SlideShare a Scribd company logo
1 of 6
Curriculum Vitae
NAME: James Joseph Lindsay
ADDRESS: 28 Clay Thorne Drive
Gainsborough
Lincolnshire
DN21 1TZ
MOBILE: 07967457906
EMAIL: jlindsay59@googlemail.com
DATE OF BIRTH: 16th
Dec 1959
HEALTH: Excellent
NATIONALITY: British
DRIVING: Full Clean License
PERSONAL PROFILE
I have worked for several high profile Rail companies on a vast array of projects and commissions where I have
been responsible for leading and supervising the work of other professionals. Highly proficient and confident in
making important decisions quickly especially in the installation of all areas of cables signaling and other rail-
associated equipment. My portfolio also includes experience in: drawings, location points, axle counters, TPWS,
TRTS, disc boxes, track circuits in the new works, existing stage works, fringe works, and associated maintenance
work along with rewiring of REBs and relay rooms. i have a proven track record of working in small and large teams
throughout all aspects of rail and signal installation projects. I have a good understanding of safety critical
operating. I am currently seeking a new and challenging role with a company or organization that can utilize this
wide portfolio of expertise.
* Good interpersonal skills
* Flexible approach and willing to adapt
* Clear thinker who creates and develops ideas
* Confident in decision making and taking the initiative
* A dedicated and reliable team member who leads by example
* Proficient communicator, verbal and written
EDUCATION & QUALIFICATIONS
1975 - 1977 Lincolnshire College, Gainsborough
City & Guilds Electrical Engineering Technology
City & Guilds Basic Electrical Engineering
1970 - 1975 North Border Comprehensive School
Educated to CSE standard in all core subjects including:
English Language and Mathematics
PROFESSIONAL QUALIFICATIONS
The Institute of Railway Signal Engineers (IRSE) Team Leader
IRSE A1 Assessor
IRSE Installer 1.2.110
IRSE Team Leader 1.8.100 No.0061583
SPWEE Course
Lookout
COSS
PTS
CAREER HISTORY
2002 - Present
Throughout the past 15 years I have worked in many roles for a wide range of high profile rail contractors including
experience as a Signal Engineer Safety Critical Operative and Controller of Site Safety. Below I have summarized my
recent experiences along with a brief outline of my associated skills and achievement’s.
Sept 2014 - March 2015 TEAM LEADER
M.P.I Siemens Rail, Reading
RORI Project
* Working on the London NLLRIP installing line-side and 4ft equipment.
* New wiring of REBs and ACE relay rooms.
* Completing termination of various cables into location DIS boxes and all
line-side equipment including signals, AWS, TPWS, points, Axle counters
and track circuits.
Sept 2013 - May 2014 TEAM LEADER/SIGNALING SUPERVISOR
TPS, Malaysia
* Responsible for wide range of supervision, management and motivation
Duties for 22 personnel
* Carrying out various tasks including: Snagging, Axle counter, ATPs, REBs
along with Evs.
Aug 2012 - Sept 2013 SIGNALING SUPERVISOR
MPI, Amey Rail, Retford
* Supervising, managing and motivating30 personnel, including the
Supervision of 8 teams of installation staff.
* Organizing work-loads along with liaising with management on a daily
basis.
* Attending various management meetings to discuss progress of work.
Apr 2011 - Aug 2012 SIGNALING SUPERVISOR
MPI Agency - Atkins, Edinburgh
* Responsible for working on the Edinburgh Axle Counter upgrade project supervising 4
teams of installers.
* Accounting for all work allocated to staff and reporting work progress to senior
management.
Mar 2011 - Apr 2011 SIGNALING TEAM LEADER/SUPERVISOR
Eldings, Wales
* Responsible to Ansaldo STS (UK) on the ERTMS Cambrian lines commissioning.
* Installing axle counters, relays, LXA pedestals, balise along with wiring of cables into
locations and trackside equipment.
* Assisting in the installation of clamp locking points from preparation building to
installation and wiring.
* Recovery of the RETB signaling equipment.
May 2009 - Mar 2011 SIGNALING TEAM LEADER
Atkins, London
* Working on the London NLLRIP installing line-side and 4ft equipment.
* Completing termination of various cables into location DIS boxes and all line-side
equipment including signals, AWS, TPWS, points, Axle counters and track circuits.
* New wiring of REBs and ACE relay rooms.
Sep 2008 - Apr 2009 INSTALLATION/CABLE SUPERVISOR
Westinghouse (Via EPC Global), London
* Responsible for the organization of installation and cable teams on the Sub Surface Lines
(SSL) track immunization project on the Metropolitan Lines.
* Organizing work schedules for teams, equipment and consumables.
* Responsible for ensuring the protection and safety of staff for teams going trackside.
* Correlating all associated paperwork including audits of administration completed by
team leaders.
* Attending interface and progress meetings with clients to resolve issues raised by site
