EMERGENCY
A MAJOR EMERGENCY OCCURING AT A WORKS IS ONE THAT MAY
AFFECT SEVERAL DEPARTMENTS WITHIN IT AND/ OR MAY CAUSE
SERIOUS INJURIES, LOSS OF LIFE , EXTENSIVE DAMAGE TO PROPERTY
OR SERIOUS DISRUPTION OUTSIDE THE WORKS.
CAUSES :
1. NORMALLY DUE TO MAL FUNCTION OF THE NORMAL OPERATION.
2. INTERVENTION OF OUTSIDE AGENCY
a) FLOODING
b) CRASHED AIR CRAFT
c) ARSON OR SABOTAGE
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
1A/9
A PLANT WITH HAZARDOUS OPERATION/PROCESS MAY LEAD TO
MAJOR ACCIDENT WITH DISASTROUS CONSEQUENCE IN SPITE OF
BEST SAFETY MEASURES.
CD/SAFETY.TRG/02
MAJOR ACCIDENT RESULTS FROM UNCONTROLLED DEVELOPMENT
IN INDUSTRIAL ACTIVITIES CAUSING.
•SERIOUS BODILY INJURY
•LOSS OF LIFE
•EXTENSIVE DAMAGE TO PROPERTY
•ADVERSE EFFECT ON ENVIRONMENT
•DISRUPTION INSIDE AND OUTSIDE THE PLANT
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
2/9
CAUSES OF DISASTER
CD/SAFETY.TRG/02
•TOXIC RELEASE
•MAJOR FIRE/ EXPLOSION
•RADIATION LEAKS.
•EARTHQUAKE
•FLOOD
•AIRCRAFT CRASH
•ARSON / SABOTAGE
SEVERITY OF DISASTROUS EFFECT CAN BE REDUCED BY
PRE DISASTER PLANNING CALLED EMERGENCY
PLANNING.
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
3/9
ON- SITE EMERGENCY PLANNING
WHY REQUIRED :-
1. TO CONTROL THE DAMAGE AND LOSS OF LIFE & PROPERTY IN
CASE OF A MAJOR ACCIDENT.
2. TO FULFIL THE STATUTORY OBLIGATION
THE FACTORIES ACT, 1948, SEC41(B) (4)
EVERY OCCUPIER SHALL, WITH THE APPROVAL OF THE CHIEF
INSPECTOR , DRAW UPAN ON -SITE EMERGENCY PLAN AND
DETAILED DISASTER CONTROL MEASURES FOR HIS FACTORY AND
MAKE KNOWN TO THE WORKERS EMPLOYED THEREIN AND TO
THE GENERAL PUBLIC LIVING IN THE VICINITYOF THE FACTORY
,THE SAFETY MEASURES REQUIRED TO BE TAKEN IN THE EVENT
OF THE ACCIDENT TAKING PLACE.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
4/9
BASIC AND ESSENTIAL FEATURES
1. IDENTIFICATION AND ASSESEMENT OF RISK
• HAZARD ANALYSIS
• HAZOP
PROBABILITY OF OCCURRENCE OF
• MAJOR FIRE / EXPLOSION
• COLLAPSING OF BUILDING / STRUCTURES
• RELEASE OF TOXIC SUBSTANCES etc.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
5/9
2. EFFECTIVE COMMUNICATION AND CO- ORDINATION
• DECLARATION OF EMERGENCY AND RAISING OF ALARM
ALARM SHOULD BE AUDIBLE FROM ALL LOCATIONS
ALARM SHOULD BE CLEARLY INDICATING THE EMERGENCY
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
6/9
3. APPOINTEMENT OF KEY PERSONNEL
(WITH SPECIFIC DUTIES AND RESPONSIBILITIES)
a) WORKS INCIDENT CONTROLLER
• ASSESS THE SITUATION TO DECIDE WHETHER MAJOR EMERGENCY
EXISTS OR LIKELY TO DEVELOP.
• INITIATES EMERGENCY PROCEDURES.
• INFORMS WORKS MAIN CONTROLLER.
• ASSUMES RESPONSIBILITY OF WORKS MAIN CONTROLLER UNTIL HE
ARRIVES.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
7/9
WORKS MAIN CONTROLLER
• SELECTED FROM SENIOR MOST TECHNICAL PERSONS.
•AUTHOTISED TO ACTIVATE MAJOR EMERGENCY PROCEDURESS.
• CO- ORDINATES , DIRECTS & GUIDES PLANT AND OUTSIDE
EMERGENCY SERVICES.
• LIASE WITH RESCUE AUTHRITIES, MEDICAL TEAM, FIRE
BRIGADE, POLICE AND OTHER LOCAL AUTHORITIES.
• CONTROLS TRAFFIC MOVEMENT AND REHABILITATION OF
AFFECTED PEOPLE.
• ISSUES STATEMENT TO PRESS , RADIO, TV etc.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
8/9
4. OTHER KEY PERSONNEL
• PLAY KEY ROLE IN ADVISING AND IMPLEMENTING
DECISIONS OF WORKS MAIN CONTROLLER.
• SENIOR PERSONS FROM - PRODUCTION
-ENGINEERING
- PERSONNEL
- SAFETY/ SECURITY
- LABORATORY
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
9/9
5. EMERGENCY CONTROL CENTRE
- SUITABLY LOCATED AND ADEQUATELY EQUIPPED WITH
•RELEVANT DATA(MSDS etc)
• EQUIPMENTS -PPEs etc.
• EFFECTIVE MEANS OF COMMUNICATION
TELEPHONE, WIRELESS, WALKIE TALKIE, MESSANGERS.
• CONTACT ADDRESS / TELEPHONE NOS. OF SENIOR
EXECUTIVES , KEY PERSONNEL(CALL OUT LIST )
•PLAN SHOWING QUANTITIES AND LOCATION OF HAZARDOUS
MATERAL/AREA, SAFE AREA FOR EVACUATION.
• INFORMATION ON ANTIDOTES FOR HAZARDOUS
CHEMICALS.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
10/
EMERGENCY PLAN FOR CHANDA WORKS
EXPECTED EMERGENCIES :
1.
2.
3.
4.
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
11/
EMERGENCY PLAN FOR CHANDA WORKS
RAISING OF ALARM :
1.WHO CAN RAISE THE ALRM ?
2.WHERE ALL THE ALARM SWITCHES WILL BE
LOCATED ?
3.HOW THE ALARM WILL DISTINGUISH BETWEEN
TYPES OF EMERGENCIES ?
4.WHERE WILL THE ALARMS BE LOCATED ?
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
12/
APPOINTMENT OF KEY PERSONNEL
1. WORKS INCIDENT CONTROLLER ?
2. WORKS MAIN CONTROLLER ?
3. OTHER KEY PERSONNEL ?
A) RUNNERS
B) FIRST AIDERS
C) FIRE FIGHTERS
D) CORDONING TEAM
E) SECURITY
F) TRAFFIC CONTROLLING TEAM
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
13/
EMERGENCY CONTROL CENTRE
1. WHERE IT SHOULD BE LOCATED ?
2. HOW MANY ECC SHOULD BE THERE ?
3. EQUIPMENTS INSIDE THE ECC
a) TEL NOS. OF EMERGENCY SERVICES
b)TEL NOS. OF KEY PERSONNELS.
C) LIST OF ALL RESCUE TEAM MEMBERS
d ) INFORMATION ON ANTIDOTES
e ) WIRELESS/ WALKIE-TALKIE

