ELCIR CYCLE FOR PROJECT MANAGERS:
1-PROJECTINITIATION
A/PROJECT DEFINITION: First of all we define the project and LG with the accounting
department (Ibrahim)
B/CONTRACT READING: PM should real all contract conditions , specifications and condition
of contract (attach all info on ERP)
C/ DRAWINGS: PM should know and study all the project drawings, and they have to
prepare the list of drawings and RFI’s (Define entity, submittal categories). And send to
Jean Rabahieh ONLY the drawings that are needed for costing of items.
D/ MACRO PLAN: PM prepares a simple macro planning to identify major project milestones
and date. This planning is rather simple and straight forward, it should also be attached on
ERP. Step D (macro plan) goes in parallel with step C (drawings)
C/ESTIMATION: the project manager should define the estimate name (tenders of the
project), and enter the tender BOQ’s manually or by importing it from excel. Then, Email &
NotifyEstimator(jean rabahieh) & Cost control manager (Ibrahim) to proceed with budget
costing. Several estimates can be done for the project if needed using an easy copy/paste
then modify method.
Estimator (jean) should estimate the direct cost of those BOQ’s, and cost controller(Ibrahim)
will do the indirect cost.. After all this, the results should be discussed with theCONCERNED
PM (discuss the budget).After final agreement, the PM should sign the budget and the
General manager (Jean marc). At this point, the budget becomes the responsibility of the
PM.
Accounting
Define project
define LG
PM
Contract/reading
list of drawings/RFI
Macro plan (attach)
WBS
Take off (WBS vs BOQ)
send item drawings to
jean
Estimate/budget
Direct cost (jean)
Indirect cost (ibrahim)
check budget with PM &
General manager
PM Prepares Risk log
2
After the estimation is done the project managers define a contract with all the information
about it (advance payment, retention, taxes…), and they import the BOQ’s of this contract
from the agreed upon estimate (budget) into contracts and partial contract(contract
subdivisions in case the contract is divided by client).
D/ RISKLOG: A risklogthat identifiesthe risksof the projectsasper a special template tobe
providedbyGeneral manager.Thisrisklogshouldbe preparedbyPMafter agreeingonbudget,and
it shouldalsobe attachedonERP.
E/ Work Breakdown Structure:After reading all the drawings , the PM should be able to
divide his project by location according to a logic that suits the relevant project. We call this
a WBS, and the PM has to input the WBS of the Project (WBS master list and detail
list).Examples of Work breakdown structures are as follows:
WBS Example 1
WBS Example 2
bldg
level1
doors crowns
level 2
fire doors doors crowns
bldg
level1
apt1 apt2
level 2
apt 1 apt 2
3
The objective of the WBS is to prepare the take off and production orders as per project
needs, as well as project reporting documents. Typically, This division should reflect the
client requirements, planning and/or the way the Project manager should look at the
project. All concerned parties should speak the “same language” of the project and respect
this division.
E/ TAKE OFF:After defining the WBS and contract, the take off is prepared and every
location (WBS) will include the relevant BOQ’s that are in this WBS/location.
WBS WBS description BOQ BOQ description qty
101100 bldg1-level 1-doors 01fr120x320 fire rate door 120 by320 3
04cr2111 crown width211 cm… 5
05fr213x234 fire rate door 213 by234 8
Take off Example
N.B: most of the steps of project initiation, can go in parallel, and the PM should
orchestrate and coordinate with all the parties (estimation, design, production). It is the
responsibility of the PM to enter, the BOQ, WBS, list of drawings and take off. The
Materials, production time and labor resources and indirect costing INPUT are the
responsibility of the estimators (jean and Ibrahim)
4
2-PROJECTOPERATION
A/MICRO PLANNING: After the budget is done the project manager should draw the
