SlideShare a Scribd company logo
1 of 1
Download to read offline
SP JULY 2009
NOTES:
Report all errors and discrepancies promptly to architects before proceeding with
the works.
Do not scale drawing. Figured dimensions to be worked to in all cases.
The contractor is responsible for checking dimensions, tolerances and references.
All structural information to be taken from engineers drawings.
NOTES:
Report all errors and discrepancies promptly to architects before proceeding with
the works.
Do not scale drawing. Figured dimensions to be worked to in all cases.
The contractor is responsible for checking dimensions, tolerances and references.
All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk
Company number 3499361
info@crawfordpartnership.co.uk
Tel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnership
www.crawfordpartnership.co.uk
Company number 3499361
info@crawfordpartnership.co.uk
Tel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnership
WORKING DRAWINGS UNLESS LABELLED OTHERWISE
82A Colney Hatch Lane.plnK:0000 Crawford Partnership Projects2009-236 (82a Colney Hatch Lane)000.15.drawings000.15.02 drawings2 - Planning82A Colney Hatch Lane.pln
1:100 @ A2
Ground floor plan
AC
82A COLNEY HATCH LANE
2009-236-2-103
MR K. WILSON & MS C. HARDMAN
CHECKED:
REV REVISION / AUTHORDATE
DRAWING NO.:
DRAWING TITLE:
PROJECT:
REV:
CLIENT:
STATUS:
DRAWN: DATE:
SCALE:

More Related Content

Viewers also liked (9)

Contemporary Art Movements In 1960s
Contemporary Art Movements In 1960sContemporary Art Movements In 1960s
Contemporary Art Movements In 1960s
 
Et après !
Et après !Et après !
Et après !
 
Abhi resume short 2014
Abhi resume short 2014Abhi resume short 2014
Abhi resume short 2014
 
EPAACHIEVE
EPAACHIEVEEPAACHIEVE
EPAACHIEVE
 
portfolio small 33
portfolio small 33portfolio small 33
portfolio small 33
 
Como Cocinar en Microondas
Como Cocinar en MicroondasComo Cocinar en Microondas
Como Cocinar en Microondas
 
POE copyMcGreevy
POE copyMcGreevyPOE copyMcGreevy
POE copyMcGreevy
 
Je pars
Je parsJe pars
Je pars
 
Client relations article
Client relations articleClient relations article
Client relations article
 

Similar to portfolio small 78 (20)

portfolio small 66
portfolio small 66portfolio small 66
portfolio small 66
 
portfolio small 73
portfolio small 73portfolio small 73
portfolio small 73
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
John H Collins CV March 2016 Word Doc
John H Collins CV March  2016 Word DocJohn H Collins CV March  2016 Word Doc
John H Collins CV March 2016 Word Doc
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
nick sumners Cv (1)
nick sumners Cv (1)nick sumners Cv (1)
nick sumners Cv (1)
 
constructions project
constructions projectconstructions project
constructions project
 
WDT November 2016 IStructE Advert
WDT November 2016 IStructE AdvertWDT November 2016 IStructE Advert
WDT November 2016 IStructE Advert
 
METRO COMPANY PROFILE
METRO COMPANY PROFILEMETRO COMPANY PROFILE
METRO COMPANY PROFILE
 
S_Whitehead_Architects_Residential
S_Whitehead_Architects_ResidentialS_Whitehead_Architects_Residential
S_Whitehead_Architects_Residential
 
WDT October 2016 IStructE Advert
WDT October 2016 IStructE AdvertWDT October 2016 IStructE Advert
WDT October 2016 IStructE Advert
 
abdi cv
abdi cvabdi cv
abdi cv
 
26th Street Development
26th Street Development26th Street Development
26th Street Development
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
WDT September 2016 IStructE Advert
WDT September 2016 IStructE AdvertWDT September 2016 IStructE Advert
WDT September 2016 IStructE Advert
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
willem cv
willem cvwillem cv
willem cv
 
Matt King SQPeng Introduction FEB15
Matt King SQPeng Introduction FEB15Matt King SQPeng Introduction FEB15
Matt King SQPeng Introduction FEB15
 
Emma McMullan CV 2
Emma McMullan CV 2Emma McMullan CV 2
Emma McMullan CV 2
 

More from Silvia Pizzini (20)

portfolio small 8
portfolio small 8portfolio small 8
portfolio small 8
 
portfolio small 7
portfolio small 7portfolio small 7
portfolio small 7
 
portfolio small 3
portfolio small 3portfolio small 3
portfolio small 3
 
portfolio small 2
portfolio small 2portfolio small 2
portfolio small 2
 
portfolio small 77
portfolio small 77portfolio small 77
portfolio small 77
 
portfolio small 68
portfolio small 68portfolio small 68
portfolio small 68
 
portfolio small 34
portfolio small 34portfolio small 34
portfolio small 34
 
portfolio small 32
portfolio small 32portfolio small 32
portfolio small 32
 
portfolio small 27
portfolio small 27portfolio small 27
portfolio small 27
 
portfolio small 24
portfolio small 24portfolio small 24
portfolio small 24
 
portfolio small 20
portfolio small 20portfolio small 20
portfolio small 20
 
portfolio small 23
portfolio small 23portfolio small 23
portfolio small 23
 
portfolio small 18
portfolio small 18portfolio small 18
portfolio small 18
 
portfolio small 63
portfolio small 63portfolio small 63
portfolio small 63
 
portfolio small 64
portfolio small 64portfolio small 64
portfolio small 64
 
portfolio small 65
portfolio small 65portfolio small 65
portfolio small 65
 
portfolio small 61
portfolio small 61portfolio small 61
portfolio small 61
 
portfolio small 60
portfolio small 60portfolio small 60
portfolio small 60
 
portfolio small 59
portfolio small 59portfolio small 59
portfolio small 59
 
portfolio small 62
portfolio small 62portfolio small 62
portfolio small 62
 

portfolio small 78

  • 1. SP JULY 2009 NOTES: Report all errors and discrepancies promptly to architects before proceeding with the works. Do not scale drawing. Figured dimensions to be worked to in all cases. The contractor is responsible for checking dimensions, tolerances and references. All structural information to be taken from engineers drawings. NOTES: Report all errors and discrepancies promptly to architects before proceeding with the works. Do not scale drawing. Figured dimensions to be worked to in all cases. The contractor is responsible for checking dimensions, tolerances and references. All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk Company number 3499361 info@crawfordpartnership.co.uk Tel: 020 8444 2070 · Fax: 020 8444 1180 1a Muswell Hill, London, N10 3TH Architecture Interior Design Development crawford partnership www.crawfordpartnership.co.uk Company number 3499361 info@crawfordpartnership.co.uk Tel: 020 8444 2070 · Fax: 020 8444 1180 1a Muswell Hill, London, N10 3TH Architecture Interior Design Development crawford partnership WORKING DRAWINGS UNLESS LABELLED OTHERWISE 82A Colney Hatch Lane.plnK:0000 Crawford Partnership Projects2009-236 (82a Colney Hatch Lane)000.15.drawings000.15.02 drawings2 - Planning82A Colney Hatch Lane.pln 1:100 @ A2 Ground floor plan AC 82A COLNEY HATCH LANE 2009-236-2-103 MR K. WILSON & MS C. HARDMAN CHECKED: REV REVISION / AUTHORDATE DRAWING NO.: DRAWING TITLE: PROJECT: REV: CLIENT: STATUS: DRAWN: DATE: SCALE: