SlideShare a Scribd company logo
1 of 19
RETAIL GYM LIBRARY &TUTORING COUNCILING WORSHIP
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/16/2013 3:01:33 AM
1 : 100
A
A ISSUED FOR DA. COVER SHEET
A00
AM
P01 03/06/13
03/06/13
Drawing List
Sheet Number Sheet Name Sheet Issue Date Revision Drawn By Checked By
A00 COVER SHEET 03/06/13 B AM AM
A01 CONTEXT PLAN 03/06/13 A AM AM
A02 CONTEXT PLAN WITH ANALYSIS 03/06/13 A AM AM
A03 EXISTING GROUND FLOOR PLAN 03/06/13 A AM AM
A04 EXISTING FIRST & SECOND FLOOR PLANS 03/06/13 A AM AM
A05 EXISTING EAST & WEST ELEVATIONS 03/06/13 A AM AM
A06 EXISTING NORTH & SOUTH ELEVATIONS 03/06/13 A AM AM
A07 EXISTING SECTION A - A 03/06/13 A AM AM
A08 PROPOSED PLANS 1 13/06/13 B AM AM
A09 PROPOSED PLANS 2 13/06/13 B AM AM
A10 PROPOSED PLANS 3 13/06/13 B AM AM
A11 PROPOSED EAST & WEST ELEVATIONS 03/06/13 A AM AM
A12 PROPOSED NORTH & SOUTH ELEVATIONS 03/06/13 A AM AM
A13 PROPOSED SECTIONS 13/06/13 B AM AM
A14 AREA ANALYSIS 13/06/13 B AM AM
A15 STREET VIEW ANALYSIS 03/06/13 A AM AM
A16 STREET ELEVATION ANALYSIS 03/06/13 A AM AM
A17 DRIVEWAY DETAIL 03/06/13 A AM AM
A18 SHADOW DIAGRAM 06/02/13 A AM AM
SITE LOCATION
LAKEMBA
TRAIN STATION
LAKEMBA LIBRARY
& SENIOR CITIZEN
CENTRE
SHOPS
SHOPS SHOPS
PUBLIC PARKING
HOLLY SPIRIT
COLLEGE
N
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 3:56:56 PM
As indicated
A
A ISSUED FOR DA. CONTEXT PLAN
A01
AM
P01 03/06/13
03/06/13
1 : 1000
1
Context Plan
NORTHWESTERLY
WINTERWIND
TEMPERATE
SOUTHEASTERLY
BREEZE
VIEW CORRIDOR
TO CANTERBURY
ROAD
VIEW CORRIDOR
TO LAKEMBA
TRAIN STATION
N
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 3:57:57 PM
As indicated
A
A REVISED FLOOR PLANS. CONTEXT PLAN WITH
ANALYSIS
A02
AM
P01 03/06/13
03/06/13
1 : 500
1
Context Plan With Analysis
NORTH
W
EST
EAST
UP
UP
UP
UP
SHOP"NETWORKVIDEO"
SINGLESTOREY
BRICKSHOPSANDGYM
THREESTOREY
42.000
4 2.000
42.000
43.000
43.000
43.000
42
66 42
39
42
46
41
88
42
11
42
57
43
11
42
73
42
48
42
52
42
69
42
18
42
00
41
77
41
90
41
90
41
92
41
92
41
91
42
18
42
22
41
95
42
10
42
12
41
94
42
02
42
15
43
30
42
86
42
76
42
55
43
15
43
79
43
78
43
56
42
97
42
9643
20
43
07
42
90
42
78
43
29
43
04
42
72
43
10
43
12
43
00
42
45
48
31
48
38
44
79
52
06
52
07
48
38
47
94
45
23
42
66
41
85 41
88
42
43
42
38
42
12
42
11
41
94
41
87
56
19
51
25 77
45
83
42
33
43
00
42
96
44
21
44
3
43
53
43
53
44
99
44
58
44
47
44
67
44
36
44
24
44
79
44
03
44
42
44
85
44
18
43
53
43
68
43
94
43
66
44
43
44
61
44
64
44
32
44
16
47
84
44.36
1 5 . 2 4
44.36
1 5 . 2 4
AWNING
AWNING
VC
BRICK
GARAGE
TWOBRICK
TOILETS
BRICKWALL
BRICKWALL
METALSTEPS
KERBANDGUTTER
COVERED
PIT
CONCRETEPATH CONCRETEPATH
POLEPOLE
POLEPOLE
POLE
POLEPOLE
PRAM
CROSSING
PCNO PARKING
SEWER
BDYTRAP
INSPECTION
POINT
SEWER
VENT
SEAT
METAL
STEPSSTEPS
METAL
AWNING
AWNING
AWNING
TEL
PIT
LAMP
POLE
W
ATER
PATH
AWNINGBALCONY
PAVEDPATHWAY
BUILDINGABOVE
NO.130
NO.138
NO.132-136
BM
RL
INKERB
97A.HD
INSPECTION
POINT
LOT1INDP124861
LOT13INDP668872
676.6m2
DPAREA
U/SGUT48.14
D
RO
O
F
GRATE
BALCONY
G
AR.
MONITORING
PIT
PARAPET
D/S
D/S
D/SD/S
D/S
D/S
D/S
D/S
LAN
D
IN
G
LAN
D
IN
G
LAN
D
IN
G
LAN
D
IN
G
RAISED
CONCRETEAREA
U/SGUT51.19
D/S
O
O
F
R
O
O
F
STEPS
STEPS
SINGLESTOREY
RAISED
CONCRETEAREASEWER
VENT
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
A C D
15240
5190 4850 5200
600 3640 950 4850 860 3740 600
260
3480 500 6740 500 3500 260
14720
1
46050705705540490564049053605005090470
29670
4705570
4320 470 5220 470 4240
55804805590470537046056904705560
46050604905650490559049054004905550
480 4260
240 3360 490 6610 500 3280 240
470 4280
470 5240 480 4260
5590
14720
600 3640 5800 860 3740 600
10040 5200
15240
SHOP 1
(BUTCHER)
SHOP 2
(WESTERN UNION)
SHOP 4
(INDIAN GROCERY)
SHOP 3
(BURAQ GROCERY)
STAIRS
SHOP 5
(WOMEN CLOTHS)
SHOP 7
(SPICES)
RL. 43.300 m
RL. 44.160 m
RL. 44.580 m
RL. 44.610 m RL. 44.640 m
RL. 44.430 m
RL. 44.320 m
RL. 43.940 m
RL. 43.940 m
RL. 43.680 mRL. 43.680 m
RL. 43.880 m
RL. 44.110 m
SHOP 6
(GROCERY)
SHOP 8
(LEBANESE GROCERY)
SHOP 8
(LEBANESE GROCERY)
PROFILE OF ARCADE OVER
A06 1
A05
2
A05
1
2
3
4
5
6
A062
PROFILE OF AWNING OVER
TWO BRICK TOILETS
COVEREDPIT
SEAT
RAISEDCONCRETEAREAS
DAVIDSON LANE
HALDON STREET
FIRESTAIRCASE
FIRE STAIRCASE TO LEVEL 2
8
7
B
6000817063606030613058605810
30190
A C D
1
A06 1
A05
2
A05
1
2
3
4
5
6
A062
15240
5190 4850 5200
600 3640 5800 860 3740 600
3480 500 6740 500 3500
14720
46050705705540490564049053605005090470
29670
4705570
4320 470 5220 470 4240
55804805590470537046056904705560
46050604905650490559049054004905550
480 4260
240 3360 490 6610 500 3280 240
470 4280
470 5240 480 4260
5590
14720
600 3640 5800 860 3740 600
10040 5200
15240
SHOP 1
(BUTCHER)
SHOP 2
(WESTERN UNION)
SHOP 4
(INDIAN GROCERY)
SHOP 3
(BURAQ GROCERY)
STAIRS
SHOP 5
(WOMEN CLOTHS)
SHOP 7
(SPICES)
RL. 43.300 m
RL. 44.160 m
RL. 44.580 m
RL. 44.610 m RL. 44.640 m
RL. 44.430 m
RL. 44.320 m
RL. 43.940 m
RL. 43.940 m
RL. 43.680 mRL. 43.680 m
RL. 43.880 m
RL. 44.110 m
SHOP 6
(GROCERY)
SHOP 8
(LEBANESE GROCERY)
SHOP 8
(LEBANESE GROCERY)
PROFILE OF ARCADE OVER
TWO BRICK TOILETS
COVEREDPIT
SEAT
RAISEDCONCRETEAREAS
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
DAVIDSON LANE
HALDON STREET
8
7
B
6000817063606030613058605810
30190
N
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 3:59:45 PM
1 : 100
A
A ISSUED FOR DA. EXISTING GROUND FLOOR
PLAN
A03
AM
P01 03/06/13
03/06/13
1 : 100
1
Ground Floor-Existing
1 : 100
2
Ground Floor-Existing (Survey)
UP
UP UP
A C D
1
46550855003850110140049056404901610110217011015405705070460
29670
465508549054004903230110225049056504905060460
29670
4320 470 5220 470 4240
558048055904702770110249046056904705560
5570
480 4260
470 4280
2810 470 5240 480 4260
5590
1300 110
FEMALE TOILETS
MALE TOILETS
STAIRS
OFFICE
STORE
GYM
FIREEGRESS
GYM
PASSAGE
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
A06 1
A05
2
A05
1
2
3
4
5
6
A062
DAVIDSON LANE
HALDON STREET
15240
5190 4850 5200
260
14720
260
240 3360 490 6610 500 3280 240
14720
5190 4850 5200
15240
930 880100 1660 1075 2500 1050 2500 1050 2500 995
1000 2500 1080 2500 1080 2500 1080 2500 1000
ARCADE PROFILE
AWNING PROFILE
FIRE STAIRCASE
FIRESTAIRCASE
8
7
B
6000817063606030613058605810
30190
A C D
1
A06 1
A05
2
A05
1
2
3
4
5
6
A062
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
DAVIDSON LANE
HALDON STREET
FIRE STAIRCASE
STAIRS
WORSHIP PLACE
(To Be Confirmed Later)
29950
29890
15240
5190 4850 5200
260
14720
260
150
14940
150
5190 4850 5200
15240
1000 2500 1080 2500 1080 2500 1080 2500 1000
23952602985570554049011501103080110119049053605005085465
239526029754905650490559049054004905085465
1000 5000 1130 980 1130 5000 1000
8
7
B
6000817063606030613058605810
30190
N
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:00:45 PM
1 : 100
A
A ISSUED FOR DA. EXISTING FIRST & SECOND
FLOOR PLANS
A04
AM
P01 03/06/13
03/06/13
1 : 100
1
Level 1-Existing
1 : 100
2
Level 2-Existing
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
ACD
NO. 126A
NO. 140
132-136
NO. 142-144
NO. 128
374037802900
10420
VOID
BOUNDARY
BOUNDARY
HALDON STREET
B
519048505200
15240
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
A C D
BOUNDARY
NO. 126A
NO. 140
132-136
NO. 142-144
NO. 128
290037803740
BOUNDARY
VOID
10420
DAVIDSON LANE
B
5190 4850 5200
15240
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:02:05 PM
1 : 100
A
A ISSUED FOR DA. EXISTING EAST & WEST
ELEVATIONS
A05
AM
P01 03/06/13
03/06/13
1 : 100
1
East Elevation - Existing
1 : 100
2
West Elevation - Existing
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
1 2 3 4 5 6 8
132-136
BOUNDARY
BOUNDARY
NO. 126A
290037803740
10420
HALDON STREET
DAVIDSON LANE
7
5810 5860 6130 6030 6360 8170 6000
44360
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
1234568
132-136
BOUNDARY
BOUNDARY
290037803740
10420
NO. 140
HALDON STREET
DAVIDSON LANE
7
6000 8170 6360 6030 6130 5860 5810
44360
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:10:25 PM
1 : 100
A
A ISSUED FOR DA. EXISTING NORTH & SOUTH
ELEVATIONS
A06
AM
P01 03/06/13
03/06/13
1 : 100
1
North Elevation - Existing
1 : 100
2
South Elevation - Existing
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
1
482020035802002700200
234568
700104201280
WORSHIP PLACE
GYMGYM
RL. 52.100 m
RL. 48.320 m
RL. 44.580 m
RL. 44.160 m
RL. 43.530 m
RL. 43.300 m
RL. 44.610 mRL. 44.430 m
RL. 44.110 m
RL. 43.940 m
RL. 43.730 m
132-136
BOUNDARY
BOUNDARY
HALDON STREET
DAVIDSON LANE
7
6000 8170 6360 6030 6130 5860 5810
44360
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:11:43 PM
1 : 100
A
A ISSUED FOR DA. EXISTING SECTION A - A
A07
AM
P01 03/06/13
03/06/13
1 : 100
1
Section A - A - Existing
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
GARAGE DOOR
STAIR-01
383606000
STAIR -02
DRIVEWAY
FHR
LANDSCAPE LANDSCAPE
02b
BICYCLE/BIKE
PARKINGSPACE
12 CAR SPACES
LOUVRES
1
A13
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
SETBACK LIMIT @ 6m
STAIR -03
1660
15240
305
25002400240002500270
500 4435 500 4355 500 4450 500