detailed plan of his project. They can use any planning method like primavera, MS project or
even excel. Then they will allocate BOQ items to the tasks at hand (they will know it from
the Take off preparation step before. This will give the procurement plan and know what
are the material that should be bought at the right time so when they are needed they can
find it without affecting on the project plan. Manpower histogram of installation should also
be inputed by the PM to the micro plan.
B/ BARCODING:Once every BOQ has a WBS, we can concatenate the BOQ with the WBS and
we obtain a barcode that can be used and known in design, PM, shipping and production
departments.
wbs desc boq Descry qty unit
101100 bldg1-level 1-doors 01fr120x320 fire rate door 120 by320 3 pcs
04cr2111 crown width211 cm… 5 lm
05fr213x234 fire rate door 213 by234 8 pcs
An example thatindicate the fire rated door of building 1, level 1 is as follows:
Barcode: 101100-01fr120x320
Barcode reading :bldg 1-level 1-doors- fire rate door 120 by 320
C/ SUBMITTALS : there is a procedure to follow-up all the dates and content of all the
submittals to the client, as well as the client responses and their date and content. So, the
history of any submittals is automatically generated once this procedure is followed up by
the PM.
PM Planning
Budget+ plan = procurementplan
withJM(cash flow of purchasing)
Take off +plan=Work order
planningwithproduction(cash
flow of clientpayments)
PM
Progress/paymentcertificate
Submittals
Work orderissue asper plan
RFP
Change orders
Installationbudget/Subcontract
5
Submittals are divided by categories like materials, drawings… .Subcategories are also
possible to report like doors, crowns… separately, if needed.
D/ Request for Purchases (RFP): Prepare the major items to be purchased and their required
times by PM.
E/ WORK ORDERS:As per the planning tasks and their allocated quantities , the project
manager should prepare the work orders in coordination with the production. Client
deadlines should be clear, however, it is possible to put work orders in advance if that suits
the production, but delays should not be acceptable. The planning of work orders should
reflect client/project priorities. The PM responsibility is to issue the work orders and their
deadline/required times. In case, there is a priority of certain quantities for a certain item,
we suggest separating the work orders with priority from those with lower priority.
F/ INSTALLATION BUDGET: an installation budget form is to be prepared by site and
submitted to PM. This file should be attached to contract on ERP.
G/ SUBCONTRACTING: PM should input ad follow the procedure for tender management
system on ERP to so prepare subcontracting contracts with their payment follow up.
H/ CHANGE ORDERS: there is a procedure to prepare variation orders, with follows up on
drawings, letters, and client answers all linked together in submittals.The PM should follow
this procedure in variation order preparation. Once the client accepts/approves a variation
order, then the PM, with one click,puts the VO as an addendum to the contract and can do
progress on it.
I/ PAYMENT CERTIFICATE:Preparation of progress periods and progress quantities should be
inputted by the PM. Once the Client approves the concerned certificate the PM can close
the certificate with one click and the accounting receives the automated receivable invoice
all linked up to the concerned certificate automatically. Once a payment certificate is closed,
it can not be deleted, so a roll back starting from accounting has to be generated first then a
re-opening of the certificate is possible and ready for modification or deletion.
Please note that the PM’s can NOT exceed the cumulative contract quantities without a
variation order (the system does not allow it). In case the contract includes priced items
without quantities, then the allowed progress quantities are open ended, but this should be
indicated in the contract.

