134 East Road Pearsall—2014
During After
Work completed:
 Removal of car wreck from front yard
 Repaving in front of side gate
 Rubbish removal from yard
 Replacing water grate in front of garage
 Relaying pavers in front of garage
 Removing of weeds from front yards
 Planting new plants into front yard
 Replacing light at entrance
 Sowing lawn
 Repainting awning
 Removing grass from between pavers
Furniture was hired for better presentation during the sales process.
Front Lounge room
Work Done
 Removal of gyprock wall
 Repaint ceiling and walls
 Remove and replace window cov-
erings
 Replacing aircon vents
 Repaint doors
 Change locks on front doors
 Replace floor covering
 Change door knob
 Replace light fittings and switches
 Replace powerpoints
Before
After
Ensuite
Work done:
 Remove and replace tiles
 Remove and replace toilet
 Remove and replace shower screen
 Remove and replace shower fittings
 Fix leaky pipe
 Remove and replace cupboard and sink
 Replace tap fittings
 Replace mirror
 Fit new blinds
 Paint ceiling and doors
 Replace ceiling fan
 Replace light fitting and light switches
 Replace power points
 Replace towel rails and toilet roll holder
Before
After
Living Room
Work Done:
 Remove rubbish
 Paint ceiling and walls
 Replace light fittings and light
switches
 Replace aircon vents
 Fixing evaporative airconditioning
 Replace floor coverings
 Replace powerpoints
Before
After
Main Bedroom Work Done:
 Removing rubbish
 Painting ceiling and walls
 Replace light fittings and light
switches
 Replace aircon vents
 Remove and replace floor covering
 Remove and replace window cov-
ering
 Paint doors
 Replace door knobs
Before
After
Before
After
Dining Room
Work Done:
 Rubbish removal
 Paintging ceiling and walls
 Replace window covering
 Fixing door lock
 Replace light fitting and switches
 Replace floor covering
 Replace aircon vents
 Replace telephone point
Kitchen
Work Done:
 Remove rubbish
 Remove cupboards, oven and hot
plate
 Remove ceiling fan
 Replaster hole in ceiling
 Replace light fittings and switches
 Install rangehood
 Install new oven and hotplate
 Install new cupboards and benchtop
 Install new sink and tap
 Replace aircon vent
 Replace window covering
 Replace floor covering
 Paint walls and ceiling
 Replace splashback
 Paint doors
 Replace door lock and knobs
Before
After
Games Room
Work Done:
 Replace light fittings and switches
 Replace aircon vent
 Replace window covering
 Replace floor covering
 Paint walls and ceiling
 Paint doors
 Replace door knobs
Before
After
Bedroom 1
Work Done:
 Replace light fittings and switches
 Replace aircon vent
 Replace window covering
 Replace floor covering
 Remove mould under old floor
covering
 Replaster hole in wardrobe
 Paint walls and ceiling
 Paint doors
 Replace door knobs
Before
After
Main Bathroom
Work Done:
 Remove previous tiles
 Remove and replace vanity
 Remove bath
 Replace light fittings and switches
 Replace ceiling fan
 Replace window covering
 Replace floor covering
 Replace bath
 Replace shower screen
 Retile walls and floor
 Replace mirror
 Replace taps
 Replace towel rails
 Paint doors
 Replace door knobs
Before
After
Laundry and Toilet
Work Done:
 Replace light fittings and switches
 Remove and replace toilet
 Replace ceiling fan
 Replace window covering
 Remove and replace tiling
 Paint walls and ceiling
 Paint doors
 Replace door knobs
 Remove laundry troph
 Install cabinets and benchtops
 Replace taps
 Fix sliding door lock
Before
After
Bedroom Three
Work Done:
 Replace light fittings and switches
 Replace aircon vent
 Replace window covering
 Replace floor covering
 Paint walls and ceiling
 Paint doors
 Replace door knobs
Before
After
Bedroom Four
Work Done:
 Remove graffiti from walls and door
 Replace light fittings and switches
 Replace aircon vent
 Replace window covering
 Replace floor covering
 Paint walls and ceiling
 Paint doors
 Replace door knobs
 Replaster holes in ceiling
Before After
Outdoor Entertainment Area
Work Done:
 Repaved damaged undercover area
 Paved additional parking spot behind gate, in
extension of entertainment area
 Removed weeds
 Extended garden bed
 Planted new plants
 Finished garden edging
 Removed rubbish
Before
After
Backyard
Work Done:
 Removed rubbish
 Extended garden bed
 Removed all weeds
 Repaved area behind laundry
 Laid new garden edge
 Emptied shed
Before
After

More Related Content

Viewers also liked

Village for Parents Deck - February 2016
Village for Parents Deck - February 2016Village for Parents Deck - February 2016
Village for Parents Deck - February 2016Chris Winn
 
Personal Persona Presentation
Personal Persona PresentationPersonal Persona Presentation
Personal Persona PresentationKristen Yates
 
Investigacion 3
Investigacion 3Investigacion 3
Investigacion 3Jenn PG
 
Abirami balasubramanian financial analyst
Abirami balasubramanian financial analystAbirami balasubramanian financial analyst
Abirami balasubramanian financial analystAbirami Balasubramanian
 
