018 ResultsSumair Dutta
 
CII Whitepaper on Indian Start-ups
CII Whitepaper on Indian Start-upsCII Whitepaper on Indian Start-ups
CII Whitepaper on Indian Start-upsVenkateshSeshadri5
 
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)SolarWinds
 
Chaos report 2012
Chaos report 2012Chaos report 2012
Chaos report 2012Placosta
 
Steljes effective meetings survey report
Steljes effective meetings survey reportSteljes effective meetings survey report
Steljes effective meetings survey reportGordon Rimmer
 
The State of the Technical Communication Industry: tcworld India 2013 Keynote...
The State of the Technical Communication Industry: tcworld India 2013 Keynote...The State of the Technical Communication Industry: tcworld India 2013 Keynote...
The State of the Technical Communication Industry: tcworld India 2013 Keynote...Scott Abel
 
Chaos summary 2009 the standish group
Chaos summary 2009 the standish groupChaos summary 2009 the standish group
Chaos summary 2009 the standish groupComputer Aid, Inc
 
Risk Assessment using LEGO® Serious Play®
Risk Assessment using LEGO® Serious Play®Risk Assessment using LEGO® Serious Play®
Risk Assessment using LEGO® Serious Play®lannoydavid
 
Idge dell private cloud2014 qp #2[1]
Idge dell private cloud2014 qp #2[1]Idge dell private cloud2014 qp #2[1]
Idge dell private cloud2014 qp #2[1]jmariani14
 
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)SolarWinds
 
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)SolarWinds
 

What's hot (19)

Gain new visibility in your DevOps team
 Gain new visibility in your DevOps team Gain new visibility in your DevOps team
Gain new visibility in your DevOps team
 
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
 
Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak Hakan Yılmaz...
Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak  Hakan Yılmaz...Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak  Hakan Yılmaz...
Analitiği Kullanarak Yüksek Performans Göstermek ve Lider Olmak Hakan Yılmaz...
 
2019 Pulse of Engineering | IEEE GlobalSpec
2019 Pulse of Engineering | IEEE GlobalSpec2019 Pulse of Engineering | IEEE GlobalSpec
2019 Pulse of Engineering | IEEE GlobalSpec
 
ISV report coMakeIT
ISV report coMakeIT ISV report coMakeIT
ISV report coMakeIT
 
Field Service Technician Feedback - 2018 Results
Field Service Technician Feedback - 2018 ResultsField Service Technician Feedback - 2018 Results
Field Service Technician Feedback - 2018 Results
 
CII Whitepaper on Indian Start-ups
CII Whitepaper on Indian Start-upsCII Whitepaper on Indian Start-ups
CII Whitepaper on Indian Start-ups
 
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Singapore)
 
Chaos report 2012
Chaos report 2012Chaos report 2012
Chaos report 2012
 
Steljes effective meetings survey report
Steljes effective meetings survey reportSteljes effective meetings survey report
Steljes effective meetings survey report
 
The State of the Technical Communication Industry: tcworld India 2013 Keynote...
The State of the Technical Communication Industry: tcworld India 2013 Keynote...The State of the Technical Communication Industry: tcworld India 2013 Keynote...
The State of the Technical Communication Industry: tcworld India 2013 Keynote...
 
Chaos report
Chaos reportChaos report
Chaos report
 
Chaos summary 2009 the standish group
Chaos summary 2009 the standish groupChaos summary 2009 the standish group
Chaos summary 2009 the standish group
 
Presentation on Business Strategy of Sony Ericsson
Presentation on Business Strategy of Sony EricssonPresentation on Business Strategy of Sony Ericsson
Presentation on Business Strategy of Sony Ericsson
 
Risk Assessment using LEGO® Serious Play®
Risk Assessment using LEGO® Serious Play®Risk Assessment using LEGO® Serious Play®
Risk Assessment using LEGO® Serious Play®
 
