SlideShare a Scribd company logo
1 of 2
Download to read offline
Nisfu Syahbanda
Quality & Improvement Engineer - Assistant Manager
Key skillsPersonal Profile
A reliable, fast learner, enthusiastic, energetic, hard working and committed
Assistant Manager Quality Innovation. Possessing extensive experience of
supporting developing and motivating vendor/teams to do better. Providing
guidance, maintaining work ability, coordinating work and work define. Drive
continuous improvements across arrange work activities. Also having a track
record of coming up with practical improvement initiatives. Currently looking to
join a suitable organization that rewards hard work and offers good opportunities
for career development.
Areas of Expertise
• Failure modes & Effect Analysis (FMEA).
• Foolproof Oriented.
• Design Quality System .
• Kaizen, 5S Implementation.
• 8D problem solving applying.
Professional Ability
• Drive continuous improvements.
• Experience in Project Management
• Good Comprehension in TPS, 6 Sigma,
5S, Fool Proof, Risk Management,
Change Management & Lean System.
• Experience Quality Management System.
• Good Perform Presentation &
Reporting Skill..
• Create Flow Process Drafting (SOP).
• Involve in People Development.
• Understand for standard ISO 9001.
• Constantly maintaininghigh levels of
accuracy.
• Experience handle of client compliance.
• Managing Vendor assessment.
Work Experience
1. Quality & Improvement Engineer (June 2006 – Present)
 Manufacturing Innovation (Drive & Counselor Project )
 Manage, monitor annual project vendor -focused quality plans and
efficiency improvement.
- Acceptable Project Theme with background statistical methodology.
- Develop project related to process improvement & process effectiveness.
- Counselor project Vendor (six Vendor). We increase up to 30% performance
(Average achievement annual 40 % reduce defect increase capability process
up to 10% and elimination cos t $700 K.
- Create system competition project to accelerate project & best practices.
 Apply process improvement, re-engineering methodologies, utilizing Lean
/ Six Sigma tools to identify & capitalize on opportunities for improvement
- Upgraded Inspection Method to reduce down time & improve quality.
- Making best parameter each model /type with DOE (6 sigma tools).
- Improvement & monitoring UPPH each line assembly vendor.
LG Electronics Indonesia, West Java, Cibitung. (May 2002 – Present)
Last Position : Quality & Improvement Engineer PCBA Part Head
(Scope: LGEIN & Suppliers)
Last Level : Assistant Manager (Part Head)
Specialization : Quality Management system, Quality Engineering, Project
Management, Lean Concept & Continuous Improvement.
Award & Honors
• BEST 1 : Quality Bank LGEIN
Reduce Worst Case Defect. ( S1 -2016)
• Silver award : Best personal
Global project in LGEIN . (S1-2016
• Silver Award : Quality Bank
theme , Management Vendor . (S2-2015)
• Great S Project Best 1 :
“Level Up Innovation Index thru redesign
and Fool proofing system” .(2012)
• DIGITAL Person Award LGEIN. (2012)
• Best Work Practice. Project: “Increase
Capability Blu ray model”. (2011)
• LGEIN Best UNIT Leader. (2009)
• 6 Sigma Green Belt. (2008)
• LGEIN Best Project. Best 1 -“Reduce
defect Home theater product”. (2007)
Sept /2016 Page 1/2 Curriculum vitae
 Design system & Monitoring supplier
 Responsible for Design & Maintained Supplier Assessment
- Set up Main & sub parameter / criteria evaluation (QCD).
- leveling vendor base on complexity level by product & System production.
 Acceptable Improvement, NCR and 4M change approval (system and process).
 Define gap closer actions versus & desired future state per selected supplier.
Phone : 0812 -8141526/6221-8853161 E-mail : nisfu.syah@gmail.com
• Quality self & successive inspection(2016)
• Reporting Skill Basic & Advanced,
LGEIN & Suppliers (2012 – 2014).
• Line BalancingBasic LGEIN & Suppliers
(2004 – 2010).
Teaching Experience