More Related Content

Similar to emergency plan.ppt

Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Helmy ismail
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipmentsSelva Prakash
 
Environment & Industrial disasters
Environment & Industrial disastersEnvironment & Industrial disasters
Environment & Industrial disastersAnkur Sharma
 
Industrial safety.
Industrial safety.Industrial safety.
Industrial safety.psc2015
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safetypsc2015
 
FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)Austin McFarland
 
Hazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites saferHazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites saferSangeeta Phadke
 
Site Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSite Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSchneider Electric
 
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.ScienceTec & CorrTec-Engineering
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jancapstonerx
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Tata communications io t solutions_ehs_v2.0
Tata communications  io t solutions_ehs_v2.0Tata communications  io t solutions_ehs_v2.0
Tata communications io t solutions_ehs_v2.0e1torres
 

Similar to emergency plan.ppt (20)

Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
Environment & Industrial disasters
Environment & Industrial disastersEnvironment & Industrial disasters
Environment & Industrial disasters
 
Industrial safety.
Industrial safety.Industrial safety.
Industrial safety.
 
K-Y call
K-Y callK-Y call
K-Y call
 
Challenging Environment In Asia Requires Emergency Response
Challenging Environment In Asia Requires Emergency ResponseChallenging Environment In Asia Requires Emergency Response
Challenging Environment In Asia Requires Emergency Response
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
The AART Way of Hazard Reporting
The AART Way of Hazard ReportingThe AART Way of Hazard Reporting
The AART Way of Hazard Reporting
 
Triage
TriageTriage
Triage
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)
 
Presentation1
Presentation1Presentation1
Presentation1
 
Hazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites saferHazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites safer
 
Site Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSite Selection for Mission Critical Facilities
Site Selection for Mission Critical Facilities
 
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jan
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates
 
Tata communications io t solutions_ehs_v2.0
Tata communications  io t solutions_ehs_v2.0Tata communications  io t solutions_ehs_v2.0
Tata communications io t solutions_ehs_v2.0
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

