Technical Support and OperationsRolls-Royce
Lease Engine Pool
Improvement Strategy
Michael Davies
April 2005
Technical Support and OperationsRolls-Royce
Mission
• To provide a world class spare engine
service that meets our customers
requirements (for standard, condition and
timeliness), without exception.
Technical Support and OperationsRolls-Royce
Engine leasing
FRONT
DESK
LED
Rates
STOBL
Transport
Insurance
Deposit
Lease offer
Lease request
Eng dispatch
Serviceable
engines
Requirements document (CRD)
Customer
Technical Support and Operations
Off wing management
Secure storage
Lease team
Fleet Ops OH Support
Campaigns
SV
Workscopes
Slots
OWC/SM
Post lease
checkLease Eng
Data Set
Aft Business
MEAROS
Policy
Process
Line main
Config
IP
Fleet planning
Pool sizing
Technical Support and OperationsRolls-Royce
Improvement planning
Scope Whole lease process
EBU policy T9/8/7/5
Additional services
Services culture Flowdown of attitude
Training
Satisfy stakeholders
Vision and mission
BR/AE strategy Transportation
Plan
Execute
Build in MQF
Previous awayday
Customer complaints
Embody RCP
Management study
StrategyBaseline
Technical Support and OperationsRolls-Royce
Objectives Establish consistent support
Develop whole process
Develop resource
Develop PPD
Define documentation
30/60/90 day achievements
Resource Identify people requirements Team size
Development planning
Plant H8
Equipment Database
Scanner
Fleet database
Problem database
FSO Monthly reports
Oversee post lease
Confirm packs
Communicate Intentions
Progress
Team/Ops/TSO/CBT/customers
Reengineer function "Spare engine services"
TargetsLinkCapability
Improvement planning (2)
Technical Support and OperationsRolls-Royce
Define KPI Operational
Business
Contractual
Customer satisfaction
Regulatory/quality
Feedback/control measures DMAIC
Identify best practice RRC
RRD
Wider RR
Benchmark
Competitor intelligence
Build in DMAIC Project 1
Future projects? > 6 months
RRCorp
Process
Excel
BenchmarkMeasurement
Improvement planning (3)
Technical Support and Operations
Identify and review top level functions
Identify and review sub functions
Review current processes Budgeting
(target mid year) Fleet planning LED in Fleet Ops tool
Fleet management SV/campaigns
Front desk engine leasing Out hours insurance/deposit
Engine movements Decision
Function
Invoicing
Post lease Map
Rework Workscope
Secure funding
Management
Inventory Manage
Store
Pool sizing New pool
Acquisitions/retirals
Existing pool
Documentation LEG
Awayday
Lease committee Review leases in period
Strategy
Lessons learnt
KPI's
aeromanager
Aftermarket (H Heuval) Embody policy on sub processes
Front desk/Fleet Ops
Activities Improvement planning (4)
Technical Support and OperationsRolls-Royce
Improvement programme
Technical Support and Operations
DMAIC (M)easure
Pareto of negative responses (out of 15)
0
2
4
6
8
10
12
Delivereytimeliness
AllDatacompleted
Otherinspectionsrequired
Customerrequirements
Sufficientdetail
NMSBcompleteandaccurate
Fullycertified
Unacceptableshortages
Modstandard(config)correct
Correctformatsused
ADlistcompleteandaccurate
Shortage/missingformcorrect
Deliveredontimetopromise
Engineratingcorrect
Enginemadeserviceable(RR)
Customerrequirementschange
Delivereyconditionagreed
Othernonconformance
Changestoshippinginfo
Conditionofengine
Leasetermsacceptable
RR/OWCmetexpectations
Accurate
Repeatboroscopeneeded
Allresponsibilitiesdischarged
FSOassistedpart2pack
Toldaboutnon-conformance
Leaseoffercorrect
Deliveredtocorrectlocation
Margincorrect
Question
Numberofnegativeresponses
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
Number of responses
Cumulative percentage
Technical Support and OperationsRolls-Royce
DMAIC
• Defects per Million
Opportunities (DPMO)
• Measured against CTQC for
Lease Group input and output
– 238,710 input DPMO (σ = 2.2)
– 244,444 output DPMO (σ = 2.2)
– Defects delivered to customer
• 97.7% bad passes