staff.
* Assisting in surveys carried out in conjunction with the client's project team.
Jul 2008 - Sep 2008 SIGNALING TEAM LEADER
Derby Westinghouse Rail Systems
* Working on the Erewash 1.B project managing 3 staff.
* Installing TPWS, AWS Axle counters and wiring of cables into locations and track-side
equipment.
* Building of relay racking in Sheffield signal box and wiring of relevant equipment on
racking.
Apr 2008 - Jul 2008 SIGNALING TEAM LEADER
Bridgen Group, Watford
* Responsible for working on the Radlett track renewal on the Hull docks upgrade.
Installing track cables, TPWS, wiring of 48c, 27c, 19c, 10c and 4c cables into various
locations and equipment types.
Jan 2008 - Apr 2008 SIGNALING TEAM LEADER
First Engineering, Stirling
* Responsible for working on the Stirling, Alloa, Kincardine systems renewals along with
the new works installation and commissioning of 3 relay rooms and 3 level-crossings.
May 2006 - Jan 2008 SIGNALING TEAM LEADER/SUPERVISOR
Kelly Rail, Channel Tunnel, London
* Responsible for working on the ctrl PROJECT.
* Supervision of new works, installation of signals, TPWS, AWS, TRTS, ERS switches, TAD
boxes and HVI track circuits.
* Location installations including preparation and termination of various FTN paired
cables and fringe works of FTN cables into Network rail locations.
* Carrying out new works installation of concentric cables into Stratford SER on the
Underground.
* Correlation an completing all associated paperwork along with audits of paperwork
completed by Team Leaders.
* Attending interface and progress meetings with clients to resolve any issues raised by
site staff.
Dec 2005 - Apr 2006 SIGNALING TEAM LEADER
GM Rail, Alderly Edge, Stockport
* Responsible for working on Atkins SWIM and TPWS projects.
* Installing of Ansaldo interlocking system as well as conventional track-side equipment.
Oct 2005 - Dec 2005 SIGNALING INSTALLER
GM Rail, Northern Ireland
* Signaling installer on Amey Spie Bleach Green to Whitehead.
* Remodeling in Northern Ireland.
* Installing and complete rewiring of relay room.
Feb 2005 - Apr 2005 SIGNALING INSTALLER
MPI, (Sub Contracted to WS Atkins) Doncaster
* Installing TPWS Plus to the ECML fittings of TSS and OSS aerials.
* Wiring into DIS boxes and locations along with fitting and termination of TJs and relays.
May 2004 - Jan 2005 SIGNALING TEAM LEADER
MPI (Sub-contracted to Westinghouse) Peterborough
* Responsible for working on the Peterborough interlocking renewals.
* Carrying out re-signaling work including installing of full SSI equipment, inter rack
building, overhead trunking, admiralty tray work within computer floor, earth farms,
termination into Wago blocks and various cable terminations, SSI module wiring, wiring
looms, wiring and termination of panel multiplex cabinets.
* Installing of TPWS, TSS and OSS loops and aerials, AWS and signal installation.
Mar 2004 - Apr 2004 SIGNALING TEAM LEADER
Brigden Enterprises, Stafford
* Responsible for team leader duties for Carillion at the Norton Bridge Alliance.
* Leading a team of installers on axle counters and associated equipment.
May 2003 - Feb 2004 SIGNALING INSTALLER
MPI (Sub-contracted to WS Atkins) Rugby
* Responsible for installing cables on the Rugby Alliance into various equipment, LOCS and
REBs, axle counter installation and wiring, new works installing and fringe works.
Feb 2002 - Apr 2003 SIGNALING INSTALLER
Captive Rail Group, Belfast
* Responsible for installing and maintenance work on various projects on the Belfast to
Bangor remodeling, Northern Ireland Railways.
* Installing track cables on the Evergreen project for Westinghouse Rail systems, St
Pancreas update, Dolland Moor, CTRL and Clapham Junction with Balfour Beatty.
LEISURE INTERESTS
I enjoy football and D.I.Y
REFERENCES
Excellent references are available and information will be supplied upon request.
Mar 2004 - Apr 2004 SIGNALING TEAM LEADER
Brigden Enterprises, Stafford
* Responsible for team leader duties for Carillion at the Norton Bridge Alliance.
* Leading a team of installers on axle counters and associated equipment.
May 2003 - Feb 2004 SIGNALING INSTALLER
MPI (Sub-contracted to WS Atkins) Rugby
* Responsible for installing cables on the Rugby Alliance into various equipment, LOCS and
REBs, axle counter installation and wiring, new works installing and fringe works.
Feb 2002 - Apr 2003 SIGNALING INSTALLER
Captive Rail Group, Belfast
* Responsible for installing and maintenance work on various projects on the Belfast to
Bangor remodeling, Northern Ireland Railways.
* Installing track cables on the Evergreen project for Westinghouse Rail systems, St
Pancreas update, Dolland Moor, CTRL and Clapham Junction with Balfour Beatty.
LEISURE INTERESTS
I enjoy football and D.I.Y
REFERENCES
Excellent references are available and information will be supplied upon request.

