Summer 2010 progress

  1. 1. ILION CENTRAL SCHOOL DISTRICT<br />EXCEL RENOVATIONS PROJECT<br />
  2. 2. Barringer Road Classrooms<br />
  3. 3. Barringer Road Classrooms<br />
  4. 4. New Roof at Barringer Road<br />
  5. 5. New Roof at Barringer Road<br />
  6. 6. Barringer Road Site Work<br />
  7. 7. Construction of Retaining wall B at Barringer Road<br />
  8. 8. Construction of Retaining wall A at Barringer Road<br />
  9. 9. Asphalt Milling at Barringer Road<br />
  10. 10. New Driveway Construction at Barringer Road<br />
  11. 11. Barringer Road Site Work<br />
  12. 12. Barringer Road Site Work<br />
  13. 13. Paving at Barringer Road<br />
  14. 14. Paving at Barringer Road<br />
  15. 15. Barringer Road Site Work<br />
  16. 16. Sidewalks at Barringer Road<br />
  17. 17. Water Heater System at Remington Elementary<br />
  18. 18. Remington Transformer Change -Out<br />
  19. 19. Transformer Change out at Remington Elementary<br />
  20. 20. Transformer change out at Remington Elementary<br />
  21. 21. New Air Handlers at Remington Elementary <br />
  22. 22. Wall Framing in Ground Floor of High School<br />
  23. 23. Ground Floor high School Classrooms<br />
  24. 24. HS Ground Floor Classroom<br />
  25. 25. HS Ground Floor Classroom<br />
  26. 26. HS Ground FloorOffices<br />
  27. 27. HS Ground Floor Offices<br />
  28. 28. HS Ground Floor Restroom<br />
  29. 29. New Paint in High School Small Gym<br />
  30. 30. Renovated Restrooms Near District Office<br />
  31. 31. Demolition of Old Lock Room into new 1212 Technology Suite<br />
  32. 32. Demolition of Old Locker Room into New 1212 Technology Suite<br />
  33. 33. Demo of Old Locker room into New 1212 Technology Suite<br />
  34. 34. Demo of old Locker room into 1212 Technology Suite<br />
  35. 35. Progress of Work in HS 1212 Technology Suite<br />
  36. 36. Auditorium Demolition<br />
  37. 37. Auditorium Demo<br />
  38. 38. Auditorium Demo<br />
  39. 39. New Paint and Ceilings in HS 2nd Floor Classroom<br />
  40. 40. Demo of High School 2nd Floor Bathrooms<br />
  41. 41. Demo of High School 2nd Floor Bathrooms<br />
  42. 42. High School 2nd Floor Restrooms<br />
  43. 43. Grading of New walls at Weber Ave<br />
  44. 44. Grading of New walls at Weber Ave<br />
  45. 45. Grading of New Service Road Off of Tow Path<br />
  46. 46. Excavation of Walls at Barringer Road<br />
  47. 47. Back fill of Retaining Walls at Barringer Road<br />
  48. 48. Weber Ave Walkways<br />
  49. 49. Weber Ave Service Road<br />
  50. 50. Weber Ave Service Road<br />
  51. 51. Weber Ave Service Road<br />
  52. 52. New Drainage System for Athletic Field Bleachers<br />
  53. 53. High School Athletic Field Bleachers<br />
  54. 54. High School Athletic Field Bleachers<br />

×