Idge dell private cloud2014 qp #2[1]
Idge dell private cloud2014 qp #2[1]Idge dell private cloud2014 qp #2[1]
Idge dell private cloud2014 qp #2[1]
 
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Australia)
 
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)
SolarWinds IT Trends Report 2015: Business at the Speed of IT (Germany)
 
Tsqr16 17-en
Tsqr16 17-enTsqr16 17-en
Tsqr16 17-en
 

Viewers also liked

CFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesCFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesRae Davies
 
Deconstructing Lean Construction
Deconstructing Lean ConstructionDeconstructing Lean Construction
Deconstructing Lean ConstructionDassault Systemes
 
Lean Construction - Whitepaper
Lean Construction - WhitepaperLean Construction - Whitepaper
Lean Construction - Whitepapernsivaku
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction WebinarBMGI India
 
Introduction to Lean Construction
Introduction to Lean ConstructionIntroduction to Lean Construction
Introduction to Lean ConstructionVedzen Consultants
 
Lean construction & BIM
Lean construction & BIMLean construction & BIM
Lean construction & BIMStephen Au
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introductiontabdelhamid
 

Viewers also liked (9)

CFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesCFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean Techniques
 
Deconstructing Lean Construction
Deconstructing Lean ConstructionDeconstructing Lean Construction
Deconstructing Lean Construction
 
Lean Construction - Whitepaper
Lean Construction - WhitepaperLean Construction - Whitepaper
Lean Construction - Whitepaper
 
LEAN Construction
LEAN ConstructionLEAN Construction
LEAN Construction
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction Webinar
 
Introduction to Lean Construction
Introduction to Lean ConstructionIntroduction to Lean Construction
Introduction to Lean Construction
 
Lean construction & BIM
Lean construction & BIMLean construction & BIM
Lean construction & BIM
 
Lean construction
Lean constructionLean construction
Lean construction
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introduction
 

Similar to Lci co p launch survey summary 16 4-14

AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdf
AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdfAR-SA-2022-16th-Annual-State-Of-Agile-Report.pdf
AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdfRodrigo Costa, MSc, HCMP
 
Lab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reportingLab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reportingThomas Toomse-Smith
 
Putting Together the Pieces - The 2013 Guide to S&OP Technology Selection
Putting Together the Pieces - The 2013 Guide to S&OP Technology SelectionPutting Together the Pieces - The 2013 Guide to S&OP Technology Selection
Putting Together the Pieces - The 2013 Guide to S&OP Technology SelectionLora Cecere
 
FP&A Trends Survey 2021
FP&A Trends Survey 2021FP&A Trends Survey 2021
FP&A Trends Survey 2021James Myers
 
Eurogroup Consulting: a new perspective on operational excellence
Eurogroup Consulting: a new perspective on operational excellenceEurogroup Consulting: a new perspective on operational excellence
Eurogroup Consulting: a new perspective on operational excellenceEurogroup Consulting NEDERLAND
 
2014 survey-monitoring-evaluation-v4
2014 survey-monitoring-evaluation-v42014 survey-monitoring-evaluation-v4
2014 survey-monitoring-evaluation-v4Meegan Scott
 
Why Is S&OP So Hard? 28 MAY 2015
Why Is S&OP So Hard? 28 MAY 2015 Why Is S&OP So Hard? 28 MAY 2015
Why Is S&OP So Hard? 28 MAY 2015 Lora Cecere
 
EI CITA BIM Transition Survey
EI CITA BIM Transition SurveyEI CITA BIM Transition Survey
EI CITA BIM Transition SurveyJohn Hunt
 
How Technology is changing Bidding
How Technology is changing BiddingHow Technology is changing Bidding
How Technology is changing BiddingAmplio Services
 
Version one 10th-annual-state-of-agile-report
Version one 10th-annual-state-of-agile-reportVersion one 10th-annual-state-of-agile-report
Version one 10th-annual-state-of-agile-reportMateusz Żeromski
 
