General Intro
■ King Khalid International Airport ( ‫مطار‬‫الدولي‬ ‫خالد‬ ‫الملك‬ )
■ IATA: RUH
■ ICAO: OERK
■ It is located 35 kilometers north of Riyadh, Saudi Arabia,
■ Designed by the architectural firm HOK, and Arabian Bechtel Company Limited served as the construction
manager on behalf of the Saudi government.
■ The land area allocated for this airport is among the largest (second-largest, after King Fahd International
Airport) in the world.
■ The airport occupies an area of 375 square kilometers (93,000 acres).
■ This airport was an alternative landing site for NASA's Space Shuttle.
■ Riyadh’s King Khalid International Airport (KKIA) was ranked 11th in the world’s on-time performance
(OTP) star rating for large airports in 2018
History
■ King Khalid International Airport (KKIA) opened for operations in late 1983.
■ Early airport was opened in 1946 which is now Riyadh air base.
■ There are five main passenger terminals at the airport, four of them were built when the
airport started operation in November 1982, and terminal 5 was opened in 2016.
Administrative Body & Managemet
■ Owner : The Saudi general authority of civil aviation.(GACA)
■ Riyadh Airports Company is currently managing and operating King Khalid
International Airport.
■ Terminal 5 is Operated by Irish airport operator Dublin Airport Authority, it is Saudi's
first privately run airport terminal and can handle 12 million passengers per year.
KKIA
Geographical Details
■ It is located 35 kilometres (22 mi) north of Riyadh.
■ Latitude / Longitude: 24°57'27"N / 46°41'55"E
■ Elevation : 2049 ft
■ King Khaled Airport possesses one of the world’s tallest air control traffic towers. Standing 81m high.
■ most defining features is a mosque located in the centre of the passenger terminal. Capable of
accommodating 5,000 worshippers inside and another 5,000 in its outside plaza.
■ Also notable is the airport’s 500,000m² of landscaping, which includes more than 225,000 trees, vines,
shrubs and ground cover plants. All the plants selected for the site are tolerant to the region’s arid
climate.
■ Two large three-level garages have been constructed directly in front of the passenger terminals, one on
either side of the airport mosque. The design capacity of the garages is 11,600 vehicles.
Runways
RWY designation direction Dimensions of RWY Strength and surface of
RWY and
15L 150˚ Length 4205m (13,796ft)
Width 60m (200ft)
Asphalt
33R 330˚ Length 4205m (13,796ft)
Width 60m (200ft)
Asphalt
15R 150˚ Length 4205m (13,796ft)
Width 60m (200ft)
Asphalt
33L 330˚ Length 4205m (13,796ft)
Width 60m (200ft)
Asphalt
 2 parallel runways
 Runway shoulders 7.5 m (25 ft) x 2
 Runway paved blast pads 120 m (390 ft) x 2
Aprons andTaxiways
■ 8 aprons
■ 10 major taxiways
■ A,B,D,E,F,G,H,N,P,R,S &T
■ Taxiway width 23 m (75 ft)
■ Taxiway shoulders 13 m (43 ft) x 2
Terminals
■ There are five main passenger terminals at the airport
■ Each terminal has 8 gates
■ All terminals are a triangular shape structure except terminal 5.
■ Terminal 1 is used for all international flights
■ Terminal 2 is used by all international flights for SkyTeam members, including Saudia,
and Flynas.
■ Terminal 3 is closed for renovations. It was used to service all Saudia and Flynas
domestic flights until Terminal 5 was opened for operation.
■ Terminal 4 is unused, having never been utilized since construction, and remains without
air bridges. Now it is under development which will last for five years.
Terminals Contd..
■ Terminal 5 is the newest terminal opened in 2016, which is now used
by Saudia and Flynas for domestic flights.
■ Terminal 5 is a rectangular building which can serve 16 narrow-body or 8 wide-body
aircraft.
■ Terminal 5 is Operated by Irish airport operator Dublin Airport Authority, it is Saudi's
first privately run airport terminal and can handle 12 million passengers per year.
■ Royal Terminal
Heads of state and other high-ranking VIP visitors to the kingdom are greeted in the Royal Pavilion.
The Royal Pavilion has open spaces, garden areas, and fountains and ceremonial hall.
■ General Aviation Terminal
A general aviation complex has been constructed north of runway number 1 for use by private
aircraft and is reached by a special access road which runs north from the airport access highway. The
general aviation facility includes a passenger terminal, aircraft parking and maintenance
facilities, taxiways and parking for visitors.
■ Cargo Complex
Cargo terminal with 3 docking stations with loading / unloading facilities
Operations And Facilities
1 Fuel/oil types Jet A1, AVGAS 100 / 130 / Turbine / Turbo prop oil grades
available
2 Fuelling facilities/capacity Hydrants on the main aprons.
Browsers on General Aviation Apron.
For AVGAS fuel, request has to be made 3 hours in advance.
4 De-icing facilities NIL
5 Hangar space for visiting aircraft NIL
6 Repair facilities for visiting aircraft NIL
7 Restaurants Ample in various terminals
8 Transportation Bus, taxi and limousine
9 Medical facilities 36-bed hospital in aerodrome & First Aid clinic is
available at the terminal building
10 Fire fighting equipment index E or CAT 9
 KKIA undergo 24 hours operation
 40 airbridges
 2 remote parking areas (east /West)
■ Navigational Aids
ILS CAT 1 is installed on both runways
VORTAC
Vasi 3 bar (16units)
■ Approach Lighning System
Alsf II
Annual Pax Turnover
■ King Khaled International Airport has witnessed a steady increase in passengers during
the last decade. In 1998, it handled just more than eight million passengers and had
60,000 aircraft movements.
■ In 2017, 24.8 million passengers used the airport.
■ In 2018 ,26.6 million passengers used the airport with 215,000 aircraft movements.
Major Carriers
■ KKIA is the hub of SAUDIA & FLYNAS
■ A total of 53 airlines are operated
■ 5 cargo airlines including DHL & FEDx
Terminal 5 Carriers
Terminal 2 carriers
Terminal 1 carriers
Future Expansion
■ The airport will be linked with the city's new metro system, and the GACA has reached
an agreement with Riyadh Development Authority for the purpose. The metro system
will help passengers reach the city center quickly and comfortably. (85 percent
completed)
■ Opening of saudia executive terminal at terminal 3 by 2030
■ Expansion of terminal 3 and 4 to increase pax turnover from 25 to 40 million by 2038.
Accidents And Incidents
■ On 27 July 2010 at 11:38 local time, Lufthansa Cargo Flight 8460, an MD-11 registered
D-ALCQ, crashed upon landing at the airport and was damaged beyond repair in the
ensuing fire. The Pilot in command and the First Officer – the only two persons on board
– were uninjured
■ On 4 November 2017, a missile fired by Yemen rebels in response to the Saudi Arabian-
led intervention in Yemen was intercepted by Saudi Air Force near the airport. No
damage was reported, but passengers inside the airport's domestic terminal reacted to the
detonation
KKIA Airport Overview
KKIA Airport Overview