Training Experience
• Industrial Engineering IntermediateTTT
Overseas Korea representatives from
Indonesia.
• 6 Sigma Training - Green Belt & Black Belt .
• Change Management - by LGEIN.
• Awareneess of ISO 9001: 2000 - by (TUV).
• Quality Innovation - by Overseas Korea
representatives from Indonesia.
• Assistant Manager & Manager Course -
by LGEIN.
• Persentation skills for Leader -by Building
•Blue Ocean Strategy  by LGEIN
• Toyota Production System for value
innovation by LGEIN & Toyota
• English Course TOEIC.
• Inovation Mind  by LGEIN
Nisfu Syahbanda
Griya Bintara Indah EE2/3 RT009/12
Bintara , Bekasi Barat , Kota Bekasi.
Indonesia, 17134
Place & date of Birth:
Jakarta ,July 20th, 1978
Phone : 08128141526 / 6221 8853161
E-Mail : nisfu.syah@gmail.com
Contact Details
Bachelor Degree
Darma Persada University .
Industrial Engineering
GPA : 2.86
Mandatory: SMUN 91 East Jakarta,
Academic Qualification
Sept /2016 Page 2/2 Curriculum vitae
References
Available on request.
 Quality Management System
 Performing assessments, internal audit ,supplier audits report document
control & develop new procedures by ISO System & standard Regulation.
 Quality Field responsibility PCBA part
Lead in the development of quality assurance standards to reflect customer
requirement and reduce customer complain.
 Reviews and recommends appropriate corrective action and improvements to
ensure consistency with the quality assurance function and the quality.
 Quality Engineering
 Identifies problem areas, delivers solutions to enhance quality control
(QC) and prevent future issues
- Analyze and improve quality processes to improve overall workflow
efficiency and effectiveness.
- Lead non-conformance investigation,root cause analysis and
corrective/preventative action efforts throughout the value stream.
 Monitoring and examining each stage of production
- Ensuring that all testing is perform highest standard.
- Develop process to remove waste from non conference management
process.
2. Quality Production Department (June 2002 – 2006)
• Production Performance Monitoring
Managed the production process in manner that optimized workflow and
efficiency in order to meet production goals and profitability objective .
• Quality Controller & Process Management
Arrange & standardize work instruction in process related to Lean Concept.
Project Experience / Key Achievements
Project theme Improve Achievement Year
Level Up System
quality Bank .
Leader
- Set up system Self and
successive line assembly.
- Blocking system product less
inspect & skip element check.
- Modify softwarejig inspect.
- Reduce defect rate 50%.
- Increase UPH 30% in station
inspectionfunction & appearance.
- Lowered product returns by 15%.
- Saving average $151K/Month.
2016
(S1)
Increase Performance
Productivity & Quality
Vendor Assembly .
Manage& Counselor
10 project team
- Set up system E-monitoring
Line performance.
- Developed supplier
qualification program.
- Flexible line arrangement.
- System monitoring real time
material in process .
- Reduce defect rate 30%.
- Increase insert point machine.
production <sub & full ass’y >.
- Run Flexible line.
- Saving Cost $ 3,680 K/year .
2015
System Quality bank
Leader
- System tracking Inspection
product.
- Quality Clinic to up feedback.
- Modify signal parameter jig.
- Reduce defect rate 38% .
- Part return 40%.
- Repair & material damage cost.
$ 2,100 K/ Year.
2015
2014
Project Level Up
System Quality
Vendor
Leader
- System qualificationoperator.
- ESD & EOS Map.
- self sequent inspection.
- 5R/5S Map.
- Process mapping vs time study.
- Reduce defect 34% .
- Eliminate bottlenecks .
- Reduce cost $ 2,300K /Year
<repair + waiting cost >.
2013
Project Increase 30%
Supplier Performance
Leader
-Scanning system process.
- create education line.
- Quality respond & High
accurate 1st inspection.
- Synchronized flows 50%.
- total cycle time reduce 50% .
- WIP reduce 30%.
2012