• 2.3% introduced by Lease team
• Post lease check and
documentation by OWC
Technical Support and OperationsRolls-Royce
Improvement summary
• Review current operation – Containment
• Implement improvement scheme for 2005
– Process overhaul
– Service level
– Implement firm eng status – GO / NO GO
– Fleet management
– Pre or locally approved expenditure
– Rebrand - “Spare engine services”
Technical Support and OperationsRolls-Royce
5 – Manage Installed Equipment
5.6 Supply Lease Engines
Overall process ownership – Operations Room (TS&O)
Key deliverable – Delivery of lease engines within committed time-scales where contractually required
5.6.2
Determine most
appropriate lease asset
to use, based on
geographic, config
requirements
5.6.3
Generate lease rates
for use in STOBL
(or reverse STOBL) as
required
5.6.5
Launch lease engine
transportation logistics
Asses requirement
for On-Platform Care
intervention
5.6.6a
Instruct any workscope
requirements to
address configuration
issues
5.6.7
Ensure customer
delivers all required
lease engine group
paperwork
Update business
plan as required
5.4.3
5.6.1
Determine if lease
engine support is
required based on
contractual obligations
5.6.4
Execute STOBL with
Customer
Advise Aftermarket of
potential costs
5.6.6b
Generate workscope
requirements to
address configuration
issues and obtain
slot as required
5.6.8
During lease, ensure
customer maintains
accurate flying hours,
cycles and maintenance
information
Investigate
opportunities for On-
Wing Care
intervention
Process lead : Chris ComptonProcess owner : Rob Hill ASG 5.6
5.5
Technical Support &
Operations
Customer Business
Aftermarket
accountability
Regional
accountability
Overhaul
Support
accountability
Ops Room
accountability
Issue 1.2
Air En MarDef
Technical Support and OperationsRolls-Royce
Post lease checks - use of OWC
• Dissatisfaction (Customer Complaints)
– Missing components
– Incorrect documentation
• Engine downtime (ROI)
– Average 22 days to declare serviceability
– 65% LEDS finished
– 1% LEDS complete and accurate
• Replacement parts (Incremental cost)
– Non-recovered parts (MVP bags)
• Effect of alternatives is already known!!!
Technical Support and OperationsRolls-Royce
Cost of OWC – 2005
Cost of OWC per engine type
21%
17%
20%
20%
11%
11%
T500
T800
T700
524
535
Tay
OWC charges summary
Base Remote Parts $1,500 Averages Post lease $10,650
Pre-lease inspection $1,500 $2,200 Travel/subsistence $1,500 Pre lease $4,850
Post lease check $6,500 $8,800
Engine stand transfer $4,500 -
Additional cost prediction
Ops forecast
Installations $118,825
T500 T800 T700 524 535 Tay
Installations 14 8 9 9 5 4 Terminations $372,750
Terminations 7 6 7 7 4 4
Total $108,500 $83,300 $96,375 $96,375 $54,725 $52,300 $491,575 Total $491,575
Technical Support and OperationsRolls-Royce
Decreased eng downtime
• 10 day improvement on post lease service-
ability performance
– Currently 22 days
– With OWC 12 days (or better)
• Assuming 2 leases/ESN/year
– +20 revenue days or ~ 6% /ESN/year ($5000/day)
– 120 days on normal fleet (+1 lease/36% eng) ~$10M
– 340 days on large fleet (> 100% eng) ~$15M
– Pool size and flexibility
Technical Support and OperationsRolls-Royce
Engine condition
Post lease = NO-GO
• Post lease check
• Lease Eng Data Set (LEDS)
• Discrepancies addressed
• Secure storage
Pre lease = GO
• Transport
• Locate
• Storage
Discrepancies
- documented
- communicated
- written agreement
Intermediate condition = M.E.L.
Technical Support and OperationsRolls-Royce
Improvement scheme – buy off
• Communication & buy off
– Aftermarket (Exec/ABE’s/Finance)
– Regions (CS/Commercial)
– TS&O (Exec/Ops Room)
• Policies in place for major changes
– Post lease checks on large engines (Trent/RB211)
– GO/NO-GO engine status implemented
• Lease rate price increase
– Recover an amount of potential revenue
– Increased service level thru OWC
– Communicate
Technical Support and Operations
The End

