Contents of site selection
The following consideration should be kept in mind when
deciding on the site for barrage.
1. Choose place of barrage
2.Width of river
3. Land approach
4.Bank of river
5. Earth condition
6. Central approach of river
7. Easy construct the canal
8. Material easily available
9. Select the site of head regulator
Choose the place of barrage
 Choose the place of barrage living near farmland you
may need to build more long canals for irrigation
Width of river
. Neither the width of the river barrage location be too
high or not too low
. In both these cases can causes damage to the river
barrage location.
. The first event river will collect the silt and otherwise
will harvest .
Land approach
 River flow should be straight on the barrage place
been right least 1.5 km. .
 To make a room for the barrage at both sides of the
river at the place where it should have
Bank of river
. The bank of river barrage on the location must be
strong and high visibility .
. Otherwise flood bank to make more high rise
Earth condition
 If I place the rocks in the river bottom it would be
better for the barrage construction and stability of
the barrage.
Central approach
 Larger way toward the middle of the river should be
the barrage.
Easy construct the canal
 Barrage place should add up the construction of a
large canal staged this easy
Availability of Material
 Should add up to a barrage of place where
construction materials are readily available.
Select the site of head regulator
 If you already have a flood canal system into account
when selecting the appropriate location head
regulator canals barrage.
Where two river matched
 If two rivers are matched to the barrage built on the
location of the matching suitable location far away
place to go barrage .
Consideration for site of
barrage:

For Good command along long feeder channels
 Width of river at site should preferably be minimum
 Good land approach
 Foundation consideration
 Existence of inundation canals - choice is limited if
want to convert them into permanent canal
 Easy diversion of river after construction
 Existence of central approach of river to barrage
after diversion.
Barrage width
 River in alluvial plains while in flood spread over
miles in width and in dry weather flow in channels.
Site selection of barrage

More Related Content

What's hot

Flood estimation
Flood estimation Flood estimation
Flood estimation RAJ BAIRWA
 
River morphology as_the_science_of_sustainability
River morphology as_the_science_of_sustainabilityRiver morphology as_the_science_of_sustainability
River morphology as_the_science_of_sustainabilityErik Mosselman
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel studyroidghozi
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningRamanuj Jaldhari
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillwayssaibabu48
 
Dams arvind gupta-12march13 (2)
Dams   arvind gupta-12march13 (2)Dams   arvind gupta-12march13 (2)
Dams arvind gupta-12march13 (2)Arvind Gupta
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure Kiran Jadhav
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Denish Jangid
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fslAditya Mistry
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 

What's hot (20)

Flood estimation
Flood estimation Flood estimation
Flood estimation
 
River morphology as_the_science_of_sustainability
River morphology as_the_science_of_sustainabilityRiver morphology as_the_science_of_sustainability
River morphology as_the_science_of_sustainability
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel study
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillways
 
Methods of Irrigation
Methods of IrrigationMethods of Irrigation
Methods of Irrigation
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Dams arvind gupta-12march13 (2)
Dams   arvind gupta-12march13 (2)Dams   arvind gupta-12march13 (2)
Dams arvind gupta-12march13 (2)
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Reservoir
ReservoirReservoir
Reservoir
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
 
Canal of design
Canal of designCanal of design
Canal of design
 

Similar to Site selection of barrage

Bandhara Irrigation 1to8.pptx
Bandhara Irrigation 1to8.pptxBandhara Irrigation 1to8.pptx
Bandhara Irrigation 1to8.pptxPushkar866863
 
Components and Layout
Components and LayoutComponents and Layout
Components and LayoutAtoDoping
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.kaustubhpetare
 
MINOR AND MICRO IRRIGATION.pdf
MINOR AND MICRO IRRIGATION.pdfMINOR AND MICRO IRRIGATION.pdf
MINOR AND MICRO IRRIGATION.pdfAMRUTA JARE
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworksJimit Shah
 
DRAINAGE-.pptx
DRAINAGE-.pptxDRAINAGE-.pptx
DRAINAGE-.pptxMood Naik
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage workEddy Ankit Gangani
 
WREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemWREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemMitaliShelke
 
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantagesabdqadeer
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636saibabu48
 

Similar to Site selection of barrage (20)

Bandhara Irrigation 1to8.pptx
Bandhara Irrigation 1to8.pptxBandhara Irrigation 1to8.pptx
Bandhara Irrigation 1to8.pptx
 
Components and Layout
Components and LayoutComponents and Layout
Components and Layout
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
 
MINOR AND MICRO IRRIGATION.pdf
MINOR AND MICRO IRRIGATION.pdfMINOR AND MICRO IRRIGATION.pdf
MINOR AND MICRO IRRIGATION.pdf
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Dams
DamsDams
Dams
 
DRAINAGE-.pptx
DRAINAGE-.pptxDRAINAGE-.pptx
DRAINAGE-.pptx
 
Grassed water ways
Grassed water waysGrassed water ways
Grassed water ways
 
Grassed waterway.pptx
Grassed waterway.pptxGrassed waterway.pptx
Grassed waterway.pptx
 
Iv2616901694
Iv2616901694Iv2616901694
Iv2616901694
 
minor and micro irrigation
 minor and micro irrigation minor and micro irrigation
minor and micro irrigation
 
Storage works
Storage worksStorage works
Storage works
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
WREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemWREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution system
 
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
 
Module-5.pptx
Module-5.pptxModule-5.pptx
Module-5.pptx
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636
 

Recently uploaded

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Site selection of barrage

  • 1.
  • 2. Contents of site selection The following consideration should be kept in mind when deciding on the site for barrage. 1. Choose place of barrage 2.Width of river 3. Land approach 4.Bank of river 5. Earth condition 6. Central approach of river 7. Easy construct the canal 8. Material easily available 9. Select the site of head regulator
  • 3. Choose the place of barrage  Choose the place of barrage living near farmland you may need to build more long canals for irrigation
  • 4. Width of river . Neither the width of the river barrage location be too high or not too low . In both these cases can causes damage to the river barrage location. . The first event river will collect the silt and otherwise will harvest .
  • 5. Land approach  River flow should be straight on the barrage place been right least 1.5 km. .  To make a room for the barrage at both sides of the river at the place where it should have
  • 6. Bank of river . The bank of river barrage on the location must be strong and high visibility . . Otherwise flood bank to make more high rise
  • 7. Earth condition  If I place the rocks in the river bottom it would be better for the barrage construction and stability of the barrage.
  • 8. Central approach  Larger way toward the middle of the river should be the barrage.
  • 9. Easy construct the canal  Barrage place should add up the construction of a large canal staged this easy
  • 10. Availability of Material  Should add up to a barrage of place where construction materials are readily available.
  • 11. Select the site of head regulator  If you already have a flood canal system into account when selecting the appropriate location head regulator canals barrage.
  • 12. Where two river matched  If two rivers are matched to the barrage built on the location of the matching suitable location far away place to go barrage .
  • 13.
  • 14. Consideration for site of barrage:  For Good command along long feeder channels  Width of river at site should preferably be minimum  Good land approach  Foundation consideration  Existence of inundation canals - choice is limited if want to convert them into permanent canal  Easy diversion of river after construction  Existence of central approach of river to barrage after diversion.
  • 15. Barrage width  River in alluvial plains while in flood spread over miles in width and in dry weather flow in channels.