Closed Side Setting (CSS) Measurement Device
JULY 2015
WWW.MINTAP.COM.AU 1
BRANT TAPLEY- Principal Metallurgist and Director
Outline
- Introduction
- Crusher Operation and current CSS measurement techniques
- Impact of not measuring and monitoring the CSS accurately and frequently
- New Alternative- The “C-Gap”
- Benefits of the “C-Gap”
- Implementing the “C-Gap”
- Summary
WWW.MINTAP.COM.AU 2
Introduction
About Brant Tapley:
- Graduated WASM 2004- BEng (Minerals Eng)
& BSc (Chemistry)
- Gold, base metals, magnetite
- Australia, Norway and Russia
- Metallurgical Consultant specialising in:
◦ Plant Optimisation
◦ Feasibility Studies
◦ Test work studies
◦ Due Diligence
- MAusIMM and MIQA
WWW.MINTAP.COM.AU 3
Introduction- continued
About Mintap Services Pty Ltd:
- Introduced to the series III CSS measuring
device in Norway 2011
- Registered company in 2012
- Awarded Worldwide Distribution rights 2012
- Sold first unit in 2014
- To date, the C-Gap has been implemented
across a range of different commodities and
crushing installations in 7 countries
- Mintap South American Distributor to
commence business in Q3 2015.
WWW.MINTAP.COM.AU 4
Crusher Operation
What is the Closed Side Setting (CSS)?
-Minimum gap setting of when the mantle bowl rotates
within the crusher or moving plate is closest to the fixed
plate in a jaw crusher (‘closed’ position)
- Gyratory’s: typically 90 to 220mm
-Secondary’s: typically 30-60mm
-Tertiary’s/Scats: typically 8-20mm
-Jaw Crushers: 80-150mm
WWW.MINTAP.COM.AU 5
Current CSS Measurement Techniques
Technique Pro’s Con’s Comments
Lead Weights Accurate measurement -Costly
-Single use
-Disposal issues (lead)
-Heavy (manual labour)
Only used for tertiary crushers of
small CSS’s
Aluminium Balls Cheap -Inaccurate (ball expands once
crushed)
-Prolonged downtime
-Requires more than one Operators
-Isolations required
-Limited use
Most common technique for
measuring secondary’s and
gyratory’s
Clay filled hessian bags Cheap As above An alternative to Al balls
Steel Drums Cheap As above Another alternative
Old Oil Filters Cheap As above
Environmental issues
Not recommended-
from personal experience!!!
Manual Measurements More accurate - Downtime
- Safety
-Laborious: 2 Maint staff to check,
1 as sentry
WWW.MINTAP.COM.AU 6
One ‘alternative’
WWW.MINTAP.COM.AU
Moving Conveyor Belt
Waiting for the crushed oil filters to arrive
7
Lead weight OPEX
Actual case study:
- Site has one small Omnicone 350 scats
crusher
- Measures CSS once per shift (only one face,
not the recommended N, S, E and W);
- Annual lead cost = AUD$22k
This cost does not account for environmental
disposal
WWW.MINTAP.COM.AU 8
Production downtime analysis
Example: Met manager wants to check the CSS on a gyratory to ensure it’s at 100mm CSS
What’s required:
1. Raise work order, organise maintenance schedule and organise excavator to clear the top of
the crusher of loose rocks
2. Conduct JSA/Take 5 equivalent on task or generate SOP (0.5 hour)
3. Shut down crusher. Clean loose rocks, isolate crusher, feeders and conveyor belts (1 hours)
4. Obtain access to bottom of crusher, inch crusher motor manually to ensure its at the closed
position then measure gap with a tape measure or equivalent (1 hours)
5. Leave crusher, de-isolate, restart (0.5 hour)
Time taken- 3 hours production downtime
WWW.MINTAP.COM.AU 9
Long downtime and personnel availability results in the job not being completed as often as required
CSS Measurement Techniques- c’td
- Measuring Metal to Metal one/shift is not
calibrating
Why?
- does not take into account wear
- complete reliance upon the mantle height
measurement (mm)
WWW.MINTAP.COM.AU 10
Monitoring Mantra
“You don’t know what you don’t know
You don’t measure what you don’t value
You can’t value what you don’t measure
If you can’t measure it you can’t control it
If you can’t control it you can’t improve it.”
WWW.MINTAP.COM.AU 11