More Related Content

What's hot

What's hot (20)

Heathrow airport
Heathrow airportHeathrow airport
Heathrow airport
 
The History and Development of Aviation in the State of Kuwait
The History and Development of Aviation in the State of KuwaitThe History and Development of Aviation in the State of Kuwait
The History and Development of Aviation in the State of Kuwait
 
Airline industry III
Airline industry IIIAirline industry III
Airline industry III
 
Air industry ii
Air industry iiAir industry ii
Air industry ii
 
Costliest airlines in the world
Costliest airlines in the worldCostliest airlines in the world
Costliest airlines in the world
 
African market_Maritime business seminar on 24.11.2016
African market_Maritime business seminar on 24.11.2016African market_Maritime business seminar on 24.11.2016
African market_Maritime business seminar on 24.11.2016
 
IATA Cargo Data Backbone 2016-07-LinkedIn
IATA Cargo Data Backbone 2016-07-LinkedInIATA Cargo Data Backbone 2016-07-LinkedIn
IATA Cargo Data Backbone 2016-07-LinkedIn
 
AIRPORT SECURITY
AIRPORT SECURITYAIRPORT SECURITY
AIRPORT SECURITY
 
Moroccan port: Tangier Med
Moroccan port: Tangier MedMoroccan port: Tangier Med
Moroccan port: Tangier Med
 
Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)
 
GPA spaceport booklet digital version
GPA spaceport booklet digital versionGPA spaceport booklet digital version
GPA spaceport booklet digital version
 
Martinair
MartinairMartinair
Martinair
 
Dube trade port 360 brochure
Dube trade port 360 brochureDube trade port 360 brochure
Dube trade port 360 brochure
 
Business & General Aviation News.
Business & General Aviation News.Business & General Aviation News.
Business & General Aviation News.
 