Cloud-Based Contact Center Study - Connect First
Cloud-Based Contact Center Study - Connect FirstCloud-Based Contact Center Study - Connect First
Cloud-Based Contact Center Study - Connect FirstConnect First
 
The race for supply chain 2030
The race for supply chain 2030The race for supply chain 2030
The race for supply chain 2030Tristan Wiggill
 
Why Is Supply Chain Planning So Hard? 16 FEB 2016
Why Is Supply Chain Planning So Hard?  16 FEB 2016Why Is Supply Chain Planning So Hard?  16 FEB 2016
Why Is Supply Chain Planning So Hard? 16 FEB 2016Lora Cecere
 
ICFAI IT and Systems - Solved assignments and case study help
ICFAI IT and Systems  - Solved assignments and case study helpICFAI IT and Systems  - Solved assignments and case study help
ICFAI IT and Systems - Solved assignments and case study helpsmumbahelp
 
Yonix presents: It’s all about stakeholder communication
Yonix presents: It’s all about stakeholder communicationYonix presents: It’s all about stakeholder communication
Yonix presents: It’s all about stakeholder communicationyonix
 
Realizing the benefits: The Impact of Integrated Reporting
Realizing  the benefits: The Impact  of Integrated ReportingRealizing  the benefits: The Impact  of Integrated Reporting
Realizing the benefits: The Impact of Integrated ReportingSustainable Brands
 
QSO 680 Module One Journal Guidelines and Rubric Overvi.docx
QSO 680 Module One Journal Guidelines and Rubric  Overvi.docxQSO 680 Module One Journal Guidelines and Rubric  Overvi.docx
QSO 680 Module One Journal Guidelines and Rubric Overvi.docxmakdul
 
Supply chain Outsourcing advantages and pitfalls
Supply chain Outsourcing advantages and pitfallsSupply chain Outsourcing advantages and pitfalls
Supply chain Outsourcing advantages and pitfallsEng.Hamad Abdullah, MSCM
 

Similar to Lci co p launch survey summary 16 4-14 (20)

AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdf
AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdfAR-SA-2022-16th-Annual-State-Of-Agile-Report.pdf
AR-SA-2022-16th-Annual-State-Of-Agile-Report.pdf
 
Lab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reportingLab insight into retail investors use of digital for corporate reporting
Lab insight into retail investors use of digital for corporate reporting
 
Putting Together the Pieces - The 2013 Guide to S&OP Technology Selection
Putting Together the Pieces - The 2013 Guide to S&OP Technology SelectionPutting Together the Pieces - The 2013 Guide to S&OP Technology Selection
Putting Together the Pieces - The 2013 Guide to S&OP Technology Selection
 
FP&A Trends Survey 2021
FP&A Trends Survey 2021FP&A Trends Survey 2021
FP&A Trends Survey 2021
 
Eurogroup Consulting: a new perspective on operational excellence
Eurogroup Consulting: a new perspective on operational excellenceEurogroup Consulting: a new perspective on operational excellence
Eurogroup Consulting: a new perspective on operational excellence
 
2014 survey-monitoring-evaluation-v4
2014 survey-monitoring-evaluation-v42014 survey-monitoring-evaluation-v4
2014 survey-monitoring-evaluation-v4
 
Why Is S&OP So Hard? 28 MAY 2015
Why Is S&OP So Hard? 28 MAY 2015 Why Is S&OP So Hard? 28 MAY 2015
Why Is S&OP So Hard? 28 MAY 2015
 
EI CITA BIM Transition Survey
EI CITA BIM Transition SurveyEI CITA BIM Transition Survey
EI CITA BIM Transition Survey
 
Improving sales and operations (S&0P) in fmcg companies
Improving sales and operations (S&0P) in fmcg companiesImproving sales and operations (S&0P) in fmcg companies
Improving sales and operations (S&0P) in fmcg companies
 
