PPT ON THERMAL POWER PLANT
1. A PRESENTATION
ON
PRACTICAL TRAINING
AT
GOVT. ENGG. COLLEGE JHALAWAR
Submitted to:-
Mr. Ashish Khandelwal
Head of Department
Electrical Engineering 1
Submitted by:-
Naval Kishor
B.tech. 4th year
2013UEE033
3. INTRODUCTION
3
Project Kalisindh Super Thermal Power Project, Jhalawar
Capacity 1200 MW(2×600 MW)
Project Site Village-Undel, Motipura, Nimoda, Singharia & Deveri of Tehsil Jhalarapatan, Distt.
Jhalawar
Project Location The project site is about 12 km from NH-12, 2km from state highway and 8 km
from Ramganj Mandi - Bhopal broad gauge rail line.
Land Area 2230 Bigha/564 Hq. (1400 Bigha/350 Hq. in I stage)
Water Source and Quantity Dam on Kalisindh river 3400 CuM/Hrs.
Fuel Source Main fuel- Coal from captive coal blocks (Paras east and Kanta Basin in
Chhattisgarh state)
Secondary Fuel- FO/HSD.
Quantity of Fuel (at 80% PLF) Coal-56 Lacs TPA
FO/HSD-13000-14000 KL/A
Electro Static Precipitator 99.98 % Capacity
Stack Height 275 m
Revised Cost Rs. 9479.51 Crores
5. WORKING PRINCIPLE
5
1-4 : Water is pumped into the boiler at high pressure.
4-5 : Water is converted into steam at constant pressure.
5-7 : Expansion of steam in the steam turbine.
7-1 : Rejection of heat into the condenser.
6. COAL HANDLING PLANT
It consist three parts
Wagon unloading system
Conveying system
Crushing system
8700 tons coal is required
per day for each unit.
Coal is supplied from Parsa
kanta mines Chhattisgarh.
6
8. BOILER
8
Water is converted to generate steam
Types
1.Water tube boiler
2.Fire tube boiler
A boiler is always designed to absorb
max amount of heat released in process
of combustion.
FD fan:-To supply air for combustion of
fuel in furnace.
ID fan:-For sucking out flue gases and
discharge to atmosphere.
9. BOILER SPECIFICATION
9
S. NO. PARAMETER RATING
1 Type of Furnace Water Tube
2 Steam Capacity 670 tons/Hr. at 535° C
3 Capacity of Boiler Circulating pump 40000-48000 𝑚3
/Hr.
4 Speed of ID Fan 600 RPM
5 Speed of FD Fan 1500 RPM
6 Coal Required 320 tons/Hr.
7 Temp. & Pressure of main Steam 535° C, 178 kg/𝑚3
8 Temp. & Pressure of hot reheat Steam 500° C, 43.7 kg/𝑚3
10. eCONOMISER
10
It is a heat exchanger
device that heats up fluids
or recovers residual heat
from the combustion
product.
It improves the efficiency
of plant 10-12%.
Temperature : 315° C
11. STEAM TURBINE
11
It is a machine in which
shaft is rotated by impact
or reaction of steam on
blades of turbine.
When Steam is used then
it is called steam turbine.
TYPE :- Reaction turbine
Mechanical
Energy
Kinetic
Energy
12. 12
SUPERHEATER HP
REHEATER
IP LP LP
CONDENSER
Steam at
535°C
STEAM
Steam at
545°C
Steam
at
535°C
Steam at
545°C
Steam flow in turbine
13. TURBINE SPECIFICATION
13
S. NO. PARAMETER RATING
1. Speed 3000 r.p.m
2. Rotation Direction (view from turbine) anticlock wise
3. Number of stages 42
4. Rated output with extraction flow 600 MW
5. Main steam throttle flow at HP Inlet 1848.5 TPH
6. Main steam pressure to HP turbine inlet 167 kg/sq.cm
7. Main steam temperature. to HP turbine inlet 538°C
8. Re-heater steam flow at IP inlet 1587.942 TPH
9. Re-heater steam temperature. at IP inlet 538°C
10. Steam pressure at LP inlet 35.12 kg/sq.cm
11. Final feed water temperature 274.9°C
14. GENERATOR
14
An electrical generator is a
machine which converts
mechanical energy into
electrical energy through
electro mechanical energy
conversion.
The generator is driven by
directly coupled steam
turbine at a speed of 3000
rpm.
15. Generator specification
15
S. NO. PARAMETER RATING
1
Made By
CQ. GEAR BOX LTD.
CHINA
2 Apparent output 706 MVA
3 Active output 600 MW
4 Power factor 0.85 lagging
5 Rated voltage 22 KV
6 Rated current 18525 Amp
7 Rated speed 3000 r.p.m
8 Frequency 50 Hz
16. Cooling towers
• The two cooling towers of the
facility are 202 metres tall and the
tallest in the world.
• A cooling tower is a heat
rejection device which extracts
waste heat to the atmosphere
through the cooling of a water
steam to a lower temperature.
16
17. Electrostatic precipitator
17
ESP is mostly used for
removing the suspended
particles from the flue
gases.
Consists of two electrodes
• Emitting Electrode
• Collecting Electrode
The motor operated
hammer is used for
removed deposited
particles.
18. Ash Handling Plant
Electrostatic Precipitator is
used in ash handling plant to
remove fly ash.
Use of ash
• Manufacturing of building
materials.
• Making of concrete.
• Manufacturing of cement.
• Road construction etc.
18
19. TRANSFORMER
19
It is a device that transfers
electric energy from
one alternating-
current circuit to one or
more other circuits, either
increasing (stepping up) or
reducing (stepping down)
the voltage.
Various Transformers at
KaTPP
• Generating Transformer
• Unit Auxiliary
Transformer
• Station Transformer
20. SWITCHYARD
20
Switchyard is the interconnector between generation and
transmission and the same voltage is maintained in
switchyard.
Switch consists of the following instruments-
• Lightening Arresters
• Current Transformer
• Voltage Transformer
• Capacitive Voltage Transformer
• Bus Bar
• Isolators
• Insulators
• Circuit Breakers
• Protective Relays