Herchmer Crescent Residential Energy Audit
Description of the House
The house on Herchmer Crescent is a split-level, 2 story property. The front of the house (road side) faces East,
with the North wall oriented at -9° N. The size of the living area (1st and 2nd floors only) is approximately 1,200
ft2 (1,186 ft2). The volume of the entire heated building envelop is approximately 16,000 ft3 (16,134 ft3). This
volume includes the basement, crawlspace, 1st and 2nd floors, but not the attics (which are unheated).
Space heating is provided by a 20kW electric furnace. Water heating is provided by a 40 gallon electric hot water
tank. Additionally, a small natural gas fireplace gets used occasionally, and is mostly a decorative appliance.
Below-grade foundation walls consist of 10" concrete block. Within the crawlspace, the block is bare with no
insulation. Within the basement, the block is covered from the inside by a thin softwood facing with a small air
gap between the two. Also to note is that the joist header space within the crawlspace is only insulated on the
West facing wall with 2" XPS foam; the North and East facing joist header spaces are un-insulated.
First floor (above crawlspace) walls are framed by 2"x4" studs @ 16"o.c., giving 3.5" of space insulated with
yellow fiberglass insulation (R=3.5/"). These walls also consist of a 0.5" layer of gypsum board, a small air cavity
(R=1), OSB sheathing (0.5") and an outside brick veneer facing (4" thick). Second floor (above basement) walls
are similar in construction, with the exception of thin aluminum siding instead of brick veneer.
The roof is of a split-level gable construction, with the attic spaces unheated. The first floor attic/ceiling is
insulated with 5" of yellow fiberglass between studs 20" o.c. The second floor attic/ceiling is insulated with both
5" yellow and 7" pink fiberglass, also between studs 20" o.c.
There are two wooden doors, at front entrance (1st floor, brick veneer wall) and read entrance (basement, un-
insulated concrete block wall). There are also many types of windows on East/West walls, including vinyl double
pane sliders, a vinyl sliding door, a wood double pane fixed and a low-e vinyl double pane slider.
Air Leakage
To determine the leavel of air leakage at the home, a blower door test was done yeilding the following Values:
To give some understanding as to what these numbers represent, consider the following:
The very best new home will have an ACH50 of around 1.0; typical newer homes will have an ACH50 of about
4.0; mildly leaky homes will have an ACH50 value of around 7.0, and if an ACH50 value of 10-15+ is measured,
that would be considered a space will considerable air leakage issues.
Since the value measured for this home was 7.09 ACH50, it can be considered mildly leaky.
Also to note is the equivalent leakage area of 180.1 in2. This means that if all the areas of infiltration were added
up to form a single hole, it would have an area of 180.1 in2, slightly larger than 1 square foot.
A noticeable draft was present around the door to the basement, which would indicate high airflow from the
basement to the main floors. It's probable that substantial air leakage was emanating from the un-insulated
foundation walls in both the basement (behind the wood paneling) and the crawlspace.
Pie Charts (Heat Loss as $; Energy $ spent)
Introduction to Recommendations
The objective of this audit was to offer the home-owner recommendations that would yield the greatest savings
per dollar invested. To achieve this, we first had to model the building in RetScreen. We could then identify
those areas of the home which were the greatest contributors to heat loss and energy consumption. This data is
displayed visually through pie charts on the previous page. Finally, we could offer recommendations to alleviate
those losses and provide a dollar estimate of expected savings per year.
Recommended Upgrades
1. Natural Gas Furnace
Space heating through electricity is extremely expensive. The existing electric furnace
may be very efficient, but the operating cost over a cold Canadian winter is
extremely high. More than half the yearly energy dollars spent at the house are
through the existing electric furnace, totaling nearly $2700. Replacing the electric