How Technology is changing Bidding
How Technology is changing BiddingHow Technology is changing Bidding
How Technology is changing Bidding
 
Version one 10th-annual-state-of-agile-report
Version one 10th-annual-state-of-agile-reportVersion one 10th-annual-state-of-agile-report
Version one 10th-annual-state-of-agile-report
 
Version one 10th Annual State o Agile Report
Version one 10th Annual State o Agile ReportVersion one 10th Annual State o Agile Report
Version one 10th Annual State o Agile Report
 
Cloud-Based Contact Center Study - Connect First
Cloud-Based Contact Center Study - Connect FirstCloud-Based Contact Center Study - Connect First
Cloud-Based Contact Center Study - Connect First
 
The race for supply chain 2030
The race for supply chain 2030The race for supply chain 2030
The race for supply chain 2030
 
Why Is Supply Chain Planning So Hard? 16 FEB 2016
Why Is Supply Chain Planning So Hard?  16 FEB 2016Why Is Supply Chain Planning So Hard?  16 FEB 2016
Why Is Supply Chain Planning So Hard? 16 FEB 2016
 
ICFAI IT and Systems - Solved assignments and case study help
ICFAI IT and Systems  - Solved assignments and case study helpICFAI IT and Systems  - Solved assignments and case study help
ICFAI IT and Systems - Solved assignments and case study help
 
Yonix presents: It’s all about stakeholder communication
Yonix presents: It’s all about stakeholder communicationYonix presents: It’s all about stakeholder communication
Yonix presents: It’s all about stakeholder communication
 
Realizing the benefits: The Impact of Integrated Reporting
Realizing  the benefits: The Impact  of Integrated ReportingRealizing  the benefits: The Impact  of Integrated Reporting
Realizing the benefits: The Impact of Integrated Reporting
 
QSO 680 Module One Journal Guidelines and Rubric Overvi.docx
QSO 680 Module One Journal Guidelines and Rubric  Overvi.docxQSO 680 Module One Journal Guidelines and Rubric  Overvi.docx
QSO 680 Module One Journal Guidelines and Rubric Overvi.docx
 
Supply chain Outsourcing advantages and pitfalls
Supply chain Outsourcing advantages and pitfallsSupply chain Outsourcing advantages and pitfalls
Supply chain Outsourcing advantages and pitfalls
 

Recently uploaded

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Recently uploaded (20)

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Lci co p launch survey summary 16 4-14