More Related Content

What's hot

Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Cost Engineering for Tendering & Contracting
Cost Engineering for Tendering & ContractingCost Engineering for Tendering & Contracting
Cost Engineering for Tendering & ContractingMartin van Vliet
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letterTeo Kean Hui
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignmentlohwenjun
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final AccountKai Yun Pang
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project ReportTeo Kean Hui
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesPang Khai Shuen
 
PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - AssignmentQuo Ming
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Kai Yun Pang
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - QuestionKai Yun Pang
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013CCT International
 
Assignment 1 - Software
Assignment 1 - SoftwareAssignment 1 - Software
Assignment 1 - SoftwareKai Yun Pang
 

What's hot (20)

Construction management
Construction managementConstruction management
Construction management
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
Cost Engineering for Tendering & Contracting
Cost Engineering for Tendering & ContractingCost Engineering for Tendering & Contracting
Cost Engineering for Tendering & Contracting
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letter
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project Report
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - Slides
 
PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - Assignment
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
Chapter 4- Contract Management
Chapter 4- Contract ManagementChapter 4- Contract Management
Chapter 4- Contract Management
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Accounting standard 7
Accounting standard 7Accounting standard 7
Accounting standard 7
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
 
Assignment 1 - Software
Assignment 1 - SoftwareAssignment 1 - Software
Assignment 1 - Software
 

Similar to project initiation

Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Bhalindra Bath - projects & M&A law
 
01.15+Audit-Success.pdf
01.15+Audit-Success.pdf01.15+Audit-Success.pdf
01.15+Audit-Success.pdfhelmut15
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Antonio Coladarce
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts MANNU KUMAR
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slideSithick Mohamed .
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
03 Architectural Job Phases
03 Architectural Job Phases03 Architectural Job Phases
03 Architectural Job PhasesDouglas Vail
 
Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Dhruv Seth
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectNekumi Kida
 

Similar to project initiation (20)

Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
01.15+Audit-Success.pdf
01.15+Audit-Success.pdf01.15+Audit-Success.pdf
01.15+Audit-Success.pdf
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
 
Newsletter TE&A
Newsletter TE&ANewsletter TE&A
Newsletter TE&A
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
M Simpson coursework
M Simpson courseworkM Simpson coursework
M Simpson coursework
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Quality application
Quality applicationQuality application
Quality application
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
03 Architectural Job Phases
03 Architectural Job Phases03 Architectural Job Phases
03 Architectural Job Phases
 
Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A Project
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