emergency plan.ppt

  • 1. EMERGENCY PLANNING ACC-CHANDA --SAFETY CD/SAFETY.TRG/02 1/9 EMERGENCY A MAJOR EMERGENCY OCCURING AT A WORKS IS ONE THAT MAY AFFECT SEVERAL DEPARTMENTS WITHIN IT AND/ OR MAY CAUSE SERIOUS INJURIES, LOSS OF LIFE , EXTENSIVE DAMAGE TO PROPERTY OR SERIOUS DISRUPTION OUTSIDE THE WORKS. CAUSES : 1. NORMALLY DUE TO MAL FUNCTION OF THE NORMAL OPERATION. 2. INTERVENTION OF OUTSIDE AGENCY a) FLOODING b) CRASHED AIR CRAFT c) ARSON OR SABOTAGE
  • 2. EMERGENCY PLANNING ACC-CHANDA --SAFETY 1A/9 A PLANT WITH HAZARDOUS OPERATION/PROCESS MAY LEAD TO MAJOR ACCIDENT WITH DISASTROUS CONSEQUENCE IN SPITE OF BEST SAFETY MEASURES. CD/SAFETY.TRG/02 MAJOR ACCIDENT RESULTS FROM UNCONTROLLED DEVELOPMENT IN INDUSTRIAL ACTIVITIES CAUSING. •SERIOUS BODILY INJURY •LOSS OF LIFE •EXTENSIVE DAMAGE TO PROPERTY •ADVERSE EFFECT ON ENVIRONMENT •DISRUPTION INSIDE AND OUTSIDE THE PLANT
  • 3. EMERGENCY PLANNING ACC-CHANDA --SAFETY 2/9 CAUSES OF DISASTER CD/SAFETY.TRG/02 •TOXIC RELEASE •MAJOR FIRE/ EXPLOSION •RADIATION LEAKS. •EARTHQUAKE •FLOOD •AIRCRAFT CRASH •ARSON / SABOTAGE SEVERITY OF DISASTROUS EFFECT CAN BE REDUCED BY PRE DISASTER PLANNING CALLED EMERGENCY PLANNING.
  • 4. EMERGENCY PLANNING ACC-CHANDA --SAFETY 3/9 ON- SITE EMERGENCY PLANNING WHY REQUIRED :- 1. TO CONTROL THE DAMAGE AND LOSS OF LIFE & PROPERTY IN CASE OF A MAJOR ACCIDENT. 2. TO FULFIL THE STATUTORY OBLIGATION THE FACTORIES ACT, 1948, SEC41(B) (4) EVERY OCCUPIER SHALL, WITH THE APPROVAL OF THE CHIEF INSPECTOR , DRAW UPAN ON -SITE EMERGENCY PLAN AND DETAILED DISASTER CONTROL MEASURES FOR HIS FACTORY AND MAKE KNOWN TO THE WORKERS EMPLOYED THEREIN AND TO THE GENERAL PUBLIC LIVING IN THE VICINITYOF THE FACTORY ,THE SAFETY MEASURES REQUIRED TO BE TAKEN IN THE EVENT OF THE ACCIDENT TAKING PLACE. CD/SAFETY.TRG/02
  • 5. EMERGENCY PLANNING ACC-CHANDA --SAFETY 4/9 BASIC AND ESSENTIAL FEATURES 1. IDENTIFICATION AND ASSESEMENT OF RISK • HAZARD ANALYSIS • HAZOP PROBABILITY OF OCCURRENCE OF • MAJOR FIRE / EXPLOSION • COLLAPSING OF BUILDING / STRUCTURES • RELEASE OF TOXIC SUBSTANCES etc. CD/SAFETY.TRG/02
  • 6. EMERGENCY PLANNING ACC-CHANDA --SAFETY 5/9 2. EFFECTIVE COMMUNICATION AND CO- ORDINATION • DECLARATION OF EMERGENCY AND RAISING OF ALARM ALARM SHOULD BE AUDIBLE FROM ALL LOCATIONS ALARM SHOULD BE CLEARLY INDICATING THE EMERGENCY CD/SAFETY.TRG/02