More Related Content

What's hot

Conway Case Study - Optimizing Application Integration SDLC
Conway Case Study -  Optimizing Application Integration SDLCConway Case Study -  Optimizing Application Integration SDLC
Conway Case Study - Optimizing Application Integration SDLCRam Vittal
 
Alvin Eaton NEW 1 (3)
Alvin Eaton  NEW 1 (3)Alvin Eaton  NEW 1 (3)
Alvin Eaton NEW 1 (3)Alvin Eaton
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Envecon One Stop IT Solution for Maritime and Asset Intensive Industry
Envecon One Stop IT Solution for Maritime and Asset Intensive IndustryEnvecon One Stop IT Solution for Maritime and Asset Intensive Industry
Envecon One Stop IT Solution for Maritime and Asset Intensive Industryenveconit
 
Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam Khalil
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
CV Alan Crossan 210915
CV Alan Crossan 210915CV Alan Crossan 210915
CV Alan Crossan 210915Alan Crossan
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramIbrahim Al-Hudhaif
 

What's hot (9)

Conway Case Study - Optimizing Application Integration SDLC
Conway Case Study -  Optimizing Application Integration SDLCConway Case Study -  Optimizing Application Integration SDLC
Conway Case Study - Optimizing Application Integration SDLC
 
Alvin Eaton NEW 1 (3)
Alvin Eaton  NEW 1 (3)Alvin Eaton  NEW 1 (3)
Alvin Eaton NEW 1 (3)
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Envecon One Stop IT Solution for Maritime and Asset Intensive Industry
Envecon One Stop IT Solution for Maritime and Asset Intensive IndustryEnvecon One Stop IT Solution for Maritime and Asset Intensive Industry
Envecon One Stop IT Solution for Maritime and Asset Intensive Industry
 
Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Logistics1
Logistics1Logistics1
Logistics1
 
CV Alan Crossan 210915
CV Alan Crossan 210915CV Alan Crossan 210915
CV Alan Crossan 210915
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 

Viewers also liked

Ceqa saudi project (pm)
Ceqa saudi project (pm)Ceqa saudi project (pm)
Ceqa saudi project (pm)Michael Davies
 
Programme project (ej)
Programme  project (ej)Programme  project (ej)
Programme project (ej)Michael Davies
 
Airlines review project (rrna)
Airlines review project (rrna)Airlines review project (rrna)
Airlines review project (rrna)Michael Davies
 
Market overview project (pcso)
Market overview project (pcso)Market overview project (pcso)
Market overview project (pcso)Michael Davies
 
Services project (rrb)
Services project (rrb)Services project (rrb)
Services project (rrb)Michael Davies
 

Viewers also liked (7)

Ceqa saudi project (pm)
Ceqa saudi project (pm)Ceqa saudi project (pm)
Ceqa saudi project (pm)
 
Programme project (ej)
Programme  project (ej)Programme  project (ej)
Programme project (ej)
 
Airlines review project (rrna)
Airlines review project (rrna)Airlines review project (rrna)
Airlines review project (rrna)
 
Market overview project (pcso)
Market overview project (pcso)Market overview project (pcso)
Market overview project (pcso)
 
Services project (rrb)
Services project (rrb)Services project (rrb)
Services project (rrb)
 
