Owner: Joanne Olson – Viroqua, WI
Pre-retrofit Post-retrofit
1
Energy Independence at
709 Independence Lane
Deep Energy Reduction
- A Staged Approach
Stage 1: Exterior Retrofit
Stage 2: Basement Retrofit with
Appliance Upgrades
Stage 3: Renewable Energy
2
3-Staged Approach
(Due to Cost Considerations)
Stage 1: Exterior Retrofit ~$70,000 (actual)
Stage 2: Basement Retrofit ~$13,000 (wall & floor
estimate)
Stage 3: Renewable Energy ~$30,000 (hopeful, to get to
net zero 6 KW system)
• Replace appliances such as refrigerator, stove, & misc.
throughout
• Incentives & tax credits will help ~$20,000
• Total estimated cost to achieve near net zero: $93,000
• Energy savings won’t quite pay for upgrades, but added
comfort & health are worth $450/month to finance
project.
• We hope that PACE financing will be available in the
next few years.
3
House & Household Summary
• Household size: 1 grandma
• 1948 ranch with basement
• 2,052 ft2 finished floor area (1,100 up, 952 conditioned
basement below grade)
• 2x4 frame construction
• Poorly insulated & drafty, single-pane windows
• 30-year-old natural gas water heater & furnace (furnace is
a first-generation condensing unit ~88% efficiency; we are
waiting to replace it. It’s not a priority. We replaced the
motor with a high efficiency motor).
• Grandma is there full-time, with the exception of a few
weeks of vacation per year. She does have visitors
throughout the year; they add to the energy load.
4
What’s the Energy Cost?
Cost of Natural Gas (NG): $1.10/therm
– @90% efficiency = $1.22 /therm (100,000 btus)
– @90% efficiency = 82,000 btus/dollar
Total bill ÷ Total usage (i.e., therms) = Cost/unit
Cost of Electricity: $.13/kWh
– @100% efficiency = $3.81/therm
– @100% efficiency = 26,250 btus/dollar
For heat/dryer/stove NG is 3.12 times more
cost effective (electricity@ 90% efficiency)
5
Project Highlights
Eave extension, foamed with closed
cell SPF eliminating soffit ventilation
Exterior retrofit, eave extension,
foamed bathroom wall, cellulose
cavity insulation. R-30+ walls
3” polyiso on great room/cathedral
roof added above existing insulation
3” polyiso above grade walls, 3” of
XPS below grade
6
Current Site Household
Energy Use & THC1 Threshold
(Based on Actual Usage)
PRE
• Heating: 120 MMBtu
• Cooling: 2.5 MMBtu
• Hot Water: 20 MMBtu
• Everything Else: 23
MMBtu
TOTAL: 165 MMBtu
THC OPTION A: 12,000 kWh
or 41 MMBtu
1(www.thousandhomechallenge.org)
0
20
40
60
80
100
120
140
160
180
mmbtu pre
Heating
Cooling
Hot Water
Everything
Else
TOTAL
7
Pre- & Post-Direct
Indicators of Performance
Stage 1 of 3
• Btu/kWh per Household
Pre = 165 MMBtu; Post = ~112 MMBtu
• Household Annual Cost ($)
– Pre $1,550 (NG) $600 (elec) Total = $2,150
– Post $600 (NG) $600 (elec) Total = $1,200
• Projected Post kWh/FFA (Finished Floor Area)
16 kWh per FFA (total energy use)
• Water & Sewage
About the same ~200 cubic feet/month (7.4 gallons = 1 cubic foot)
– Important note: Natural gas is about ½ the cost of propane, so if propane were
used it would be ~ double the energy cost & savings
8
Site Energy Household
Reductions (Stage 1)
Joanne is pretty conservation minded already. She did share a freezer, but she
recently bought one of her own. No renewables have been installed yet, so results
are mostly efficiency savings. There is still room for some improvement.
Behavioral Choices
Efficiency
Renewables
Community
Solutions
9
Usage: Electric & Natural Gas
-50
0
50
100
150
200
Total Heating Water Appliances PV and
Thermal
Pre-Retro
Stage 1 Actual
Stage 2 Modeled
Stage 3 Modeled
MMBtu (1,000,000 Btu=1 MMBtu)
56% reduction of total usage in Stage 1
66% reduction in Stage 2
- 97% reduction in Stage 3
41 MMBtu is the 75%
reduction needed to meet
the 1,000 Home Challange
10
THC Thresholds
-50
0
50
100
150
200
Pre Retro Stage 1 Stage 2 Stage 3
MMBtu
Solar
Appliances
Hot Water
Heating
41 MMBtu is the THC Threshold.
We could probably reach it if she
didn’t use the small space
heater/fireplace (70% efficient
heater vs. 90% furnace).