More Related Content

What's hot (18)

new Perth Stadium community forum presentation
new Perth Stadium community forum presentationnew Perth Stadium community forum presentation
new Perth Stadium community forum presentation
 
Resume Doc
Resume DocResume Doc
Resume Doc
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
VINCENT PEREIRA CV
VINCENT PEREIRA CVVINCENT PEREIRA CV
VINCENT PEREIRA CV
 
rickydoverresume1
rickydoverresume1rickydoverresume1
rickydoverresume1
 
TonyCV updated5dec16

TonyCV updated5dec16
TonyCV updated5dec16

TonyCV updated5dec16

 
CV-linkedin
CV-linkedinCV-linkedin
CV-linkedin
 
ETP Group Presentation
ETP Group PresentationETP Group Presentation
ETP Group Presentation
 
CV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD EngineerCV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD Engineer
 
greenid cv
greenid cvgreenid cv
greenid cv
 
Resume Sept. 2016
Resume Sept. 2016Resume Sept. 2016
Resume Sept. 2016
 
2015 Resume
2015 Resume2015 Resume
2015 Resume
 
Papilla Company Introduction
Papilla Company IntroductionPapilla Company Introduction
Papilla Company Introduction
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
Graeme Leitch CV
Graeme Leitch CVGraeme Leitch CV
Graeme Leitch CV
 
MOVENTAS
MOVENTAS MOVENTAS
MOVENTAS
 
Lugo Marine Brochure 2011
Lugo Marine Brochure 2011Lugo Marine Brochure 2011
Lugo Marine Brochure 2011
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 

Similar to jims cv 2015 (20)

cv2016
cv2016cv2016
cv2016
 
CV_for_M_Howarth_(1) (1)
CV_for_M_Howarth_(1) (1)CV_for_M_Howarth_(1) (1)
CV_for_M_Howarth_(1) (1)
 
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
 
C.V
C.VC.V
C.V
 
Paul Hickey CV.
Paul Hickey CV.Paul Hickey CV.
Paul Hickey CV.
 
scooby cv4
scooby cv4scooby cv4
scooby cv4
 
c.v
c.vc.v
c.v
 
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829
 
Stephen Brooks CV
Stephen Brooks CVStephen Brooks CV
Stephen Brooks CV
 
richie CV 2015
richie CV 2015richie CV 2015
richie CV 2015
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013
 
Terry Johnston's CV
Terry Johnston's CVTerry Johnston's CV
Terry Johnston's CV
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
JAMES READ - CV 2014
JAMES READ - CV 2014JAMES READ - CV 2014
JAMES READ - CV 2014
 
RICHARD LEMIN CV 2016
RICHARD LEMIN  CV 2016RICHARD LEMIN  CV 2016
RICHARD LEMIN CV 2016
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
Richard Kirby CV2014
Richard Kirby CV2014Richard Kirby CV2014
Richard Kirby CV2014
 