1100 1750 1640
230
1400
110020001450
LIFT3
200
1200650065006500650065004200
100037100
260
6mSLOPE@1:15
1100 2000 3020
15240
RL. 41.580 m
38360
FHR
GreyBollardswith
30%luminance
01
02
03
04
11
12
10
SHARED AREA
BD
BD
BD
BD
GreyBollardswith
30%luminance
TactileIndicators
06
07
200
149525002500250025001000
09
08
01b
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
6380 230 8630
6510 5600 3130
4380 2000 230 5500
120
2880
130
03b
GARAGE DOOR LOUVREOPENING
6720
200
60 5400 6720 2600 60
200
48001200
260
2250
230
2250
230
10375
230
4550
230
2300
230
2300
230
116951000
200 2310
230
2920 6720 2600 60200
38360
7
6000817063606030613058605810
5190 4850 5200
RL. 41.980 m
RL. 41.580 m
LOTNO.126A
LOTNO.140
B
1
A17
BD
BD
BD
05
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
LOBBY
area: 64.6 sqm
STAIR-01
STAIR -02
UNISEX
TOILET
ACCESSIBLE
TOILET
KITCHENETTE
OFFICE
area: 26.20 sqm
FOOTPATH
1
A13
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
LIFT3
2730
500 4435 500 2925
230
1200 500 4450 500
ACCESSTODAVIDSONLANE
10012595
230
2300
230
2300
230
4550
230
2000
110
2290
110
5865
230
2250
230
2250
260
6000
STAIR-03
SETBACK LIMIT @ 6m
FHR
FHR
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
7
RL. 44.580 m
RL. 44.580 m
RETAIL SHOP NO:1
area:38.2 sqm
RETAIL SHOP NO:2
area:36.2 sqm
RETAIL SHOP NO:3
area:30.6 sqm
RETAIL SHOP NO:4
area:39.6 sqm
383606000
15240
383606000
5190 4850 5200
B
6000817063606030613058605810
LOTNO.126A
LOTNO.140
RETAIL SHOP NO:5
area:44.5 sqm
STORAGE
area:45.4 sqm
260
1080 2400 1195
230
3285
50
6480
260
4675
1000
3120 1555 230 4175 230 5410
1100 2250 1140
230
1400 230
1100 1750
21203175
15240
4980 4360 5900
260
2850 1640
230
1400
230
2730
230
5410
260
260
6870
110
6105
110
4730
110
5590
110
5900100
1000
3000
110
1565
1100225012001085
25
1180
110
870
110
2345
110
2250
230
2195
COFFEEBAR
area:8.7sqm
2480
3500
FHR
Room
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
MALE TOILET
FEMALE TOILET
ACCESSIBLE
TOILET
STAIR-01
STAIR -02
BALCONY
area: 45.45 sqm
BALCONY
area: 8 sqm
1
A13
411044360
245
260
1640
260
5470560
110
2045
110
2000
230
2300
230
2300
230
4550
230
2300
110
5485
230
2250
230
2250
260
110022501200920
25
1355
SETBACK LIMIT @ 6m
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
FHR
FHR
GYM SPACE
area: 372.82 sqm
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
7
B
RL. 48.320 m
LOTNO.126A
LOTNO.140
4110383606000
15240
5190 4850 5200
60006030613058605810
15240
BALCONY
area: 8 sqm
BALCONY
area: 8 sqm
5185 10055
500 4435 500 675 3000 680 500 675 3100 675 500
260 14720 260
1100 2250 1140 230
1100 2250 260
260
3610 1475 4545
400
4550
140
260
5003615
2140260
2140
PROFILE OF FLOWERBED OVER
800 900
25
815 2090
110
3000 110 1520
1100
25
920
800 900
25
1005 1900
110
2620 2120
LOBBY
area:18.15sqm
N
EXISTING WALLS & SLABS
NEW BRICK WALLS
NEW CONCRETE FACE
NEW CONCRETE WALLS & SLABS
NEW CONCRETE FACE WITH
TILED FINISH
GENERAL LEGEND
NEW LANDSCAPE AREA
NEW TIMBER PERGOLA & SCREEN
NEW TOILETS PARTITION
EXISTING WALLS
EXISTING CONCRETE SLABS
& COLUMNS
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:12:45 PM
1 : 100
B
B REVISED FLOOR PLANS. PROPOSED PLANS 1
A08
AM
P01 13/06/13
13/06/13
1 : 100
1
Basement 1
1 : 100
2
Ground Floor-Retail
1 : 100
3
Level 1-GYM
N
EXISTING WALLS & SLABS
NEW BRICK WALLS
NEW CONCRETE FACE
NEW CONCRETE WALLS & SLABS
NEW CONCRETE FACE WITH
TILED FINISH
GENERAL LEGEND
NEW LANDSCAPE AREA
NEW TIMBER PERGOLA & SCREEN
NEW TOILETS PARTITION
EXISTING WALLS
EXISTING CONCRETE SLABS
& COLUMNS
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
ASSEMBLY ROOM
area:95.60 sqm
MALE TOILET
FEMALE TOILET
ACCESSIBLE
TOILET
SHOESSTORAGE
WASHING
FACILITIES
STAIR-01
STAIR -02
WORSHIP PLACE
area: 202.40 sqm
QIBLA DIRECTION: 277.78º
LOBBY
area:35.36sqm
1
A13
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
SETBACK LIMIT @ 6m
1100 2250 1280
FHR
FHR
BALCONY
area: 34.60 sqm
LANDSCAPELANDSCAPE
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
7
B
BALCONY
area: 8 sqm
BALCONY
area: 8 sqm
BALCONY
area: 8 sqm
260 14720 260
500 670 3100 665 500 625 3100 630 500 675 3100 675 500
5190 4850 5200
15240
600038360
817063606030613058605810
2140
260
4445
110
3430
110
2200
230
2300
230
2300
230
120022501100
230
2000
110
2200
110
3475
230
2250
260
14306702860
15240
5190 4850 5200
260 14720 260
3610 1475 4545 400 4550 140
9980
383606000
28606702475
260
3050
10725
964011061702602140
4601685
LOTNO.126A
LOTNO.140
RL. 52.100 m
LANDSCAPE area :4.62 sqm
5601190
25
900800
11351135920
2250 230 2500
3000 110 1870
1135
800900
25
1145560
SHOESSTORAGE
3240
110
1630
WASHING
FACILITIES
1135920
4401705
1740 2395 110 7125
4135
17254125
9630
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
MALE TOILET
FEMALE TOILET
ACCESSIBLE
TOILET
STAIR-01
BALCONY
area: 39.80 sqm
BALCONY
area: 50.63 sqm
LOBBY
area:16.25sqm
LANDSCAPE
area: 4.6 sqm
1
A13
SETBACK LIMIT @ 6m
FHR
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
15003500
260
3170
110
2045
110
2000
230
2300
230
2300
230
4550
230
3485
110
2360
260
27056701045
LANDSCAPELANDSCAPE LANDSCAPE area :4.62 sqm
110022501200800900
25
1200560
383606000
15003500
260
5370
110
10070
110
7800
260
2705670
383606000
STORAGE
area: 8.68 sqm
ADMINISTRATION / OFFICES
area: 61.70 sqm
COUNCELING
area: 101.60 sqm
LIBRARY
area: 85.25 sqm
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
7
B
LANDSCAPE
area: 4.53 sqm
LANDSCAPE
area: 4.6 sqm
15240
5190 4850 5200
500 4435 500 4355 500 4450 500
260
240
4265 670 4355 500 4450
240
260
4520 110 10090
817063606030613058605810
2250 230 1200 110
15240
5190 4850 5200
260
14720
260
5175 4355 500 4450
240
14720
LOTNO.126A
LOTNO.140
RL. 55.000 m
PROFILE OF PERGOLA OVER
PROFILE OF BALCONY OVER
2250
230
2040
3000
110
1410
920 1135 1575
560
110
1100
25
920
800 900
25
785110 1900
3680
2510 2120 10090
27602610
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
MALE TOILET
FEMALE TOILET
ACCESSIBLE
TOILET
TUTORING
area: 216.86 sqm
STAIR-01
BALCONY
area: 42.3 sqm
BALCONY
area: 10 sqm
1
A13
RL. 58.600 m
500 1110 2220 1125 485 4355 500 1115 2225 1115 500
4960 5300 4975
15240
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
SETBACK LIMIT @ 6m
1355
25
9201500
60009380261302850
1500
2150
260
19805
260
2985670
28502613093806000
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
7
B
LOBBY
area:14.57sqm
5190 4850 5200
260
4310 110 10300
260
LANDSCAPELANDSCAPE LANDSCAPE area : 4.62 sqm
6000817063606030613058605810
6702985
260
2300
230
4550
230
2300
230
2300
230
2000
110
2045
110
5602610
260
21502850
15240
5190 4850 5200
260
5175 4355
500
4450
240
260
4310
110
10300
PROFILE OF SUNSHADE OVERPROFILE OF SUNSHADE OVER
PROFILE OF PERGOLA OVER
FHR
110022501200
800 900
25
685 1900
2250
230
1830
3000 110 1200
1100
25
920
800 900
25
685 1900
110
2300 2120
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 5:41:53 PM
1 : 100
B
B REVISED FLOOR PLANS. PROPOSED PLANS 2
A09
AM
P01 13/06/13
13/06/13
1 : 100
1
Level 2-Worship
1 : 100
2
Level 3-Library
1 : 100
3
Level 4-Tutoring
A11
1
A122
A11
2
A12 1
2
A13
LIFT1
LIFT2
STAIR-01
1
A13
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
RL. 62.200 m
A C D
1
2
3
4
5
6
DAVIDSON LANE
HALDON STREET
8
7
B
110022501200
6701890
230
4550
230
2300
230
2300
230
768510609503000
2250 230
15240
5190 4850 5200
260
4680
180
5000
185
4680
260
19030223303000
6000817063606030613058605810
15240
5190 4850 5200
260 2480 12240 260
ROOF
LANDSCAPELANDSCAPE LANDSCAPE area : 4.62 sqm
EXISTING WALLS & SLABS
NEW BRICK WALLS
NEW CONCRETE FACE
NEW CONCRETE WALLS & SLABS
NEW CONCRETE FACE WITH
TILED FINISH
GENERAL LEGEND
NEW LANDSCAPE AREA
NEW TIMBER PERGOLA & SCREEN
NEW TOILETS PARTITION
EXISTING WALLS
EXISTING CONCRETE SLABS
& COLUMNS
N
A11
1
A122
A11
2
A12 1
2
A13
1
A13
A C D
1
2
3
4
5
6
8
7
B
LIFT1
LIFT2
STAIR-01
RL. 62.200 m
670
1890
230
4550
230
2300
230
2300
230
768510609503000
2250 230
15240
5190 4850 5200
260
4680
180
5000
185
4680
260
19030223303000
6000817063606030613058605810
15240
5190 4850 5200
260 2480 1640 2130 5600 2870 260
ROOF
LANDSCAPELANDSCAPE
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
DAVIDSON LANE
HALDON STREET
DRIVEWAY
LANDSCAPE LANDSCAPE
6mSLOPE@1:14
BALCONY
LANDSCAPELANDSCAPE LANDSCAPE
LANDSCAPELANDSCAPE LANDSCAPE
LANDSCAPELANDSCAPE LANDSCAPE
LANDSCAPE
LANDSCAPELANDSCAPE LANDSCAPE
BALCONY
BALCONY
BALCONY
BALCONY
1
A17
RL. 63.600 m
RL. 63.600 m
RL. 64.700 m
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:14:59 PM
1 : 100
B
B REVISED FLOOR PLANS. PROPOSED PLANS 3
A10
AM
P01 13/06/13
13/06/13
1 : 100
1
Roof Level
1 : 100
2
Site Plan
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
RL
Level 4
58.600
RL
Roof Level
62.200
NO. 126A
NO. 140
132-136NO. 142-144
NO. 128
37403780290036003600
104207200
17620
ACD B
15240
518048505200
34405002500580
300
130016001300160038020001820
300
13501350
220
30010001800800
BOUNDARY
BOUNDARY
O
PEN
IN
G
HALDON STREET
RL
Ground Floor
44.580
RL
Level 1
48.320
BOUNDARY
RL
Level 2
52.100
