1. (APPENDIX B-5) Lab Technician – Noor-ul Amin
mailed:noor.rodic@gmail.com mob.no.8803230561
PROPOSEDPOSITION : Lab Technician
MANE OF FIRM : RODIC CONSULTANTSPVT.LTD.
NEME OFSTAFF : Noor-ul Amin
PROFESSION : Civil Engineer
YEARS WITH FIRE/ENTITY : Available toworkforthisWork
withRODIC ConsultantsPvt.Ltd. NATIONALY: Indian
MEMBERSHIP OF PROFESSIONALSOCIETIES:NA
DETAILS TASKS ASIGNED:
• Responsible toassistantmaterialengineer
• Conductall filedandlaboratorytests
• Maintainrecordof all testsperfumed
EDUCATION:
• B.Sc.(PMC) from the Universityof Kashmir,Srinagarin1994.
OTHER TRAINING : NA
KEY QUALIFICATION:
Mr.Noor-ul Amin, a B.Sc., with having more than 13+ years of professional Experience in Rail Tunnel and Highway
projectsmainlyonqualitycontrol andconstructionsupervisionand material testing. My expertise includes Rail Tunnel
and highway Construction Material investigation calibration and commissioning of hot mix asphalt plant as well as
concrete batchingplantandWM plantcalibrationperformedresponsible dutiesforconstructionsupervision of flexible
pavementRoadsandrigidpavementRoadbridges.CDworkscementconcrete pavement,performedvarioustestrelated
to SOIL.GSB,WBM, WMM, BUSG, DBM, BM, SDBC, BC,J.M.F.ect,to SPECIFICATIONSbyvirtue of thisexperience work in
Rail Tunnel andhighwayconstruction.Hasvastexposure inRoadsurveying,constructionmaintenance and construction
supervision of roads, bridge culverts, rural roads, quality control on state highways. He has experience of developing
quality assurance and quality control system for roads and bridges.
Some of his RelevantProjects are:
• Construction of Rehabilitation, Strengthening and four lining of Quazigund to Banihal Section from Km 189.350
to204.700 of NH-1A,including2-Tunnels(2-Lane) of 069 Km & 8.45 Km LengthOn NH-1A, BOFOT (Annuity) Basis, in the
State of Jammu and Kashmir
• Construction of Udhampur-Sriagar-Baramulla Rail Project, Tunnel of 11.2Km.in the State of Jammu & Kashmir,
• Construction Supervision of 2/4 Lane state Highway in the State of Jammu & Kashmir.
EMPLOYMENT RECORD: 01
May 2014 to Till Date RODIC Consultants Pvt.Ltd. Lab Technician
ProjectName
:
Construction of Rehabilitation, Strengthening and four lining of Quazigund to Banihal
SectionfromKm189.350 to204.700 of NH-1A,including2-Tunnels(2-Lane) of 069 Km &
8.45 Km Length On NH-1A, BOFOT (Annuity) Basis, in the State of Jammu and Kashmir
2. Location : Jammu& Kashmir
Duration : 2 Years
Client : National HighwayAuthorityof India.
Main ProjectFeatures : Tunnel Length:8.45 Km,ProjectCostRs.2400 Crore.
Position : Lab Technician
ActivitiesPerformed : Responsible in testing of material like soil, cement, concrete, bitumen, aggregate,
bituminousmixesand sand etc., Preparation of lab and field reports also attending field
density test for embankment sub grade, GSB, WMM, DBM, BC, attending and checking
concrete mixes at structural sites also attending the rate of spray test for prime coat as
tack coat lookingafterworkof the supervisionforconstructionof embankmentsubgrade,
sub bases WMM.
EMPLOYMENT RECORD: 02
June 2006 to May 2014 Hindustan Construction Company Ltd. Lab Technician
ProjectName : Constructionof Udhampur-Sriagar-BaramullaRail Project,Tunnelof 11.2Km.inthe State
of Jammu& Kashmir,
Location : Jammu& Kashmir
Duration : 8 Years
Client : Ircon International Ltd.
Main ProjectFeatures : Tunnel Length:11.20 Km,ProjectCost Rs.630 Crore.
Position : Lab Technician
ActivitiesPerformed : Responsible in testing of material like soil, cement, concrete, bitumen, aggregate,
bituminousmixesand sand etc., Preparation of lab and field reports also attending field
density test for embankment sub grade, GSB, WMM, DBM, BC, attending and checking
concrete mixes at structural sites also attending the rate of spray test for prime coat as
tack coat lookingafterworkof the supervisionforconstructionof embankmentsubgrade,
sub bases WMM.
