cresa.com
Michael Rice provided Dornier Medtech
with professional Project Management
services from various ‘preliminary vision
/ scheme concepts’ to the fully organized
step-by-step process of a full renovation.
The existing Dornier footprint was
approximately 24,000 RSF of office front-end spaces with an attached 11,000 RSF
warehouse. The scope of the project was a five phase design build renovation of the
occupied office space and related work place amenities. In step one, Rice gained Client
approval of a full ‘fresh-looking’ design palette with upgraded finishes and specifications
of replacement materials against a budget focused tenant improvement allowance.
Teaming with the selected general contractor, B.J. Gunter, all steps of the schedule
were continuously balanced upon minimum stress on Dornier’s staff, and efficiently
monitoring engineering and build-out components. Within the methodical process,
Rice coordinated with Gunter’s Construction Manager and sub-contractor teams
replacing all floorcoverings, wall finishes, updates to lighting fixtures, some required
HVAC improvements, and selected new furnishings, as well as the refurbishment of
150 file and storage unit cabinets. Some highlights of the new work environment
are a new Reception Area, an updated Presentation/Conference Room, a complete
new Breakroom with adjoining staff lounge, enhancements to the staff patio area,
focused technology and AV items for the Training Room areas, and fully upgraded
restrooms. Towards the end of the project with ‘budget savings’, Rice worked with
A-R-T & Associates developing a corporate art program and created a ‘Dornier History
Wall’ incorporating the Client’s archival photos.
•	 Sophisticated ‘design concepts’ for the full renovation of a regional headquarters.
•	 Under a tightly phased schedule, renovation of occupied office areas.
•	 Blending new collaborative ‘community’ meeting spots into the existing workplace.
•	 A fresh, new color and finish palette to work with existing workstations and furnishings.
•	 Modular flooring solutions with new, patterned carpets under open area workstations.
•	 New tailored pattern broadloom carpet and vinyl flooring installed in meeting areas.
•	 Provided a new ‘art program’ of bold colors accenting the workplace.
Dornier Medtech
Atlanta, GA
24,000 SF office
11,000 SF warehouse
Project Team
Cresa Atlanta
Michael Rice, VP - Project Management
General Contractor: B.J. Gunter
Art Consultant: A-R-T & Associates

More Related Content

Similar to DMT Case Study with Bullets_Tabloid

Shital_Portfolio
Shital_PortfolioShital_Portfolio
Shital_Portfolioshital koli
 
C:\Fakepath\Portfolio Pwpt 2010
C:\Fakepath\Portfolio Pwpt 2010C:\Fakepath\Portfolio Pwpt 2010
C:\Fakepath\Portfolio Pwpt 2010billwinsley
 
Project Cost and Scheduling Management.docx
Project Cost and Scheduling Management.docxProject Cost and Scheduling Management.docx
Project Cost and Scheduling Management.docxZiyad Zaidi
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Outlukebraithwaite
 
Renovation Project at Chick-fil-A’s Corporate Campus in College Park
Renovation Project at Chick-fil-A’s Corporate Campus in College ParkRenovation Project at Chick-fil-A’s Corporate Campus in College Park
Renovation Project at Chick-fil-A’s Corporate Campus in College ParkMcKenney's Inc
 
MHS Case Study 2014 v3
MHS Case Study 2014 v3MHS Case Study 2014 v3
MHS Case Study 2014 v3Chris Webber
 
BIM Keeps Project on Track
BIM Keeps Project on TrackBIM Keeps Project on Track
BIM Keeps Project on TrackMcKenney's Inc
 
Lance E. King - Resume
Lance E. King - ResumeLance E. King - Resume
Lance E. King - ResumeLance King
 
Richard Gerdes Resume 2016 (1)
Richard Gerdes Resume 2016 (1)Richard Gerdes Resume 2016 (1)
Richard Gerdes Resume 2016 (1)richardgerdes99
 
Amicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_emailAmicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_emailChristopher Maguigan
 

Similar to DMT Case Study with Bullets_Tabloid (20)

Xdesign Profile Corporate
Xdesign Profile  CorporateXdesign Profile  Corporate
Xdesign Profile Corporate
 