Secondary Crushers- Russia
Production impact of not measuring CSS
- Closed circuits (with screen(s))
◦ Higher recirculating loads impacting new tonnage rates
◦ Reduced screen efficiency with associated higher screen wear
- Open circuits
◦ Larger top size and overall size downstream
Lower crusher throughput and/or larger P80/P100 will impact:
- Milling and beneficiation throughput
- Targeted grind/crush size
WWW.MINTAP.COM.AU 12
Tertiary crusher product reporting to a rod mill
Other impacts
- Crusher Wear Life
◦ Reduced choke feeding/autogenous crushing
leading to higher wear hence downtime and
costs
WWW.MINTAP.COM.AU 13
Gyratory Crusher, Russia
Ideal CSS Measurement Strategy
1. Measure CSS every shift and record for operations and
maintenance planners
2. For cone crushers, measure N, S, E and W
3. Minimal downtime
4. Safe- eliminate the need for personnel to enter the
crusher chamber
5. Minimal people required
6. Accurate and reliable
7. Minimal cost
8. No environmental disposal issues
WWW.MINTAP.COM.AU 14
New Alternative: The “C-Gap”
• Numerous Bulb sizes- ability for one hand held unit to
measure all crushers
• Hose lengths from 3 to 30m in length
• Ability to be calibrated
• +/- 1mm accuracy
• Runs on 4 x AA batteries
• IP54 splash and dust proof container
• RCM Certified (AS/NZS CISPR 22: 2009)
WWW.MINTAP.COM.AU 15
German designed, trialled and manufactured
How does it work?
The bulb is ‘squeezed’ by the crusher resulting in an increase in pressure within the closed system. The handheld unit
measures the pressure change and correlates this to the Closed Side Setting
Measuring ranges and Hose lengths
WWW.MINTAP.COM.AU 16
Measuring Range (mm) Hose Lengths (m)
7-22 3
10-22 5
18-34 7
33-49 11
48-60 15
52-75 20
72-95 25
92-115 30
110-130
128-148
145-165
163-185
183-205
200-220
Advantages of the “C-Gap”
1. Safety
2. Ability to quickly measure every shift thus minimise
downtime
3. Only one person required
4. Accuracy
5. Reduced costs
a) Lead weights, Al foil etc
b) Improved asset management (longer wear times, more reliable
measure of when to replace a mantle/concaves/liners
6. Significantly reduce lead consumption- enviro benefits
7. Minimal store stock- spare bulbs and AA batteries
WWW.MINTAP.COM.AU 17
Other Information
Currently being used at the following sites:
a) Oz Minerals Prominent Hill, Australia
b) Severstal Kostomuksha Iron Ore, Russia
c) OceanaGold Didipio Gold, The Philippines
d) Newmont Phoenix Gold, USA
e) Citic Pacific Cape Preston Magnetite, Australia
f) Rio Tinto Argyle Diamond Mine, Australia
g) First Quantum Sentinel Copper Mine, Zambia
h) Detour Gold Mine, Canada
i) Newmont Boddington Gold Mine, Australia
j) BHP Antamina, Peru
k) Northparkes Gold Mine, Australia
12 months manufacturers warranty
Direct purchase or Hire purchase*available *Australian and New Zealand
customers only
References available via contact with Mintap
WWW.MINTAP.COM.AU 18
Implementation Strategy
Ways to justify the purchase of a C-Gap:
-Determine time it takes to measure the gap currently and apply a
$/min factor to it;
-Annual spend on lead weights/yr - assuming the CSS is measured!!!)
-Determine impact of operating outside normal CSS parameters to
crushing and downstream performance;
- If the crushers are operated and maintained by Contractors,
strongly suggest they purchase one.
-And Safety of course!!!!
WWW.MINTAP.COM.AU 19
Summary
1. C-Gap replaces rudimental, cumbersome,
laborious, unsafe and costly methods;
2. Allows operators to check the CSS every
shift, not every week or worse, not at all;
3. Caters for Gyratorys, Jaws and Cone
Crushers
4. CSS 7-220mm
5. Hose lengths up to 30m
6. Accuracy +/- 1mm
WWW.MINTAP.COM.AU 20
First C-Gap to Africa
Mintap Services Contact Information
Name: Brant Tapley
Email : sales@mintap.com.au
Website: www.mintap.com.au
Phone: +61 427 127 544
Mintap Services
WWW.MINTAP.COM.AU 21