RL
Level 3
55.000
RL
Level 4
58.600
RL
Roof Level
62.200
RL
Basement 1
41.580
NO. 126A
NO. 140
132-136 NO. 142-144
NO. 128
360036002900378037403000
196201000
BOUNDARY
A C DB
11460
520048505180
7200119001520
OPENING
17001000900270090027002002700108027001040170010008002400
PARKING DOOR
4006004006004004008001200600
3508501700400375300510002700
DAVIDSON LANE
EXISTING WALLS & SLABS
NEW BRICK WALLS
NEW CONCRETE FACE
NEW CONCRETE WALLS & SLABS
NEW CONCRETE FACE WITH
TILED FINISH
GENERAL LEGEND
NEW LANDSCAPE AREA
NEW TIMBER PERGOLA & SCREEN
NEW TOILETS PARTITION
EXISTING WALLS
EXISTING CONCRETE SLABS
& COLUMNS
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:29:07 PM
1 : 100
A
A ISSUED FOR DA. PROPOSED EAST & WEST
ELEVATIONS
A11
AM
P01 03/06/13
03/06/13
1 : 100
1
EAST ELEV
1 : 100
2
WEST ELEV
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
RL
Level 4
58.600
RL
Roof Level
62.200
RL
Basement 1
41.580
1 2 3 4 5 6 87
BOUNDARY
BOUNDARY
45.00°
DAVIDSON LANE
1800
6m SLOPE @ 1 : 14
SETBACK@6m
19601347578049401800600
3340176203000
36003600290037803740
955135080028002500724014402840
300
5001320200019801100
180
160
500
300
300
HALDON STREET
LOT NO. 126A
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
RL
Level 4
58.600
RL
Roof Level
62.200
RL
Basement 1
41.580
1234568 7
BOUNDARY
BOUNDARY
45.00°
DAVIDSON LANE
SETBACK@6m
HALDON STREET
LOT NO. 140
1800
20001346080049601780600
3370176203000
1070230580028002500724014402840
36003600290037803740
300182020001980
180
160
500
300
300
6m SLOPE @ 1 : 14
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:48:50 PM
1 : 100
A
A ISSUED FOR DA. PROPOSED NORTH &
SOUTH ELEVATIONS
A12
AM
P01 03/06/13
03/06/13
1 : 100
1
NORTH ELEV
1 : 100
2
SOUTH ELEV
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
RL
Level 4
58.600
RL
Roof Level
62.200
RL
Basement 1
41.580
2700360036002900378037403000
3340176203000
1234568 7
K=17620
J=7200I=10420
H=3140
EXISTING
E=3540
EXISTING
C=3580
EXISTING
C=2700
NEW
C=3400
NEW
C=3400
B = 2140
B = 2140
B = 3500
L = 5000
1000260010002600100019001000200078010006740
RETAIL
PARKING
GYM
WORSHIP
LIBRARY
TUTORING
HALDON
STREET
45.00°
DAVIDSON
LANE
BOUNDARY
BOUNDARY
AWNING
1800
6m SLOPE @ 1 : 15
SETBACK@6m
6000 7030
RL
Ground Floor
44.580
RL
Level 1
48.320
RL
Level 2
52.100
RL
Level 3
55.000
RL
Level 4
58.600
RL
Roof Level
62.200
RL
Basement 1
41.580
J=7200I=10420
360036002900378037403000
AWNING
K=17620
1 2 3 4 5 6 87
RETAIL
PARKING
GYM
WORSHIP
LIBRARY
TUTORING
HALDON
STREET
45.00°
DAVIDSON
LANE
BOUNDARY
BOUNDARY
1800
6m SLOPE @ 1 : 15
SETBACK@6m
H=3440
EXISTING
E=3540
EXISTING
C=3580
EXISTING
C=2700
NEW
C=3400
NEW
C=3400
B = 2140
B = 2140
B = 3500
L = 5000
3370176203000
100026001000260010001900100019808007740
60012001000
60007030
EXISTING WALLS & SLABS
NEW BRICK WALLS
NEW CONCRETE FACE
NEW CONCRETE WALLS & SLABS
NEW CONCRETE FACE WITH
TILED FINISH
GENERAL LEGEND
NEW LANDSCAPE AREA
NEW TIMBER PERGOLA & SCREEN
NEW TOILETS PARTITION
EXISTING WALLS
EXISTING CONCRETE SLABS
& COLUMNS
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:50:28 PM
1 : 100
B
B REVISED FLOOR PLANS. PROPOSED SECTIONS
A13
AM
P01 13/06/13
13/06/13
1 : 100
1
Section B -B
1 : 100
2
Section C - C
N
192.84
RETAIL
AREA ANALYSIS
AMENITIES
CIRCULATION
COFFEE BAR
OFFICES
RETAIL
STORAGE
234.18
CIRCULATION
30.07
AMENITIES
28.08
OFFICES
45.91
STORAGE
LIFT1
LIFT2
STAIR-01
STAIR -02
LIFT3
STAIR -03
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
SETBACK LIMIT @ 6m
DAVIDSON LANE
HALDON STREET
28.27
COFFEEBAR
376.00
COMMERCIAL
AREA ANALYSIS
AMENITIES
BALCONY
CIRCULATION
COMMERCIAL
14.38
AMENITIES
43.43
CIRCULATION
20.87
CIRCULATION
32.34
BALCONY
49.58
BALCONY
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
SETBACK LIMIT @ 6m
LIFT1
LIFT2
STAIR-01
STAIR -02
DAVIDSON LANE
HALDON STREET
21.25
AMENITIES
204.23
WORSHIP PLACE
AREA ANALYSIS
AMENITIES
BALCONY
CIRCULATION
LANDSCAPE
OFFICES
WORSHIP PLACE
60.94
CIRCULATION
41.78
AMENITIES
10.79
CIRCULATION
96.30
OFFICES
27.92
BALCONY
36.77
BALCONY
SETBACK LIMIT @ 6m
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
9.86
LANDSCAPE
LIFT1
LIFT2
STAIR-01
STAIR -02
DAVIDSON LANE
HALDON STREET
26.59
AMENITIES
103.28
COUNCELING
AREA ANALYSIS
AMENITIES
BALCONY
CIRCULATION
COUNCELING
LANDSCAPE
LIBRARY
OFFICES
STORAGE
41.19
CIRCULATION
16.09
AMENITIES
54.46
BALCONY
43.64
BALCONY
SETBACK LIMIT @ 6m
LIFT1
LIFT2
STAIR-01
5.28
LANDSCAPE
5.17
LANDSCAPE
5.29
LANDSCAPE
9.87
LANDSCAPE
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
69.56
OFFICES
9.01
STORAGE
86.27
LIBRARY
DAVIDSON LANE
HALDON STREET
20.77
AMENITIES
AREA ANALYSIS
AMENITIES
BALCONY
CIRCULATION
LANDSCAPE
TUTORING
217.99
TUTORING
39.49
CIRCULATION
14.08
AMENITIES
49.45
BALCONY
12.77
BALCONY
SETBACK LIMIT @ 6m
LIFT1
LIFT2
STAIR-01
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
6.48
LANDSCAPE
DAVIDSON LANE
HALDON STREET
19.88
AMENITIES
34.05
LANDSCAPE
16.99
LANDSCAPE
36.27
DRIVEWAY
479.42
CARPARKING
AREA ANALYSIS
CARPARKING
CIRCULATION
DRIVEWAY
LANDSCAPE
52.52
CIRCULATION
30.50
CIRCULATION
GARAGE DOOR
BOUNDARY (15.24m)
BOUNDARY (15.24m)
BOUNDARY(44.36m)
BOUNDARY(44.36m)
12 CAR SPACES
LIFT1
LIFT2
STAIR-01
STAIR -02
LIFT3
STAIR -03
SETBACK LIMIT @ 6m
DAVIDSON LANE
HALDON STREET
02b
BICYCLE/BIKE
PARKINGSPACE
01
02
03
04
05
11
12
10
SHARED AREA
06
07
09
08
01b
03b
Area Schedule
Name Area Ratio
AMENITIES 204.89 7%
BALCONY 306.93 10%
CARPARKING 479.42 15%
CIRCULATION 533.90 17%
COFFEE BAR 28.27 1%
COMMERCIAL 376.00 12%
COUNCELING 103.28 3%
DRIVEWAY 36.27 1%
LANDSCAPE 92.99 3%
LIBRARY 86.27 3%
OFFICES 193.94 6%
RETAIL 192.84 6%
STORAGE 54.93 2%
TUTORING 217.99 7%
WORSHIP PLACE 204.23 7%
Grand total 3112.14 100%
TOTAL LAND AREA ~ 647 SQM
TOTAL BUILDING AREA = 2504 QM = 3.87:1 FSR
PARKING AREA = 480 SQM (1 LEVEL)
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 4:54:42 PM
As indicated
B
B REVISED FLOOR PLANS. AREA ANALYSIS
A14
AM
P01 13/06/13
13/06/13
1 : 200
1
Ground Floor
1 : 200
2
Level 1-Commercial
1 : 200
3
Level 2-Worship
1 : 200
4
Level 3-Library
1 : 200
5
Level 4-Tutoring
1 : 200
6
Basement 1
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 5:13:09 PM
A
A ISSUED FOR DA. STREET VIEW ANALYSIS
A15
AM
P01 03/06/13
03/06/13
5
Street View - 1 ( Proposed )
6
Street View - 2 ( Proposed )
APPROVED-DA-142-144 HALDON STREET
APPROVED-DA-142-144 HALDON STREET
1
Street View - 1 ( Existing )
2
Street View - 2 ( Existing )
APPROVED-DA-142-144 HALDON STREET
APPROVED-DA-142-144 HALDON STREET
AWNING IS LEVELED WITH EXISTING
SLAB LEVELS ALIGNED WITH EXISTING AND
APROVED ADJACENT DEVELOPMENTS
BASE LEVEL ALIGNED WITH ADJACENT
APROVED DEVELOPMENTS
NO. 126A (EXISTING)
NO. 140 (EXISTING)
132-136 (PROPOSED)
NO. 142-144 ( APROVED)
NO. 128 (EXISTING)
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 5:15:36 PM
1 : 100
A
A ISSUED FOR DA. STREET ELEVATION
ANALYSIS
A16
AM
P01 03/06/13
03/06/13
VIEW FROM HALDON STREET
TOWARDS LAKEMBA TRAIN STATION
HALDON STREET EXISTING STREET ELEVATIONS
VIEW FROM HALDON STREET
TOWARDS CANTERBURY ROAD
DAVIDSON LANE EXISTING STREET ELEVATION
1 : 100
1
Elevation Analysis
RL
Basement 1
41.580
87
6000
FOOTPATH RL 41.980
400
20 200 20
3.81°
600
150150
450
6M SLOPE @ 1:15
STREET RL 41.830
200
50
200mm CONCRETE SLAB OVER 50mm SAND WITH CDP INSULATION
RAIN WATER DRAIN (to
hydrolic engineer's details)
420 200 200
200200
to public rain water sewer
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 5:17:36 PM
1 : 20
A
A ISSUED FOR DA. DRIVEWAY DETAIL
A17
AM
P01 03/06/13
03/06/13
1 : 20
1
Driveway Detail
DAVIDSONLANE
HALDONSTREET
AWNING
NO. 126A
NO. 140
132-136
NO. 142-144
NO. 128
DAVIDSONLANE
HALDONSTREET
PARKING
LIFT1
LIFT2
STAIR-02
DAVIDSONLANE
HALDONSTREET
AWNING
NO. 126A
NO. 140
132-136
NO. 142-144
NO. 128
HALDONSTREET
PARKING
LIFT1
LIFT2
STAIR-02
LIFT1
LIFT2
STAIR-02
DAVIDSONLANE
HALDONSTREET
AWNING
NO. 126A
NO. 140
132-136
NO. 142-144
NO. 128
HALDONSTREET
PARKING
N
PRELIMINARY ISSUE ONLY
Plot Date:
1:100 @ A1
Issue:
Project NO:
Drawing NO
Date
Scale:Drawn by:
Client:
Project:
DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL
DETAILS MUST MEET SITE CONDITIONS, RELEVANT
AUTHORITIES AND APPLICABLE BUILDING STANDARDS.
* Use written dimensions only. Do not scale from drawing.
* Contractors shall confirm all dimensions on-site prior to
comencing any work or making any shop drawings.
* All materials to be used in accordance with the
manufacturer's specifications and instructions, and shall
comply withrelevant Australian Standards.
* Copyright of this drawing and design remain the
property of MHANNA DESIGNYagoona NSW 2199
E: ymohanna@bigpond.net.au M:+61 405376059
T: +61 2 97933031
F: +61 2 8078 6652
91 Saltash Street
Drawing Title:
NORTHProject Managers:
Tel: 02 9725 4644
Fax:02 9609 2677
Email: lui.guidone@northwestgroup.org
6/15/2013 5:30:04 PM
As indicated
SHADOW DIAGRAM
A18
AM
P01 06/02/13
06/02/13
1 : 500
1
Shadow - 21 June - 9AM 1 : 500
2
Shadow - 21 June - 12AM
1 : 500
3
Shadow - 21 June - 3PM

