SlideShare a Scribd company logo
1 of 1
Download to read offline
ABSTRACT
This final project is a study prepared to review the feasibility of aviation operations in Central
and East Indonesia. El Tari (Kupang), Pattimura (Ambon), and Frans Kaisepo (Biak) airports
are representations of such zones which are made as operating bases. The planned Aviation
operations shall be aviation operations using airplane with capacity of 18 up to and including
50 passengers.
This study is based on airline analysis as the test media and competitive variable for
comparison. Airline analysis conducted in this study comprises several phases. First of all, it
is market analysis which is used to review traffic growth found in routes in each base.
Secondly, equipment analysis used to review the conformity of aircraft capacity and market
and also characteristics of aircraft and airport. Thirdly, operation analysis used to review
whether the combination of airplane and market can be engineered in order that operating
aspects meet technical and economic conditions. Fourthly, economic analysis used to review
levels of cost and revenue obtained from production yield. Fifthly, financial analysis used to
review the feasibility of investment of the implemented operation planning.
The result of the said operation planning shows that operation in EL Tari and Pattimura
airlines uses ATR 42-320 aircraft and that in Frans Kaisepo uses DHC 6-300 aircraft.
Economic and financial analysis results proof that the operation planning implemented is
appropriate to be realized. With average of profit margin amounting to 8.92%, NPV value is
USD 209,774.97 and IRR value is 2%.
keywords: frequency, seat load factor, market share, block hour, fuel consumption.

More Related Content

Similar to Thesis Abstract_Irfani Priananda

V4I8-IJERTV4IS080396
V4I8-IJERTV4IS080396V4I8-IJERTV4IS080396
V4I8-IJERTV4IS080396Saurav Barua
 
Paper journal of advanced transportation
Paper journal of advanced transportationPaper journal of advanced transportation
Paper journal of advanced transportationpacagnella
 
Shared aircraft spares holdings or pooling: To increase air carrier operation...
Shared aircraft spares holdings or pooling: To increase air carrier operation...Shared aircraft spares holdings or pooling: To increase air carrier operation...
Shared aircraft spares holdings or pooling: To increase air carrier operation...Mersie Amha Melke
 
AIRPORT OPERATIONS.pptx
AIRPORT OPERATIONS.pptxAIRPORT OPERATIONS.pptx
AIRPORT OPERATIONS.pptxGAUTAMHALDAR6
 
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...irjes
 
A classification and assessment of research streams on low cost modeling in c...
A classification and assessment of research streams on low cost modeling in c...A classification and assessment of research streams on low cost modeling in c...
A classification and assessment of research streams on low cost modeling in c...Alexander Decker
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGGovindaRajuluBadana1
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdfssuser553bbc
 
Airport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport DesignAirport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport DesignAllison Thompson
 
Analyse the reasons as to how and why Hong Kong.docx
Analyse the reasons as to how and why Hong Kong.docxAnalyse the reasons as to how and why Hong Kong.docx
Analyse the reasons as to how and why Hong Kong.docxwrite12
 
CNS department industrial training report
CNS department industrial training reportCNS department industrial training report
CNS department industrial training reportPRAJJWAL ROHELA
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdfssuser553bbc
 
Project Report - Mukul Jain
Project Report - Mukul JainProject Report - Mukul Jain
Project Report - Mukul Jainmukuljainn
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignSiniša Prvanov
 
overview on airport operation
overview on airport operationoverview on airport operation
overview on airport operationAiDY
 
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...SITA
 
AAI (Airports Authority of India) Report
AAI (Airports Authority of India) ReportAAI (Airports Authority of India) Report
AAI (Airports Authority of India) ReportLokesh Negi
 

Similar to Thesis Abstract_Irfani Priananda (20)

V4I8-IJERTV4IS080396
V4I8-IJERTV4IS080396V4I8-IJERTV4IS080396
V4I8-IJERTV4IS080396
 
Paper journal of advanced transportation
Paper journal of advanced transportationPaper journal of advanced transportation
Paper journal of advanced transportation
 
Shared aircraft spares holdings or pooling: To increase air carrier operation...
Shared aircraft spares holdings or pooling: To increase air carrier operation...Shared aircraft spares holdings or pooling: To increase air carrier operation...
Shared aircraft spares holdings or pooling: To increase air carrier operation...
 
AIRPORT OPERATIONS.pptx
AIRPORT OPERATIONS.pptxAIRPORT OPERATIONS.pptx
AIRPORT OPERATIONS.pptx
 
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
 
A classification and assessment of research streams on low cost modeling in c...
A classification and assessment of research streams on low cost modeling in c...A classification and assessment of research streams on low cost modeling in c...
A classification and assessment of research streams on low cost modeling in c...
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
 
Airport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport DesignAirport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport Design
 
Analyse the reasons as to how and why Hong Kong.docx
Analyse the reasons as to how and why Hong Kong.docxAnalyse the reasons as to how and why Hong Kong.docx
Analyse the reasons as to how and why Hong Kong.docx
 
CNS department industrial training report
CNS department industrial training reportCNS department industrial training report
CNS department industrial training report
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdf
 
Project Report - Mukul Jain
Project Report - Mukul JainProject Report - Mukul Jain
Project Report - Mukul Jain
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building Design
 
Final report on CNS
Final report on CNSFinal report on CNS
Final report on CNS
 
Project risk Managemnt final Report
Project risk Managemnt final ReportProject risk Managemnt final Report
Project risk Managemnt final Report
 
overview on airport operation
overview on airport operationoverview on airport operation
overview on airport operation
 
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
India Aviation ICT Forum 2013 - G. Chandramouli, MD, Kunnur International Air...
 
Training Report
Training ReportTraining Report
Training Report
 
AAI (Airports Authority of India) Report
AAI (Airports Authority of India) ReportAAI (Airports Authority of India) Report
AAI (Airports Authority of India) Report
 

Thesis Abstract_Irfani Priananda

  • 1. ABSTRACT This final project is a study prepared to review the feasibility of aviation operations in Central and East Indonesia. El Tari (Kupang), Pattimura (Ambon), and Frans Kaisepo (Biak) airports are representations of such zones which are made as operating bases. The planned Aviation operations shall be aviation operations using airplane with capacity of 18 up to and including 50 passengers. This study is based on airline analysis as the test media and competitive variable for comparison. Airline analysis conducted in this study comprises several phases. First of all, it is market analysis which is used to review traffic growth found in routes in each base. Secondly, equipment analysis used to review the conformity of aircraft capacity and market and also characteristics of aircraft and airport. Thirdly, operation analysis used to review whether the combination of airplane and market can be engineered in order that operating aspects meet technical and economic conditions. Fourthly, economic analysis used to review levels of cost and revenue obtained from production yield. Fifthly, financial analysis used to review the feasibility of investment of the implemented operation planning. The result of the said operation planning shows that operation in EL Tari and Pattimura airlines uses ATR 42-320 aircraft and that in Frans Kaisepo uses DHC 6-300 aircraft. Economic and financial analysis results proof that the operation planning implemented is appropriate to be realized. With average of profit margin amounting to 8.92%, NPV value is USD 209,774.97 and IRR value is 2%. keywords: frequency, seat load factor, market share, block hour, fuel consumption.