11
THC REDUCTION MATRIX
Stage 1: Joanne Olson ANNUAL HOUSEHOLD kWh- MODELED Usage-not actual
Loads
Current
Use
Proposed Usage Reductions - kWh/yr Target Use
THC
Threshold
(breakout
may be
estimated)
Efficiency
Behavioral
Choices
Renewables
Community
Solutions
(kWh/yr)
Building
Upgrades
Equipment
Upgrades
On-site
Offsets
(kWh/yr) (kWh/yr)
Heating 33,030 13,624 19406 11,017
Cooling
Hot Water 8,251 4,413 3,838
All Else 4,233 894 3,339 1,058
Total 45,514 13,624 5,307 26,583 12,075
REDUCTION 18,931 KWh/yr
12
Basis for Predicting
Reductions
4 scenarios run using RemRate software
1) Baseline
2) Above grade exterior retrofit
3) Basement retrofit
4) Solar/renewables
Software was fairly accurate in the 2nd scenario.
The rest is yet to come!
13
Modeled Usage - All Stages
We used RemRate to perform several energy
model ratings (HERS Rating)
• Existing: 125
• Stage 1: 67
• Stage 2: 48
• Stage 3: 16
14
Stage 1: Pre- & Post-Indirect
Indicators of Performance
Btu/kWh per HCDD1 has gone down
substantially (see next slide).
Home Energy Rating (HERS)
• Pre: 125
• Post: 67
1 HCDD: heating & cooling degree day
15
Heating Degree Days
Look at Before and After
Project Completed Oct 2009
16
Gas Usage 2009-2010
Heating & Hot Water Only
(Dryer & cooking are electric)
Stage 1 retrofit mostly completed by 10/09
• 4 family members for 2 weeks in Dec 2010
- Lots of cooking & showers
• Changed from electric to gas range Dec 2010
• ERV was set at 70% and now is @20%-30%
Therms/Month
17
Electricity Usage
•Electricity increased because of greater dehumidifier use
•High water table caused damp basement
•With increased envelope tightness, dampness is amplified
•To be addressed in Stage 2!
• Installed ERV Nov 2010
• New sump pump Dec 2010
• New fan motor for furnace 2010
• Dehumidification & A/C 2009 & 2010
• New freezer July 2010
18
Project’s Biggest
Challenges/Opportunities
Where to draw the line on “project creep?”
• We could have spent much more time & money;
each day brought more decisions.
Cost of materials
• We found & bought misordered insulation from a
large construction company for about ½ price
and ERV was 1/5 of the price. Spray foam was
purchased from the manufacturer at a discount
because of dated product.
19
What Was Challenging?
• To air seal we foamed & foamed & foamed.
• We nearly created a thermal bridge-free
house. We didn’t get the openings (windows
& doors) because of the time & cost vs. the
benefit.
• The budget… we live in an area in which it
will be difficult to recover costs at point of
sale. The value proposition was increased
comfort as well as lowered bills.
20
What Worked Well?
My crew! Once they understood all of the key
concepts, such as the drainage plane, they didn’t
need a lot of guidance. A mock-up wall section
communicated effectively.
• Grandma’s flexibility: She allowed me to make
judgment calls on the spot as needed. She didn’t
hover over the project. I don’t know if I could have
inspired this type of confidence in all of my clients.
This helped things move along.
• Exterior retrofit: Minimal disturbance, all new
siding & drainage plane.
21
Building Enclosure Summary
• Walls: 2x4 dense pack cellulose with 3”
(R-20) of rigid polyiso. Fur out for
drainage plane & cement board siding.
Serious fiberglass windows with 7 series
glass
• Cathedral Roof: R-20 polyiso skin with
existing fiberglass cavity & 2 inches of
EPS for a total of R-40. Unvented
• Attic: Sealed soffit venting with closed
cell foam & R-60 cellulose throughout
• Basement: Stage 2
22
Cool Stuff!
New Overhangs - New Unvented Soffit
Before After
Before After 23
Air Leakage
Blower Door Test Results
PRE (June 21, 2009)
2,100 CFM 50
8 ACH 50 (includes basement)
.45 CFM 50/Ft2 surface area (6 sides)
POST (January 15, 2010)
700 CFM 50
2.6 ACH 50 (includes basement)
.15 CFM 50/Ft2 surface area (6 sides)
24
Ratios & Specs
TOTAL AREA (Ft2)
• Conditioned Space: 2,052
• Finished Floor Area: 2,052
• Shell Area: 4,716
• Foundation Wall: 665
• Slab Floor: 1,278
• Frame Floor: 0
• Rim & Band Joist: 95
• Above-Grade Wall: 1,376
• Window: 225.4
• Door: 34.0
• Ceiling: 1,302
• Skylight: 0.0
• Duct: 964.4
RATIOS
• Window-to-Wall: 0.164
• Window-to-Floor: 0.110
WINDOW AREA BY ORIENTATION (Ft2)
• North: 44.7
• Northeast: 0.0
• East: 38.0
• Southeast: 0.0
• South: 78.3
• Southwest: 0.0
• West: 64.4
• Northwest: 0.0
25
Winter Comfort
Heating System
Current:
– Stand alone natural gas fireplace for radiant
space heat in “great room” the main room
~70% efficient
– Old condensing forced air, tested at 90%!