More Related Content

Viewers also liked

Sulaymaniah Central Park
Sulaymaniah Central ParkSulaymaniah Central Park
Sulaymaniah Central ParkMike Darwich
 
Stockland District Centre S
Stockland District Centre SStockland District Centre S
Stockland District Centre SMike Darwich
 
NORWEST HOUSING PROJECT
NORWEST HOUSING PROJECTNORWEST HOUSING PROJECT
NORWEST HOUSING PROJECTMike Darwich
 
1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA sMike Darwich
 
Kooindah Waters, Goldcoast
Kooindah Waters, GoldcoastKooindah Waters, Goldcoast
Kooindah Waters, GoldcoastMike Darwich
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA sMike Darwich
 
5 TIVOLI AVENUE ROSE BAY s
5 TIVOLI AVENUE ROSE BAY s5 TIVOLI AVENUE ROSE BAY s
5 TIVOLI AVENUE ROSE BAY sMike Darwich
 
2-Senior Housing (RVT)S
2-Senior Housing (RVT)S2-Senior Housing (RVT)S
2-Senior Housing (RVT)SMike Darwich
 
Kanye west front_cover_deconstruction
Kanye west front_cover_deconstructionKanye west front_cover_deconstruction
Kanye west front_cover_deconstructionShane Oakes
 
CEO-023-領導新趨勢-僕人領導
CEO-023-領導新趨勢-僕人領導CEO-023-領導新趨勢-僕人領導
CEO-023-領導新趨勢-僕人領導handbook
 
Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...
Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...
Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...Instituto Observatório Social
 
Mid Level Production Engineer with 4 yrs Experience
Mid Level Production Engineer with 4 yrs ExperienceMid Level Production Engineer with 4 yrs Experience
Mid Level Production Engineer with 4 yrs ExperienceKarthik M
 
Certificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges Duarte
Certificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges DuarteCertificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges Duarte
Certificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges DuarteAna Rita Duarte
 

Viewers also liked (20)

Sulaymaniah Central Park
Sulaymaniah Central ParkSulaymaniah Central Park
Sulaymaniah Central Park
 
Stockland District Centre S
Stockland District Centre SStockland District Centre S
Stockland District Centre S
 
Masters s
Masters sMasters s
Masters s
 
NORWEST HOUSING PROJECT
NORWEST HOUSING PROJECTNORWEST HOUSING PROJECT
NORWEST HOUSING PROJECT
 
1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s
 
Tchicobo Hotel
Tchicobo HotelTchicobo Hotel
Tchicobo Hotel
 
Kooindah Waters, Goldcoast
Kooindah Waters, GoldcoastKooindah Waters, Goldcoast
Kooindah Waters, Goldcoast
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s
 
ITCC Hotel s
ITCC Hotel sITCC Hotel s
ITCC Hotel s
 
5 TIVOLI AVENUE ROSE BAY s
5 TIVOLI AVENUE ROSE BAY s5 TIVOLI AVENUE ROSE BAY s
5 TIVOLI AVENUE ROSE BAY s
 
2-Senior Housing (RVT)S
2-Senior Housing (RVT)S2-Senior Housing (RVT)S
2-Senior Housing (RVT)S
 
on-blue
on-blueon-blue
on-blue
 
Kanye west front_cover_deconstruction
Kanye west front_cover_deconstructionKanye west front_cover_deconstruction
Kanye west front_cover_deconstruction
 
CEO-023-領導新趨勢-僕人領導
CEO-023-領導新趨勢-僕人領導CEO-023-領導新趨勢-僕人領導
CEO-023-領導新趨勢-僕人領導
 
Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...
Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...
Perfil de trabalhadores e trabalhadoras do Setor Energético do estado de São ...
 