More Related Content

What's hot (20)

V5.0.1
V5.0.1V5.0.1
V5.0.1
 
Sujays resume details
Sujays resume detailsSujays resume details
Sujays resume details
 
Resume
ResumeResume
Resume
 
EMEELIZA_HORNILLA_CAPONPON
EMEELIZA_HORNILLA_CAPONPONEMEELIZA_HORNILLA_CAPONPON
EMEELIZA_HORNILLA_CAPONPON
 
Michael-Godoy-Resume
Michael-Godoy-ResumeMichael-Godoy-Resume
Michael-Godoy-Resume
 
Enri resume
Enri    resumeEnri    resume
Enri resume
 
Peralta, Mac-Jordan Resume
Peralta, Mac-Jordan ResumePeralta, Mac-Jordan Resume
Peralta, Mac-Jordan Resume
 
Pallavi Chaturvedi cv
Pallavi Chaturvedi cvPallavi Chaturvedi cv
Pallavi Chaturvedi cv
 
CV_Noviek Heru_2016_Nov
CV_Noviek Heru_2016_NovCV_Noviek Heru_2016_Nov
CV_Noviek Heru_2016_Nov
 
Panneer selvam quality
Panneer selvam quality Panneer selvam quality
Panneer selvam quality
 
cv2
cv2cv2
cv2
 
Kelven Satterfield Resume 2017
Kelven Satterfield Resume 2017Kelven Satterfield Resume 2017
Kelven Satterfield Resume 2017
 
Kanthreddy Profile_QA_1
Kanthreddy Profile_QA_1Kanthreddy Profile_QA_1
Kanthreddy Profile_QA_1
 
Ashok bhandari
Ashok bhandariAshok bhandari
Ashok bhandari
 
Resume-Arshdeep Singh
Resume-Arshdeep SinghResume-Arshdeep Singh
Resume-Arshdeep Singh
 
Sujay resume details S
Sujay resume details SSujay resume details S
Sujay resume details S
 
Copy of Resume
Copy of ResumeCopy of Resume
Copy of Resume
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Sagar Pagar-1
Sagar Pagar-1Sagar Pagar-1
Sagar Pagar-1
 
HARISH1 (1)
HARISH1 (1)HARISH1 (1)
HARISH1 (1)
 

Viewers also liked

El parto verónica
El parto   verónicaEl parto   verónica
El parto verónicamaestrasexto
 
Primeros pasos con Mailchimp ¿Qué es y para que sirve?
Primeros pasos con Mailchimp ¿Qué es y para que sirve? Primeros pasos con Mailchimp ¿Qué es y para que sirve?
Primeros pasos con Mailchimp ¿Qué es y para que sirve? Sandra More
 
Mundo de las computadoras
Mundo de las computadorasMundo de las computadoras
Mundo de las computadoraslilianatiban
 
Perfil de sucesso trabalhado
Perfil de sucesso trabalhadoPerfil de sucesso trabalhado
Perfil de sucesso trabalhadoPaulo Bergmann
 
El parto mª josé
El parto   mª joséEl parto   mª josé
El parto mª josémaestrasexto
 
Encontro de Fé programação
Encontro de Fé programaçãoEncontro de Fé programação
Encontro de Fé programaçãoPaulo Bergmann
 
Tic II - tematica I - practica I - carrizo mariel
Tic II -  tematica I - practica I - carrizo marielTic II -  tematica I - practica I - carrizo mariel
Tic II - tematica I - practica I - carrizo marielmacarrizo
 
Prevecorp Planos de Saúde PME
Prevecorp Planos de Saúde PMEPrevecorp Planos de Saúde PME
Prevecorp Planos de Saúde PMEPaulo Bergmann
 
Acidos y bases presentaciones multimedia
Acidos y bases presentaciones multimediaAcidos y bases presentaciones multimedia
Acidos y bases presentaciones multimediaesjara_08
 
Kronman. vivir en el derecho
Kronman. vivir en el derechoKronman. vivir en el derecho
Kronman. vivir en el derechoSANDRA SALAS
 
DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019Douglas Hart Snr
 
Tic ii tematica 3 practica 1 bazan griselda
Tic ii tematica 3 practica 1 bazan griseldaTic ii tematica 3 practica 1 bazan griselda
Tic ii tematica 3 practica 1 bazan griseldaGrispecial
 
Evolucion y teoria de darwin
Evolucion y teoria de darwinEvolucion y teoria de darwin
Evolucion y teoria de darwinAna Alonso
 
Torneo nacional de dardos los itabos dic 2012 2
Torneo nacional de dardos los itabos dic 2012 2Torneo nacional de dardos los itabos dic 2012 2
Torneo nacional de dardos los itabos dic 2012 2wvargascr
 

Viewers also liked (20)

El parto verónica
El parto   verónicaEl parto   verónica
El parto verónica
 
Primeros pasos con Mailchimp ¿Qué es y para que sirve?
Primeros pasos con Mailchimp ¿Qué es y para que sirve? Primeros pasos con Mailchimp ¿Qué es y para que sirve?
Primeros pasos con Mailchimp ¿Qué es y para que sirve?
 