More Related Content

What's hot

Steel Tracks
Steel TracksSteel Tracks
Steel TracksFrankPlas
 
08-03-15 Muth pump
08-03-15  Muth pump08-03-15  Muth pump
08-03-15 Muth pumpMark Meza
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Matters
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013Hans Holkenborg
 
151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...Benoit Latapie
 
FWP 2017 l Lionel JOSSE, STX Europe Offshore Energy
FWP 2017 l Lionel JOSSE, STX Europe Offshore EnergyFWP 2017 l Lionel JOSSE, STX Europe Offshore Energy
FWP 2017 l Lionel JOSSE, STX Europe Offshore EnergyBluesign
 

What's hot (12)

Steel Tracks
Steel TracksSteel Tracks
Steel Tracks
 
08-03-15 Muth pump
08-03-15  Muth pump08-03-15  Muth pump
08-03-15 Muth pump
 
og_4[1]
og_4[1]og_4[1]
og_4[1]
 
1
11
1
 
Spotlight 1Astander
Spotlight 1AstanderSpotlight 1Astander
Spotlight 1Astander
 
Narrow Pavement Widening - Atlanta District
Narrow Pavement Widening - Atlanta DistrictNarrow Pavement Widening - Atlanta District
Narrow Pavement Widening - Atlanta District
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management Presentation
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013
 
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
 
151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...
 
FWP 2017 l Lionel JOSSE, STX Europe Offshore Energy
FWP 2017 l Lionel JOSSE, STX Europe Offshore EnergyFWP 2017 l Lionel JOSSE, STX Europe Offshore Energy
FWP 2017 l Lionel JOSSE, STX Europe Offshore Energy
 
BTS OILFIELD INTRO
BTS OILFIELD INTROBTS OILFIELD INTRO
BTS OILFIELD INTRO
 

Similar to Mintap C-Gap Presentation July 2015

Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaDr. Bikram Jit Singh
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONiQHub
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...irvan septyan mulyana
 
How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1David Mallinson MAICD
 
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offsDeswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offsDeswik
 
Oxidative aging and rheological performance of modified asphalt binder
Oxidative aging and rheological performance of modified asphalt binderOxidative aging and rheological performance of modified asphalt binder
Oxidative aging and rheological performance of modified asphalt binderCheng (Wayne) Zhu
 
Ahmed Salem New CV - 12.2016
Ahmed Salem New CV - 12.2016Ahmed Salem New CV - 12.2016
Ahmed Salem New CV - 12.2016Abu Alaa, Ahmed S
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006James AH Campbell
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019David H Moloney
 
Standard Plant.ppt
Standard Plant.pptStandard Plant.ppt
Standard Plant.pptAshfaq Ahmad
 
Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Michael Chapman
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 

Similar to Mintap C-Gap Presentation July 2015 (20)

09.02.2012 Modern coking coal technology, Peter Long
09.02.2012 Modern coking coal technology, Peter Long09.02.2012 Modern coking coal technology, Peter Long
09.02.2012 Modern coking coal technology, Peter Long
 
Alumiunium casting
Alumiunium castingAlumiunium casting
Alumiunium casting
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
 
Sector Gear
Sector GearSector Gear
Sector Gear
 
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptxAir Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
 
How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1
 
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offsDeswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
 
Oxidative aging and rheological performance of modified asphalt binder
Oxidative aging and rheological performance of modified asphalt binderOxidative aging and rheological performance of modified asphalt binder
Oxidative aging and rheological performance of modified asphalt binder
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Ahmed Salem New CV - 12.2016
Ahmed Salem New CV - 12.2016Ahmed Salem New CV - 12.2016
Ahmed Salem New CV - 12.2016
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Standard Plant.ppt
Standard Plant.pptStandard Plant.ppt
Standard Plant.ppt
 
Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016Mike Chapman - Belt Splicer - Feb 2016
Mike Chapman - Belt Splicer - Feb 2016
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 