Air transport- Sudhir Kiran
Air transport- Sudhir KiranAir transport- Sudhir Kiran
Air transport- Sudhir Kiran
 
cruise of miami
cruise of miamicruise of miami
cruise of miami
 
The concorde project
The concorde projectThe concorde project
The concorde project
 
Dube cargo terminal techknow facts
Dube cargo terminal techknow factsDube cargo terminal techknow facts
Dube cargo terminal techknow facts
 
Chittagong port
Chittagong portChittagong port
Chittagong port
 
Ryan air
Ryan airRyan air
Ryan air
 

Similar to KKIA Airport Overview

Jeddah airport case study
Jeddah airport case studyJeddah airport case study
Jeddah airport case studyAyman Aljahdali
 
JOHN F.KENNEDT INTERNATIONAL AIRPORT
JOHN F.KENNEDT INTERNATIONAL AIRPORTJOHN F.KENNEDT INTERNATIONAL AIRPORT
JOHN F.KENNEDT INTERNATIONAL AIRPORTmqasim786
 
Qatar airways presentation
Qatar airways presentationQatar airways presentation
Qatar airways presentationRaju Dong
 
Orlando international airport
Orlando international airportOrlando international airport
Orlando international airportirfan shafiq
 
Trivandrum international airport
Trivandrum international airportTrivandrum international airport
Trivandrum international airportHemanthKumar1450
 
1.introduction
1.introduction1.introduction
1.introductionMani Vel
 
Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)BME
 
New Islamabad International Airport
New Islamabad International AirportNew Islamabad International Airport
New Islamabad International AirportWisalHasnain
 
A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012
A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012
A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012Mary Montoya
 
Transferability of Chinese Human Resource Management Practices in Bangladesh:...
Transferability of Chinese Human Resource Management Practices in Bangladesh:...Transferability of Chinese Human Resource Management Practices in Bangladesh:...
Transferability of Chinese Human Resource Management Practices in Bangladesh:...FaisalWali
 
Airport Hangars And Aircraft Maintenance Operations
Airport Hangars And Aircraft Maintenance OperationsAirport Hangars And Aircraft Maintenance Operations
Airport Hangars And Aircraft Maintenance OperationsMichael Bseliss
 
Zhytomyr International Airport
Zhytomyr International Airport Zhytomyr International Airport
Zhytomyr International Airport Taras Strygunenko
 

Similar to KKIA Airport Overview (20)

Jeddah airport case study
Jeddah airport case studyJeddah airport case study
Jeddah airport case study
 
JOHN F.KENNEDT INTERNATIONAL AIRPORT
JOHN F.KENNEDT INTERNATIONAL AIRPORTJOHN F.KENNEDT INTERNATIONAL AIRPORT
JOHN F.KENNEDT INTERNATIONAL AIRPORT
 
Consignments March 2015
Consignments March 2015Consignments March 2015
Consignments March 2015
 
Emirates ppt
Emirates pptEmirates ppt
Emirates ppt
 
VKO Booklet En'15
VKO Booklet En'15VKO Booklet En'15
VKO Booklet En'15
 
Bangalore kochi airport
Bangalore kochi airportBangalore kochi airport
Bangalore kochi airport
 
UNIT-3.pptx
UNIT-3.pptxUNIT-3.pptx
UNIT-3.pptx
 
Qatar airways presentation
Qatar airways presentationQatar airways presentation
Qatar airways presentation
 
Orlando international airport
Orlando international airportOrlando international airport
Orlando international airport
 
Presentation1
Presentation1Presentation1
Presentation1
 
Trivandrum international airport
Trivandrum international airportTrivandrum international airport
Trivandrum international airport
 
Hamad international airport
Hamad international airportHamad international airport
Hamad international airport
 
1.introduction
1.introduction1.introduction
1.introduction
 
report
reportreport
report
 
Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)Istanbul New Airport (İstanbul Yeni Havalimanı)
Istanbul New Airport (İstanbul Yeni Havalimanı)
 
New Islamabad International Airport
New Islamabad International AirportNew Islamabad International Airport
New Islamabad International Airport
 
A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012
A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012
A T. BUSINESS MANAGEMENT REVIEW-December Edition 2012
 
Transferability of Chinese Human Resource Management Practices in Bangladesh:...
Transferability of Chinese Human Resource Management Practices in Bangladesh:...Transferability of Chinese Human Resource Management Practices in Bangladesh:...
Transferability of Chinese Human Resource Management Practices in Bangladesh:...
 
