1. 36 Whitehouse road Bircotes Doncaster S Yorks DN11 8EQ 07976 096022 mikh9363@aol.com
Michael Howarth
Objective Team Leader /Supervisor/Site Manager
Experience 1979-1987 HM FORCES ARMY BAOR
Driver T ank Transporter
• Responsible for The Tank Transporter as the No1 Driverof a three man crew
• To load main battle tanks and move to combatarea
• Recovery of battle damaged tanks back to rear echelon repairstation
Two tours Northern Ireland and one tour UN Peacekeeping Force UNFICYP
1987-1992 British Coal Harworth colliery
Underground Train Driver
•
• Responsible for moving men and materials to and from
• the coal face
• Supervising workman responsible for close personal supervision of trainee
workmen General haulageand Coal faceBack up
1992-1997 Home
Self-employed Ground worker and fencing operative
• Responsible for Supplying and erecting Fencing and
• Groundwork’s on new building sites nationwide
• Supervised multiple fencingand groundwork gangs on contracts
around the country
• Ordering of materials and reading site and boundary plans
1997 -
PRESENT
1997 – 2000 Various Rail Agencies United
Kingdom
Ganger Station refurbishments
Railway Signalling Installation
• Railway signaling and Telecoms installation
• Work as an IRSE LicensedTeam leader/Installer(Supervisor/site managing)
(Up to date IRSE Log book)
Also hold COSS Competency and Full first aider
I am employed primarily fitting and wiring Railway Signaling equipment on
the Rail network and London Underground working to Design construction
2. drawings also liaise with Test I have worked on Numerous projects within
the United Kingdom for various companies and Agencies and I have
recently finished working as an ITL on the Balfour Beatty/Ansaldo JV
Double track project in Malaysia from Ipoh to Padand Basar This role was
titled as Team leader but was a site managers role as I ran two stations
Kodiang Halt and Arau (The Kings station) and issued tasks to 50 plus men
(Local workforce) on my sites daily, I have worked on a variety of Rail
Projects UK wide Before the Malaysian project, I worked on The Thrumpton
Resignalling Project for Amey Colas
Oct 2013- 16/04/14)
Team/Leader (on site supervisor/ Manager)
Malaysia Double Track Project for BBAS Joint Venture
worked as a Team Leader (supervisor/on site manager) on the KEDAH LINE
Between Ipoh and Padang Basar on the Thailand border
I was responsible for two stations Kodiang Halt and Arau
I was primarily on site to Help and Advise and assist local contract companies
and their workforce to perform installation tasks
The companies I dealt with were
Touchtronics Signalling new works
Erantic, cable management
Kosi, Fibre optics cabling
Job Description
· Management of all Sub-Contractors
· Allocating planned works to site teams
· Daily monitoring of Quality & Standard of works
· Site Surveys with Sub-Contractors to agree all works including Design
Issues
· Tracking Design Issues
· Ordering Site Materials
· Producing Com Lot Paperwork documentation.
· Attending Com Lot work package Inspections (Documentation & On-
Site)
· Hands on explanation of Complex Installation activities to Sub-
3. Contractors
· Updating Installation Manager on Site Progress
· Compilation of Site Snagging lists
· On-Site liaison with Clients (MGJV & KSET
The Job was an onsite manager and Team Leader as you were involved daily
with the deployment of Installation teams and issue work to them, keep the
site running and report back to main office site managers on progress
Filling out shift reports and ordering equipment for site tasks
APRIL 2014-SEPTEMBER 2014
Worked as Team leader Installation on various projects
Sudforth Lane Resignalling -Siemens
Peterborough Resignalling-Siemens
Ipswich Resignalling -Amaro
Swansea Resignalling-Amaro
All through MPI Agency
SEPTEMBER 2014 - PRESENT
READING RESIGNALLING RSAR
Team Leader New works Installation
Siemens
Education 1974-1979 NORTH BORDER COMPREHENSIVE Bircotes Notts
36 Whitehouse road
Bircotes
Doncaster
S Yorkshire
DN11 8EQ
07976 096022
Mikh9363@aol.com
Interests
Rugby CurrentlylearningtospeakThai