Mintap C-Gap Presentation July 2015

  • 1. Closed Side Setting (CSS) Measurement Device JULY 2015 WWW.MINTAP.COM.AU 1 BRANT TAPLEY- Principal Metallurgist and Director
  • 2. Outline - Introduction - Crusher Operation and current CSS measurement techniques - Impact of not measuring and monitoring the CSS accurately and frequently - New Alternative- The “C-Gap” - Benefits of the “C-Gap” - Implementing the “C-Gap” - Summary WWW.MINTAP.COM.AU 2
  • 3. Introduction About Brant Tapley: - Graduated WASM 2004- BEng (Minerals Eng) & BSc (Chemistry) - Gold, base metals, magnetite - Australia, Norway and Russia - Metallurgical Consultant specialising in: ◦ Plant Optimisation ◦ Feasibility Studies ◦ Test work studies ◦ Due Diligence - MAusIMM and MIQA WWW.MINTAP.COM.AU 3
  • 4. Introduction- continued About Mintap Services Pty Ltd: - Introduced to the series III CSS measuring device in Norway 2011 - Registered company in 2012 - Awarded Worldwide Distribution rights 2012 - Sold first unit in 2014 - To date, the C-Gap has been implemented across a range of different commodities and crushing installations in 7 countries - Mintap South American Distributor to commence business in Q3 2015. WWW.MINTAP.COM.AU 4
  • 5. Crusher Operation What is the Closed Side Setting (CSS)? -Minimum gap setting of when the mantle bowl rotates within the crusher or moving plate is closest to the fixed plate in a jaw crusher (‘closed’ position) - Gyratory’s: typically 90 to 220mm -Secondary’s: typically 30-60mm -Tertiary’s/Scats: typically 8-20mm -Jaw Crushers: 80-150mm WWW.MINTAP.COM.AU 5
  • 6. Current CSS Measurement Techniques Technique Pro’s Con’s Comments Lead Weights Accurate measurement -Costly -Single use -Disposal issues (lead) -Heavy (manual labour) Only used for tertiary crushers of small CSS’s Aluminium Balls Cheap -Inaccurate (ball expands once crushed) -Prolonged downtime -Requires more than one Operators -Isolations required -Limited use Most common technique for measuring secondary’s and gyratory’s Clay filled hessian bags Cheap As above An alternative to Al balls Steel Drums Cheap As above Another alternative Old Oil Filters Cheap As above Environmental issues Not recommended- from personal experience!!! Manual Measurements More accurate - Downtime - Safety -Laborious: 2 Maint staff to check, 1 as sentry WWW.MINTAP.COM.AU 6
  • 7. One ‘alternative’ WWW.MINTAP.COM.AU Moving Conveyor Belt Waiting for the crushed oil filters to arrive 7
  • 8. Lead weight OPEX Actual case study: - Site has one small Omnicone 350 scats crusher - Measures CSS once per shift (only one face, not the recommended N, S, E and W); - Annual lead cost = AUD$22k This cost does not account for environmental disposal WWW.MINTAP.COM.AU 8
  • 9. Production downtime analysis Example: Met manager wants to check the CSS on a gyratory to ensure it’s at 100mm CSS What’s required: 1. Raise work order, organise maintenance schedule and organise excavator to clear the top of the crusher of loose rocks 2. Conduct JSA/Take 5 equivalent on task or generate SOP (0.5 hour) 3. Shut down crusher. Clean loose rocks, isolate crusher, feeders and conveyor belts (1 hours) 4. Obtain access to bottom of crusher, inch crusher motor manually to ensure its at the closed position then measure gap with a tape measure or equivalent (1 hours) 5. Leave crusher, de-isolate, restart (0.5 hour) Time taken- 3 hours production downtime WWW.MINTAP.COM.AU 9 Long downtime and personnel availability results in the job not being completed as often as required
  • 10. CSS Measurement Techniques- c’td - Measuring Metal to Metal one/shift is not calibrating Why? - does not take into account wear - complete reliance upon the mantle height measurement (mm) WWW.MINTAP.COM.AU 10
  • 11. Monitoring Mantra “You don’t know what you don’t know You don’t measure what you don’t value You can’t value what you don’t measure If you can’t measure it you can’t control it If you can’t control it you can’t improve it.” WWW.MINTAP.COM.AU 11 Secondary Crushers- Russia
