Figuring the cost of avionics
Cost of Digital Avionics
 How much does it cost?
 How much to operate?
Avionics cost is important for both civil and military
aircraft but the relative importance of cost is different
between civil and military aircraft
Civil aircraft – avionics cost is as important as the
performance variables such as reliability and weight
Military aircraft – contribution of avionics for mission
success is more important than avionics cost
Categories of avionics cost
 Acquisition cost
Ex : original equipments,
initial spares
 Operating cost
Ex : maintenance personal
wages, maintenance support
Life Cycle Cost
Life cycle cost (LCC) : total cost for a
digital avionics system from conception
through final disposition
Civil aircraft : two types of LCC
 Investment cost
 Cost of ownership
LCC For Digital Avionics
Relation between LCC and
MTBF
Relation between LCC and
MTBF
The pair of curves should be constructed as
early as possible in design process to
achieve minimum LCC design
To achieve increased MTBF, higher quality
design is increased which in turn increases
design development and testing cost
This relation ship is determined from data
based on predecessor systems of similar
design
Life Cycle Cost For Civil Avionics
-Investment Cost
Investment cost :what it costs to put the system in
service
Equation for investment cost
IC = FIC + FSPC + FSUC
FIC = (UC + INS) X QPA X NA
Where UC – unit cost
QPA – installation cost per unit
NA – number of aircraft in fleet ( for a given
operator)
FIC – fleet installed cost
FSUC – fleet support cost
FSPC – fleet spare cost
FSPC = ICRS + ICES
where
ICRS – initial cost of rotable parts
ICES – initial cost of expendable spares
ICRS = UC X NS
where NS = number of spares
ICES = MM X NMS/12
Where
MM – maintenance material cost per year per fleet
NMS – number of months of stock in initial
provisioning
MM = (NA X UTIL X QPA X FR) X CE
Where
UTIL – flight hours per year per aircraft
FR – failures per flight hour
CE – cost per expendable item
As MM increases the number months of
stock(NMS) decreases to minimize the sum of
reorder and inventory holding cost
Operating cost:The important elements of OC are
maintenance labor including direct maintenance
material,direct maintenance labor, fuel penalties and
spares holding
Equation for operating cost
N-1
OC =∑{[ DML X (1 + MBF) + DMM + FP] X
i=0
UTIL X NA + SH} X (1 + INF/100)i
Where
N – service life, years
DML – direct maintenance labor, line and shop,
dollars per flight per hour
Life Cycle Cost For Civil Avionics
-Operating Cost
MBF – maintenance burden factor, typically
2< MBF >2.4
DMM – direct maintenance material
INF – inflation rate, percent per year
INF = FP + FCW + FCP
Where
FCW – fuel cost in dollars per flight hour
FCP – fuel cost penalties due to operate the system,
cooling air, and system induced drag penalties

More Related Content

What's hot

CAPEX plan - optimazed (fragment)
CAPEX plan - optimazed (fragment)CAPEX plan - optimazed (fragment)
CAPEX plan - optimazed (fragment)
Anatoly Ryabukha
 
Thesis Abstract_Irfani Priananda
Thesis Abstract_Irfani PrianandaThesis Abstract_Irfani Priananda
Thesis Abstract_Irfani Priananda
Irfani Priananda
 

What's hot (12)

ISCRAM 2013: Analysis of a German First Responder Exercise: Requirements for ...
ISCRAM 2013: Analysis of a German First Responder Exercise: Requirements for ...ISCRAM 2013: Analysis of a German First Responder Exercise: Requirements for ...
ISCRAM 2013: Analysis of a German First Responder Exercise: Requirements for ...
 
Basic Concepts of Cost Accounting-B.V.Raghunandan
Basic  Concepts of Cost Accounting-B.V.RaghunandanBasic  Concepts of Cost Accounting-B.V.Raghunandan
Basic Concepts of Cost Accounting-B.V.Raghunandan
 
Vision of construction mechanizer
Vision of construction mechanizerVision of construction mechanizer
Vision of construction mechanizer
 
CAPEX plan - optimazed (fragment)
CAPEX plan - optimazed (fragment)CAPEX plan - optimazed (fragment)
CAPEX plan - optimazed (fragment)
 
Thesis Abstract_Irfani Priananda
Thesis Abstract_Irfani PrianandaThesis Abstract_Irfani Priananda
Thesis Abstract_Irfani Priananda
 
Lease evaluation
Lease evaluation  Lease evaluation
Lease evaluation
 
Mechanization in construction_Advanced Construction Technology (Semester-6), ...
Mechanization in construction_Advanced Construction Technology (Semester-6), ...Mechanization in construction_Advanced Construction Technology (Semester-6), ...
Mechanization in construction_Advanced Construction Technology (Semester-6), ...
 
Ais section ch3
Ais section ch3Ais section ch3
Ais section ch3
 
Cims in aerospace industry
Cims in aerospace industryCims in aerospace industry
Cims in aerospace industry
 
Aircraft 2
Aircraft 2 Aircraft 2
Aircraft 2
 
8 machineries pt1
8 machineries pt18 machineries pt1
8 machineries pt1
 
Core Training Presentations- 7 Welfare, Benefit-Cost Analysis
Core Training Presentations- 7 Welfare, Benefit-Cost AnalysisCore Training Presentations- 7 Welfare, Benefit-Cost Analysis
Core Training Presentations- 7 Welfare, Benefit-Cost Analysis
 

Similar to avionics cost

T-X Requirements matrix
T-X Requirements matrixT-X Requirements matrix
T-X Requirements matrix
Nicolas Perron
 