Airport Hangars And Aircraft Maintenance Operations
Airport Hangars And Aircraft Maintenance OperationsAirport Hangars And Aircraft Maintenance Operations
Airport Hangars And Aircraft Maintenance Operations
 
Zhytomyr International Airport
Zhytomyr International Airport Zhytomyr International Airport
Zhytomyr International Airport
 

Recently uploaded

100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptxAnupama Kate
 
Digi Khata Problem along complete plan.pptx
Digi Khata Problem along complete plan.pptxDigi Khata Problem along complete plan.pptx
Digi Khata Problem along complete plan.pptxTanveerAhmed817946
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service LucknowAminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknowmakika9823
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...soniya singh
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Callshivangimorya083
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubaihf8803863
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
Predicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project PresentationPredicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project PresentationBoston Institute of Analytics
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...Pooja Nehwal
 

Recently uploaded (20)

100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx
 
Digi Khata Problem along complete plan.pptx
Digi Khata Problem along complete plan.pptxDigi Khata Problem along complete plan.pptx
Digi Khata Problem along complete plan.pptx
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service LucknowAminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
Aminabad Call Girl Agent 9548273370 , Call Girls Service Lucknow
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
 
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
Predicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project PresentationPredicting Employee Churn: A Data-Driven Approach Project Presentation
Predicting Employee Churn: A Data-Driven Approach Project Presentation
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
 