  • 12. Production impact of not measuring CSS - Closed circuits (with screen(s)) ◦ Higher recirculating loads impacting new tonnage rates ◦ Reduced screen efficiency with associated higher screen wear - Open circuits ◦ Larger top size and overall size downstream Lower crusher throughput and/or larger P80/P100 will impact: - Milling and beneficiation throughput - Targeted grind/crush size WWW.MINTAP.COM.AU 12 Tertiary crusher product reporting to a rod mill
  • 13. Other impacts - Crusher Wear Life ◦ Reduced choke feeding/autogenous crushing leading to higher wear hence downtime and costs WWW.MINTAP.COM.AU 13 Gyratory Crusher, Russia
  • 14. Ideal CSS Measurement Strategy 1. Measure CSS every shift and record for operations and maintenance planners 2. For cone crushers, measure N, S, E and W 3. Minimal downtime 4. Safe- eliminate the need for personnel to enter the crusher chamber 5. Minimal people required 6. Accurate and reliable 7. Minimal cost 8. No environmental disposal issues WWW.MINTAP.COM.AU 14
  • 15. New Alternative: The “C-Gap” • Numerous Bulb sizes- ability for one hand held unit to measure all crushers • Hose lengths from 3 to 30m in length • Ability to be calibrated • +/- 1mm accuracy • Runs on 4 x AA batteries • IP54 splash and dust proof container • RCM Certified (AS/NZS CISPR 22: 2009) WWW.MINTAP.COM.AU 15 German designed, trialled and manufactured How does it work? The bulb is ‘squeezed’ by the crusher resulting in an increase in pressure within the closed system. The handheld unit measures the pressure change and correlates this to the Closed Side Setting
  • 16. Measuring ranges and Hose lengths WWW.MINTAP.COM.AU 16 Measuring Range (mm) Hose Lengths (m) 7-22 3 10-22 5 18-34 7 33-49 11 48-60 15 52-75 20 72-95 25 92-115 30 110-130 128-148 145-165 163-185 183-205 200-220
  • 17. Advantages of the “C-Gap” 1. Safety 2. Ability to quickly measure every shift thus minimise downtime 3. Only one person required 4. Accuracy 5. Reduced costs a) Lead weights, Al foil etc b) Improved asset management (longer wear times, more reliable measure of when to replace a mantle/concaves/liners 6. Significantly reduce lead consumption- enviro benefits 7. Minimal store stock- spare bulbs and AA batteries WWW.MINTAP.COM.AU 17
  • 18. Other Information Currently being used at the following sites: a) Oz Minerals Prominent Hill, Australia b) Severstal Kostomuksha Iron Ore, Russia c) OceanaGold Didipio Gold, The Philippines d) Newmont Phoenix Gold, USA e) Citic Pacific Cape Preston Magnetite, Australia f) Rio Tinto Argyle Diamond Mine, Australia g) First Quantum Sentinel Copper Mine, Zambia h) Detour Gold Mine, Canada i) Newmont Boddington Gold Mine, Australia j) BHP Antamina, Peru k) Northparkes Gold Mine, Australia 12 months manufacturers warranty Direct purchase or Hire purchase*available *Australian and New Zealand customers only References available via contact with Mintap WWW.MINTAP.COM.AU 18
  • 19. Implementation Strategy Ways to justify the purchase of a C-Gap: -Determine time it takes to measure the gap currently and apply a $/min factor to it; -Annual spend on lead weights/yr - assuming the CSS is measured!!!) -Determine impact of operating outside normal CSS parameters to crushing and downstream performance; - If the crushers are operated and maintained by Contractors, strongly suggest they purchase one. -And Safety of course!!!! WWW.MINTAP.COM.AU 19
  • 20. Summary 1. C-Gap replaces rudimental, cumbersome, laborious, unsafe and costly methods; 2. Allows operators to check the CSS every shift, not every week or worse, not at all; 3. Caters for Gyratorys, Jaws and Cone Crushers 4. CSS 7-220mm 5. Hose lengths up to 30m 6. Accuracy +/- 1mm WWW.MINTAP.COM.AU 20 First C-Gap to Africa
  • 21. Mintap Services Contact Information Name: Brant Tapley Email : sales@mintap.com.au Website: www.mintap.com.au Phone: +61 427 127 544 Mintap Services WWW.MINTAP.COM.AU 21