Mid Level Production Engineer with 4 yrs Experience
Mid Level Production Engineer with 4 yrs ExperienceMid Level Production Engineer with 4 yrs Experience
Mid Level Production Engineer with 4 yrs Experience
 
La sangre
La sangreLa sangre
La sangre
 
Certificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges Duarte
Certificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges DuarteCertificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges Duarte
Certificado MODA LISBOA - THE TIMERS 2015 - Ana Rita Borges Duarte
 
Vorlon.js
Vorlon.jsVorlon.js
Vorlon.js
 
Tecnologías de información y comunicación
Tecnologías de información y comunicaciónTecnologías de información y comunicación
Tecnologías de información y comunicación
 

Similar to Haldon Street Centre

Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016Salma Mahgoub
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,NIZAM ISMAIL
 
Haatso Residential Constuction Drawings.pdf
Haatso Residential Constuction Drawings.pdfHaatso Residential Constuction Drawings.pdf
Haatso Residential Constuction Drawings.pdfGabochie Design
 
ZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdfZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdfGabochie Design
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5Campus
 
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund MumbaiContractorbhai.com
 
Mr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroomMr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroomContractorbhai.com
 
inte building 1-Elev 1
inte building 1-Elev 1inte building 1-Elev 1
inte building 1-Elev 1Shane Maguire
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGary Randall
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020David Renn
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation Kailyn Lee
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation Shze Hwa Lee
 
Conscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochure
Conscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochureConscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochure
Conscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochureAshwani Kumar
 

Similar to Haldon Street Centre (20)

Guilford Centre
Guilford CentreGuilford Centre
Guilford Centre
 
My drawings
My drawingsMy drawings
My drawings
 
Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016Salma Mahgoub Portfolio.pdf Dec 2016
Salma Mahgoub Portfolio.pdf Dec 2016
 
LD-EL-01 @ issue B
LD-EL-01 @ issue BLD-EL-01 @ issue B
LD-EL-01 @ issue B
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
 
Haatso Residential Constuction Drawings.pdf
Haatso Residential Constuction Drawings.pdfHaatso Residential Constuction Drawings.pdf
Haatso Residential Constuction Drawings.pdf
 
ZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdfZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdf
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
 
Mr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroomMr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroom
 
inte building 1-Elev 1
inte building 1-Elev 1inte building 1-Elev 1
inte building 1-Elev 1
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Lombard House
Lombard HouseLombard House
Lombard House
 
Conscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochure
Conscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochureConscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochure
Conscient habitat residences sector 78 Daridabad | 9911 81-6000 | brochure
 
portfolio small 78
portfolio small 78portfolio small 78
portfolio small 78
 
portfolio small 77
portfolio small 77portfolio small 77
portfolio small 77
 

More from Mike Darwich

Potts Hill Residence
Potts Hill ResidencePotts Hill Residence
Potts Hill ResidenceMike Darwich
 
Low Cost Residences
Low Cost ResidencesLow Cost Residences
Low Cost ResidencesMike Darwich
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 sMike Darwich
 
MACCROSAN STREET PORTE DOUGLAS s
MACCROSAN STREET PORTE DOUGLAS sMACCROSAN STREET PORTE DOUGLAS s
MACCROSAN STREET PORTE DOUGLAS sMike Darwich
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
15-Great Northern Hotel,Newcastle
15-Great Northern Hotel,Newcastle15-Great Northern Hotel,Newcastle
15-Great Northern Hotel,NewcastleMike Darwich
 
RED BOOK HHR aw_0 P1
RED BOOK HHR aw_0 P1RED BOOK HHR aw_0 P1
RED BOOK HHR aw_0 P1Mike Darwich
 

More from Mike Darwich (12)

Potts Hill Residence
Potts Hill ResidencePotts Hill Residence
Potts Hill Residence
 
Goldcoast housing
Goldcoast housingGoldcoast housing
Goldcoast housing
 
Low Cost Residences
Low Cost ResidencesLow Cost Residences
Low Cost Residences
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Milton Avenue s
Milton Avenue sMilton Avenue s
Milton Avenue s
 
Perspectives s
Perspectives sPerspectives s
Perspectives s
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
 
MACCROSAN STREET PORTE DOUGLAS s
MACCROSAN STREET PORTE DOUGLAS sMACCROSAN STREET PORTE DOUGLAS s
MACCROSAN STREET PORTE DOUGLAS s
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
15-Great Northern Hotel,Newcastle
15-Great Northern Hotel,Newcastle15-Great Northern Hotel,Newcastle
15-Great Northern Hotel,Newcastle
 