furnace with a high efficiency natural gas furnace would result in substantial yearly
savings.
Replacing the existing 20kW furnace with a 70,000 BTU, 95% efficiency furnace
would yield as estimate $712 in yearly fuel cost savings. The payback for this upgrade
should be no more than 2 years, making it a very attractive option.
2. Reducing Air Leakage/Heat Loss in Basement/Crawlspace
Significant air leakage was noted coming from the basement during our blower
door test. This is most likely caused by the un-insulated concrete block walls in the
crawlspace, the inadequately insulated below grade walls in the basement and the
three un-insulated crawlspace joist header spaces. The best option may be to add a
2" layer of XPS foam to the crawlspace walls, fill the air cavity in the below grade
basement walls with spray foam and add 3" of fiberglass insulation to the un-
insulated joist header spaces. This would reduce the amount of air leakage from
these spaces, plus add additional heat loss protection.
After implementing these upgrades with the software model, expected yearly
energy savings were found to be $194. This is a moderate savings, but the upgrades
would not be difficult, nor too expensive to implement, so the payback time would
be reasonable: within 5 years.
3. Electrical Baseloads
Electrical baseloads are all loads within the house that consume electricity. This
includes appliances, electronics, lighting and more. Additional "vampire" loads
exist in the form of electronic appliances on standby, such as computers, stereos
and televisions. Currently, nearly $1300 a year is being spent to service these
loads, which total nearly 25 kWh's per day. If that 25 kWh's could be cut in half,
substantial energy savings could be accrued.
To achieve this, a swath of energy efficient upgrades would have to be initiated.
Replacing all incandescent lights with CFL's would be the first step. It may be cost
effective to replace older appliances like the washing machine, dryer, dishwasher
or refrigerator. Many provincial rebates exist to encourage homeowners to do
this. Turning off home electronics would reducing their idle electricity
consumption. Even remembering to turn off lights in rooms not in use would go
towards achieving energy savings.
If it would be possible to cut in half the current baseload electricity consumption of 25 kWh's, a yearly savings of
$307 would result.
4. First Floor Attic Insulation Upgrade
Attics are a substantial source for heat loss and air leakage if improperly insulated. The first floor attic is only
insulated with 5" fiberglass, which isn't sufficient. An addition 7" of fiberglass insulation would add almost 25 R
value, yielding an annual savings of $119. This would be a very easy and cost effective upgrade, with very short
payback time.
Other Potential Upgrades
 Reduce the heating setpoint by 1-2°.
 Increase the cooling setpoint by 1-2°.
 Reduce the temperature of the hot water tank from 60°C to 50°C.
 Upgrade one/several/all the house windows to low-e argon.
 Install a heat recovery ventilator.
Appendix A: Volume Calculations
Space Measurements
Crawlspace 23' x 25'5.5" x 4'2" = 2439.8 ft3
Basement 20'3" x 26' x 8' = 4212.0 ft3
1st Floor 23' x 25'5.5" x 8' = 4684.3 ft3
2nd Floor 28' x 21'5" x 8' = 4797.3 ft3
Total Volume = 16,133.4 ft3
Appendix B: Weather Reconciliation Calculations
Appendix C: 3D Surface Charts of Electricity Consumption 2013
Appendix D: Daily Gas Consumption
42 Herchmer Gas Consumption - Actual
Days from Current m3
Date last Reading since last
15-Jan-14 Actual 306 2,855.00 25.00
15-Mar-13 Actual 58 2,830.00 3.00
16-Jan-13 Actual 62 2,827.00 52.00
15-Nov-12 Actual 59 2,775.00 47.00
17-Sep-12 Actual 62 2,728.00 50.00
17-Jul-12 Actual 62 2,678.00 53.00
16-May-12 Actual 62 2,625.00 51.00
15-Mar-12 Actual 58 2,574.00 49.00
17-Jan-12 Actual 61 2,525.00 50.00
17-Nov-11 Actual 63 2,475.00 50.00
15-Sep-11 Actual 62 2,425.00 50.00
15-Jul-11 Actual 2,375.00
Total Number of days were gas was used: Sum(C4:C14) Total gas used (m3): Sum(E4:E14)
915 480.00
Average Daily Gas Consumption = Total gas used (m3) / Total number of days
"= 480 / 915"
0.525 Cubic Meters gas per day
0.000
0.100
0.200
0.300
0.400
0.500
0.600
0.700
0.800
0.900
Gasconcumptionperday(m3/day)
Date
Gas Consumption (m3/day) over time