SPTechCon Austin 2016 - Content Types-Love Them or Lose It
SPTechCon Austin 2016 - Content Types-Love Them or Lose ItSPTechCon Austin 2016 - Content Types-Love Them or Lose It
SPTechCon Austin 2016 - Content Types-Love Them or Lose ItMarc D Anderson
 

Viewers also liked (9)

Village for Parents Deck - February 2016
Village for Parents Deck - February 2016Village for Parents Deck - February 2016
Village for Parents Deck - February 2016
 
Personal Persona Presentation
Personal Persona PresentationPersonal Persona Presentation
Personal Persona Presentation
 
Investigacion 3
Investigacion 3Investigacion 3
Investigacion 3
 
Upload
UploadUpload
Upload
 
Olg int dwnlds_rm
Olg int dwnlds_rmOlg int dwnlds_rm
Olg int dwnlds_rm
 
Sichotubared
SichotubaredSichotubared
Sichotubared
 
Final peersimp pt
Final peersimp ptFinal peersimp pt
Final peersimp pt
 
Abirami balasubramanian financial analyst
Abirami balasubramanian financial analystAbirami balasubramanian financial analyst
Abirami balasubramanian financial analyst
 
SPTechCon Austin 2016 - Content Types-Love Them or Lose It
SPTechCon Austin 2016 - Content Types-Love Them or Lose ItSPTechCon Austin 2016 - Content Types-Love Them or Lose It
SPTechCon Austin 2016 - Content Types-Love Them or Lose It
 

Similar to Before-after

Kitchen pres
Kitchen presKitchen pres
Kitchen presm n
 
Watch a Home Elevation from Start to Finish!
Watch a Home Elevation from Start to Finish!Watch a Home Elevation from Start to Finish!
Watch a Home Elevation from Start to Finish!JKindDesigns
 
Home Repair Columbus
 Home Repair Columbus Home Repair Columbus
Home Repair Columbushestr
 
Lozier Scope of Work
Lozier Scope of Work Lozier Scope of Work
Lozier Scope of Work Nakul Kongovi
 
Andrew Biddle Project List
Andrew Biddle Project List Andrew Biddle Project List
Andrew Biddle Project List Drew Biddle
 
Remidial Activity for reducing punch item
Remidial Activity for reducing punch itemRemidial Activity for reducing punch item
Remidial Activity for reducing punch itemAl-Amin Ahmed Nabin
 
17608 mapleboro ave maple heights oh 44137
17608 mapleboro ave maple heights oh 4413717608 mapleboro ave maple heights oh 44137
17608 mapleboro ave maple heights oh 44137Dana Katz
 
HandymanLINECARD2014
HandymanLINECARD2014HandymanLINECARD2014
HandymanLINECARD2014Ken Burg
 
Move out cleaning_checklist (1)
Move out cleaning_checklist (1)Move out cleaning_checklist (1)
Move out cleaning_checklist (1)JAIPRAKASH03
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsAyla Damon
 
Whole House Remodel
Whole  House  RemodelWhole  House  Remodel
Whole House RemodelJim Magnotta
 
Our Addition Process
Our Addition ProcessOur Addition Process
Our Addition ProcessKaren Fry
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_DrawingsMark Daly
 
Hose cleaning Services By: JambySteam.com
Hose cleaning Services By: JambySteam.com Hose cleaning Services By: JambySteam.com
Hose cleaning Services By: JambySteam.com WilliamIngwerson
 

Similar to Before-after (20)

Sunset Work Summay_LinkedIn
Sunset Work Summay_LinkedInSunset Work Summay_LinkedIn
Sunset Work Summay_LinkedIn
 
Kitchen pres
Kitchen presKitchen pres
Kitchen pres
 
Watch a Home Elevation from Start to Finish!
Watch a Home Elevation from Start to Finish!Watch a Home Elevation from Start to Finish!
Watch a Home Elevation from Start to Finish!
 
HomeAdoptationVsModification
HomeAdoptationVsModificationHomeAdoptationVsModification
HomeAdoptationVsModification
 
Home Repair Columbus
 Home Repair Columbus Home Repair Columbus
Home Repair Columbus
 
Lozier Scope of Work
Lozier Scope of Work Lozier Scope of Work
Lozier Scope of Work
 
Home Worx
Home WorxHome Worx
Home Worx
 
Scope Of Work Allison Ave
Scope Of Work   Allison AveScope Of Work   Allison Ave
Scope Of Work Allison Ave
 
Andrew Biddle Project List
Andrew Biddle Project List Andrew Biddle Project List
Andrew Biddle Project List
 
Remidial Activity for reducing punch item
Remidial Activity for reducing punch itemRemidial Activity for reducing punch item
Remidial Activity for reducing punch item
 
17608 mapleboro ave maple heights oh 44137
17608 mapleboro ave maple heights oh 4413717608 mapleboro ave maple heights oh 44137
17608 mapleboro ave maple heights oh 44137
 
HandymanLINECARD2014
HandymanLINECARD2014HandymanLINECARD2014
HandymanLINECARD2014
 