EMPLOYMENT RECORD: 03
Apr 2003 to May 2006 Hindustan Construction Company Ltd. Lab Technician
ProjectName : ConstructionSupervisionof 2/4 Lane state Highwayin the State of Jammu& Kashmir.
Location : Jammu& Kashmir
Duration : 3 Years2 Months
Client : PWD.Govtof Jammu& Kashmir
Position : Lab Technician
ActivitiesPerformed : Executionandsupervisional typesof labtestsmaterialsusedinconstructionof road
projectfielddensitytestsoil testlike proctorheavy&Lightcompation,Californiabearing
ratio(soaked) Sieve analysisandAsphalttestlike penetration.TemperatureandThickness
monitoringetc.Preparationof jobmix formulafordense bituminous(DBM,BM,BC),work
as per MS2 Specifications(MarshallStability)
LANGUAGES: Speaking Reading Writing
English Good Good Good
Hindi Good Good Good
Urdu Good Good Good
Summary of qualification& experience vis-à-visthe requirementsasTOR
Requirements as per TOR (Enclosure-B) Possessed by the
staff member
Break-up of experience
BriefDescriptionof project
Men-
months
provided
3. He should be least diploma holders/
graduate in science with about 3 years of
experience in handling quality control
tests laboratories for road/ bridge/ tunnel
works.
B.Sc, (PCM) in
1994 with 13
years’ Experience.
Construction of Unhamper-
Srinagar-Baramulla Rail project
tunnel of 11.2 Km. In the state of
Jammu & Kashmir;
8 Years
Higher weightage will be given for
experience with NHAI projects on
NH/state highways
Yes Construction supervision of road
and Buildings in the state of
Jammu & Kashmir
3 Years
2
Months
CERTIFICATION BY THE CANDIDATE:
I, the undersigned (Noor-ui Amin, Rodic consultants Pvt. 4 Floor, tower-A DLF Cyber city, DLF cyber greens-122002,
Haryana, India; Tel; 124 4539030) undertake that this CV correctly describes myself, my qualifications and my
experience and NHAL would be at liberty to debar me if any information given in the CV, in particular the summary of
qualification & experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have
neitherbeen debarred by NHAI nor let any assignment with the consultants engaged by NHAI/contracting firm (Rodic
ConsultantsPvt.Ltd),foranyc0ntinuingworkworkof NHAI WITHOUT COMPLETING MY ASSIGNMENT.I will be available
for the entire duration of the current project’ Independent Engineer Services for four lining of Quazigund to Banihal
Section from Km 189.350 to204.700 of NH-1A, including 2-Tunnels (2-Lane) of 069 Km & 8.45 Km Length On NH-1A,
BOFOT (Annuity) Basis, in the State of Jammu and Kashmir (package no. IE/NHDP-Phase-II/BOT/II/J&K)”,If I leave this
assignmentin the middle of the work, NHAI would be at liberty to debar me from taking any assignment in any of the
NHAIworksfor an appropriate periodof time tobe decided by NHAI.I have no objection if my service are extended by
NHAI for the work in future.
For Key Personnel Intermittent Input, add the following:
I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for
submission of proposals) including those for which LOA has been received by the firm and the inputs in these
assignments shall not affect the work of the current assignment.
NOTE: VCs of KeyPersonnel having intermittent inputs will be considered only if the assignment on hand as on 7 days
before due date of proposal including those for which LOA has been received from the Client do not exceed 3 (three).
Date:
(Day/Month/Year)
CERTIFICATION BYTHE FIRM:
The undersignedonbehalf of (RodicConsultantPvt.Ltd.certifythat Mr. Noor-ul Amin,4th
Floor, Tower-A DLF Cyber City
DLF Cyber Grees,Gurgon-122002, Haryana, India; Tel: 124 4539030), to the best of our knowledge has not left his
assignment with any other consulting firm engaged by NHAI/ contracting firm ( firm to be sucervised now) for the
ongoing projects. We understand that if the information about leaving the past assignment is known to NHAI, NHAI
wouldbe at libertytoremove the personnel from the present assignmemet and debar him for an apocopate period to
be decided by NHAI.
Date:
(Signature of staff memberorauthorizedrepresentative of the from) (Day/Month/Year)
Name of Assignment Client Date of
LOA
Likely start
(Month/Year)
Likely end
(Month/Year
Total input of the person
(man-months)
NA