More Related Content

What's hot

2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House LectureTE Studio
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsRDH Building Science
 
TE Studio - Intep Portfolio
TE Studio - Intep PortfolioTE Studio - Intep Portfolio
TE Studio - Intep PortfolioTE Studio
 
Evergreen alabama lyeffion 5 final report (5)
Evergreen alabama   lyeffion 5 final report (5)Evergreen alabama   lyeffion 5 final report (5)
Evergreen alabama lyeffion 5 final report (5)Thermacote
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House ProjectsTE Studio
 
passivehouse article
passivehouse articlepassivehouse article
passivehouse articleJoe Chouinard
 
First Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseFirst Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseTE Studio
 
St. James Church - Energy Audit Report
St. James Church - Energy Audit ReportSt. James Church - Energy Audit Report
St. James Church - Energy Audit ReportMichael Clarke
 
New updated power point lpg
New updated power point lpgNew updated power point lpg
New updated power point lpgsisterscarlos
 
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...GreenHomeNYC
 
Green needham nsl weatherization colonials and ranches
Green needham nsl weatherization   colonials and ranchesGreen needham nsl weatherization   colonials and ranches
Green needham nsl weatherization colonials and ranchesGreen Needham
 
High Mass Construction with SunTerra EnergyBlock
High Mass Construction with SunTerra EnergyBlockHigh Mass Construction with SunTerra EnergyBlock
High Mass Construction with SunTerra EnergyBlockSunterra Homes
 
Sarvesh energy audit_final_presentation
Sarvesh energy audit_final_presentationSarvesh energy audit_final_presentation
Sarvesh energy audit_final_presentationSarvesh Dandekar
 
Climate Responsive Architecture
Climate Responsive ArchitectureClimate Responsive Architecture
Climate Responsive ArchitectureMithilesh Mandal
 
Permaculture in the Tropics
Permaculture in the TropicsPermaculture in the Tropics
Permaculture in the Tropicsereciclaje
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusTE Studio
 

What's hot (20)

Energy Conservation And Going Green Gccc 0109
Energy Conservation And Going Green Gccc 0109Energy Conservation And Going Green Gccc 0109
Energy Conservation And Going Green Gccc 0109
 
2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture
 
2345 project
2345 project2345 project
2345 project
 
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential BuildingsEnergy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
Energy Consumption in Low-Rise Wood Frame Multi-Unit Residential Buildings
 
TE Studio - Intep Portfolio
TE Studio - Intep PortfolioTE Studio - Intep Portfolio
TE Studio - Intep Portfolio
 
Evergreen alabama lyeffion 5 final report (5)
Evergreen alabama   lyeffion 5 final report (5)Evergreen alabama   lyeffion 5 final report (5)
Evergreen alabama lyeffion 5 final report (5)
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House Projects
 
Responding to nature
Responding to natureResponding to nature
Responding to nature
 
passivehouse article
passivehouse articlepassivehouse article
passivehouse article
 
First Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseFirst Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit House
 
St. James Church - Energy Audit Report
St. James Church - Energy Audit ReportSt. James Church - Energy Audit Report
St. James Church - Energy Audit Report
 
New updated power point lpg
New updated power point lpgNew updated power point lpg
New updated power point lpg
 
Bill Quigley Passive solar house CI
Bill Quigley Passive solar house CIBill Quigley Passive solar house CI
Bill Quigley Passive solar house CI
 
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
April Forum: The Hit List - The Top Tips to Green NYC Buildings Part 1 of 3 E...
 
Green needham nsl weatherization colonials and ranches
Green needham nsl weatherization   colonials and ranchesGreen needham nsl weatherization   colonials and ranches
Green needham nsl weatherization colonials and ranches
 
High Mass Construction with SunTerra EnergyBlock
High Mass Construction with SunTerra EnergyBlockHigh Mass Construction with SunTerra EnergyBlock
High Mass Construction with SunTerra EnergyBlock
 
Sarvesh energy audit_final_presentation
Sarvesh energy audit_final_presentationSarvesh energy audit_final_presentation
Sarvesh energy audit_final_presentation
 
Climate Responsive Architecture
Climate Responsive ArchitectureClimate Responsive Architecture
Climate Responsive Architecture
 
Permaculture in the Tropics
Permaculture in the TropicsPermaculture in the Tropics
Permaculture in the Tropics
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House Plus
 

Viewers also liked

Jelecos Services Overview
Jelecos Services OverviewJelecos Services Overview
Jelecos Services OverviewJessica Sheldon
 
Композитні матеріали на основі полімерів
Композитні матеріали на основі полімерівКомпозитні матеріали на основі полімерів
Композитні матеріали на основі полімерівTechToday
 
Sports Authority Job Openings Search
Sports Authority Job Openings SearchSports Authority Job Openings Search
Sports Authority Job Openings SearchZachary Atwood
 
Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...
Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...
Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...In-SHUCK-ch Nation
 