jims cv 2015

  • 1. Curriculum Vitae NAME: James Joseph Lindsay ADDRESS: 28 Clay Thorne Drive Gainsborough Lincolnshire DN21 1TZ MOBILE: 07967457906 EMAIL: jlindsay59@googlemail.com DATE OF BIRTH: 16th Dec 1959 HEALTH: Excellent NATIONALITY: British DRIVING: Full Clean License PERSONAL PROFILE I have worked for several high profile Rail companies on a vast array of projects and commissions where I have been responsible for leading and supervising the work of other professionals. Highly proficient and confident in making important decisions quickly especially in the installation of all areas of cables signaling and other rail- associated equipment. My portfolio also includes experience in: drawings, location points, axle counters, TPWS, TRTS, disc boxes, track circuits in the new works, existing stage works, fringe works, and associated maintenance work along with rewiring of REBs and relay rooms. i have a proven track record of working in small and large teams throughout all aspects of rail and signal installation projects. I have a good understanding of safety critical operating. I am currently seeking a new and challenging role with a company or organization that can utilize this wide portfolio of expertise. * Good interpersonal skills * Flexible approach and willing to adapt * Clear thinker who creates and develops ideas * Confident in decision making and taking the initiative * A dedicated and reliable team member who leads by example * Proficient communicator, verbal and written EDUCATION & QUALIFICATIONS 1975 - 1977 Lincolnshire College, Gainsborough City & Guilds Electrical Engineering Technology City & Guilds Basic Electrical Engineering 1970 - 1975 North Border Comprehensive School Educated to CSE standard in all core subjects including: English Language and Mathematics PROFESSIONAL QUALIFICATIONS
  • 2. The Institute of Railway Signal Engineers (IRSE) Team Leader IRSE A1 Assessor IRSE Installer 1.2.110 IRSE Team Leader 1.8.100 No.0061583 SPWEE Course Lookout COSS PTS CAREER HISTORY 2002 - Present Throughout the past 15 years I have worked in many roles for a wide range of high profile rail contractors including experience as a Signal Engineer Safety Critical Operative and Controller of Site Safety. Below I have summarized my recent experiences along with a brief outline of my associated skills and achievement’s. Sept 2014 - March 2015 TEAM LEADER M.P.I Siemens Rail, Reading RORI Project * Working on the London NLLRIP installing line-side and 4ft equipment. * New wiring of REBs and ACE relay rooms. * Completing termination of various cables into location DIS boxes and all line-side equipment including signals, AWS, TPWS, points, Axle counters and track circuits. Sept 2013 - May 2014 TEAM LEADER/SIGNALING SUPERVISOR TPS, Malaysia * Responsible for wide range of supervision, management and motivation Duties for 22 personnel * Carrying out various tasks including: Snagging, Axle counter, ATPs, REBs along with Evs. Aug 2012 - Sept 2013 SIGNALING SUPERVISOR MPI, Amey Rail, Retford * Supervising, managing and motivating30 personnel, including the Supervision of 8 teams of installation staff. * Organizing work-loads along with liaising with management on a daily basis. * Attending various management meetings to discuss progress of work. Apr 2011 - Aug 2012 SIGNALING SUPERVISOR MPI Agency - Atkins, Edinburgh * Responsible for working on the Edinburgh Axle Counter upgrade project supervising 4 teams of installers. * Accounting for all work allocated to staff and reporting work progress to senior management.
  • 3. Mar 2011 - Apr 2011 SIGNALING TEAM LEADER/SUPERVISOR Eldings, Wales * Responsible to Ansaldo STS (UK) on the ERTMS Cambrian lines commissioning. * Installing axle counters, relays, LXA pedestals, balise along with wiring of cables into locations and trackside equipment. * Assisting in the installation of clamp locking points from preparation building to installation and wiring. * Recovery of the RETB signaling equipment. May 2009 - Mar 2011 SIGNALING TEAM LEADER Atkins, London * Working on the London NLLRIP installing line-side and 4ft equipment. * Completing termination of various cables into location DIS boxes and all line-side equipment including signals, AWS, TPWS, points, Axle counters and track circuits. * New wiring of REBs and ACE relay rooms. Sep 2008 - Apr 2009 INSTALLATION/CABLE SUPERVISOR Westinghouse (Via EPC Global), London * Responsible for the organization of installation and cable teams on the Sub Surface Lines (SSL) track immunization project on the Metropolitan Lines. * Organizing work schedules for teams, equipment and consumables. * Responsible for ensuring the protection and safety of staff for teams going trackside. * Correlating all associated paperwork including audits of administration completed by team leaders. * Attending interface and progress meetings with clients to