SlideShare a Scribd company logo
1 of 65
Laterite Bed in Kallgundi, Suliya, Manglore
dispersants
concrete
Conplast SP-430
Sieve
size
(mm)
Mass
Retained
Corrected
mass
Retained
Percentage
Retained
Cumulative
percentage
retained
Fineness
Modulus
Grading zone
Standard as
per
IS 383-2007
4.75 0.044 43.052 4.30 04.31 95.69 100
2.36 0.236 230.92 23.09 27.40 72.59 90-100
1.18 0.228 223.10 22.31 49.72 50.28 60-95
0.6 0.227 222.13 22.21 71.93 28.07 30-70
0.3 0.161 157.34 15.73 87.67 12.33 15-34
0.15 0.091 89.041 8.90 96.57 3.43 5-20
Receiver 0.035 34.247 3.42 100.00 - 0-10
MATERIALS VALUE
COARSE AGGREGATE 2.611
M-SAND 2.41
LATERITE 2.656
CEMENT 3.105
MATERIALS
WATER
ABSORPTION ( % )
M-SAND 9.6
LATERITE 25.46
PROPERTIES RESULT PERMISSIBLE
LIMIT AS PER
IS 8112-1989
FINENESS 2% 0-5 %
NORMAL
CONSISTENCY
31.5% 25-33 %
SPECIFIC
GRAVITY
3.105 -
SETTING
TIME
A. INITIAL
B. FINAL
150 MINUTE
230 MINUTE
Should not :
Be less than 30 Be
less than 540 min
C.S OF
MORTAR
CUBES:
A. 3 DAYS
B. 7 DAYS
C. 28 DAYS
26.02 N/mm2
38.44 N/mm2
54.46 N/mm2
Should not :
Be less than 23 Mpa
Be less than 33 Mpa
Be less than 43 Mpa
Grade of concrete 25 N/mm2
Type of cement OPC 53 grade
Maximum size of aggregate 25 mm
Maximum cement content 240 kg/m3
Maximum W/C ratio 0.6
Workability (slump) 50 mm
Exposure condition Moderate
Method of concreting Manual
Degree of supervision Good
Type of aggregate Angular
Specific gravity:
 Cement
 Coarse aggregate
 Fine aggregate
3.105
2.61
2.41
Water absorption:
 Coarse aggregate
 Fine aggregate
0.5
0.1
Free moisture content:
 Coarse aggregate
 Fine aggregate
nil
nil
TYPES OF FINE
AGGREGATE ZONE 2
STANDARD DEVIATION 4
CALCULATION:
 Target strength
 Selection of water cement
ratio
 Water content
Cement content
31.6 N/mm2
0.55
186 litres
MIX CALCULATION:
 Volume of concrete
 Volume of cement
 Volume of water
 Volume of all in aggregate
 Mass of coarse aggregate
 Mass of fine aggregate
1 m3
0.190 m3
0.186 m3
0.705 m3
1122.398 kg
662.610 kg
MIX PROPORTION :
 Cement
 Fine aggregate
 Coarse aggregate
1
1.959
3.319
DAYS 3 DAYS 7 DAYS 28 DAYS
0%
REPLACEMENT
24.44 N/mm2 31.42 N/mm2 48.8 N/mm2
10%
REPLACEMENT
37.64 N/mm2 50.97 N/mm2 63.55 N/mm2
20%
REPLACEMENT
34.80 N/mm2 40.08 N/mm2 54.22 N/mm2
30%
REPLACEMENT
29.77 N/mm2 36.62 N/mm2 48 N/mm2
24.44
37.64
34.8
29.77
0
5
10
15
20
25
30
35
40
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
COMPRESSIVE STRENGTH OF CONCRETE FOR
3-DAYS
STRENGTH IN N/mm2
31.42
50.97
40.08
36.62
0
10
20
30
40
50
60
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
COMPRESSIVE STRENGTH OF CONCRETE FOR
7-DAY
STRENGTH IN N/mm2
48.8
63.55
54.22
48
0
10
20
30
40
50
60
70
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
COMPRESSIVE STRENGHT OF CONCRETE FOR
28-DAY
STRENGTH IN N/mm2
Graph Representing Compressive Strength of Concrete at Different Ratios of Laterite Replacement
Testing of Cubes in Compression Testing Machine
DAYS 3 DAYS 7 DAYS 28 DAYS
0%
REPLACEMENT
2.774 N/mm2 3.211 N/mm2 3.706 N/mm2
10%
REPLACEMENT
2.970 N/mm2 3.423 N/mm2 3.820 N/mm2
20%
REPLACEMENT
2.850 N/mm2 3.183 N/mm2 3.635 N/mm2
30%
REPLACEMENT
2.447 N/mm2 2.787 N/mm2 3.027 N/mm2
2.774
2.97
2.85
2.447
0
0.5
1
1.5
2
2.5
3
3.5
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
SPLITTINGTENSILE STRENGTH OF CONCRETE FOR
3-DAY
STRENGTH IN N/mm2
3.211
3.423
3.183
2.787
0
0.5
1
1.5
2
2.5
3
3.5
4
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
SPLITTINGTENSILE STRENGTH OF CONCRETE FOR
7-DAY
STRENGTH IN N/mm2
3.706
3.82
3.635
3.027
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
SPLITTINGTENSILE STRENGTH OF CONCRETE FOR
28-DAY
STRENGTH IN N/mm2
Graph Representing Splitting Tensile Strength of Concrete at Different Ratios Of Laterite Replacement
Testing of cylinders in Compression testing Machine
DAYS 3 DAYS 7 DAYS 28 DAYS
0%
REPLACEMENT
2.610 N/mm2 2.781 N/mm2 4.281 N/mm2
10%
REPLACEMENT
2.901 N/mm2 3.741 N/mm2 4.782 N/mm2
20%
REPLACEMENT
2.730 N/mm2 3.522 N/mm2 4.080 N/mm2
30%
REPLACEMENT
2.502 N/mm2 2.691 N/mm2 3.522 N/mm2
2.61
2.901
2.73
2.502
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
FLEXURAL STRENGTH OF CONCRETE FOR
3-DAY
STRENGTH IN N/mm2
2.781
3.741
3.522
2.691
0
0.5
1
1.5
2
2.5
3
3.5
4
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
FLEXURAL STRENGTH OF CONCRETE FOR
7-DAY
STRENGTH IN N/mm2
4.281
4.782
4.08
3.522
0
1
2
3
4
5
6
0% REPLACEMENT 10% REPLACEMENT 20% REPLACEMENT 30% REPLACEMENT
FLEXURAL STRENGTH OF CONCRETE FOR
28-DAY
STRENGTH IN N/mm2
Graph Representing Flexural Strength of Concrete at Various Laterite Replacement Ratios
Testing Of Beams in Universal Testing Machine
Click here to know more