Báo cáo thực tập
Báo cáo thực tậpBáo cáo thực tập
Báo cáo thực tậpThành Văn
 
Paris Expo CykleBoks
Paris Expo CykleBoksParis Expo CykleBoks
Paris Expo CykleBoksOana Maries
 

Viewers also liked (12)

joel resume
joel resumejoel resume
joel resume
 
Jelecos Services Overview
Jelecos Services OverviewJelecos Services Overview
Jelecos Services Overview
 
Tugas 3 sosial media
Tugas 3 sosial mediaTugas 3 sosial media
Tugas 3 sosial media
 
Композитні матеріали на основі полімерів
Композитні матеріали на основі полімерівКомпозитні матеріали на основі полімерів
Композитні матеріали на основі полімерів
 
Sports Authority Job Openings Search
Sports Authority Job Openings SearchSports Authority Job Openings Search
Sports Authority Job Openings Search
 
Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...
Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...
Land Resources & Capital Infrastructure: the 3rd Pillar of In-SHUCK-ch's Nati...
 
SureshKumarJ-Sr.PM
SureshKumarJ-Sr.PMSureshKumarJ-Sr.PM
SureshKumarJ-Sr.PM
 
Báo cáo thực tập
Báo cáo thực tậpBáo cáo thực tập
Báo cáo thực tập
 
Paris Expo CykleBoks
Paris Expo CykleBoksParis Expo CykleBoks
Paris Expo CykleBoks
 
PaulResume-2016
PaulResume-2016PaulResume-2016
PaulResume-2016
 
Question 2
Question 2Question 2
Question 2
 
Rubb
RubbRubb
Rubb
 

Similar to Residential Energy Audit Report

Quantity Surveying Practice.docx
Quantity Surveying Practice.docxQuantity Surveying Practice.docx
Quantity Surveying Practice.docxwrite5
 
Introduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdfIntroduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdfbkbk37
 
Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011Eleanor Olsen
 
Energy efficiency by cool roofs
Energy efficiency by cool roofsEnergy efficiency by cool roofs
Energy efficiency by cool roofshardik6373
 
P1.14 heating and insulating buildings
P1.14 heating and insulating buildingsP1.14 heating and insulating buildings
P1.14 heating and insulating buildingsSteve Bishop
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy AssignmentsEamon Healy
 
Going Green Without the Greenbacks
Going Green Without the GreenbacksGoing Green Without the Greenbacks
Going Green Without the GreenbacksEleanor Olsen
 
Going Green Without Greenbacks
Going Green Without GreenbacksGoing Green Without Greenbacks
Going Green Without GreenbacksEleanor Olsen
 
Low Energy Office Proposal
Low Energy Office Proposal Low Energy Office Proposal
Low Energy Office Proposal robatherton
 
F.E.S-Board® Brochure
F.E.S-Board® BrochureF.E.S-Board® Brochure
F.E.S-Board® BrochureMike Berry
 
Designing & Building Home As System
Designing & Building Home As SystemDesigning & Building Home As System
Designing & Building Home As SystemCherylALee
 
Passive house Presentation to West Bay School
Passive house Presentation to West Bay SchoolPassive house Presentation to West Bay School
Passive house Presentation to West Bay SchoolJames Dean
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10SmarterHomeGuide
 

Similar to Residential Energy Audit Report (20)

Quantity Surveying Practice.docx
Quantity Surveying Practice.docxQuantity Surveying Practice.docx
Quantity Surveying Practice.docx
 
Introduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdfIntroduction People have been more concerned about the effects.pdf
Introduction People have been more concerned about the effects.pdf
 
Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011
 
Energy efficiency by cool roofs
Energy efficiency by cool roofsEnergy efficiency by cool roofs
Energy efficiency by cool roofs
 
Olson thc case_study
Olson thc case_studyOlson thc case_study
Olson thc case_study
 
P1.14 heating and insulating buildings
P1.14 heating and insulating buildingsP1.14 heating and insulating buildings
P1.14 heating and insulating buildings
 
Nutech - Killeagh
Nutech - KilleaghNutech - Killeagh
Nutech - Killeagh
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy Assignments
 
Going Green Without the Greenbacks
Going Green Without the GreenbacksGoing Green Without the Greenbacks
Going Green Without the Greenbacks
 
Going Green Without Greenbacks
Going Green Without GreenbacksGoing Green Without Greenbacks
Going Green Without Greenbacks
 
Heat Transfer Project
Heat Transfer ProjectHeat Transfer Project
Heat Transfer Project
 
Net Zero Energy Project
Net Zero Energy Project Net Zero Energy Project
Net Zero Energy Project
 
GroupA_poster 1
GroupA_poster 1GroupA_poster 1
GroupA_poster 1
 
Beers
BeersBeers
Beers
 
Low Energy Office Proposal
Low Energy Office Proposal Low Energy Office Proposal
Low Energy Office Proposal
 
F.E.S-Board® Brochure
F.E.S-Board® BrochureF.E.S-Board® Brochure
F.E.S-Board® Brochure
 
Designing & Building Home As System
Designing & Building Home As SystemDesigning & Building Home As System
Designing & Building Home As System
 
Passive house Presentation to West Bay School
Passive house Presentation to West Bay SchoolPassive house Presentation to West Bay School
Passive house Presentation to West Bay School
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
The Spencer Pavillion 100152598
The Spencer Pavillion 100152598The Spencer Pavillion 100152598
The Spencer Pavillion 100152598
 

More from Michael Clarke

Micro-Hydro Design Project
Micro-Hydro Design ProjectMicro-Hydro Design Project
Micro-Hydro Design ProjectMichael Clarke
 
Retrofit Analysis and Recommendation Report
Retrofit Analysis and Recommendation ReportRetrofit Analysis and Recommendation Report
Retrofit Analysis and Recommendation ReportMichael Clarke
 
Blower Door Test Results - April 2014
Blower Door Test Results - April 2014Blower Door Test Results - April 2014
Blower Door Test Results - April 2014Michael Clarke
 
Building Systems - Mock Company Presentation
Building Systems - Mock Company PresentationBuilding Systems - Mock Company Presentation
Building Systems - Mock Company PresentationMichael Clarke
 
PV System Design Project
PV System Design ProjectPV System Design Project
PV System Design ProjectMichael Clarke
 
Arduino HVAC Temperature Controller
Arduino HVAC Temperature ControllerArduino HVAC Temperature Controller
Arduino HVAC Temperature ControllerMichael Clarke
 
MicroHydro Design Project REPORT
MicroHydro Design Project REPORTMicroHydro Design Project REPORT
MicroHydro Design Project REPORTMichael Clarke
 
Fort Henry - Energy Audit Report
Fort Henry - Energy Audit ReportFort Henry - Energy Audit Report
Fort Henry - Energy Audit ReportMichael Clarke
 
LEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stLEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stMichael Clarke
 
Ten German Lessons for Canadian Energy Policy
Ten German Lessons for Canadian Energy PolicyTen German Lessons for Canadian Energy Policy
Ten German Lessons for Canadian Energy PolicyMichael Clarke
 
Mike_MakerSpace_Poster_Final
Mike_MakerSpace_Poster_FinalMike_MakerSpace_Poster_Final
Mike_MakerSpace_Poster_FinalMichael Clarke
 

More from Michael Clarke (14)

Off-Grid Solar Work
Off-Grid Solar WorkOff-Grid Solar Work
Off-Grid Solar Work
 
Micro-Hydro Design Project
Micro-Hydro Design ProjectMicro-Hydro Design Project
Micro-Hydro Design Project
 
Retrofit Analysis and Recommendation Report
Retrofit Analysis and Recommendation ReportRetrofit Analysis and Recommendation Report
Retrofit Analysis and Recommendation Report
 
Blower Door Test Results - April 2014
Blower Door Test Results - April 2014Blower Door Test Results - April 2014
Blower Door Test Results - April 2014
 
Building Systems - Mock Company Presentation
Building Systems - Mock Company PresentationBuilding Systems - Mock Company Presentation
Building Systems - Mock Company Presentation
 
PV System Design Project
PV System Design ProjectPV System Design Project
PV System Design Project
 
Arduino HVAC Temperature Controller
Arduino HVAC Temperature ControllerArduino HVAC Temperature Controller
Arduino HVAC Temperature Controller
 
MicroHydro Design Project REPORT
MicroHydro Design Project REPORTMicroHydro Design Project REPORT
MicroHydro Design Project REPORT
 
Fort Henry - Energy Audit Report
Fort Henry - Energy Audit ReportFort Henry - Energy Audit Report
Fort Henry - Energy Audit Report
 
LEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stLEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1st
 