Cfms project (asrc)
Cfms project (asrc)Cfms project (asrc)
Cfms project (asrc)
 
sujeetkumar_cv1
sujeetkumar_cv1sujeetkumar_cv1
sujeetkumar_cv1
 

Similar to Lease strategy project (lem)

Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012GMoore77
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics ReportingTSSParatransit
 
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsHow Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsTSSParatransit
 
Sparrows Corporate Presentation
Sparrows Corporate PresentationSparrows Corporate Presentation
Sparrows Corporate PresentationBenji George
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenancessusereb347d
 
Workshop Presentation_Final
Workshop Presentation_FinalWorkshop Presentation_Final
Workshop Presentation_FinalMICHAEL BLUMBERG
 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEhab Lamee
 
Roy sayre 01.2016
Roy sayre 01.2016Roy sayre 01.2016
Roy sayre 01.2016Roy Sayre
 
Engine Leasing - Aeolus Guide to Maintenance Cost Savings
Engine Leasing - Aeolus Guide to Maintenance Cost SavingsEngine Leasing - Aeolus Guide to Maintenance Cost Savings
Engine Leasing - Aeolus Guide to Maintenance Cost SavingsFergalWhelanPorter
 
140428 SIBS Presentation
140428 SIBS Presentation140428 SIBS Presentation
140428 SIBS PresentationMike Fallows
 
imp-mathew_ship_energy_audit.pdf
imp-mathew_ship_energy_audit.pdfimp-mathew_ship_energy_audit.pdf
imp-mathew_ship_energy_audit.pdfKumarPranav27
 
Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh Handigol
 
Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012Absoft Limited
 
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...Peter Stinson
 

Similar to Lease strategy project (lem) (20)

Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012Pollard Equipment Capabilities 2012
Pollard Equipment Capabilities 2012
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
 
Ted Bouchier - CV
Ted Bouchier - CVTed Bouchier - CV
Ted Bouchier - CV
 
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsHow Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
 
Sparrows Corporate Presentation
Sparrows Corporate PresentationSparrows Corporate Presentation
Sparrows Corporate Presentation
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance
 
Technology and Cost Assessments for New Passenger Cars in China - Hui He
Technology and Cost Assessments for New Passenger Cars in China - Hui HeTechnology and Cost Assessments for New Passenger Cars in China - Hui He
Technology and Cost Assessments for New Passenger Cars in China - Hui He
 
Workshop Presentation_Final
Workshop Presentation_FinalWorkshop Presentation_Final
Workshop Presentation_Final
 
CV.
CV.CV.
CV.
 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEE
 
Roy sayre 01.2016
Roy sayre 01.2016Roy sayre 01.2016
Roy sayre 01.2016
 
Engine Leasing - Aeolus Guide to Maintenance Cost Savings
Engine Leasing - Aeolus Guide to Maintenance Cost SavingsEngine Leasing - Aeolus Guide to Maintenance Cost Savings
Engine Leasing - Aeolus Guide to Maintenance Cost Savings
 
140428 SIBS Presentation
140428 SIBS Presentation140428 SIBS Presentation
140428 SIBS Presentation
 
Throttle Energy Business PPT
Throttle Energy Business PPTThrottle Energy Business PPT
Throttle Energy Business PPT
 
imp-mathew_ship_energy_audit.pdf
imp-mathew_ship_energy_audit.pdfimp-mathew_ship_energy_audit.pdf
imp-mathew_ship_energy_audit.pdf
 
Vestas modified 1
Vestas modified 1Vestas modified 1
Vestas modified 1
 
Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015Mahesh CV updated 30th Sep 2015
Mahesh CV updated 30th Sep 2015
 
Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012
 
dapski042116
dapski042116dapski042116
dapski042116
 
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
 

Recently uploaded

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Recently uploaded (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Lease strategy project (lem)