Central Park
Central ParkCentral Park
Central Park
 
RED BOOK HHR aw_0 P1
RED BOOK HHR aw_0 P1RED BOOK HHR aw_0 P1
RED BOOK HHR aw_0 P1
 

Haldon Street Centre

  • 1. RETAIL GYM LIBRARY &TUTORING COUNCILING WORSHIP PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/16/2013 3:01:33 AM 1 : 100 A A ISSUED FOR DA. COVER SHEET A00 AM P01 03/06/13 03/06/13 Drawing List Sheet Number Sheet Name Sheet Issue Date Revision Drawn By Checked By A00 COVER SHEET 03/06/13 B AM AM A01 CONTEXT PLAN 03/06/13 A AM AM A02 CONTEXT PLAN WITH ANALYSIS 03/06/13 A AM AM A03 EXISTING GROUND FLOOR PLAN 03/06/13 A AM AM A04 EXISTING FIRST & SECOND FLOOR PLANS 03/06/13 A AM AM A05 EXISTING EAST & WEST ELEVATIONS 03/06/13 A AM AM A06 EXISTING NORTH & SOUTH ELEVATIONS 03/06/13 A AM AM A07 EXISTING SECTION A - A 03/06/13 A AM AM A08 PROPOSED PLANS 1 13/06/13 B AM AM A09 PROPOSED PLANS 2 13/06/13 B AM AM A10 PROPOSED PLANS 3 13/06/13 B AM AM A11 PROPOSED EAST & WEST ELEVATIONS 03/06/13 A AM AM A12 PROPOSED NORTH & SOUTH ELEVATIONS 03/06/13 A AM AM A13 PROPOSED SECTIONS 13/06/13 B AM AM A14 AREA ANALYSIS 13/06/13 B AM AM A15 STREET VIEW ANALYSIS 03/06/13 A AM AM A16 STREET ELEVATION ANALYSIS 03/06/13 A AM AM A17 DRIVEWAY DETAIL 03/06/13 A AM AM A18 SHADOW DIAGRAM 06/02/13 A AM AM
  • 2. SITE LOCATION LAKEMBA TRAIN STATION LAKEMBA LIBRARY & SENIOR CITIZEN CENTRE SHOPS SHOPS SHOPS PUBLIC PARKING HOLLY SPIRIT COLLEGE N PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 3:56:56 PM As indicated A A ISSUED FOR DA. CONTEXT PLAN A01 AM P01 03/06/13 03/06/13 1 : 1000 1 Context Plan
  • 3. NORTHWESTERLY WINTERWIND TEMPERATE SOUTHEASTERLY BREEZE VIEW CORRIDOR TO CANTERBURY ROAD VIEW CORRIDOR TO LAKEMBA TRAIN STATION N PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 3:57:57 PM As indicated A A REVISED FLOOR PLANS. CONTEXT PLAN WITH ANALYSIS A02 AM P01 03/06/13 03/06/13 1 : 500 1 Context Plan With Analysis NORTH W EST EAST
  • 4. UP UP UP UP SHOP"NETWORKVIDEO" SINGLESTOREY BRICKSHOPSANDGYM THREESTOREY 42.000 4 2.000 42.000 43.000 43.000 43.000 42 66 42 39 42 46 41 88 42 11 42 57 43 11 42 73 42 48 42 52 42 69 42 18 42 00 41 77 41 90 41 90 41 92 41 92 41 91 42 18 42 22 41 95 42 10 42 12 41 94 42 02 42 15 43 30 42 86 42 76 42 55 43 15 43 79 43 78 43 56 42 97 42 9643 20 43 07 42 90 42 78 43 29 43 04 42 72 43 10 43 12 43 00 42 45 48 31 48 38 44 79 52 06 52 07 48 38 47 94 45 23 42 66 41 85 41 88 42 43 42 38 42 12 42 11 41 94 41 87 56 19 51 25 77 45 83 42 33 43 00 42 96 44 21 44 3 43 53 43 53 44 99 44 58 44 47 44 67 44 36 44 24 44 79 44 03 44 42 44 85 44 18 43 53 43 68 43 94 43 66 44 43 44 61 44 64 44 32 44 16 47 84 44.36 1 5 . 2 4 44.36 1 5 . 2 4 AWNING AWNING VC BRICK GARAGE TWOBRICK TOILETS BRICKWALL BRICKWALL METALSTEPS KERBANDGUTTER COVERED PIT CONCRETEPATH CONCRETEPATH POLEPOLE POLEPOLE POLE POLEPOLE PRAM CROSSING PCNO PARKING SEWER BDYTRAP INSPECTION POINT SEWER VENT SEAT METAL STEPSSTEPS METAL AWNING AWNING AWNING TEL PIT LAMP POLE W ATER PATH AWNINGBALCONY PAVEDPATHWAY BUILDINGABOVE NO.130 NO.138 NO.132-136 BM RL INKERB 97A.HD INSPECTION POINT LOT1INDP124861 LOT13INDP668872 676.6m2 DPAREA U/SGUT48.14 D RO O F GRATE BALCONY G AR. MONITORING PIT PARAPET D/S D/S D/SD/S D/S D/S D/S D/S LAN D IN G LAN D IN G LAN D IN G LAN D IN G RAISED CONCRETEAREA U/SGUT51.19 D/S O O F R O O F STEPS STEPS SINGLESTOREY RAISED CONCRETEAREASEWER VENT BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) A C D 15240 5190 4850 5200 600 3640 950 4850 860 3740 600 260 3480 500 6740 500 3500 260 14720 1 46050705705540490564049053605005090470 29670 4705570 4320 470 5220 470 4240 55804805590470537046056904705560 46050604905650490559049054004905550 480 4260 240 3360 490 6610 500 3280 240 470 4280 470 5240 480 4260 5590 14720 600 3640 5800 860 3740 600 10040 5200 15240 SHOP 1 (BUTCHER) SHOP 2 (WESTERN UNION) SHOP 4 (INDIAN GROCERY) SHOP 3 (BURAQ GROCERY) STAIRS SHOP 5 (WOMEN CLOTHS) SHOP 7 (SPICES) RL. 43.300 m RL. 44.160 m RL. 44.580 m RL. 44.610 m RL. 44.640 m RL. 44.430 m RL. 44.320 m RL. 43.940 m RL. 43.940 m RL. 43.680 mRL. 43.680 m RL. 43.880 m RL. 44.110 m SHOP 6 (GROCERY) SHOP 8 (LEBANESE GROCERY) SHOP 8 (LEBANESE GROCERY) PROFILE OF ARCADE OVER A06 1 A05 2 A05 1 2 3 4 5 6 A062 PROFILE OF AWNING OVER TWO BRICK TOILETS COVEREDPIT SEAT RAISEDCONCRETEAREAS DAVIDSON LANE HALDON STREET FIRESTAIRCASE FIRE STAIRCASE TO LEVEL 2 8 7 B 6000817063606030613058605810 30190 A C D 1 A06 1 A05 2 A05 1 2 3 4 5 6 A062 15240 5190 4850 5200 600 3640 5800 860 3740 600 3480 500 6740 500 3500 14720 46050705705540490564049053605005090470 29670 4705570 4320 470 5220 470 4240 55804805590470537046056904705560 46050604905650490559049054004905550 480 4260 240 3360 490 6610 500 3280 240 470 4280 470 5240 480 4260 5590 14720 600 3640 5800 860 3740 600 10040 5200 15240 SHOP 1 (BUTCHER) SHOP 2 (WESTERN UNION) SHOP 4 (INDIAN GROCERY) SHOP 3 (BURAQ GROCERY) STAIRS SHOP 5 (WOMEN CLOTHS) SHOP 7 (SPICES) RL. 43.300 m RL. 44.160 m RL. 44.580 m RL. 44.610 m RL. 44.640 m RL. 44.430 m RL. 44.320 m RL. 43.940 m RL. 43.940 m RL. 43.680 mRL. 43.680 m RL. 43.880 m RL. 44.110 m SHOP 6 (GROCERY) SHOP 8 (LEBANESE GROCERY) SHOP 8 (LEBANESE GROCERY) PROFILE OF ARCADE OVER TWO BRICK TOILETS COVEREDPIT SEAT RAISEDCONCRETEAREAS BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) DAVIDSON LANE HALDON STREET 8 7 B 6000817063606030613058605810 30190 N PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 3:59:45 PM 1 : 100 A A ISSUED FOR DA. EXISTING GROUND FLOOR PLAN A03 AM P01 03/06/13 03/06/13 1 : 100 1 Ground Floor-Existing 1 : 100 2 Ground Floor-Existing (Survey)
  • 5. UP UP UP A C D 1 46550855003850110140049056404901610110217011015405705070460 29670 465508549054004903230110225049056504905060460 29670 4320 470 5220 470 4240 558048055904702770110249046056904705560 5570 480 4260 470 4280 2810 470 5240 480 4260 5590 1300 110 FEMALE TOILETS MALE TOILETS STAIRS OFFICE STORE GYM FIREEGRESS GYM PASSAGE BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) A06 1 A05 2 A05 1 2 3 4 5 6 A062 DAVIDSON LANE HALDON STREET 15240 5190 4850 5200 260 14720 260 240 3360 490 6610 500 3280 240 14720 5190 4850 5200 15240 930 880100 1660 1075 2500 1050 2500 1050 2500 995 1000 2500 1080 2500 1080 2500 1080 2500 1000 ARCADE PROFILE AWNING PROFILE FIRE STAIRCASE FIRESTAIRCASE 8 7 B 6000817063606030613058605810 30190 A C D 1 A06 1 A05 2 A05 1 2 3 4 5 6 A062 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) DAVIDSON LANE HALDON STREET FIRE STAIRCASE STAIRS WORSHIP PLACE (To Be Confirmed Later) 29950 29890 15240 5190 4850 5200 260 14720 260 150 14940 150 5190 4850 5200 15240 1000 2500 1080 2500 1080 2500 1080 2500 1000 23952602985570554049011501103080110119049053605005085465 239526029754905650490559049054004905085465 1000 5000 1130 980 1130 5000 1000 8 7 B 6000817063606030613058605810 30190 N PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:00:45 PM 1 : 100 A A ISSUED FOR DA. EXISTING FIRST & SECOND FLOOR PLANS A04 AM P01 03/06/13 03/06/13 1 : 100 1 Level 1-Existing 1 : 100 2 Level 2-Existing
  • 6. RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 ACD NO. 126A NO. 140 132-136 NO. 142-144 NO. 128 374037802900 10420 VOID BOUNDARY BOUNDARY HALDON STREET B 519048505200 15240 RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 A C D BOUNDARY NO. 126A NO. 140 132-136 NO. 142-144 NO. 128 290037803740 BOUNDARY VOID 10420 DAVIDSON LANE B 5190 4850 5200 15240 PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:02:05 PM 1 : 100 A A ISSUED FOR DA. EXISTING EAST & WEST ELEVATIONS A05 AM P01 03/06/13 03/06/13 1 : 100 1 East Elevation - Existing 1 : 100 2 West Elevation - Existing
  • 7. RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 1 2 3 4 5 6 8 132-136 BOUNDARY BOUNDARY NO. 126A 290037803740 10420 HALDON STREET DAVIDSON LANE 7 5810 5860 6130 6030 6360 8170 6000 44360 RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 1234568 132-136 BOUNDARY BOUNDARY 290037803740 10420 NO. 140 HALDON STREET DAVIDSON LANE 7 6000 8170 6360 6030 6130 5860 5810 44360 PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:10:25 PM 1 : 100 A A ISSUED FOR DA. EXISTING NORTH & SOUTH ELEVATIONS A06 AM P01 03/06/13 03/06/13 1 : 100 1 North Elevation - Existing 1 : 100 2 South Elevation - Existing
  • 8. RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 1 482020035802002700200 234568 700104201280 WORSHIP PLACE GYMGYM RL. 52.100 m RL. 48.320 m RL. 44.580 m RL. 44.160 m RL. 43.530 m RL. 43.300 m RL. 44.610 mRL. 44.430 m RL. 44.110 m RL. 43.940 m RL. 43.730 m 132-136 BOUNDARY BOUNDARY HALDON STREET DAVIDSON LANE 7 6000 8170 6360 6030 6130 5860 5810 44360 PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:11:43 PM 1 : 100 A A ISSUED FOR DA. EXISTING SECTION A - A A07 AM P01 03/06/13 03/06/13 1 : 100 1 Section A - A - Existing