Marketing pessoal
Marketing pessoalMarketing pessoal
Marketing pessoal
 
Joaquin miranda bernal
Joaquin miranda bernalJoaquin miranda bernal
Joaquin miranda bernal
 
Mundo de las computadoras
Mundo de las computadorasMundo de las computadoras
Mundo de las computadoras
 
Perfil de sucesso trabalhado
Perfil de sucesso trabalhadoPerfil de sucesso trabalhado
Perfil de sucesso trabalhado
 
El parto mª josé
El parto   mª joséEl parto   mª josé
El parto mª josé
 
Fim do mundo
Fim do mundoFim do mundo
Fim do mundo
 
Encontro de Fé programação
Encontro de Fé programaçãoEncontro de Fé programação
Encontro de Fé programação
 
Tic II - tematica I - practica I - carrizo mariel
Tic II -  tematica I - practica I - carrizo marielTic II -  tematica I - practica I - carrizo mariel
Tic II - tematica I - practica I - carrizo mariel
 
Prevecorp Planos de Saúde PME
Prevecorp Planos de Saúde PMEPrevecorp Planos de Saúde PME
Prevecorp Planos de Saúde PME
 
Acidos y bases presentaciones multimedia
Acidos y bases presentaciones multimediaAcidos y bases presentaciones multimedia
Acidos y bases presentaciones multimedia
 
Kronman. vivir en el derecho
Kronman. vivir en el derechoKronman. vivir en el derecho
Kronman. vivir en el derecho
 
DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019DGI-CHT-ENC-B1-XX-M-60-0019
DGI-CHT-ENC-B1-XX-M-60-0019
 
Final tutores
Final tutores Final tutores
Final tutores
 
Ensayo humberto vides
Ensayo humberto videsEnsayo humberto vides
Ensayo humberto vides
 
Tic ii tematica 3 practica 1 bazan griselda
Tic ii tematica 3 practica 1 bazan griseldaTic ii tematica 3 practica 1 bazan griselda
Tic ii tematica 3 practica 1 bazan griselda
 
Evolucion y teoria de darwin
Evolucion y teoria de darwinEvolucion y teoria de darwin
Evolucion y teoria de darwin
 
Torneo nacional de dardos los itabos dic 2012 2
Torneo nacional de dardos los itabos dic 2012 2Torneo nacional de dardos los itabos dic 2012 2
Torneo nacional de dardos los itabos dic 2012 2
 
Lectura
LecturaLectura
Lectura
 

Similar to Quality Engineer Drives Continuous Improvement

Similar to Quality Engineer Drives Continuous Improvement (20)

Andy's Resume
Andy's ResumeAndy's Resume
Andy's Resume
 
Sr Engg Quality_Shobha Ambekar
Sr Engg Quality_Shobha AmbekarSr Engg Quality_Shobha Ambekar
Sr Engg Quality_Shobha Ambekar
 
Product Quality
Product Quality Product Quality
Product Quality
 
Jayaseelan Agile _April 2016
Jayaseelan Agile _April 2016Jayaseelan Agile _April 2016
Jayaseelan Agile _April 2016
 
Dusitsun Narkprasert CV6
Dusitsun Narkprasert CV6Dusitsun Narkprasert CV6
Dusitsun Narkprasert CV6
 
CV_RRBARTE
CV_RRBARTECV_RRBARTE
CV_RRBARTE
 
resume G.Roul
resume G.Roulresume G.Roul
resume G.Roul
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
GS CV
GS CVGS CV
GS CV
 
Faheem- CV
Faheem- CVFaheem- CV
Faheem- CV
 
Narendra Singh_Resume
Narendra Singh_ResumeNarendra Singh_Resume
Narendra Singh_Resume
 
Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016Adjie Prasetyo - Curriculum_Vitae 2016
Adjie Prasetyo - Curriculum_Vitae 2016
 
Murali_Resume_updated[1]
Murali_Resume_updated[1]Murali_Resume_updated[1]
Murali_Resume_updated[1]
 
Vikas_Kumar_4Year EXP
Vikas_Kumar_4Year EXPVikas_Kumar_4Year EXP
Vikas_Kumar_4Year EXP
 
Course 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptxCourse 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptx
 
Mehak Marwaha
Mehak MarwahaMehak Marwaha
Mehak Marwaha
 
Resume_Aravind 1
Resume_Aravind 1Resume_Aravind 1
Resume_Aravind 1
 
kka 110316
kka 110316kka 110316
kka 110316
 
Palan CV - 2016
Palan CV - 2016Palan CV - 2016
Palan CV - 2016
 
Palan cv 2016
Palan cv   2016Palan cv   2016
Palan cv 2016
 

Quality Engineer Drives Continuous Improvement

  • 1. Nisfu Syahbanda Quality & Improvement Engineer - Assistant Manager Key skillsPersonal Profile A reliable, fast learner, enthusiastic, energetic, hard working and committed Assistant Manager Quality Innovation. Possessing extensive experience of supporting developing and motivating vendor/teams to do better. Providing guidance, maintaining work ability, coordinating work and work define. Drive continuous improvements across arrange work activities. Also having a track record of coming up with practical improvement initiatives. Currently looking to join a suitable organization that rewards hard work and offers good opportunities for career development. Areas of Expertise • Failure modes & Effect Analysis (FMEA). • Foolproof Oriented. • Design Quality System . • Kaizen, 5S Implementation. • 8D problem solving applying. Professional Ability • Drive continuous improvements. • Experience in Project Management • Good Comprehension in TPS, 6 Sigma, 5S, Fool Proof, Risk Management, Change Management & Lean System. • Experience Quality Management System. • Good Perform Presentation & Reporting Skill.. • Create Flow Process Drafting (SOP). • Involve in People Development. • Understand for standard ISO 9001. • Constantly maintaininghigh levels of accuracy. • Experience handle of client compliance. • Managing Vendor assessment. Work Experience 1. Quality & Improvement Engineer (June 2006 – Present)  Manufacturing Innovation (Drive & Counselor Project )  Manage, monitor annual project vendor -focused quality plans and efficiency improvement. - Acceptable Project Theme with background statistical methodology. - Develop project related to process improvement & process effectiveness. - Counselor project Vendor (six Vendor). We increase up to 30% performance (Average achievement annual 40 % reduce defect increase capability process up to 10% and elimination cos t $700 K. - Create system competition project to accelerate project & best practices.  Apply process improvement, re-engineering methodologies, utilizing Lean / Six Sigma tools to identify & capitalize on opportunities for improvement - Upgraded Inspection Method to reduce down time & improve quality. - Making best parameter each model /type with DOE (6 sigma tools). - Improvement & monitoring UPPH each line assembly vendor. LG Electronics Indonesia, West Java, Cibitung. (May 2002 – Present) Last Position : Quality & Improvement Engineer PCBA Part Head (Scope: LGEIN & Suppliers) Last Level : Assistant Manager (Part Head) Specialization : Quality Management system, Quality Engineering, Project Management, Lean Concept & Continuous Improvement. Award & Honors • BEST 1 : Quality Bank LGEIN Reduce Worst Case Defect. ( S1 -2016) • Silver award : Best personal Global project in LGEIN . (S1-2016 • Silver Award : Quality Bank theme , Management Vendor . (S2-2015) • Great S Project Best 1 : “Level Up Innovation Index thru redesign and Fool proofing system” .(2012) • DIGITAL Person Award LGEIN. (2012) • Best Work Practice. Project: “Increase Capability Blu ray model”. (2011) • LGEIN Best UNIT Leader. (2009) • 6 Sigma Green Belt. (2008) • LGEIN Best Project. Best 1 -“Reduce defect Home theater product”. (2007) Sept /2016 Page 1/2 Curriculum vitae  Design system & Monitoring supplier  Responsible for Design & Maintained Supplier Assessment - Set up Main & sub parameter / criteria evaluation (QCD). - leveling vendor base on complexity level by product & System production.  Acceptable Improvement, NCR and 4M change approval (system and process).  Define gap closer actions versus & desired future state per selected supplier. Phone : 0812 -8141526/6221-8853161 E-mail : nisfu.syah@gmail.com
