2. Introduction to EILB
• The European Institute for Law and Business (EILB) is an institution
affiliated to The Hague Center for Law and Arbitration (HCLA)
dedicated to providing services in diverse fields of international
business.
• Our Strength:
o Location
o Knowledge to Market:
o Knowledge of Iran and EU and their markets as well as the contacts established with
licensors, technology owners and industry associations and institutions
2
6. South Azadegan Oil
Field Development
• Location: Khuzestan Province
• Client/Owner: Petroleum
Engineering and Development
Company
• Contractor: Jahan pars Group
• Estimated budget: 700 MEURO
• Duration: 18 Months
• Description: Engineering Design,
Procurement, Construction,
Installation, Commissioning and
Finance of Central Treatment and
Export plant (CTEP)
6
7. Olefin
petrochemical
complex
• Location: Chahbahar Free-zone
• Client/Owner: Sina chemical
industrial development
• Estimated budget: 1400 MEURO
• Duration: 48 Months
• Description: EPC and investment
for the following plants
o Gas to Methanol
o Methanol to Olefin
o Olefin to polyolefin (type/grade of PO will be
selected when the conceptual studies be
finalized by the consultant)
7
8. Dehgolan -
Miandoab 56 inch
Pipeline
• Location: North West Iran
• Client/Owner: Iranian Gas
engineering development
• Contractor: Jahan Pars Group
• Estimated budget: 483 MEURO
• Duration: 36 Months
• Description: Engineering Design,
Procurement, Construction,
Installation , Commissioning and
financing of 230 Km length 56 inches
Gas Pipeline
8
9. Sahar Oil Refinery
• Location: Qeshm Island
• Client/Owner: Sohar Oil Refinery
• Estimated budget: 240 MEURO
• Duration: 48 Months
• Description: EPC for 40,000 BBD
heavy crude oil refinery in Qeshm
island free zone
• Products: Gasoline, Gasoil,
Bitumen, Fuel Oil, and LPG
9
10. Linear Alkyl
Benzene Plant
• Location: Koshkuiyeh
Petrochemical Complex, Kerman
province, Centre Iran
• Client/Owner: Kerman Pet. Co.
• Estimated budget: 600 MEURO
• Duration: 48 Months
• Description: EPC for LAB plant
with capacity of 150,000 MT/year
10
11. Jask Crude Oil
Tank Terminal
• Location: Jask, Hormozgan Iran
• Owner: Atyieh Damavand
Investment Group
• Project cost: 263 MEURO
• Description: 10 Million barrel fixed
and floating roof tank farm in
Hormozgan province
11
12. Gas Engine Power
Plant
• Location: Rasht, Gillan, North Iran
• Client/Owner: Ghadir Investment
Co.
• Estimated budget: 10 MEURO
• Duration: 12 Months
• Description: EPC and investment
for 25 MW Gas engine power
plant (DG)
12
13. Gas engine power plant
• Location: Kerman, Iran
• Client/Owner: Mahtab Gostar Karmania Company
• Estimated budget: 14 MEURO (25 MW)
• Duration: 12 Months
• Description: EPC and investment for 4X 25 MW Gas engine power
plant (DG) in centre of Iran
13
14. Jalal Combined
Cycle Power Plant
• Location: Tehran, Iran
• Client/Owner: Tamin Energy
Development Co.
• Estimated budget: 255 MEURO
• Duration: 36 Months
• Description: Investment in
construction of a 500 MW
combined cycle power plant in the
field of large scale thermal power
plants
14
15. Wind Power Plant
• Location: Nehbandan, Khorasan,
East Iran
• Client/Owner: Tamin Energy
Development Co.
• Estimated budget: 73 MEURO
• Description: Investment in
construction of a 50 MW wind
power plant
15
16. Photovoltaic
Power plant
• Location: Kerman province, Centre
Iran
• Client/Owner: Kerman Chamber of
Commerce
• Estimated budget: 1.8 MEURO
• Duration: 12 Months
• Description: Investment on EPC for
1.2 MW, Photovoltaic power plant
in Centre of Iran
16
18. Water Conveyance
from Persian Gulf to
Yazd Province
• Location: Yazd, Keman and Hormozgan provinces
• Client/Owner: Yazd province water distribution co.
• Contractor: Jahan Pars Group
• Estimated budget: 1756 MEURO
• Duration: 48 Months
• Description: Transporting of 250 million cu. m/year
of water from Persian Gulf to Yazd, construction of
water desalination unit with capacity of 250 million cu.
m /year (Reverse Osmosis Technology)
o Pipeline Length: App.700 Km.
o Line Diameter : 2,200 mm
o Pipe Material : Steel
18
19. National Water company projects
No. Description
Estimated cost
MEURO
Investment type
1 EPC and operation of Wastewater treatment plant (70 villages) 123 BOT
2 EPC for Disalination unit in Fars province (3 projects) 73 BOO
3 EPC for Disalination unit in Southern provinces (3 million m3 in two phases) 1756 BOO
4 EPC watre transmission and supply including pumping stations 35 BOT
5 Implementation of NRW projects (35 projects) 175 BOT/ROT
6
Sludge management and construction of
WWTP in large cities
179 BOT
7
Completion of wastewater systems against allocation of effluents in the frame (17
projects)
675 Buyback
8
Construction of small scale treatment plants in the administration buildings of the
Ministry of Energy (100 units)
159 Purchase
19
20. Water Transmission
to Gorgan
• Location: Golestan Province, North
Iran
• Client/Owner: Golestan water
organization
• Estimated budget: 35 MEURO
(BOT)
• Description: 40 KM water pipeline
to Gorgan including 3 pump
stations, desalination unit and
tanks
20
21. Water Transmission
project
• Location: Golestan Province, North
Iran
• Client/Owner: Golestan water
organization
• Estimated budget: 75 MEURO
(BOT)
• Description: Water transmission to
3 different cities in North of Iran
21
22. Bandar Abbas-
Kerman Free way
• Location: Bandar Abbas to Kerman
• Client/Owner: Kerman Alavi
development group
• Estimated budget: 900 MEURO
• Duration: 48 Months
• Description: 356 Km freeway from
south to centre of Iran
22
24. Greenhouse
project
• Location: Khuzestan province, South
Iran
• Client/Owner: Saba Gol Khuzestan
Co.
• Estimated budget: 12 MEURO
• Duration: 12 Months
• Description: EPC and operation of 10
Hectare modern Greenhouse in
Khuzestan province
oProducts:
o Decorative flowers
o Vegetables
24
25. Greenhouse
Project
• Location: Karaj, North/Centre Iran
• Client/Owner: Soil and Water
Company
• Estimated budget: 150 MEURO
• Duration: 48 Months
• Description: EPC and operation of
100 Hectare modern greenhouse in
Karaj area, nearby Payam airport in
different phases
oProducts:
o Decorative Flowers
o Tomato, Cucumber and Strawberry
25