Ten German Lessons for Canadian Energy Policy
Ten German Lessons for Canadian Energy PolicyTen German Lessons for Canadian Energy Policy
Ten German Lessons for Canadian Energy Policy
 
greenProfit
greenProfitgreenProfit
greenProfit
 
PV Trailer
PV TrailerPV Trailer
PV Trailer
 
Mike_MakerSpace_Poster_Final
Mike_MakerSpace_Poster_FinalMike_MakerSpace_Poster_Final
Mike_MakerSpace_Poster_Final
 

Residential Energy Audit Report

  • 1. Michael Clarke Monday, March 10th, 2014. Instructor: Ian Kilborn ESET 430 - Lab Assignment 6-7 Herchmer Crescent Residential Energy Audit
  • 2. Description of the House The house on Herchmer Crescent is a split-level, 2 story property. The front of the house (road side) faces East, with the North wall oriented at -9° N. The size of the living area (1st and 2nd floors only) is approximately 1,200 ft2 (1,186 ft2). The volume of the entire heated building envelop is approximately 16,000 ft3 (16,134 ft3). This volume includes the basement, crawlspace, 1st and 2nd floors, but not the attics (which are unheated). Space heating is provided by a 20kW electric furnace. Water heating is provided by a 40 gallon electric hot water tank. Additionally, a small natural gas fireplace gets used occasionally, and is mostly a decorative appliance. Below-grade foundation walls consist of 10" concrete block. Within the crawlspace, the block is bare with no insulation. Within the basement, the block is covered from the inside by a thin softwood facing with a small air gap between the two. Also to note is that the joist header space within the crawlspace is only insulated on the West facing wall with 2" XPS foam; the North and East facing joist header spaces are un-insulated. First floor (above crawlspace) walls are framed by 2"x4" studs @ 16"o.c., giving 3.5" of space insulated with yellow fiberglass insulation (R=3.5/"). These walls also consist of a 0.5" layer of gypsum board, a small air cavity (R=1), OSB sheathing (0.5") and an outside brick veneer facing (4" thick). Second floor (above basement) walls are similar in construction, with the exception of thin aluminum siding instead of brick veneer. The roof is of a split-level gable construction, with the attic spaces unheated. The first floor attic/ceiling is insulated with 5" of yellow fiberglass between studs 20" o.c. The second floor attic/ceiling is insulated with both 5" yellow and 7" pink fiberglass, also between studs 20" o.c. There are two wooden doors, at front entrance (1st floor, brick veneer wall) and read entrance (basement, un- insulated concrete block wall). There are also many types of windows on East/West walls, including vinyl double pane sliders, a vinyl sliding door, a wood double pane fixed and a low-e vinyl double pane slider.
  • 3. Air Leakage To determine the leavel of air leakage at the home, a blower door test was done yeilding the following Values: To give some understanding as to what these numbers represent, consider the following: The very best new home will have an ACH50 of around 1.0; typical newer homes will have an ACH50 of about 4.0; mildly leaky homes will have an ACH50 value of around 7.0, and if an ACH50 value of 10-15+ is measured, that would be considered a space will considerable air leakage issues. Since the value measured for this home was 7.09 ACH50, it can be considered mildly leaky. Also to note is the equivalent leakage area of 180.1 in2. This means that if all the areas of infiltration were added up to form a single hole, it would have an area of 180.1 in2, slightly larger than 1 square foot. A noticeable draft was present around the door to the basement, which would indicate high airflow from the basement to the main floors. It's probable that substantial air leakage was emanating from the un-insulated foundation walls in both the basement (behind the wood paneling) and the crawlspace.
  • 4. Pie Charts (Heat Loss as $; Energy $ spent)
