Roadmap to Membership of RICS - Pathways and Routes
Consistent Results
1.
PROVEN RESULTS
Consistent Action Creates Consistent Results – Back to Back
8.5” 8,000’+ Laterals Runs in the Month of June 2017
Operator Location
RSP Permian Midland County, Texas, USA
Well Type Total Rigs
Horizontal 2
Distance Drilled Run Duration
8,891 ft, 87.17 Drilling Hours
10,700 ft 88.75 Drilling Hours
Overall Average ROP Products/Services
102.00’/hr Aim Contender Motor
120.56’/hr RTOC MSA Survey Corrections & Distance Monitoring
(Contact an Aim rep. for more information)
Customer Objectives
• Maintain consistent performance across all rigs currently running.
• Minimize sliding and doglegs in the lateral while maximizing ROP.
• Maintain tight target constraints for wellbore placement.
Customer Results
• Successfully drilled 2 lateral runs over 8000’+ on 2 different rigs simultaneously.
• Stayed within the required geological target with minimal sliding (Slide – 15%, Rotate – 85%)
• Consistent performance gives elevated confidence that set objectives will be achieved or exceeded.
Value to Client
• Reduced days and cost on multiple rigs.
• With the assistance of the Aim’s RTOC real-time MSA calculations, the wellbore was drilled with reduced EOU’s for
optimum wellbore placement.
• Giving consistent results allows the client to measure the effectiveness and reliability of its drilling team.
Trinidad Pena
Director of Sales