  • 7. EMERGENCY PLANNING ACC-CHANDA --SAFETY 6/9 3. APPOINTEMENT OF KEY PERSONNEL (WITH SPECIFIC DUTIES AND RESPONSIBILITIES) a) WORKS INCIDENT CONTROLLER • ASSESS THE SITUATION TO DECIDE WHETHER MAJOR EMERGENCY EXISTS OR LIKELY TO DEVELOP. • INITIATES EMERGENCY PROCEDURES. • INFORMS WORKS MAIN CONTROLLER. • ASSUMES RESPONSIBILITY OF WORKS MAIN CONTROLLER UNTIL HE ARRIVES. CD/SAFETY.TRG/02
  • 8. EMERGENCY PLANNING ACC-CHANDA --SAFETY 7/9 WORKS MAIN CONTROLLER • SELECTED FROM SENIOR MOST TECHNICAL PERSONS. •AUTHOTISED TO ACTIVATE MAJOR EMERGENCY PROCEDURESS. • CO- ORDINATES , DIRECTS & GUIDES PLANT AND OUTSIDE EMERGENCY SERVICES. • LIASE WITH RESCUE AUTHRITIES, MEDICAL TEAM, FIRE BRIGADE, POLICE AND OTHER LOCAL AUTHORITIES. • CONTROLS TRAFFIC MOVEMENT AND REHABILITATION OF AFFECTED PEOPLE. • ISSUES STATEMENT TO PRESS , RADIO, TV etc. CD/SAFETY.TRG/02
  • 9. EMERGENCY PLANNING ACC-CHANDA --SAFETY 8/9 4. OTHER KEY PERSONNEL • PLAY KEY ROLE IN ADVISING AND IMPLEMENTING DECISIONS OF WORKS MAIN CONTROLLER. • SENIOR PERSONS FROM - PRODUCTION -ENGINEERING - PERSONNEL - SAFETY/ SECURITY - LABORATORY CD/SAFETY.TRG/02
  • 10. EMERGENCY PLANNING ACC-CHANDA --SAFETY 9/9 5. EMERGENCY CONTROL CENTRE - SUITABLY LOCATED AND ADEQUATELY EQUIPPED WITH •RELEVANT DATA(MSDS etc) • EQUIPMENTS -PPEs etc. • EFFECTIVE MEANS OF COMMUNICATION TELEPHONE, WIRELESS, WALKIE TALKIE, MESSANGERS. • CONTACT ADDRESS / TELEPHONE NOS. OF SENIOR EXECUTIVES , KEY PERSONNEL(CALL OUT LIST ) •PLAN SHOWING QUANTITIES AND LOCATION OF HAZARDOUS MATERAL/AREA, SAFE AREA FOR EVACUATION. • INFORMATION ON ANTIDOTES FOR HAZARDOUS CHEMICALS. CD/SAFETY.TRG/02
  • 11. EMERGENCY PLANNING ACC-CHANDA --SAFETY 10/ EMERGENCY PLAN FOR CHANDA WORKS EXPECTED EMERGENCIES : 1. 2. 3. 4.
  • 12. EMERGENCY PLANNING ACC-CHANDA --SAFETY 11/ EMERGENCY PLAN FOR CHANDA WORKS RAISING OF ALARM : 1.WHO CAN RAISE THE ALRM ? 2.WHERE ALL THE ALARM SWITCHES WILL BE LOCATED ? 3.HOW THE ALARM WILL DISTINGUISH BETWEEN TYPES OF EMERGENCIES ? 4.WHERE WILL THE ALARMS BE LOCATED ?
  • 13. EMERGENCY PLANNING ACC-CHANDA --SAFETY 12/ APPOINTMENT OF KEY PERSONNEL 1. WORKS INCIDENT CONTROLLER ? 2. WORKS MAIN CONTROLLER ? 3. OTHER KEY PERSONNEL ? A) RUNNERS B) FIRST AIDERS C) FIRE FIGHTERS D) CORDONING TEAM E) SECURITY F) TRAFFIC CONTROLLING TEAM
  • 14. EMERGENCY PLANNING ACC-CHANDA --SAFETY 13/ EMERGENCY CONTROL CENTRE 1. WHERE IT SHOULD BE LOCATED ? 2. HOW MANY ECC SHOULD BE THERE ? 3. EQUIPMENTS INSIDE THE ECC a) TEL NOS. OF EMERGENCY SERVICES b)TEL NOS. OF KEY PERSONNELS. C) LIST OF ALL RESCUE TEAM MEMBERS d ) INFORMATION ON ANTIDOTES e ) WIRELESS/ WALKIE-TALKIE