  • 1. Technical Support and OperationsRolls-Royce Lease Engine Pool Improvement Strategy Michael Davies April 2005
  • 2. Technical Support and OperationsRolls-Royce Mission • To provide a world class spare engine service that meets our customers requirements (for standard, condition and timeliness), without exception.
  • 3. Technical Support and OperationsRolls-Royce Engine leasing FRONT DESK LED Rates STOBL Transport Insurance Deposit Lease offer Lease request Eng dispatch Serviceable engines Requirements document (CRD) Customer
  • 4. Technical Support and Operations Off wing management Secure storage Lease team Fleet Ops OH Support Campaigns SV Workscopes Slots OWC/SM Post lease checkLease Eng Data Set Aft Business MEAROS Policy Process Line main Config IP Fleet planning Pool sizing
  • 5. Technical Support and OperationsRolls-Royce Improvement planning Scope Whole lease process EBU policy T9/8/7/5 Additional services Services culture Flowdown of attitude Training Satisfy stakeholders Vision and mission BR/AE strategy Transportation Plan Execute Build in MQF Previous awayday Customer complaints Embody RCP Management study StrategyBaseline
  • 6. Technical Support and OperationsRolls-Royce Objectives Establish consistent support Develop whole process Develop resource Develop PPD Define documentation 30/60/90 day achievements Resource Identify people requirements Team size Development planning Plant H8 Equipment Database Scanner Fleet database Problem database FSO Monthly reports Oversee post lease Confirm packs Communicate Intentions Progress Team/Ops/TSO/CBT/customers Reengineer function "Spare engine services" TargetsLinkCapability Improvement planning (2)
  • 7. Technical Support and OperationsRolls-Royce Define KPI Operational Business Contractual Customer satisfaction Regulatory/quality Feedback/control measures DMAIC Identify best practice RRC RRD Wider RR Benchmark Competitor intelligence Build in DMAIC Project 1 Future projects? > 6 months RRCorp Process Excel BenchmarkMeasurement Improvement planning (3)
  • 8. Technical Support and Operations Identify and review top level functions Identify and review sub functions Review current processes Budgeting (target mid year) Fleet planning LED in Fleet Ops tool Fleet management SV/campaigns Front desk engine leasing Out hours insurance/deposit Engine movements Decision Function Invoicing Post lease Map Rework Workscope Secure funding Management Inventory Manage Store Pool sizing New pool Acquisitions/retirals Existing pool Documentation LEG Awayday Lease committee Review leases in period Strategy Lessons learnt KPI's aeromanager Aftermarket (H Heuval) Embody policy on sub processes Front desk/Fleet Ops Activities Improvement planning (4)
  • 9. Technical Support and OperationsRolls-Royce Improvement programme
  • 10. Technical Support and Operations DMAIC (M)easure Pareto of negative responses (out of 15) 0 2 4 6 8 10 12 Delivereytimeliness AllDatacompleted Otherinspectionsrequired Customerrequirements Sufficientdetail NMSBcompleteandaccurate Fullycertified Unacceptableshortages Modstandard(config)correct Correctformatsused ADlistcompleteandaccurate Shortage/missingformcorrect Deliveredontimetopromise Engineratingcorrect Enginemadeserviceable(RR) Customerrequirementschange Delivereyconditionagreed Othernonconformance Changestoshippinginfo Conditionofengine Leasetermsacceptable RR/OWCmetexpectations Accurate Repeatboroscopeneeded Allresponsibilitiesdischarged FSOassistedpart2pack Toldaboutnon-conformance Leaseoffercorrect Deliveredtocorrectlocation Margincorrect Question Numberofnegativeresponses 0.00% 20.00% 40.00% 60.00% 80.00% 100.00% 120.00% Number of responses Cumulative percentage
  • 11. Technical Support and OperationsRolls-Royce DMAIC • Defects per Million Opportunities (DPMO) • Measured against CTQC for Lease Group input and output – 238,710 input DPMO (σ = 2.2) – 244,444 output DPMO (σ = 2.2) – Defects delivered to customer • 97.7% bad passes • 2.3% introduced by Lease team • Post lease check and documentation by OWC
