ISSUE NO. 28
Projects EPCM
El-Shabab power plant
Rapid economic development and a
fast-expanding population mean that
the output of Egypt’s energy sector
requires substantial expansion. The
El-Shabab power plant project will
add an additional 1000 mega-watts to
the country’s electricity-generating
capacity.
The client is the East Delta Electricity
Production Company, a state-owned
entity which operates under the Ministry
of Electricity in Egypt. El-Shabab is
located in El-Salhiya, which is about
85km north-east of Cairo.
Kharafi National is undertaking
the engineering, procurement and
construction of eight gas turbine
generators, each with an output of
125 MW. As the EPC contractor, KN is
responsible for the design, delivery,
installation, testing and commissioning
of the units. The company will also be
synchronising the new generators with
Egypt’s national power grid.
The generators – GE Frame 9 from the
USA – were chosen and sourced by
KN, whose scope of work also includes
auxiliary equipment such as electronic
and electrical control cabinets, fin fan
coolers, exhaust stacks, compressor
and turbine washing skids, and so on,
as well as two solar tanks, a water
services tank, a reverse osmosis (RO)
tank and a demineralization tank.
The scope of work covers all related civil
works, such as the foundations for the
turbines and skids, electrical buildings,
control buildings, the gas-insulated
switch-gear building, medium and low
voltage buildings, the RO treatment
plant, an industrial waste plant, a
fabrication shop and the associated
warehousing.
KN is also constructing the infrastruc-
tural utilities and underground net-
works that will serve the power units, including water and sewage treatment plants,
along with all associated piping, the electrical high, medium and low cable networks,
and the instrumentation networks. In addition, the company is building the road
network for the entire plant.
The project is well on schedule to be finished in June this year. All eight turbines and
their ancillaries have been installed on their foundations, while the mechanical skids
for the first six units are currently being put in. The civil and mechanical works are
at an advanced stage and the construction of the underground utilities and tanks are
in progress.
El-Shabab power plant project is massive and the generators KN is installing are
immense, as can be seen from the photograph. Financially, it is one of the largest
projects KN has ever undertaken and winning the tender was, in itself, a massive
endorsement of Kharafi National’s capabilities in the EPC of power plants. Its
successful completion will consolidate the company’s reputation in the Egyptian
market and propel it to the forefront of international bidders for mega-sized power
plant projects in the Middle East.
Strenuous efforts to develop the Egyptian market are now paying off in a big way and Kharafi
National was recently awarded several mega-projects in Egypt. One of these is El-Shabab
power plant project – one of the largest projects KN has ever undertaken on its own.
Project Brief
El-Shabab Power Plant Project
Client : East Delta Electricity Production Company
Main Contractor : Kharafi National
Project Number : 3044
Scope of Work : EPC – design, delivery, installation, testing,
commissioning and synchronising 8 power units
with total output 1000MW
Start : October 2010
Finish : June 2011
Duration : 8.5 months
Employees (at peak) : 4,500

More Related Content

What's hot

GCL System PPT July 2016
GCL System PPT July 2016GCL System PPT July 2016
GCL System PPT July 2016
Maria Samoila
 
GEA30652-Battery-Apps-FS_R2
GEA30652-Battery-Apps-FS_R2GEA30652-Battery-Apps-FS_R2
GEA30652-Battery-Apps-FS_R2
Harold Schnetzka
 
1920 C-PACE Case Study
1920 C-PACE Case Study1920 C-PACE Case Study
1920 C-PACE Case Study
Rhianna Riggs
 
Cleantech America ACWA Presentation
Cleantech America ACWA PresentationCleantech America ACWA Presentation
Cleantech America ACWA Presentation
Mark Stout
 
SA energy presentation for PG_E
SA energy presentation for PG_ESA energy presentation for PG_E
SA energy presentation for PG_E
Rogeema Kenny
 

What's hot (20)

IHSAN CV
IHSAN   CVIHSAN   CV
IHSAN CV
 
ARENA: Large-scale solar photovoltaics – competitive round
ARENA: Large-scale solar photovoltaics – competitive roundARENA: Large-scale solar photovoltaics – competitive round
ARENA: Large-scale solar photovoltaics – competitive round
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 
Part 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFTPart 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFT
 