  • 1. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 14 Lean Construction Institute - Ireland Community of Practice (CoP) Launch Survey Summary Notes April 16th 2014 Survey, Report & Analysis carried out by: Lynn Tolan, Dr Arlene Egan & Paul Ebbs (PhathomHQ) paul@phathomhq.com +353 87 9209969
  • 2. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 www.phathomhq.com © Table of Contents Introduction .....................................................................................................................................1 Job Title/position within organisation?.............................................................................................2 Which sector(s) does your organisation fit(s) into? ..........................................................................2 Indicate your current level of understanding of Lean? .....................................................................2 Indicate your current level of experience using Lean?.....................................................................3 Which Lean tools have you/ organisation used?..............................................................................4 Comments on which lean tools have you and your organisation used?...........................................5 In relation to the last CoP event; what was GOOD about this event? ..............................................6 In relation to the last CoP event; what would you CHANGE? ..........................................................6 Would you be willing to share your experience of Lean with this CoP? ...........................................7 In which contexts would you be willing to share your experiences, learnings or insights on Lean?..7 Can you offer ideas for speakers, examples, stories etc., that could be used in future CoP events? ........................................................................................................................................................8 What topics should be addressed in CoP events over the next 12 months?....................................8 Other comments or ideas: ...............................................................................................................9
  • 3. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 1 | P a g e www.phathomhq.com © Introduction This survey was carried out at the launch of Lean Construction Ireland’s Community of Practice (CoP). All responses are anonymous although 99 out of 116 people supplied their name (85%) and 76 out of 116 people supplied email addresses (66%). Approximately 48 organisations were represented in this survey and their sizes are represented in Figure 1. Respondents’ professions are illustrated in Figure 2 and industry sector in Figure 3. The average years’ experience of the respondents was circa 21 years with 109 out of 116 people completing this box. This survey outlines some thoughts and comments from a wide range of construction industry stakeholders on their understanding and experience of Lean Principles & Tools. The results are very subjective and only high level analysis was carried for this report and suggests people have a better understanding of Lean over experience with it. Last Planner; Just-in-Time; Daily Huddle; and BIM were the most popular Lean Tools. Respondents indicated that the introduction, overview, presentations and format of the event were good points (plus) from the event while comments regarding the format and practical implementation of Lean were suggested changes (delta). Ideas and suggestions for future events and over the next 12 months included more real life examples of Lean implementation; training requirements & how to change behaviours; and collaboration. Finally, any other comments or ideas gathered from the survey are included at the end of this report. Figure 1: Size of Respondents Organisation 12, 12% 4, 4% 5, 5% 82, 79% 01 - 10 11 - 51 51-200 200+
  • 4. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 2 | P a g e www.phathomhq.com © Job Title/position within organisation? Figure 2: Respondents Professions Which sector(s) does your organisation fit(s) into? Figure 3: Sectors of Respondents Indicate your current level of understanding of Lean? 23 15% 43 28% 45 29% 12 8% 3 2% 7 4% 21 14% Owner Designer Contractor Trade Supplier Consultancy/Training Other 35 (30%) 39 (34%) 8 (7%) 4 (3%) 6 (5%) 24 (21%) Directors (Managing; Project; Operations; Regional) Managers (Commercial; Contract; Construction; ESHQ) Engineers (Lead; Construction; Design, Electrical) QS Education (Academic; Student) Other (Consultants; Trainers)
  • 5. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 3 | P a g e www.phathomhq.com © Figure 4: Current level of understanding of Lean Indicate your current level of experience using Lean? Figure 5: Current level of understanding of Lean 3% 6% 15% 9% 13% 16% 21% 12% 4% 1% 0 5 10 15 20 25 30 1 2 3 4 5 6 7 8 9 10 16% 12% 12% 15% 14% 16% 6% 5% 3% 1% 0 2 4 6 8 10 12 14 16 18 20 1 2 3 4 5 6 7 8 9 10 The results from this question are very subjective. The respondents were asked to indicate their own level of understanding of Lean with no real foundations to scale from other than 1 being no understanding and 10 being a high level of understanding No of Respondents No experience Very experienced It is interesting and worth noting when comparing Figures 4 & 5 that the respondents understanding of Lean is greater than their experience. Those with no experience for example (16%) was in contrast to those with little understanding (3%). Additionally, the attendees on the night cannot be considered as a true sample of the Irish AEC industry and some of the results may be skewed due to the subjective nature of the questions and also to the fact that many of the respondents were from large companies employing 200+ people and are using some Lean Tools themselves or within their organisations. No of Respondents No understanding High level of understanding