  • 12. Technical Support and OperationsRolls-Royce Improvement summary • Review current operation – Containment • Implement improvement scheme for 2005 – Process overhaul – Service level – Implement firm eng status – GO / NO GO – Fleet management – Pre or locally approved expenditure – Rebrand - “Spare engine services”
  • 13. Technical Support and OperationsRolls-Royce 5 – Manage Installed Equipment 5.6 Supply Lease Engines Overall process ownership – Operations Room (TS&O) Key deliverable – Delivery of lease engines within committed time-scales where contractually required 5.6.2 Determine most appropriate lease asset to use, based on geographic, config requirements 5.6.3 Generate lease rates for use in STOBL (or reverse STOBL) as required 5.6.5 Launch lease engine transportation logistics Asses requirement for On-Platform Care intervention 5.6.6a Instruct any workscope requirements to address configuration issues 5.6.7 Ensure customer delivers all required lease engine group paperwork Update business plan as required 5.4.3 5.6.1 Determine if lease engine support is required based on contractual obligations 5.6.4 Execute STOBL with Customer Advise Aftermarket of potential costs 5.6.6b Generate workscope requirements to address configuration issues and obtain slot as required 5.6.8 During lease, ensure customer maintains accurate flying hours, cycles and maintenance information Investigate opportunities for On- Wing Care intervention Process lead : Chris ComptonProcess owner : Rob Hill ASG 5.6 5.5 Technical Support & Operations Customer Business Aftermarket accountability Regional accountability Overhaul Support accountability Ops Room accountability Issue 1.2 Air En MarDef
  • 14. Technical Support and OperationsRolls-Royce Post lease checks - use of OWC • Dissatisfaction (Customer Complaints) – Missing components – Incorrect documentation • Engine downtime (ROI) – Average 22 days to declare serviceability – 65% LEDS finished – 1% LEDS complete and accurate • Replacement parts (Incremental cost) – Non-recovered parts (MVP bags) • Effect of alternatives is already known!!!
  • 15. Technical Support and OperationsRolls-Royce Cost of OWC – 2005 Cost of OWC per engine type 21% 17% 20% 20% 11% 11% T500 T800 T700 524 535 Tay OWC charges summary Base Remote Parts $1,500 Averages Post lease $10,650 Pre-lease inspection $1,500 $2,200 Travel/subsistence $1,500 Pre lease $4,850 Post lease check $6,500 $8,800 Engine stand transfer $4,500 - Additional cost prediction Ops forecast Installations $118,825 T500 T800 T700 524 535 Tay Installations 14 8 9 9 5 4 Terminations $372,750 Terminations 7 6 7 7 4 4 Total $108,500 $83,300 $96,375 $96,375 $54,725 $52,300 $491,575 Total $491,575
  • 16. Technical Support and OperationsRolls-Royce Decreased eng downtime • 10 day improvement on post lease service- ability performance – Currently 22 days – With OWC 12 days (or better) • Assuming 2 leases/ESN/year – +20 revenue days or ~ 6% /ESN/year ($5000/day) – 120 days on normal fleet (+1 lease/36% eng) ~$10M – 340 days on large fleet (> 100% eng) ~$15M – Pool size and flexibility
  • 17. Technical Support and OperationsRolls-Royce Engine condition Post lease = NO-GO • Post lease check • Lease Eng Data Set (LEDS) • Discrepancies addressed • Secure storage Pre lease = GO • Transport • Locate • Storage Discrepancies - documented - communicated - written agreement Intermediate condition = M.E.L.
  • 18. Technical Support and OperationsRolls-Royce Improvement scheme – buy off • Communication & buy off – Aftermarket (Exec/ABE’s/Finance) – Regions (CS/Commercial) – TS&O (Exec/Ops Room) • Policies in place for major changes – Post lease checks on large engines (Trent/RB211) – GO/NO-GO engine status implemented • Lease rate price increase – Recover an amount of potential revenue – Increased service level thru OWC – Communicate
  • 19. Technical Support and Operations The End