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Liu Dongyangyang
 
17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L
Nicolas Osorio
 
170607aviation (1).pptx, related to the aviation industry
170607aviation (1).pptx, related to the aviation industry170607aviation (1).pptx, related to the aviation industry
170607aviation (1).pptx, related to the aviation industry
shrutityagi96320
 
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
Ülger Ahmet
 

Similar to avionics cost (20)

Maintenance Cost - by BOMBARDIER.pdf
Maintenance Cost - by BOMBARDIER.pdfMaintenance Cost - by BOMBARDIER.pdf
Maintenance Cost - by BOMBARDIER.pdf
 
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
 
Shared aircraft spares holdings or pooling: To increase air carrier operation...
Shared aircraft spares holdings or pooling: To increase air carrier operation...Shared aircraft spares holdings or pooling: To increase air carrier operation...
Shared aircraft spares holdings or pooling: To increase air carrier operation...
 
Fleet optimization
Fleet optimizationFleet optimization
Fleet optimization
 
Standoutfromthe crowds
Standoutfromthe crowdsStandoutfromthe crowds
Standoutfromthe crowds
 
European Airport PerformanceFramework
European Airport PerformanceFrameworkEuropean Airport PerformanceFramework
European Airport PerformanceFramework
 
Cruising
CruisingCruising
Cruising
 
Strategic AIrlines Management 5. unit cost
Strategic AIrlines Management 5. unit costStrategic AIrlines Management 5. unit cost
Strategic AIrlines Management 5. unit cost
 
T-X Requirements matrix
T-X Requirements matrixT-X Requirements matrix
T-X Requirements matrix
 
Economic Presentation: Cost Theory and Analysis
Economic Presentation: Cost Theory and AnalysisEconomic Presentation: Cost Theory and Analysis
Economic Presentation: Cost Theory and Analysis
 
Airline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule PlanningAirline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule Planning
 
USING AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) NETWORK TO IMPROVED AVIAT...
USING AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) NETWORK TO IMPROVED AVIAT...USING AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) NETWORK TO IMPROVED AVIAT...
USING AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) NETWORK TO IMPROVED AVIAT...
 
Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...
Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...
Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...
 
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
Low Cost Carrier Tigerair Australia-Strategies, safety, sustainability and gr...
 
Slide-Igor-Mahorcic
Slide-Igor-MahorcicSlide-Igor-Mahorcic
Slide-Igor-Mahorcic
 
Winners and Losers
Winners and LosersWinners and Losers
Winners and Losers
 
17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L17_03_2015_MRO_LECTURE_For_L
17_03_2015_MRO_LECTURE_For_L
 
170607aviation (1).pptx, related to the aviation industry
170607aviation (1).pptx, related to the aviation industry170607aviation (1).pptx, related to the aviation industry
170607aviation (1).pptx, related to the aviation industry
 
Engines stock control
Engines stock controlEngines stock control
Engines stock control
 
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
 

Recently uploaded

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Recently uploaded (20)

Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 

avionics cost

  • 1. Figuring the cost of avionics Cost of Digital Avionics  How much does it cost?  How much to operate? Avionics cost is important for both civil and military aircraft but the relative importance of cost is different between civil and military aircraft Civil aircraft – avionics cost is as important as the performance variables such as reliability and weight Military aircraft – contribution of avionics for mission success is more important than avionics cost
  • 2. Categories of avionics cost  Acquisition cost Ex : original equipments, initial spares  Operating cost Ex : maintenance personal wages, maintenance support
  • 3. Life Cycle Cost Life cycle cost (LCC) : total cost for a digital avionics system from conception through final disposition Civil aircraft : two types of LCC  Investment cost  Cost of ownership
  • 4. LCC For Digital Avionics
  • 6. Relation between LCC and MTBF The pair of curves should be constructed as early as possible in design process to achieve minimum LCC design To achieve increased MTBF, higher quality design is increased which in turn increases design development and testing cost This relation ship is determined from data based on predecessor systems of similar design
  • 7. Life Cycle Cost For Civil Avionics -Investment Cost Investment cost :what it costs to put the system in service Equation for investment cost IC = FIC + FSPC + FSUC FIC = (UC + INS) X QPA X NA Where UC – unit cost QPA – installation cost per unit NA – number of aircraft in fleet ( for a given operator) FIC – fleet installed cost FSUC – fleet support cost FSPC – fleet spare cost
  • 8. FSPC = ICRS + ICES where ICRS – initial cost of rotable parts ICES – initial cost of expendable spares ICRS = UC X NS where NS = number of spares ICES = MM X NMS/12 Where MM – maintenance material cost per year per fleet NMS – number of months of stock in initial provisioning
  • 9. MM = (NA X UTIL X QPA X FR) X CE Where UTIL – flight hours per year per aircraft FR – failures per flight hour CE – cost per expendable item As MM increases the number months of stock(NMS) decreases to minimize the sum of reorder and inventory holding cost
  • 10. Operating cost:The important elements of OC are maintenance labor including direct maintenance material,direct maintenance labor, fuel penalties and spares holding Equation for operating cost N-1 OC =∑{[ DML X (1 + MBF) + DMM + FP] X i=0 UTIL X NA + SH} X (1 + INF/100)i Where N – service life, years DML – direct maintenance labor, line and shop, dollars per flight per hour Life Cycle Cost For Civil Avionics -Operating Cost
  • 11. MBF – maintenance burden factor, typically 2< MBF >2.4 DMM – direct maintenance material INF – inflation rate, percent per year INF = FP + FCW + FCP Where FCW – fuel cost in dollars per flight hour FCP – fuel cost penalties due to operate the system, cooling air, and system induced drag penalties