GCL System PPT July 2016
GCL System PPT July 2016GCL System PPT July 2016
GCL System PPT July 2016
 
Energy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEnergy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyond
 
DEPU Successor Programme
DEPU Successor ProgrammeDEPU Successor Programme
DEPU Successor Programme
 
How to Prepare for the Next Big Thing – Storage
How to Prepare for the Next Big Thing – StorageHow to Prepare for the Next Big Thing – Storage
How to Prepare for the Next Big Thing – Storage
 
GEA30652-Battery-Apps-FS_R2
GEA30652-Battery-Apps-FS_R2GEA30652-Battery-Apps-FS_R2
GEA30652-Battery-Apps-FS_R2
 
New Revenue and Cost Savings Opportunities – Realising the Value of Flexibility
New Revenue and Cost Savings Opportunities – Realising the Value of FlexibilityNew Revenue and Cost Savings Opportunities – Realising the Value of Flexibility
New Revenue and Cost Savings Opportunities – Realising the Value of Flexibility
 
Engage with...McLaren Applied
Engage with...McLaren AppliedEngage with...McLaren Applied
Engage with...McLaren Applied
 
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
ISES 2013  - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...ISES 2013  - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
 
1920 C-PACE Case Study
1920 C-PACE Case Study1920 C-PACE Case Study
1920 C-PACE Case Study
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar Project
 
Cleantech America ACWA Presentation
Cleantech America ACWA PresentationCleantech America ACWA Presentation
Cleantech America ACWA Presentation
 
Kurram garhi Dam
Kurram garhi DamKurram garhi Dam
Kurram garhi Dam
 
SA energy presentation for PG_E
SA energy presentation for PG_ESA energy presentation for PG_E
SA energy presentation for PG_E
 
Lexe1742 01
Lexe1742 01Lexe1742 01
Lexe1742 01
 
Page6 Pembroke
Page6 PembrokePage6 Pembroke
Page6 Pembroke
 
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed DrivesUnlocking the Innovation Hidden within Today’s Variable-Speed Drives
Unlocking the Innovation Hidden within Today’s Variable-Speed Drives
 

Similar to El-Shabab power plant-1

Documentation egyptmegaproject
Documentation egyptmegaprojectDocumentation egyptmegaproject
Documentation egyptmegaproject
srkm1949
 
ENBLOM Company Profile
ENBLOM Company ProfileENBLOM Company Profile
ENBLOM Company Profile
ENBLOM CO
 
ELCOGASType of projectIntegrated gasification combined c.docx
ELCOGASType of projectIntegrated gasification combined c.docxELCOGASType of projectIntegrated gasification combined c.docx
ELCOGASType of projectIntegrated gasification combined c.docx
SALU18
 
Herbertsmith energymarketrk2012-120401164817-phpapp02
Herbertsmith energymarketrk2012-120401164817-phpapp02Herbertsmith energymarketrk2012-120401164817-phpapp02
Herbertsmith energymarketrk2012-120401164817-phpapp02
Philippe Porta
 

Similar to El-Shabab power plant-1 (20)

osama dwedar ..
osama dwedar ..osama dwedar ..
osama dwedar ..
 
Documentation egyptmegaproject
Documentation egyptmegaprojectDocumentation egyptmegaproject
Documentation egyptmegaproject
 
Az Zour EPP08
Az Zour EPP08Az Zour EPP08
Az Zour EPP08
 
Micks CV_10_07_16
Micks CV_10_07_16Micks CV_10_07_16
Micks CV_10_07_16
 
Iscc report
Iscc reportIscc report
Iscc report
 
Solar in egypt guide
Solar in egypt guideSolar in egypt guide
Solar in egypt guide
 
A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements A3 - Financing geothermal development: Decreasing equity requirements
A3 - Financing geothermal development: Decreasing equity requirements
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Wind Power in Egypt
Wind Power in EgyptWind Power in Egypt
Wind Power in Egypt
 