Shital_Portfolio
Shital_PortfolioShital_Portfolio
Shital_Portfolio
 
C:\Fakepath\Portfolio Pwpt 2010
C:\Fakepath\Portfolio Pwpt 2010C:\Fakepath\Portfolio Pwpt 2010
C:\Fakepath\Portfolio Pwpt 2010
 
Project Cost and Scheduling Management.docx
Project Cost and Scheduling Management.docxProject Cost and Scheduling Management.docx
Project Cost and Scheduling Management.docx
 
J.Chase portfolio
J.Chase portfolioJ.Chase portfolio
J.Chase portfolio
 
Shital_Resume
Shital_ResumeShital_Resume
Shital_Resume
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Out
 
Rahul’s Resume
Rahul’s ResumeRahul’s Resume
Rahul’s Resume
 
Sunil_CV.pdf
Sunil_CV.pdfSunil_CV.pdf
Sunil_CV.pdf
 
Sunil_Resume.pdf
Sunil_Resume.pdfSunil_Resume.pdf
Sunil_Resume.pdf
 
fscbs overview
fscbs overview fscbs overview
fscbs overview
 
Renovation Project at Chick-fil-A’s Corporate Campus in College Park
Renovation Project at Chick-fil-A’s Corporate Campus in College ParkRenovation Project at Chick-fil-A’s Corporate Campus in College Park
Renovation Project at Chick-fil-A’s Corporate Campus in College Park
 
MHS Case Study 2014 v3
MHS Case Study 2014 v3MHS Case Study 2014 v3
MHS Case Study 2014 v3
 
BIM Keeps Project on Track
BIM Keeps Project on TrackBIM Keeps Project on Track
BIM Keeps Project on Track
 
Lance E. King - Resume
Lance E. King - ResumeLance E. King - Resume
Lance E. King - Resume
 
Binder2
Binder2Binder2
Binder2
 
FM.pptx
FM.pptxFM.pptx
FM.pptx
 
Richard Gerdes Resume 2016 (1)
Richard Gerdes Resume 2016 (1)Richard Gerdes Resume 2016 (1)
Richard Gerdes Resume 2016 (1)
 
Amicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_emailAmicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_email
 

DMT Case Study with Bullets_Tabloid

  • 1. cresa.com Michael Rice provided Dornier Medtech with professional Project Management services from various ‘preliminary vision / scheme concepts’ to the fully organized step-by-step process of a full renovation. The existing Dornier footprint was approximately 24,000 RSF of office front-end spaces with an attached 11,000 RSF warehouse. The scope of the project was a five phase design build renovation of the occupied office space and related work place amenities. In step one, Rice gained Client approval of a full ‘fresh-looking’ design palette with upgraded finishes and specifications of replacement materials against a budget focused tenant improvement allowance. Teaming with the selected general contractor, B.J. Gunter, all steps of the schedule were continuously balanced upon minimum stress on Dornier’s staff, and efficiently monitoring engineering and build-out components. Within the methodical process, Rice coordinated with Gunter’s Construction Manager and sub-contractor teams replacing all floorcoverings, wall finishes, updates to lighting fixtures, some required HVAC improvements, and selected new furnishings, as well as the refurbishment of 150 file and storage unit cabinets. Some highlights of the new work environment are a new Reception Area, an updated Presentation/Conference Room, a complete new Breakroom with adjoining staff lounge, enhancements to the staff patio area, focused technology and AV items for the Training Room areas, and fully upgraded restrooms. Towards the end of the project with ‘budget savings’, Rice worked with A-R-T & Associates developing a corporate art program and created a ‘Dornier History Wall’ incorporating the Client’s archival photos. • Sophisticated ‘design concepts’ for the full renovation of a regional headquarters. • Under a tightly phased schedule, renovation of occupied office areas. • Blending new collaborative ‘community’ meeting spots into the existing workplace. • A fresh, new color and finish palette to work with existing workstations and furnishings. • Modular flooring solutions with new, patterned carpets under open area workstations. • New tailored pattern broadloom carpet and vinyl flooring installed in meeting areas. • Provided a new ‘art program’ of bold colors accenting the workplace. Dornier Medtech Atlanta, GA 24,000 SF office 11,000 SF warehouse Project Team Cresa Atlanta Michael Rice, VP - Project Management General Contractor: B.J. Gunter Art Consultant: A-R-T & Associates