  • 9. A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 GARAGE DOOR STAIR-01 383606000 STAIR -02 DRIVEWAY FHR LANDSCAPE LANDSCAPE 02b BICYCLE/BIKE PARKINGSPACE 12 CAR SPACES LOUVRES 1 A13 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) SETBACK LIMIT @ 6m STAIR -03 1660 15240 305 25002400240002500270 500 4435 500 4355 500 4450 500 1100 1750 1640 230 1400 110020001450 LIFT3 200 1200650065006500650065004200 100037100 260 6mSLOPE@1:15 1100 2000 3020 15240 RL. 41.580 m 38360 FHR GreyBollardswith 30%luminance 01 02 03 04 11 12 10 SHARED AREA BD BD BD BD GreyBollardswith 30%luminance TactileIndicators 06 07 200 149525002500250025001000 09 08 01b A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 6380 230 8630 6510 5600 3130 4380 2000 230 5500 120 2880 130 03b GARAGE DOOR LOUVREOPENING 6720 200 60 5400 6720 2600 60 200 48001200 260 2250 230 2250 230 10375 230 4550 230 2300 230 2300 230 116951000 200 2310 230 2920 6720 2600 60200 38360 7 6000817063606030613058605810 5190 4850 5200 RL. 41.980 m RL. 41.580 m LOTNO.126A LOTNO.140 B 1 A17 BD BD BD 05 A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 LOBBY area: 64.6 sqm STAIR-01 STAIR -02 UNISEX TOILET ACCESSIBLE TOILET KITCHENETTE OFFICE area: 26.20 sqm FOOTPATH 1 A13 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) LIFT3 2730 500 4435 500 2925 230 1200 500 4450 500 ACCESSTODAVIDSONLANE 10012595 230 2300 230 2300 230 4550 230 2000 110 2290 110 5865 230 2250 230 2250 260 6000 STAIR-03 SETBACK LIMIT @ 6m FHR FHR A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 7 RL. 44.580 m RL. 44.580 m RETAIL SHOP NO:1 area:38.2 sqm RETAIL SHOP NO:2 area:36.2 sqm RETAIL SHOP NO:3 area:30.6 sqm RETAIL SHOP NO:4 area:39.6 sqm 383606000 15240 383606000 5190 4850 5200 B 6000817063606030613058605810 LOTNO.126A LOTNO.140 RETAIL SHOP NO:5 area:44.5 sqm STORAGE area:45.4 sqm 260 1080 2400 1195 230 3285 50 6480 260 4675 1000 3120 1555 230 4175 230 5410 1100 2250 1140 230 1400 230 1100 1750 21203175 15240 4980 4360 5900 260 2850 1640 230 1400 230 2730 230 5410 260 260 6870 110 6105 110 4730 110 5590 110 5900100 1000 3000 110 1565 1100225012001085 25 1180 110 870 110 2345 110 2250 230 2195 COFFEEBAR area:8.7sqm 2480 3500 FHR Room A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 MALE TOILET FEMALE TOILET ACCESSIBLE TOILET STAIR-01 STAIR -02 BALCONY area: 45.45 sqm BALCONY area: 8 sqm 1 A13 411044360 245 260 1640 260 5470560 110 2045 110 2000 230 2300 230 2300 230 4550 230 2300 110 5485 230 2250 230 2250 260 110022501200920 25 1355 SETBACK LIMIT @ 6m BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) FHR FHR GYM SPACE area: 372.82 sqm A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 7 B RL. 48.320 m LOTNO.126A LOTNO.140 4110383606000 15240 5190 4850 5200 60006030613058605810 15240 BALCONY area: 8 sqm BALCONY area: 8 sqm 5185 10055 500 4435 500 675 3000 680 500 675 3100 675 500 260 14720 260 1100 2250 1140 230 1100 2250 260 260 3610 1475 4545 400 4550 140 260 5003615 2140260 2140 PROFILE OF FLOWERBED OVER 800 900 25 815 2090 110 3000 110 1520 1100 25 920 800 900 25 1005 1900 110 2620 2120 LOBBY area:18.15sqm N EXISTING WALLS & SLABS NEW BRICK WALLS NEW CONCRETE FACE NEW CONCRETE WALLS & SLABS NEW CONCRETE FACE WITH TILED FINISH GENERAL LEGEND NEW LANDSCAPE AREA NEW TIMBER PERGOLA & SCREEN NEW TOILETS PARTITION EXISTING WALLS EXISTING CONCRETE SLABS & COLUMNS PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:12:45 PM 1 : 100 B B REVISED FLOOR PLANS. PROPOSED PLANS 1 A08 AM P01 13/06/13 13/06/13 1 : 100 1 Basement 1 1 : 100 2 Ground Floor-Retail 1 : 100 3 Level 1-GYM
  • 10. N EXISTING WALLS & SLABS NEW BRICK WALLS NEW CONCRETE FACE NEW CONCRETE WALLS & SLABS NEW CONCRETE FACE WITH TILED FINISH GENERAL LEGEND NEW LANDSCAPE AREA NEW TIMBER PERGOLA & SCREEN NEW TOILETS PARTITION EXISTING WALLS EXISTING CONCRETE SLABS & COLUMNS A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 ASSEMBLY ROOM area:95.60 sqm MALE TOILET FEMALE TOILET ACCESSIBLE TOILET SHOESSTORAGE WASHING FACILITIES STAIR-01 STAIR -02 WORSHIP PLACE area: 202.40 sqm QIBLA DIRECTION: 277.78º LOBBY area:35.36sqm 1 A13 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) SETBACK LIMIT @ 6m 1100 2250 1280 FHR FHR BALCONY area: 34.60 sqm LANDSCAPELANDSCAPE A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 7 B BALCONY area: 8 sqm BALCONY area: 8 sqm BALCONY area: 8 sqm 260 14720 260 500 670 3100 665 500 625 3100 630 500 675 3100 675 500 5190 4850 5200 15240 600038360 817063606030613058605810 2140 260 4445 110 3430 110 2200 230 2300 230 2300 230 120022501100 230 2000 110 2200 110 3475 230 2250 260 14306702860 15240 5190 4850 5200 260 14720 260 3610 1475 4545 400 4550 140 9980 383606000 28606702475 260 3050 10725 964011061702602140 4601685 LOTNO.126A LOTNO.140 RL. 52.100 m LANDSCAPE area :4.62 sqm 5601190 25 900800 11351135920 2250 230 2500 3000 110 1870 1135 800900 25 1145560 SHOESSTORAGE 3240 110 1630 WASHING FACILITIES 1135920 4401705 1740 2395 110 7125 4135 17254125 9630 A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 MALE TOILET FEMALE TOILET ACCESSIBLE TOILET STAIR-01 BALCONY area: 39.80 sqm BALCONY area: 50.63 sqm LOBBY area:16.25sqm LANDSCAPE area: 4.6 sqm 1 A13 SETBACK LIMIT @ 6m FHR BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) 15003500 260 3170 110 2045 110 2000 230 2300 230 2300 230 4550 230 3485 110 2360 260 27056701045 LANDSCAPELANDSCAPE LANDSCAPE area :4.62 sqm 110022501200800900 25 1200560 383606000 15003500 260 5370 110 10070 110 7800 260 2705670 383606000 STORAGE area: 8.68 sqm ADMINISTRATION / OFFICES area: 61.70 sqm COUNCELING area: 101.60 sqm LIBRARY area: 85.25 sqm A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 7 B LANDSCAPE area: 4.53 sqm LANDSCAPE area: 4.6 sqm 15240 5190 4850 5200 500 4435 500 4355 500 4450 500 260 240 4265 670 4355 500 4450 240 260 4520 110 10090 817063606030613058605810 2250 230 1200 110 15240 5190 4850 5200 260 14720 260 5175 4355 500 4450 240 14720 LOTNO.126A LOTNO.140 RL. 55.000 m PROFILE OF PERGOLA OVER PROFILE OF BALCONY OVER 2250 230 2040 3000 110 1410 920 1135 1575 560 110 1100 25 920 800 900 25 785110 1900 3680 2510 2120 10090 27602610 A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 MALE TOILET FEMALE TOILET ACCESSIBLE TOILET TUTORING area: 216.86 sqm STAIR-01 BALCONY area: 42.3 sqm BALCONY area: 10 sqm 1 A13 RL. 58.600 m 500 1110 2220 1125 485 4355 500 1115 2225 1115 500 4960 5300 4975 15240 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) SETBACK LIMIT @ 6m 1355 25 9201500 60009380261302850 1500 2150 260 19805 260 2985670 28502613093806000 A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 7 B LOBBY area:14.57sqm 5190 4850 5200 260 4310 110 10300 260 LANDSCAPELANDSCAPE LANDSCAPE area : 4.62 sqm 6000817063606030613058605810 6702985 260 2300 230 4550 230 2300 230 2300 230 2000 110 2045 110 5602610 260 21502850 15240 5190 4850 5200 260 5175 4355 500 4450 240 260 4310 110 10300 PROFILE OF SUNSHADE OVERPROFILE OF SUNSHADE OVER PROFILE OF PERGOLA OVER FHR 110022501200 800 900 25 685 1900 2250 230 1830 3000 110 1200 1100 25 920 800 900 25 685 1900 110 2300 2120 PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 5:41:53 PM 1 : 100 B B REVISED FLOOR PLANS. PROPOSED PLANS 2 A09 AM P01 13/06/13 13/06/13 1 : 100 1 Level 2-Worship 1 : 100 2 Level 3-Library 1 : 100 3 Level 4-Tutoring
  • 11. A11 1 A122 A11 2 A12 1 2 A13 LIFT1 LIFT2 STAIR-01 1 A13 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) RL. 62.200 m A C D 1 2 3 4 5 6 DAVIDSON LANE HALDON STREET 8 7 B 110022501200 6701890 230 4550 230 2300 230 2300 230 768510609503000 2250 230 15240 5190 4850 5200 260 4680 180 5000 185 4680 260 19030223303000 6000817063606030613058605810 15240 5190 4850 5200 260 2480 12240 260 ROOF LANDSCAPELANDSCAPE LANDSCAPE area : 4.62 sqm EXISTING WALLS & SLABS NEW BRICK WALLS NEW CONCRETE FACE NEW CONCRETE WALLS & SLABS NEW CONCRETE FACE WITH TILED FINISH GENERAL LEGEND NEW LANDSCAPE AREA NEW TIMBER PERGOLA & SCREEN NEW TOILETS PARTITION EXISTING WALLS EXISTING CONCRETE SLABS & COLUMNS N A11 1 A122 A11 2 A12 1 2 A13 1 A13 A C D 1 2 3 4 5 6 8 7 B LIFT1 LIFT2 STAIR-01 RL. 62.200 m 670 1890 230 4550 230 2300 230 2300 230 768510609503000 2250 230 15240 5190 4850 5200 260 4680 180 5000 185 4680 260 19030223303000 6000817063606030613058605810 15240 5190 4850 5200 260 2480 1640 2130 5600 2870 260 ROOF LANDSCAPELANDSCAPE BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) DAVIDSON LANE HALDON STREET DRIVEWAY LANDSCAPE LANDSCAPE 6mSLOPE@1:14 BALCONY LANDSCAPELANDSCAPE LANDSCAPE LANDSCAPELANDSCAPE LANDSCAPE LANDSCAPELANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPELANDSCAPE LANDSCAPE BALCONY BALCONY BALCONY BALCONY 1 A17 RL. 63.600 m RL. 63.600 m RL. 64.700 m PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:14:59 PM 1 : 100 B B REVISED FLOOR PLANS. PROPOSED PLANS 3 A10 AM P01 13/06/13 13/06/13 1 : 100 1 Roof Level 1 : 100 2 Site Plan