resolve issues raised by site staff. * Assisting in surveys carried out in conjunction with the client's project team. Jul 2008 - Sep 2008 SIGNALING TEAM LEADER Derby Westinghouse Rail Systems * Working on the Erewash 1.B project managing 3 staff. * Installing TPWS, AWS Axle counters and wiring of cables into locations and track-side equipment. * Building of relay racking in Sheffield signal box and wiring of relevant equipment on racking. Apr 2008 - Jul 2008 SIGNALING TEAM LEADER Bridgen Group, Watford * Responsible for working on the Radlett track renewal on the Hull docks upgrade. Installing track cables, TPWS, wiring of 48c, 27c, 19c, 10c and 4c cables into various locations and equipment types. Jan 2008 - Apr 2008 SIGNALING TEAM LEADER First Engineering, Stirling
  • 4. * Responsible for working on the Stirling, Alloa, Kincardine systems renewals along with the new works installation and commissioning of 3 relay rooms and 3 level-crossings. May 2006 - Jan 2008 SIGNALING TEAM LEADER/SUPERVISOR Kelly Rail, Channel Tunnel, London * Responsible for working on the ctrl PROJECT. * Supervision of new works, installation of signals, TPWS, AWS, TRTS, ERS switches, TAD boxes and HVI track circuits. * Location installations including preparation and termination of various FTN paired cables and fringe works of FTN cables into Network rail locations. * Carrying out new works installation of concentric cables into Stratford SER on the Underground. * Correlation an completing all associated paperwork along with audits of paperwork completed by Team Leaders. * Attending interface and progress meetings with clients to resolve any issues raised by site staff. Dec 2005 - Apr 2006 SIGNALING TEAM LEADER GM Rail, Alderly Edge, Stockport * Responsible for working on Atkins SWIM and TPWS projects. * Installing of Ansaldo interlocking system as well as conventional track-side equipment. Oct 2005 - Dec 2005 SIGNALING INSTALLER GM Rail, Northern Ireland * Signaling installer on Amey Spie Bleach Green to Whitehead. * Remodeling in Northern Ireland. * Installing and complete rewiring of relay room. Feb 2005 - Apr 2005 SIGNALING INSTALLER MPI, (Sub Contracted to WS Atkins) Doncaster * Installing TPWS Plus to the ECML fittings of TSS and OSS aerials. * Wiring into DIS boxes and locations along with fitting and termination of TJs and relays. May 2004 - Jan 2005 SIGNALING TEAM LEADER MPI (Sub-contracted to Westinghouse) Peterborough * Responsible for working on the Peterborough interlocking renewals. * Carrying out re-signaling work including installing of full SSI equipment, inter rack building, overhead trunking, admiralty tray work within computer floor, earth farms, termination into Wago blocks and various cable terminations, SSI module wiring, wiring looms, wiring and termination of panel multiplex cabinets. * Installing of TPWS, TSS and OSS loops and aerials, AWS and signal installation.
  • 5. Mar 2004 - Apr 2004 SIGNALING TEAM LEADER Brigden Enterprises, Stafford * Responsible for team leader duties for Carillion at the Norton Bridge Alliance. * Leading a team of installers on axle counters and associated equipment. May 2003 - Feb 2004 SIGNALING INSTALLER MPI (Sub-contracted to WS Atkins) Rugby * Responsible for installing cables on the Rugby Alliance into various equipment, LOCS and REBs, axle counter installation and wiring, new works installing and fringe works. Feb 2002 - Apr 2003 SIGNALING INSTALLER Captive Rail Group, Belfast * Responsible for installing and maintenance work on various projects on the Belfast to Bangor remodeling, Northern Ireland Railways. * Installing track cables on the Evergreen project for Westinghouse Rail systems, St Pancreas update, Dolland Moor, CTRL and Clapham Junction with Balfour Beatty. LEISURE INTERESTS I enjoy football and D.I.Y REFERENCES Excellent references are available and information will be supplied upon request.
  • 6. Mar 2004 - Apr 2004 SIGNALING TEAM LEADER Brigden Enterprises, Stafford * Responsible for team leader duties for Carillion at the Norton Bridge Alliance. * Leading a team of installers on axle counters and associated equipment. May 2003 - Feb 2004 SIGNALING INSTALLER MPI (Sub-contracted to WS Atkins) Rugby * Responsible for installing cables on the Rugby Alliance into various equipment, LOCS and REBs, axle counter installation and wiring, new works installing and fringe works. Feb 2002 - Apr 2003 SIGNALING INSTALLER Captive Rail Group, Belfast * Responsible for installing and maintenance work on various projects on the Belfast to Bangor remodeling, Northern Ireland Railways. * Installing track cables on the Evergreen project for Westinghouse Rail systems, St Pancreas update, Dolland Moor, CTRL and Clapham Junction with Balfour Beatty. LEISURE INTERESTS I enjoy football and D.I.Y REFERENCES Excellent references are available and information will be supplied upon request.