project initiation

  • 1. 1 ELCIR CYCLE FOR PROJECT MANAGERS: 1-PROJECTINITIATION A/PROJECT DEFINITION: First of all we define the project and LG with the accounting department (Ibrahim) B/CONTRACT READING: PM should real all contract conditions , specifications and condition of contract (attach all info on ERP) C/ DRAWINGS: PM should know and study all the project drawings, and they have to prepare the list of drawings and RFI’s (Define entity, submittal categories). And send to Jean Rabahieh ONLY the drawings that are needed for costing of items. D/ MACRO PLAN: PM prepares a simple macro planning to identify major project milestones and date. This planning is rather simple and straight forward, it should also be attached on ERP. Step D (macro plan) goes in parallel with step C (drawings) C/ESTIMATION: the project manager should define the estimate name (tenders of the project), and enter the tender BOQ’s manually or by importing it from excel. Then, Email & NotifyEstimator(jean rabahieh) & Cost control manager (Ibrahim) to proceed with budget costing. Several estimates can be done for the project if needed using an easy copy/paste then modify method. Estimator (jean) should estimate the direct cost of those BOQ’s, and cost controller(Ibrahim) will do the indirect cost.. After all this, the results should be discussed with theCONCERNED PM (discuss the budget).After final agreement, the PM should sign the budget and the General manager (Jean marc). At this point, the budget becomes the responsibility of the PM. Accounting Define project define LG PM Contract/reading list of drawings/RFI Macro plan (attach) WBS Take off (WBS vs BOQ) send item drawings to jean Estimate/budget Direct cost (jean) Indirect cost (ibrahim) check budget with PM & General manager PM Prepares Risk log
  • 2. 2 After the estimation is done the project managers define a contract with all the information about it (advance payment, retention, taxes…), and they import the BOQ’s of this contract from the agreed upon estimate (budget) into contracts and partial contract(contract subdivisions in case the contract is divided by client). D/ RISKLOG: A risklogthat identifiesthe risksof the projectsasper a special template tobe providedbyGeneral manager.Thisrisklogshouldbe preparedbyPMafter agreeingonbudget,and it shouldalsobe attachedonERP. E/ Work Breakdown Structure:After reading all the drawings , the PM should be able to divide his project by location according to a logic that suits the relevant project. We call this a WBS, and the PM has to input the WBS of the Project (WBS master list and detail list).Examples of Work breakdown structures are as follows: WBS Example 1 WBS Example 2 bldg level1 doors crowns level 2 fire doors doors crowns bldg level1 apt1 apt2 level 2 apt 1 apt 2
  • 3. 3 The objective of the WBS is to prepare the take off and production orders as per project needs, as well as project reporting documents. Typically, This division should reflect the client requirements, planning and/or the way the Project manager should look at the project. All concerned parties should speak the “same language” of the project and respect this division. E/ TAKE OFF:After defining the WBS and contract, the take off is prepared and every location (WBS) will include the relevant BOQ’s that are in this WBS/location. WBS WBS description BOQ BOQ description qty 101100 bldg1-level 1-doors 01fr120x320 fire rate door 120 by320 3 04cr2111 crown width211 cm… 5 05fr213x234 fire rate door 213 by234 8 Take off Example N.B: most of the steps of project initiation, can go in parallel, and the PM should orchestrate and coordinate with all the parties (estimation, design, production). It is the responsibility of the PM to enter, the BOQ, WBS, list of drawings and take off. The Materials, production time and labor resources and indirect costing INPUT are the responsibility of the estimators (jean and Ibrahim)
  • 4. 4 2-PROJECTOPERATION A/MICRO PLANNING: After the budget is done the project manager should draw the detailed plan of his project. They can use any planning method like primavera, MS project or even excel. Then they will allocate BOQ items to the tasks at hand (they will know it from the Take off preparation step before. This will give the procurement plan and know what are the material that should be bought at the right time so when they are needed they can find it without affecting on the project plan. Manpower histogram of installation should also be inputed by the PM to the micro plan. B/ BARCODING:Once every BOQ has a WBS, we can concatenate the BOQ with the WBS and we obtain a barcode that can be used and known in design, PM, shipping and production departments. wbs desc boq Descry qty unit 101100 bldg1-level 1-doors 01fr120x320 fire rate door 120 by320 3 pcs 04cr2111 crown width211 cm… 5 lm 05fr213x234 fire rate door 213 by234 8 pcs An example thatindicate the fire rated door of building 1, level 1 is as follows: Barcode: 101100-01fr120x320 Barcode reading :bldg 1-level 1-doors- fire rate door 120 by 320 C/ SUBMITTALS : there is a procedure to follow-up all the dates and content of all the submittals to the client, as well as the client responses and their date and content. So, the history of any submittals is automatically generated once this procedure is followed up by the PM. PM Planning Budget+ plan = procurementplan withJM(cash flow of purchasing) Take off +plan=Work order planningwithproduction(cash flow of clientpayments) PM Progress/paymentcertificate Submittals Work orderissue asper plan RFP Change orders Installationbudget/Subcontract
  • 5. 5 Submittals are divided by categories like materials, drawings… .Subcategories are also possible to report like doors, crowns… separately, if needed. D/ Request for Purchases (RFP): Prepare the major items to be purchased and their required times by PM. E/ WORK ORDERS:As per the planning tasks and their allocated quantities , the project manager should prepare the work orders in coordination with the production. Client deadlines should be clear, however, it is possible to put work orders in advance if that suits the production, but delays should not be acceptable. The planning of work orders should reflect client/project priorities. The PM responsibility is to issue the work orders and their deadline/required times. In case, there is a priority of certain quantities for a certain item, we suggest separating the work orders with priority from those with lower priority. F/ INSTALLATION BUDGET: an installation budget form is to be prepared by site and submitted to PM. This file should be attached to contract on ERP. G/ SUBCONTRACTING: PM should input ad follow the procedure for tender management system on ERP to so prepare subcontracting contracts with their payment follow up. H/ CHANGE ORDERS: there is a procedure to prepare variation orders, with follows up on drawings, letters, and client answers all linked together in submittals.The PM should follow this procedure in variation order preparation. Once the client accepts/approves a variation order, then the PM, with one click,puts the VO as an addendum to the contract and can do progress on it. I/ PAYMENT CERTIFICATE:Preparation of progress periods and progress quantities should be inputted by the PM. Once the Client approves the concerned certificate the PM can close the certificate with one click and the accounting receives the automated receivable invoice all linked up to the concerned certificate automatically. Once a payment certificate is closed, it can not be deleted, so a roll back starting from accounting has to be generated first then a re-opening of the certificate is possible and ready for modification or deletion. Please note that the PM’s can NOT exceed the cumulative contract quantities without a variation order (the system does not allow it). In case the contract includes priced items without quantities, then the allowed progress quantities are open ended, but this should be indicated in the contract.