  • 12. RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 RL Level 4 58.600 RL Roof Level 62.200 NO. 126A NO. 140 132-136NO. 142-144 NO. 128 37403780290036003600 104207200 17620 ACD B 15240 518048505200 34405002500580 300 130016001300160038020001820 300 13501350 220 30010001800800 BOUNDARY BOUNDARY O PEN IN G HALDON STREET RL Ground Floor 44.580 RL Level 1 48.320 BOUNDARY RL Level 2 52.100 RL Level 3 55.000 RL Level 4 58.600 RL Roof Level 62.200 RL Basement 1 41.580 NO. 126A NO. 140 132-136 NO. 142-144 NO. 128 360036002900378037403000 196201000 BOUNDARY A C DB 11460 520048505180 7200119001520 OPENING 17001000900270090027002002700108027001040170010008002400 PARKING DOOR 4006004006004004008001200600 3508501700400375300510002700 DAVIDSON LANE EXISTING WALLS & SLABS NEW BRICK WALLS NEW CONCRETE FACE NEW CONCRETE WALLS & SLABS NEW CONCRETE FACE WITH TILED FINISH GENERAL LEGEND NEW LANDSCAPE AREA NEW TIMBER PERGOLA & SCREEN NEW TOILETS PARTITION EXISTING WALLS EXISTING CONCRETE SLABS & COLUMNS PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:29:07 PM 1 : 100 A A ISSUED FOR DA. PROPOSED EAST & WEST ELEVATIONS A11 AM P01 03/06/13 03/06/13 1 : 100 1 EAST ELEV 1 : 100 2 WEST ELEV
  • 13. RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 RL Level 4 58.600 RL Roof Level 62.200 RL Basement 1 41.580 1 2 3 4 5 6 87 BOUNDARY BOUNDARY 45.00° DAVIDSON LANE 1800 6m SLOPE @ 1 : 14 SETBACK@6m 19601347578049401800600 3340176203000 36003600290037803740 955135080028002500724014402840 300 5001320200019801100 180 160 500 300 300 HALDON STREET LOT NO. 126A RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 RL Level 4 58.600 RL Roof Level 62.200 RL Basement 1 41.580 1234568 7 BOUNDARY BOUNDARY 45.00° DAVIDSON LANE SETBACK@6m HALDON STREET LOT NO. 140 1800 20001346080049601780600 3370176203000 1070230580028002500724014402840 36003600290037803740 300182020001980 180 160 500 300 300 6m SLOPE @ 1 : 14 PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:48:50 PM 1 : 100 A A ISSUED FOR DA. PROPOSED NORTH & SOUTH ELEVATIONS A12 AM P01 03/06/13 03/06/13 1 : 100 1 NORTH ELEV 1 : 100 2 SOUTH ELEV
  • 14. RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 RL Level 4 58.600 RL Roof Level 62.200 RL Basement 1 41.580 2700360036002900378037403000 3340176203000 1234568 7 K=17620 J=7200I=10420 H=3140 EXISTING E=3540 EXISTING C=3580 EXISTING C=2700 NEW C=3400 NEW C=3400 B = 2140 B = 2140 B = 3500 L = 5000 1000260010002600100019001000200078010006740 RETAIL PARKING GYM WORSHIP LIBRARY TUTORING HALDON STREET 45.00° DAVIDSON LANE BOUNDARY BOUNDARY AWNING 1800 6m SLOPE @ 1 : 15 SETBACK@6m 6000 7030 RL Ground Floor 44.580 RL Level 1 48.320 RL Level 2 52.100 RL Level 3 55.000 RL Level 4 58.600 RL Roof Level 62.200 RL Basement 1 41.580 J=7200I=10420 360036002900378037403000 AWNING K=17620 1 2 3 4 5 6 87 RETAIL PARKING GYM WORSHIP LIBRARY TUTORING HALDON STREET 45.00° DAVIDSON LANE BOUNDARY BOUNDARY 1800 6m SLOPE @ 1 : 15 SETBACK@6m H=3440 EXISTING E=3540 EXISTING C=3580 EXISTING C=2700 NEW C=3400 NEW C=3400 B = 2140 B = 2140 B = 3500 L = 5000 3370176203000 100026001000260010001900100019808007740 60012001000 60007030 EXISTING WALLS & SLABS NEW BRICK WALLS NEW CONCRETE FACE NEW CONCRETE WALLS & SLABS NEW CONCRETE FACE WITH TILED FINISH GENERAL LEGEND NEW LANDSCAPE AREA NEW TIMBER PERGOLA & SCREEN NEW TOILETS PARTITION EXISTING WALLS EXISTING CONCRETE SLABS & COLUMNS PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:50:28 PM 1 : 100 B B REVISED FLOOR PLANS. PROPOSED SECTIONS A13 AM P01 13/06/13 13/06/13 1 : 100 1 Section B -B 1 : 100 2 Section C - C
  • 15. N 192.84 RETAIL AREA ANALYSIS AMENITIES CIRCULATION COFFEE BAR OFFICES RETAIL STORAGE 234.18 CIRCULATION 30.07 AMENITIES 28.08 OFFICES 45.91 STORAGE LIFT1 LIFT2 STAIR-01 STAIR -02 LIFT3 STAIR -03 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) SETBACK LIMIT @ 6m DAVIDSON LANE HALDON STREET 28.27 COFFEEBAR 376.00 COMMERCIAL AREA ANALYSIS AMENITIES BALCONY CIRCULATION COMMERCIAL 14.38 AMENITIES 43.43 CIRCULATION 20.87 CIRCULATION 32.34 BALCONY 49.58 BALCONY BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) SETBACK LIMIT @ 6m LIFT1 LIFT2 STAIR-01 STAIR -02 DAVIDSON LANE HALDON STREET 21.25 AMENITIES 204.23 WORSHIP PLACE AREA ANALYSIS AMENITIES BALCONY CIRCULATION LANDSCAPE OFFICES WORSHIP PLACE 60.94 CIRCULATION 41.78 AMENITIES 10.79 CIRCULATION 96.30 OFFICES 27.92 BALCONY 36.77 BALCONY SETBACK LIMIT @ 6m BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) 9.86 LANDSCAPE LIFT1 LIFT2 STAIR-01 STAIR -02 DAVIDSON LANE HALDON STREET 26.59 AMENITIES 103.28 COUNCELING AREA ANALYSIS AMENITIES BALCONY CIRCULATION COUNCELING LANDSCAPE LIBRARY OFFICES STORAGE 41.19 CIRCULATION 16.09 AMENITIES 54.46 BALCONY 43.64 BALCONY SETBACK LIMIT @ 6m LIFT1 LIFT2 STAIR-01 5.28 LANDSCAPE 5.17 LANDSCAPE 5.29 LANDSCAPE 9.87 LANDSCAPE BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) 69.56 OFFICES 9.01 STORAGE 86.27 LIBRARY DAVIDSON LANE HALDON STREET 20.77 AMENITIES AREA ANALYSIS AMENITIES BALCONY CIRCULATION LANDSCAPE TUTORING 217.99 TUTORING 39.49 CIRCULATION 14.08 AMENITIES 49.45 BALCONY 12.77 BALCONY SETBACK LIMIT @ 6m LIFT1 LIFT2 STAIR-01 BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) 6.48 LANDSCAPE DAVIDSON LANE HALDON STREET 19.88 AMENITIES 34.05 LANDSCAPE 16.99 LANDSCAPE 36.27 DRIVEWAY 479.42 CARPARKING AREA ANALYSIS CARPARKING CIRCULATION DRIVEWAY LANDSCAPE 52.52 CIRCULATION 30.50 CIRCULATION GARAGE DOOR BOUNDARY (15.24m) BOUNDARY (15.24m) BOUNDARY(44.36m) BOUNDARY(44.36m) 12 CAR SPACES LIFT1 LIFT2 STAIR-01 STAIR -02 LIFT3 STAIR -03 SETBACK LIMIT @ 6m DAVIDSON LANE HALDON STREET 02b BICYCLE/BIKE PARKINGSPACE 01 02 03 04 05 11 12 10 SHARED AREA 06 07 09 08 01b 03b Area Schedule Name Area Ratio AMENITIES 204.89 7% BALCONY 306.93 10% CARPARKING 479.42 15% CIRCULATION 533.90 17% COFFEE BAR 28.27 1% COMMERCIAL 376.00 12% COUNCELING 103.28 3% DRIVEWAY 36.27 1% LANDSCAPE 92.99 3% LIBRARY 86.27 3% OFFICES 193.94 6% RETAIL 192.84 6% STORAGE 54.93 2% TUTORING 217.99 7% WORSHIP PLACE 204.23 7% Grand total 3112.14 100% TOTAL LAND AREA ~ 647 SQM TOTAL BUILDING AREA = 2504 QM = 3.87:1 FSR PARKING AREA = 480 SQM (1 LEVEL) PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 4:54:42 PM As indicated B B REVISED FLOOR PLANS. AREA ANALYSIS A14 AM P01 13/06/13 13/06/13 1 : 200 1 Ground Floor 1 : 200 2 Level 1-Commercial 1 : 200 3 Level 2-Worship 1 : 200 4 Level 3-Library 1 : 200 5 Level 4-Tutoring 1 : 200 6 Basement 1
  • 16. PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 5:13:09 PM A A ISSUED FOR DA. STREET VIEW ANALYSIS A15 AM P01 03/06/13 03/06/13 5 Street View - 1 ( Proposed ) 6 Street View - 2 ( Proposed ) APPROVED-DA-142-144 HALDON STREET APPROVED-DA-142-144 HALDON STREET 1 Street View - 1 ( Existing ) 2 Street View - 2 ( Existing ) APPROVED-DA-142-144 HALDON STREET APPROVED-DA-142-144 HALDON STREET
  • 17. AWNING IS LEVELED WITH EXISTING SLAB LEVELS ALIGNED WITH EXISTING AND APROVED ADJACENT DEVELOPMENTS BASE LEVEL ALIGNED WITH ADJACENT APROVED DEVELOPMENTS NO. 126A (EXISTING) NO. 140 (EXISTING) 132-136 (PROPOSED) NO. 142-144 ( APROVED) NO. 128 (EXISTING) PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 5:15:36 PM 1 : 100 A A ISSUED FOR DA. STREET ELEVATION ANALYSIS A16 AM P01 03/06/13 03/06/13 VIEW FROM HALDON STREET TOWARDS LAKEMBA TRAIN STATION HALDON STREET EXISTING STREET ELEVATIONS VIEW FROM HALDON STREET TOWARDS CANTERBURY ROAD DAVIDSON LANE EXISTING STREET ELEVATION 1 : 100 1 Elevation Analysis
  • 18. RL Basement 1 41.580 87 6000 FOOTPATH RL 41.980 400 20 200 20 3.81° 600 150150 450 6M SLOPE @ 1:15 STREET RL 41.830 200 50 200mm CONCRETE SLAB OVER 50mm SAND WITH CDP INSULATION RAIN WATER DRAIN (to hydrolic engineer's details) 420 200 200 200200 to public rain water sewer PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 5:17:36 PM 1 : 20 A A ISSUED FOR DA. DRIVEWAY DETAIL A17 AM P01 03/06/13 03/06/13 1 : 20 1 Driveway Detail
  • 19. DAVIDSONLANE HALDONSTREET AWNING NO. 126A NO. 140 132-136 NO. 142-144 NO. 128 DAVIDSONLANE HALDONSTREET PARKING LIFT1 LIFT2 STAIR-02 DAVIDSONLANE HALDONSTREET AWNING NO. 126A NO. 140 132-136 NO. 142-144 NO. 128 HALDONSTREET PARKING LIFT1 LIFT2 STAIR-02 LIFT1 LIFT2 STAIR-02 DAVIDSONLANE HALDONSTREET AWNING NO. 126A NO. 140 132-136 NO. 142-144 NO. 128 HALDONSTREET PARKING N PRELIMINARY ISSUE ONLY Plot Date: 1:100 @ A1 Issue: Project NO: Drawing NO Date Scale:Drawn by: Client: Project: DATEAMENDMENTISSUE THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. FINAL DETAILS MUST MEET SITE CONDITIONS, RELEVANT AUTHORITIES AND APPLICABLE BUILDING STANDARDS. * Use written dimensions only. Do not scale from drawing. * Contractors shall confirm all dimensions on-site prior to comencing any work or making any shop drawings. * All materials to be used in accordance with the manufacturer's specifications and instructions, and shall comply withrelevant Australian Standards. * Copyright of this drawing and design remain the property of MHANNA DESIGNYagoona NSW 2199 E: ymohanna@bigpond.net.au M:+61 405376059 T: +61 2 97933031 F: +61 2 8078 6652 91 Saltash Street Drawing Title: NORTHProject Managers: Tel: 02 9725 4644 Fax:02 9609 2677 Email: lui.guidone@northwestgroup.org 6/15/2013 5:30:04 PM As indicated SHADOW DIAGRAM A18 AM P01 06/02/13 06/02/13 1 : 500 1 Shadow - 21 June - 9AM 1 : 500 2 Shadow - 21 June - 12AM 1 : 500 3 Shadow - 21 June - 3PM