More Related Content

What's hot (20)

Building construction materials -Tiles
Building construction materials -TilesBuilding construction materials -Tiles
Building construction materials -Tiles
 
Concrete as a building material
Concrete as a building materialConcrete as a building material
Concrete as a building material
 
Lime
LimeLime
Lime
 
Marble and granite
Marble and graniteMarble and granite
Marble and granite
 
SAND.pptx
SAND.pptxSAND.pptx
SAND.pptx
 
Brick as building materials
Brick as building materialsBrick as building materials
Brick as building materials
 
FIBER REINFORCED CONCRETE
FIBER REINFORCED CONCRETEFIBER REINFORCED CONCRETE
FIBER REINFORCED CONCRETE
 
Construction materials
Construction materialsConstruction materials
Construction materials
 
Glass fibers reinforced concrete
Glass fibers reinforced concreteGlass fibers reinforced concrete
Glass fibers reinforced concrete
 
gypsum.pptx
gypsum.pptxgypsum.pptx
gypsum.pptx
 
Fibre Reinforced concrete
Fibre Reinforced concreteFibre Reinforced concrete
Fibre Reinforced concrete
 
Multi story building construction anshul
Multi story building construction anshulMulti story building construction anshul
Multi story building construction anshul
 
Stone ppt by akshay
Stone ppt by akshayStone ppt by akshay
Stone ppt by akshay
 
STABILIZATION OF BLACK COTTON SOIL
STABILIZATION OF BLACK COTTON SOILSTABILIZATION OF BLACK COTTON SOIL
STABILIZATION OF BLACK COTTON SOIL
 