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
 

KKIA Airport Overview

  • 1.
  • 2.
  • 3. Group Members G 2 ■ Muneeb Ul Haq ■ Ali Ahmed Bhatti ■ Zaid Maqsood ■ Gulzar Siddique
  • 4. General Intro ■ King Khalid International Airport ( ‫مطار‬‫الدولي‬ ‫خالد‬ ‫الملك‬ ) ■ IATA: RUH ■ ICAO: OERK ■ It is located 35 kilometers north of Riyadh, Saudi Arabia, ■ Designed by the architectural firm HOK, and Arabian Bechtel Company Limited served as the construction manager on behalf of the Saudi government. ■ The land area allocated for this airport is among the largest (second-largest, after King Fahd International Airport) in the world. ■ The airport occupies an area of 375 square kilometers (93,000 acres). ■ This airport was an alternative landing site for NASA's Space Shuttle. ■ Riyadh’s King Khalid International Airport (KKIA) was ranked 11th in the world’s on-time performance (OTP) star rating for large airports in 2018
  • 5. History ■ King Khalid International Airport (KKIA) opened for operations in late 1983. ■ Early airport was opened in 1946 which is now Riyadh air base. ■ There are five main passenger terminals at the airport, four of them were built when the airport started operation in November 1982, and terminal 5 was opened in 2016.
  • 6. Administrative Body & Managemet ■ Owner : The Saudi general authority of civil aviation.(GACA) ■ Riyadh Airports Company is currently managing and operating King Khalid International Airport. ■ Terminal 5 is Operated by Irish airport operator Dublin Airport Authority, it is Saudi's first privately run airport terminal and can handle 12 million passengers per year.
  • 8.
  • 9. Geographical Details ■ It is located 35 kilometres (22 mi) north of Riyadh. ■ Latitude / Longitude: 24°57'27"N / 46°41'55"E ■ Elevation : 2049 ft ■ King Khaled Airport possesses one of the world’s tallest air control traffic towers. Standing 81m high. ■ most defining features is a mosque located in the centre of the passenger terminal. Capable of accommodating 5,000 worshippers inside and another 5,000 in its outside plaza. ■ Also notable is the airport’s 500,000m² of landscaping, which includes more than 225,000 trees, vines, shrubs and ground cover plants. All the plants selected for the site are tolerant to the region’s arid climate. ■ Two large three-level garages have been constructed directly in front of the passenger terminals, one on either side of the airport mosque. The design capacity of the garages is 11,600 vehicles.
  • 10.
  • 11.
  • 12.
  • 13. Runways RWY designation direction Dimensions of RWY Strength and surface of RWY and 15L 150˚ Length 4205m (13,796ft) Width 60m (200ft) Asphalt 33R 330˚ Length 4205m (13,796ft) Width 60m (200ft) Asphalt 15R 150˚ Length 4205m (13,796ft) Width 60m (200ft) Asphalt 33L 330˚ Length 4205m (13,796ft) Width 60m (200ft) Asphalt  2 parallel runways  Runway shoulders 7.5 m (25 ft) x 2  Runway paved blast pads 120 m (390 ft) x 2
  • 14. Aprons andTaxiways ■ 8 aprons ■ 10 major taxiways ■ A,B,D,E,F,G,H,N,P,R,S &T ■ Taxiway width 23 m (75 ft) ■ Taxiway shoulders 13 m (43 ft) x 2
  • 15.
  • 16.
  • 17. Terminals ■ There are five main passenger terminals at the airport ■ Each terminal has 8 gates ■ All terminals are a triangular shape structure except terminal 5. ■ Terminal 1 is used for all international flights ■ Terminal 2 is used by all international flights for SkyTeam members, including Saudia, and Flynas. ■ Terminal 3 is closed for renovations. It was used to service all Saudia and Flynas domestic flights until Terminal 5 was opened for operation. ■ Terminal 4 is unused, having never been utilized since construction, and remains without air bridges. Now it is under development which will last for five years.
  • 18. Terminals Contd.. ■ Terminal 5 is the newest terminal opened in 2016, which is now used by Saudia and Flynas for domestic flights. ■ Terminal 5 is a rectangular building which can serve 16 narrow-body or 8 wide-body aircraft. ■ Terminal 5 is Operated by Irish airport operator Dublin Airport Authority, it is Saudi's first privately run airport terminal and can handle 12 million passengers per year.
  • 19.
  • 20. ■ Royal Terminal Heads of state and other high-ranking VIP visitors to the kingdom are greeted in the Royal Pavilion. The Royal Pavilion has open spaces, garden areas, and fountains and ceremonial hall. ■ General Aviation Terminal A general aviation complex has been constructed north of runway number 1 for use by private aircraft and is reached by a special access road which runs north from the airport access highway. The general aviation facility includes a passenger terminal, aircraft parking and maintenance facilities, taxiways and parking for visitors. ■ Cargo Complex Cargo terminal with 3 docking stations with loading / unloading facilities
  • 21. Operations And Facilities 1 Fuel/oil types Jet A1, AVGAS 100 / 130 / Turbine / Turbo prop oil grades available 2 Fuelling facilities/capacity Hydrants on the main aprons. Browsers on General Aviation Apron. For AVGAS fuel, request has to be made 3 hours in advance. 4 De-icing facilities NIL 5 Hangar space for visiting aircraft NIL 6 Repair facilities for visiting aircraft NIL 7 Restaurants Ample in various terminals 8 Transportation Bus, taxi and limousine 9 Medical facilities 36-bed hospital in aerodrome & First Aid clinic is available at the terminal building 10 Fire fighting equipment index E or CAT 9  KKIA undergo 24 hours operation  40 airbridges  2 remote parking areas (east /West)
  • 22. ■ Navigational Aids ILS CAT 1 is installed on both runways VORTAC Vasi 3 bar (16units) ■ Approach Lighning System Alsf II
  • 23. Annual Pax Turnover ■ King Khaled International Airport has witnessed a steady increase in passengers during the last decade. In 1998, it handled just more than eight million passengers and had 60,000 aircraft movements. ■ In 2017, 24.8 million passengers used the airport. ■ In 2018 ,26.6 million passengers used the airport with 215,000 aircraft movements.
  • 24. Major Carriers ■ KKIA is the hub of SAUDIA & FLYNAS ■ A total of 53 airlines are operated ■ 5 cargo airlines including DHL & FEDx
  • 28. Future Expansion ■ The airport will be linked with the city's new metro system, and the GACA has reached an agreement with Riyadh Development Authority for the purpose. The metro system will help passengers reach the city center quickly and comfortably. (85 percent completed) ■ Opening of saudia executive terminal at terminal 3 by 2030 ■ Expansion of terminal 3 and 4 to increase pax turnover from 25 to 40 million by 2038.
  • 29.
  • 30. Accidents And Incidents ■ On 27 July 2010 at 11:38 local time, Lufthansa Cargo Flight 8460, an MD-11 registered D-ALCQ, crashed upon landing at the airport and was damaged beyond repair in the ensuing fire. The Pilot in command and the First Officer – the only two persons on board – were uninjured ■ On 4 November 2017, a missile fired by Yemen rebels in response to the Saudi Arabian- led intervention in Yemen was intercepted by Saudi Air Force near the airport. No damage was reported, but passengers inside the airport's domestic terminal reacted to the detonation