Inter RAO - Export company presentation
Inter RAO - Export company presentationInter RAO - Export company presentation
Inter RAO - Export company presentation
 
ENBLOM Company Profile
ENBLOM Company ProfileENBLOM Company Profile
ENBLOM Company Profile
 
Transmission 29
Transmission 29Transmission 29
Transmission 29
 
Transmission-29-2012
Transmission-29-2012Transmission-29-2012
Transmission-29-2012
 
2015 10 27 irao export general presentation
2015 10 27 irao export general presentation2015 10 27 irao export general presentation
2015 10 27 irao export general presentation
 
ELCOGASType of projectIntegrated gasification combined c.docx
ELCOGASType of projectIntegrated gasification combined c.docxELCOGASType of projectIntegrated gasification combined c.docx
ELCOGASType of projectIntegrated gasification combined c.docx
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
Power stations
Power stationsPower stations
Power stations
 
Herbertsmith energymarketrk2012-120401164817-phpapp02
Herbertsmith energymarketrk2012-120401164817-phpapp02Herbertsmith energymarketrk2012-120401164817-phpapp02
Herbertsmith energymarketrk2012-120401164817-phpapp02
 
Kazakhstan energy market overview 2012
Kazakhstan energy market overview 2012Kazakhstan energy market overview 2012
Kazakhstan energy market overview 2012
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power Station
 

El-Shabab power plant-1

  • 1. 5 ISSUE NO. 28 Projects EPCM El-Shabab power plant Rapid economic development and a fast-expanding population mean that the output of Egypt’s energy sector requires substantial expansion. The El-Shabab power plant project will add an additional 1000 mega-watts to the country’s electricity-generating capacity. The client is the East Delta Electricity Production Company, a state-owned entity which operates under the Ministry of Electricity in Egypt. El-Shabab is located in El-Salhiya, which is about 85km north-east of Cairo. Kharafi National is undertaking the engineering, procurement and construction of eight gas turbine generators, each with an output of 125 MW. As the EPC contractor, KN is responsible for the design, delivery, installation, testing and commissioning of the units. The company will also be synchronising the new generators with Egypt’s national power grid. The generators – GE Frame 9 from the USA – were chosen and sourced by KN, whose scope of work also includes auxiliary equipment such as electronic and electrical control cabinets, fin fan coolers, exhaust stacks, compressor and turbine washing skids, and so on, as well as two solar tanks, a water services tank, a reverse osmosis (RO) tank and a demineralization tank. The scope of work covers all related civil works, such as the foundations for the turbines and skids, electrical buildings, control buildings, the gas-insulated switch-gear building, medium and low voltage buildings, the RO treatment plant, an industrial waste plant, a fabrication shop and the associated warehousing. KN is also constructing the infrastruc- tural utilities and underground net- works that will serve the power units, including water and sewage treatment plants, along with all associated piping, the electrical high, medium and low cable networks, and the instrumentation networks. In addition, the company is building the road network for the entire plant. The project is well on schedule to be finished in June this year. All eight turbines and their ancillaries have been installed on their foundations, while the mechanical skids for the first six units are currently being put in. The civil and mechanical works are at an advanced stage and the construction of the underground utilities and tanks are in progress. El-Shabab power plant project is massive and the generators KN is installing are immense, as can be seen from the photograph. Financially, it is one of the largest projects KN has ever undertaken and winning the tender was, in itself, a massive endorsement of Kharafi National’s capabilities in the EPC of power plants. Its successful completion will consolidate the company’s reputation in the Egyptian market and propel it to the forefront of international bidders for mega-sized power plant projects in the Middle East. Strenuous efforts to develop the Egyptian market are now paying off in a big way and Kharafi National was recently awarded several mega-projects in Egypt. One of these is El-Shabab power plant project – one of the largest projects KN has ever undertaken on its own. Project Brief El-Shabab Power Plant Project Client : East Delta Electricity Production Company Main Contractor : Kharafi National Project Number : 3044 Scope of Work : EPC – design, delivery, installation, testing, commissioning and synchronising 8 power units with total output 1000MW Start : October 2010 Finish : June 2011 Duration : 8.5 months Employees (at peak) : 4,500