1. CURRICULUM VITAE ~ Michael K Willmer
Culdoach Old Farmhouse, Culdoach Road, Tongland, DG64LU
Home: 01557 330025 Mobile: 0791522924
PERSONAL PROFILE
I have a vast and varied engineering background spread over many years
experience; from hands on field and plant work to managerial roles which
brought a different set of responsibilities which added to my skill set. I believe I
can bring this experience to your organisation without causing disappointment. I
am an enthusiastic individual with good organisational skills. I am self motivated
and very capable at working on my own but also being an effective team
member.
EDUCATION
2015 IOSH Working Safely
2015 IPAF Level 3A and 3B
2014 Level 3 Service inspection and Testing of Electrical Equipment (PAT)
2014 Abrasive wheels training
2014 Counter Balance Forklift
2013 Wind Turbine Technologies and Power Generation
2012 Part P Electrical Inspection and Installation
Level 3 Certificate Requirements for Electrical Installation 17th
Edition
Level 2 Certificate Fundamentals Inspection, Testing and Verification
2003 IOSH Managing Safety
1999 Advanced Hydraulics and Pneumatics
1989 City & Guilds Certificate Mechanical Engineering Part 3
1988 Basic MMA Welding Part 1 BS 4872
1987 City & Guilds Part 2 Certificate Mechanical Engineering Craft Studies
City & Guilds Communication Level 2
1986 City & Guilds Communication Level 1
R.O.S.P.A Safety Course
City & Guilds Part 1 Certificate Basic (Mechanical) Engineering Studies
IN HOUSE TRAINING
Fire Fighting, Oxy-acetylene burning, Managing Asbestos, Drugs and Alcohol
training for Managers, Vehicle Search Principles, Suspicious Package
Identification and Situation Management, Bomb Awareness and Protection
Techniques (Porton Down) and Permit to Work Systems.
PLANT EQUIPMENT EXPERIENCE
Pumps, fans, gearboxes, boilers, compressors, valves (automatic and manual),
conveying systems, laser alignment, heavy plant maintenance, hydraulic and
pneumatic servicing and repair, control room duties, electrical installation and
maintenance.
M K Willmer 08/04/13 1
2. Implementing and constructing preventative maintenance and predictive
maintenance programs with the use of condition monitoring and historical
breakdown analysis as well as shut down and maintenance planning through to
implementation.
EMPLOYMENT HISTORY
September 2013 – Present E Teq Ltd
Project Manager/Designer
Day to day running and workshop maintenance, management of the workforce and
raw materials ordering, job planning, designing and pricing of new projects and
seeing through to manufacture and implementation. Using metal worker design
package to design steelwork and programming the cut 5 program to laser cut, fold
and machine components as required. I am the main point of contact with major
clients including handling RTV’s and new business management. Liaison with health
and safety inspector for works inspections and implementation of health and safety
for the company with an outside contractor.
June 2012 ~ September 2013 Unemployed Due to Personal
circumstances
September 2007 ~ May 2012 All Trades Solutions Ltd
Owner/Tradesman
Carried out day to day duties within the building company including; project
management, man management, sourcing of materials, electrical installations,
plumbing and wiring of new homes. Company ceased trading December 2012.
October 2006 ~ September 2007 Premier Livestock Handling
Production Manager
Installed and Implemented Sage Systems into the business, allocating component
numbers to the manufacturing process and storage locations for components and
raw materials; including cost tracking. Rationalized the supplier chain and reduced
overall production costs whilst increasing production output.
March 2005 ~ September 2006 Castle McClelland
High Care Team Leader
Day to day management of the high care unit, attending daily management
meeting’s, bacterial health screening of department staff, routine maintenance of
department equipment to help the engineering department and quality control of the
products being produced in my area of responsibility.
January 2000 ~ February 2005 Millennium Inorganic Chemicals
Facilities Superintendent/Relief Manager
Core Responsibilities included: Security, Catering, Buildings Maintenance, Duty
Engineer Manager, Site Demolition, Asbestos Management, Hire Equipment,
Scaffolding, Crane Co-ordination, Grounds Maintenance, Site Communications, Pest
Control, Barrier Access Control Systems, Asset Management Painting, Building
Utilization Strategies, Fire Detection Systems, Road Repair and Repair Strategies,
PAT Testing, Winter Gritting, Air Conditioning, Site Cleaning Contract, Site
Housekeeping, Land Remediation, Pre-qualification Audits, Preparing Tender Scope
M K Willmer 08/04/13 2
3. Documents and Contract Negotiations. Whilst overseeing these services being
provided on a 4 hundred acre site it was my sole responsibility to ensure that any
current legislation was adhered to and that services were delivered in a safe and
proactive manner.
April 1999 ~ December 1999 Millennium Inorganic Chemicals
Contract Supervisor
Responsible for all the services and maintenance contracts for the site. Ensured that
services were delivered within the contract scope and agreement.
February 1999 ~ April 1999 Millennium Inorganic Chemicals
Mechanical Fitter
Worked in Reactive Maintenance Environments. Carried out extensive
commissioning projects for a new expansion and acted as a planner/supervisor to
plan and execute major works.
REFERENCES
References can be available on request.
M K Willmer 08/04/13 3