  • 6. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 4 | P a g e www.phathomhq.com © Which Lean tools have you/ organisation used? You Org Choosing by advantages 9 2% 9 2% The Last Planner System® 43 8% 57 10% Stretch and Flex meetings 35 6% 35 6% Value Stream Mapping 40 7% 36 7% Just in Time 50 9% 42 8% Corporate Performance Management 15 3% 19 3% Multi-Party Contracts 24 4% 27 5% Target Value Design 16 3% 24 4% Daily Huddle 59 11% 51 9% A3 Report 18 3% 18 3% Pull Planning 38 7% 37 7% Toyota Way 16 3% 10 2% Building Information Modelling 67 12% 62 11% 5S 23 4% 24 4% Six Sigma 27 5% 31 6% Big Room 19 3% 22 4% Enterprise Resource Planning System 15 3% 13 2% None of the above 13 2% 21 4% Other 16 3% 6 1%
  • 7. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 5 | P a g e www.phathomhq.com © Comments on which lean tools have you and your organisation used? The list above was not exhaustive and some of the respondents indicated use of more tools. Others argued if some of the options should not be listed as tools and that lack of communication/understanding attitudes was a barrier to successfully implementing these tools. This section of the survey also highlighted how different parts of some companies apply some Lean tools while other parts use other tools. The amount of tools being used does suggest that there are a lot of lessons learnt to be shared with the CoP.
  • 8. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 6 | P a g e www.phathomhq.com © In relation to the last CoP event; what was GOOD about this event? There were 111 comments regarding the good points of the CoP Launch. A high level coding framework was developed to analyse the comments and were broken down and summarised broadly as follows; 1. Introduction & Overview (12 comments, or 11%) - relating to the introduction; overview; kick-off; and objectives. 2. Quality of speakers & presentations (71 or 64%) – knowledge of subject matter; their enthusiasm for Lean & mindset change; topics covered; diversity of speakers; Intel video; explanations of Lean and respect for people and mindset change; concise and to the point 3. Format (28 or 25%) - Cross industry representation & mix of people; number of attendees; time-keeping & organisation; Q&A session In relation to the last CoP event; what would you CHANGE? There were 48 comments on what changes should be considered. Again a high level coding framework was developed to analyse the comments and were broken down and summarised broadly as follows; 1. Format (34 comments or 66%) – volume & screen issues; engage with more stakeholders (Owners, Contractors, Trades etc); define strategic ideas/objectives next meeting; timing; promotion of future events; outline structure for engagement, sharing & audience interaction 2. Practical Implementation (17 or 33%) – specific examples including photos, real data, tangible results and how to start; demonstrate the benefits of Lean more; more case studies; more access to practitioners; perhaps too aspirational
  • 9. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 7 | P a g e www.phathomhq.com © Would you be willing to share your experience of Lean with this CoP? Figure 6: Respondents willingness to share with the CoP In which contexts would you be willing to share your experiences, learnings or insights on Lean? Figure 7: Contexts for sharing at future CoP meetings 77, 85% 7, 8% 6, 7% Yes No Other 39, 42% 4, 4% 44, 48% 5, 6% Small Group (1-10) Large Group Both Neither
  • 10. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 8 | P a g e www.phathomhq.com © Can you offer ideas for speakers, examples, stories etc., that could be used in future CoP events? There were 76 ideas for speakers, examples etc. A high level coding framework was developed to analyse the comments and were broken down and summarised broadly as follows;  Real life examples (43 comments or 57%) – practical examples & case studies and lessons learnt from other regions/practitioners’ including big wins; what went wrong?;address real concerns for participation; technology in construction; stories from the worker’s on the ground; Last Planner, IPD; offsite construction & TIM WOOD examples  Training & Behavioural Change (17 or 22%) – structured training modules & links to 3rd level courses; applying Lean to construction; employee development – top down & bottom up strategies  Collaboration (16 or21%) – Rules & MoU for engagement and discussions; linkages to other groups and organisations including CITA; brainstorming collectively to see where we need to go What topics should be addressed in CoP events over the next 12 months? There were 67comments regarding what topics should be addressed over the next 12 months. Again a high level coding framework was developed to analyse the comments and were broken down and summarised broadly as follows;  Real life examples (35 comments or 52%) – showing real US and Irish data with real examples of success showing real wins; workforce buy-in; how construction can learn from manufacturing & aviation; explain quality philosophies’ and tools; how to embed lessons learnt, build trust & develop suitable contracts  Training & Behavioural Change (23 or 34%) – how to change behaviours, communicate & measure lean; Last Planner training & philosophy/psychology of lean; motivation & education of the workforce at the coalface  Collaboration (9 or 14%) – protocols for engagement and establishment of working task groups