Building stones II
Building stones IIBuilding stones II
Building stones II
 
Fly ash brick industry deepak tijare
Fly ash brick industry deepak tijareFly ash brick industry deepak tijare
Fly ash brick industry deepak tijare
 
Manifestation and remediation of alkali aggregate reaction
Manifestation and remediation of alkali aggregate reactionManifestation and remediation of alkali aggregate reaction
Manifestation and remediation of alkali aggregate reaction
 
Grit finish
Grit finish Grit finish
Grit finish
 
Seminar on replacement of fine aggregate
Seminar on replacement of fine aggregate Seminar on replacement of fine aggregate
Seminar on replacement of fine aggregate
 
Rice Husk Ash
Rice Husk Ash Rice Husk Ash
Rice Husk Ash
 

Viewers also liked (7)

Laterite
LateriteLaterite
Laterite
 
Ch07 sedimentary rocks
Ch07 sedimentary rocksCh07 sedimentary rocks
Ch07 sedimentary rocks
 
Aquifer
AquiferAquifer
Aquifer
 
Introduction to groundwater and aquifer
Introduction to groundwater and aquiferIntroduction to groundwater and aquifer
Introduction to groundwater and aquifer
 
Sedimentary Rocks
Sedimentary RocksSedimentary Rocks
Sedimentary Rocks
 
groundwater
groundwatergroundwater
groundwater
 
Types Of Rocks
Types Of RocksTypes Of Rocks
Types Of Rocks
 

Similar to Laterite Concrete

Study of behaviour of concrete using waste materials as a partial substitute
Study of behaviour of concrete using waste materials as a partial substituteStudy of behaviour of concrete using waste materials as a partial substitute
Study of behaviour of concrete using waste materials as a partial substituteSwathy B
 
Peclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentPeclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentAquaShield, Inc.
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacitiesJohneey Deep
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacitiesSiddiq Mohammed
 
Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...IAEME Publication
 
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...IAEME Publication
 
Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...
Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...
Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...mamta barmola
 
Lana formwork timber_beam_habe_h20
Lana formwork timber_beam_habe_h20Lana formwork timber_beam_habe_h20
Lana formwork timber_beam_habe_h20Kapil Mall
 
V3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-propertiesV3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-propertiestecnidibujos
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
SLM project presentation
SLM project presentationSLM project presentation
SLM project presentationHesham Ibrahim
 
LED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORTLED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORTLuminhome Lighting
 
Machinability of Composite Materials.pptx
Machinability of Composite Materials.pptxMachinability of Composite Materials.pptx
Machinability of Composite Materials.pptxMarwan Shehata
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisKristoforusAnggara
 

Similar to Laterite Concrete (20)

Khalid.ppt
Khalid.pptKhalid.ppt
Khalid.ppt
 
Study of behaviour of concrete using waste materials as a partial substitute
Study of behaviour of concrete using waste materials as a partial substituteStudy of behaviour of concrete using waste materials as a partial substitute
Study of behaviour of concrete using waste materials as a partial substitute
 
Tablice beton
Tablice betonTablice beton
Tablice beton
 
Rab
RabRab
Rab
 
Peclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentPeclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater Treatment
 
Factores pulgadas-diametrales
Factores pulgadas-diametralesFactores pulgadas-diametrales
Factores pulgadas-diametrales
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacities
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacities
 
Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...
 
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
 
2 parte de la pregunta 2
2 parte de la pregunta 22 parte de la pregunta 2
2 parte de la pregunta 2
 
Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...
Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...
Final pp COMPARATIVE INVESTIGATION ON SHEAR STRENGTH PREDICTION MODELS FOR SF...
 
Lana formwork timber_beam_habe_h20
Lana formwork timber_beam_habe_h20Lana formwork timber_beam_habe_h20
Lana formwork timber_beam_habe_h20
 
V3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-propertiesV3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-properties
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
SLM project presentation
SLM project presentationSLM project presentation
SLM project presentation
 
Catalogo codiacero
Catalogo codiaceroCatalogo codiacero
Catalogo codiacero
 
LED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORTLED panel light test report, IES TEST REPORT
LED panel light test report, IES TEST REPORT
 
Machinability of Composite Materials.pptx
Machinability of Composite Materials.pptxMachinability of Composite Materials.pptx
Machinability of Composite Materials.pptx
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
 

Recently uploaded

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 

Recently uploaded (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 

Laterite Concrete