  • 5. Introduction to Recommendations The objective of this audit was to offer the home-owner recommendations that would yield the greatest savings per dollar invested. To achieve this, we first had to model the building in RetScreen. We could then identify those areas of the home which were the greatest contributors to heat loss and energy consumption. This data is displayed visually through pie charts on the previous page. Finally, we could offer recommendations to alleviate those losses and provide a dollar estimate of expected savings per year. Recommended Upgrades 1. Natural Gas Furnace Space heating through electricity is extremely expensive. The existing electric furnace may be very efficient, but the operating cost over a cold Canadian winter is extremely high. More than half the yearly energy dollars spent at the house are through the existing electric furnace, totaling nearly $2700. Replacing the electric furnace with a high efficiency natural gas furnace would result in substantial yearly savings. Replacing the existing 20kW furnace with a 70,000 BTU, 95% efficiency furnace would yield as estimate $712 in yearly fuel cost savings. The payback for this upgrade should be no more than 2 years, making it a very attractive option. 2. Reducing Air Leakage/Heat Loss in Basement/Crawlspace Significant air leakage was noted coming from the basement during our blower door test. This is most likely caused by the un-insulated concrete block walls in the crawlspace, the inadequately insulated below grade walls in the basement and the three un-insulated crawlspace joist header spaces. The best option may be to add a 2" layer of XPS foam to the crawlspace walls, fill the air cavity in the below grade basement walls with spray foam and add 3" of fiberglass insulation to the un- insulated joist header spaces. This would reduce the amount of air leakage from these spaces, plus add additional heat loss protection. After implementing these upgrades with the software model, expected yearly energy savings were found to be $194. This is a moderate savings, but the upgrades would not be difficult, nor too expensive to implement, so the payback time would be reasonable: within 5 years.
  • 6. 3. Electrical Baseloads Electrical baseloads are all loads within the house that consume electricity. This includes appliances, electronics, lighting and more. Additional "vampire" loads exist in the form of electronic appliances on standby, such as computers, stereos and televisions. Currently, nearly $1300 a year is being spent to service these loads, which total nearly 25 kWh's per day. If that 25 kWh's could be cut in half, substantial energy savings could be accrued. To achieve this, a swath of energy efficient upgrades would have to be initiated. Replacing all incandescent lights with CFL's would be the first step. It may be cost effective to replace older appliances like the washing machine, dryer, dishwasher or refrigerator. Many provincial rebates exist to encourage homeowners to do this. Turning off home electronics would reducing their idle electricity consumption. Even remembering to turn off lights in rooms not in use would go towards achieving energy savings. If it would be possible to cut in half the current baseload electricity consumption of 25 kWh's, a yearly savings of $307 would result. 4. First Floor Attic Insulation Upgrade Attics are a substantial source for heat loss and air leakage if improperly insulated. The first floor attic is only insulated with 5" fiberglass, which isn't sufficient. An addition 7" of fiberglass insulation would add almost 25 R value, yielding an annual savings of $119. This would be a very easy and cost effective upgrade, with very short payback time. Other Potential Upgrades  Reduce the heating setpoint by 1-2°.  Increase the cooling setpoint by 1-2°.  Reduce the temperature of the hot water tank from 60°C to 50°C.  Upgrade one/several/all the house windows to low-e argon.  Install a heat recovery ventilator.
  • 7. Appendix A: Volume Calculations Space Measurements Crawlspace 23' x 25'5.5" x 4'2" = 2439.8 ft3 Basement 20'3" x 26' x 8' = 4212.0 ft3 1st Floor 23' x 25'5.5" x 8' = 4684.3 ft3 2nd Floor 28' x 21'5" x 8' = 4797.3 ft3 Total Volume = 16,133.4 ft3
  • 8. Appendix B: Weather Reconciliation Calculations
  • 9. Appendix C: 3D Surface Charts of Electricity Consumption 2013
  • 10.
  • 11. Appendix D: Daily Gas Consumption 42 Herchmer Gas Consumption - Actual Days from Current m3 Date last Reading since last 15-Jan-14 Actual 306 2,855.00 25.00 15-Mar-13 Actual 58 2,830.00 3.00 16-Jan-13 Actual 62 2,827.00 52.00 15-Nov-12 Actual 59 2,775.00 47.00 17-Sep-12 Actual 62 2,728.00 50.00 17-Jul-12 Actual 62 2,678.00 53.00 16-May-12 Actual 62 2,625.00 51.00 15-Mar-12 Actual 58 2,574.00 49.00 17-Jan-12 Actual 61 2,525.00 50.00 17-Nov-11 Actual 63 2,475.00 50.00 15-Sep-11 Actual 62 2,425.00 50.00 15-Jul-11 Actual 2,375.00 Total Number of days were gas was used: Sum(C4:C14) Total gas used (m3): Sum(E4:E14) 915 480.00 Average Daily Gas Consumption = Total gas used (m3) / Total number of days "= 480 / 915" 0.525 Cubic Meters gas per day 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 0.900 Gasconcumptionperday(m3/day) Date Gas Consumption (m3/day) over time