  • 11. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 9 | P a g e www.phathomhq.com © Other comments or ideas:  Very useful 'Spirit of continuous improvement' - Nick Masci  Please keep me in mind I will like to get involved  Lean is undoubtedly the way to go... But it needs to be driven by legislation/statutory requirements & by owner stipulation, otherwise spread will be stifled.  Stronger link between Lean & BIM movements in Ireland. Ralph Montague Coordinator of CITA BIM Group  Create/ set up Pilot Programmes in 'Joint Teams' across Owners, Designers, Contractors, Trades, Engineers - with defined brief of timelines - all groups come back & present their approach & successes/learning  Map out a lean journey with clear goals & objectives (that can be measured) of where Lean in Ireland needs to go! Issue a list of improvements for people to take away from the introduction sessions  There are Lean 'programme' architectures available to show what steps might be taken by an organisation  Need to educate at different levels of maturity!  Please contact me I can help  Lean is at an early stage so continue to focus on mindset and commitment and PAC or (PAL)  Leverage work being done by organisations like CITA, DIT etc  Well done on this initiative (John & Co) I believe that it is necessary to develop a common language for lean construction.  There are many options; and assumptions about what lean is. Often this is based upon very little beyond hearing a buzz phrase. This is the reason behind the suggestion above.  In future show a real example of a Lean Project and clearly explain how each party benefited (money, time, quality)  Is there a plan to provide accreditation for ongoing commitment to Lean Construction  Great Job!!  In a company there are some IP issues with sharing too much in the way of tools  CoP needs supplier involvement company's like Kingspan  Post some tools on LinkedIn. Share brights  Need some hands on trades i.e plumber; electricians etc  Great event/ great potential  Inspiring  Need to indicate how to get this on the road  What’s the roadmap  Well done
  • 12. Lean Construction Ireland Cop for Lean in the Irish Construction Industry Survey April 2014 10 | P a g e www.phathomhq.com © Conclusion The summary of the survey results herein suggest that there is a strong interest from an industry wide perspective in adopting Lean Principles into the Irish Architectural, Engineering & Construction (AEC) Industry. While is report does not maintain this is a clear picture of the current state of the Irish AEC sector it does suggest that the demand for change is real - demonstrated by the range of comments. Eighty two percent of respondents were from large organisations which would account for the number of Lean tools being used by the respondents or their organisations. Directors made up 30% of the respondents, while Managers made up another 30% and Engineers 8% with the remaining mixed between profession (QS, Consultants, Education etc). The attendance on the night was very balanced (as reflected by some comments) with owners (15%), contractors (28%) and designers (29%) making up the majority. The respondents level of understanding was higher than their experience of using Lean, however; the large number of Lean Tools that the respondents or their organisations used is encouraging. Building Information Modelling was the most popular tool followed by Last Planner System®; Daily Huddle; Just-in-Time; and Value Stream Mapping; Stretch & Flex meetings and Six Sigma. The introduction/overview of Lean Construction, quality of the presentations and format of the event were noted as good points (plus) from the event (111 comments) while the format and more practical examples made up the comments regarding future changes (48 comments). It is interesting that approximately 90% of the survey respondents indicated a willingness to share their experiences applying Lean with some preferring small groups to large and vice versa. It appears there is a lot of goodwill to improve the Irish AEC sector collectively and this is something welcomed by the Core Group of this CoP. Going forward the Respondents suggested future event content should include real life examples of Lean implementation (57%), training and behavioural change (22%) and ways to collaborate and make teams work better (21%) – there was 76 comments in this section. Sixty seven comments were received suggesting what should be addressed over the next 12 months. These were the same as above, however; the percentages’ differed – real life examples (52%); training and behavioural change (34%); and Collaboration (14%). Finally, we would welcome any further suggestions/comments/opinions on how we as an industry and collective group can embed Lean into the Irish AEC sector and we encourage people and organisations to attend and participate in future event.