  • 2. • Quality self & successive inspection(2016) • Reporting Skill Basic & Advanced, LGEIN & Suppliers (2012 – 2014). • Line BalancingBasic LGEIN & Suppliers (2004 – 2010). Teaching Experience Training Experience • Industrial Engineering IntermediateTTT Overseas Korea representatives from Indonesia. • 6 Sigma Training - Green Belt & Black Belt . • Change Management - by LGEIN. • Awareneess of ISO 9001: 2000 - by (TUV). • Quality Innovation - by Overseas Korea representatives from Indonesia. • Assistant Manager & Manager Course - by LGEIN. • Persentation skills for Leader -by Building •Blue Ocean Strategy  by LGEIN • Toyota Production System for value innovation by LGEIN & Toyota • English Course TOEIC. • Inovation Mind  by LGEIN Nisfu Syahbanda Griya Bintara Indah EE2/3 RT009/12 Bintara , Bekasi Barat , Kota Bekasi. Indonesia, 17134 Place & date of Birth: Jakarta ,July 20th, 1978 Phone : 08128141526 / 6221 8853161 E-Mail : nisfu.syah@gmail.com Contact Details Bachelor Degree Darma Persada University . Industrial Engineering GPA : 2.86 Mandatory: SMUN 91 East Jakarta, Academic Qualification Sept /2016 Page 2/2 Curriculum vitae References Available on request.  Quality Management System  Performing assessments, internal audit ,supplier audits report document control & develop new procedures by ISO System & standard Regulation.  Quality Field responsibility PCBA part Lead in the development of quality assurance standards to reflect customer requirement and reduce customer complain.  Reviews and recommends appropriate corrective action and improvements to ensure consistency with the quality assurance function and the quality.  Quality Engineering  Identifies problem areas, delivers solutions to enhance quality control (QC) and prevent future issues - Analyze and improve quality processes to improve overall workflow efficiency and effectiveness. - Lead non-conformance investigation,root cause analysis and corrective/preventative action efforts throughout the value stream.  Monitoring and examining each stage of production - Ensuring that all testing is perform highest standard. - Develop process to remove waste from non conference management process. 2. Quality Production Department (June 2002 – 2006) • Production Performance Monitoring Managed the production process in manner that optimized workflow and efficiency in order to meet production goals and profitability objective . • Quality Controller & Process Management Arrange & standardize work instruction in process related to Lean Concept. Project Experience / Key Achievements Project theme Improve Achievement Year Level Up System quality Bank . Leader - Set up system Self and successive line assembly. - Blocking system product less inspect & skip element check. - Modify softwarejig inspect. - Reduce defect rate 50%. - Increase UPH 30% in station inspectionfunction & appearance. - Lowered product returns by 15%. - Saving average $151K/Month. 2016 (S1) Increase Performance Productivity & Quality Vendor Assembly . Manage& Counselor 10 project team - Set up system E-monitoring Line performance. - Developed supplier qualification program. - Flexible line arrangement. - System monitoring real time material in process . - Reduce defect rate 30%. - Increase insert point machine. production <sub & full ass’y >. - Run Flexible line. - Saving Cost $ 3,680 K/year . 2015 System Quality bank Leader - System tracking Inspection product. - Quality Clinic to up feedback. - Modify signal parameter jig. - Reduce defect rate 38% . - Part return 40%. - Repair & material damage cost. $ 2,100 K/ Year. 2015 2014 Project Level Up System Quality Vendor Leader - System qualificationoperator. - ESD & EOS Map. - self sequent inspection. - 5R/5S Map. - Process mapping vs time study. - Reduce defect 34% . - Eliminate bottlenecks . - Reduce cost $ 2,300K /Year <repair + waiting cost >. 2013 Project Increase 30% Supplier Performance Leader -Scanning system process. - create education line. - Quality respond & High accurate 1st inspection. - Synchronized flows 50%. - total cycle time reduce 50% . - WIP reduce 30%. 2012