Staging Before & After
Staging Before & AfterStaging Before & After
Staging Before & After
 
Move out cleaning_checklist (1)
Move out cleaning_checklist (1)Move out cleaning_checklist (1)
Move out cleaning_checklist (1)
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-Layouts
 
Whole House Remodel
Whole House RemodelWhole House Remodel
Whole House Remodel
 
Whole House Remodel
Whole  House  RemodelWhole  House  Remodel
Whole House Remodel
 
Our Addition Process
Our Addition ProcessOur Addition Process
Our Addition Process
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
 
Hose cleaning Services By: JambySteam.com
Hose cleaning Services By: JambySteam.com Hose cleaning Services By: JambySteam.com
Hose cleaning Services By: JambySteam.com
 

Before-after

  • 1. 134 East Road Pearsall—2014 During After Work completed:  Removal of car wreck from front yard  Repaving in front of side gate  Rubbish removal from yard  Replacing water grate in front of garage  Relaying pavers in front of garage  Removing of weeds from front yards  Planting new plants into front yard  Replacing light at entrance  Sowing lawn  Repainting awning  Removing grass from between pavers Furniture was hired for better presentation during the sales process.
  • 2. Front Lounge room Work Done  Removal of gyprock wall  Repaint ceiling and walls  Remove and replace window cov- erings  Replacing aircon vents  Repaint doors  Change locks on front doors  Replace floor covering  Change door knob  Replace light fittings and switches  Replace powerpoints Before After
  • 3. Ensuite Work done:  Remove and replace tiles  Remove and replace toilet  Remove and replace shower screen  Remove and replace shower fittings  Fix leaky pipe  Remove and replace cupboard and sink  Replace tap fittings  Replace mirror  Fit new blinds  Paint ceiling and doors  Replace ceiling fan  Replace light fitting and light switches  Replace power points  Replace towel rails and toilet roll holder Before After
  • 4. Living Room Work Done:  Remove rubbish  Paint ceiling and walls  Replace light fittings and light switches  Replace aircon vents  Fixing evaporative airconditioning  Replace floor coverings  Replace powerpoints Before After
  • 5. Main Bedroom Work Done:  Removing rubbish  Painting ceiling and walls  Replace light fittings and light switches  Replace aircon vents  Remove and replace floor covering  Remove and replace window cov- ering  Paint doors  Replace door knobs Before After
  • 6. Before After Dining Room Work Done:  Rubbish removal  Paintging ceiling and walls  Replace window covering  Fixing door lock  Replace light fitting and switches  Replace floor covering  Replace aircon vents  Replace telephone point
  • 7. Kitchen Work Done:  Remove rubbish  Remove cupboards, oven and hot plate  Remove ceiling fan  Replaster hole in ceiling  Replace light fittings and switches  Install rangehood  Install new oven and hotplate  Install new cupboards and benchtop  Install new sink and tap  Replace aircon vent  Replace window covering  Replace floor covering  Paint walls and ceiling  Replace splashback  Paint doors  Replace door lock and knobs Before After
  • 8. Games Room Work Done:  Replace light fittings and switches  Replace aircon vent  Replace window covering  Replace floor covering  Paint walls and ceiling  Paint doors  Replace door knobs Before After
  • 9. Bedroom 1 Work Done:  Replace light fittings and switches  Replace aircon vent  Replace window covering  Replace floor covering  Remove mould under old floor covering  Replaster hole in wardrobe  Paint walls and ceiling  Paint doors  Replace door knobs Before After
  • 10. Main Bathroom Work Done:  Remove previous tiles  Remove and replace vanity  Remove bath  Replace light fittings and switches  Replace ceiling fan  Replace window covering  Replace floor covering  Replace bath  Replace shower screen  Retile walls and floor  Replace mirror  Replace taps  Replace towel rails  Paint doors  Replace door knobs Before After
  • 11. Laundry and Toilet Work Done:  Replace light fittings and switches  Remove and replace toilet  Replace ceiling fan  Replace window covering  Remove and replace tiling  Paint walls and ceiling  Paint doors  Replace door knobs  Remove laundry troph  Install cabinets and benchtops  Replace taps  Fix sliding door lock Before After
  • 12. Bedroom Three Work Done:  Replace light fittings and switches  Replace aircon vent  Replace window covering  Replace floor covering  Paint walls and ceiling  Paint doors  Replace door knobs Before After
  • 13. Bedroom Four Work Done:  Remove graffiti from walls and door  Replace light fittings and switches  Replace aircon vent  Replace window covering  Replace floor covering  Paint walls and ceiling  Paint doors  Replace door knobs  Replaster holes in ceiling Before After
  • 14. Outdoor Entertainment Area Work Done:  Repaved damaged undercover area  Paved additional parking spot behind gate, in extension of entertainment area  Removed weeds  Extended garden bed  Planted new plants  Finished garden edging  Removed rubbish Before After
  • 15. Backyard Work Done:  Removed rubbish  Extended garden bed  Removed all weeds  Repaved area behind laundry  Laid new garden edge  Emptied shed Before After