Thermostat settings: ~64º F
Planned:
Higher efficiency units. Possibly the Vertex
hot water with water-to-air heat exchange
26
Summer Comfort
• Reducing Solar Gains: Lattice with seasonal
plants shading south deck windows
• Reducing Internal Gains: Vent cook stove
• Creative Comfort: Ceiling fans & new overhangs
• Mechanical Solutions: We left older central AC &
will buy new as/if needed
• We installed a Renewaire ERV to circulate air
27
Water Heating
Installed direct vent tankless Takagi water heater. It was what the
plumber sold. I didn’t do my research first.
• Eliminated all standby losses; efficiency is great.
• Delivery of hot water is far from instantaneous!
• Water use increased! Grandma couldn’t use the “trickle’”
dishwashing & the initial hot water to the shower was wasted.
Changed dishwashing technique from a “trickle” rinse to a tub
wash.
• Tankless selected to reduce standby losses but, in reality, the
savings aren’t that great & the lag time involved in the system is
annoying. If you shut off & then turn water back on you get a
pocket of cold water.
• Renewables: Stage 3 solar DHW.
• Next job: combination space & water heating system.
28
Good Air Quality
• Key Pre-existing Problems: Radon 10 pl
– Still exists… but ERV helps
• Source Control Strategies: Stage 2
• Unanswered or Unresolved Issues: Can we
afford a basement retrofit to address the radon?
– We’re planning at least the perimeter wall retrofit &
probably not the “basement lowering”
• We made a much tighter house & changed the
drying potential of the interior so we now use a
dehumidifier in addition to our ERV.
29
Mechanical Ventilation
• Renewaire E130
• Simple design with dedicated ducts
• Operated at low speed fairly consistently
• Energy Use/Day: ~1,500 watts/day
• Performance: We’re still working on the data
such as the actual energy or anecdotal
regarding RH or comfort. Both the comfort &
relative humidity levels are higher.
• Simple design worked well
30
Mechanical Ventilation
Do Differently?
• Run ducts in attic under insulation. We
built duct chases in the house which were
more difficult & costly than running them in
the attic.
• We considered using the existing forced
air duct work but opted to have a
dedicated system to ensure reliable
airflow.
31
Major Appliances
Space Conditioning: Nothing new yet. Old
furnace is in good shape but upgraded the motor
Combustion Venting: New direct vent tankless
Takagi water heater
Mechanical Ventilation: ERV & bathroom vent
Operational Changes: Primarily use space
heater… Less efficient but only heat specific
spaces
Change of Use: Water heater - Can’t use “trickle”
dish washing & went to “tub” dish washing (no
dishwasher)
32
Electrical Use – Plug Loads
• She bought a freezer & replaced the electric stove with gas.
• Actions & Impact: Grandma was fairly good about
conservation so we primarily focused on energy efficiency.
• Observations: Higher humidity in home resulted in increased
dehumidifier & energy use. We will address this in Stage 2.
We are keeping an eye on radon levels.
• Lessons Learned: Know budget & possible padding because
of overruns. Also, prioritize. We didn’t buy a new refrigerator &
we put those $$ toward a new building shell.
33
Timeline & Major Steps
• Stage 1: 2009 Exterior retrofit & new slab
insulation in part of home (not basement)
• Stage 1½: 2010 New appliances, i.e.,
refrigerator & stove
• Stage 2: 2011 Basement retrofit
• Stage 3: 2012 Solar PV & hot water
34
Rapid Feedback & Monitoring
• Utility bills say a lot
• Monitoring temp & RH in the house. Use
Kill A Watt meters to submeter plug loads
• A live link by summer 2011!
• Tracking utility bills (now)
35
Non-Energy Benefits
• Thermal comfort is incredible
• Constant fresh air with ERV
• Exterior should be virtually maintenance
free for 20 years
• Secured expenses… Fewer worries about
energy costs
36
Furring Strips Over Drainage
Plane/House Wrap
We waited & waited for the windows so we ended up furring out over
the house wrap. This did not allow us to flash as planned. Timing is
everything. We had to move the gas line (after the meter) to
accommodate the new 4” of wall - he spun the pipe (it cost $60).
37
Cathedral Retrofit
The existing 6” Fiberglass insulation wasn’t perfect, but we decided that it
would be financially prohibitive to remove it, so we left it. We then cut back
the ridge sheathing & air sealed (foamed) it solid. The rafter tails were
completely foamed. We performed a blower door test as we went, & it
appears to be working well. One beam in the middle that we couldn’t foam
showed some leakage, but we’re not sure how. We put in 3” beveled sub
fascia build-up to take the 3” Foam insulation. Sheathing went on top of
this, then tar paper, & then shingles.
38
Basic Wall Design
This is pretty close to what we did:
• 3” of polyiso over bare sheathing
• House wrap to define drainage plane
• 6” screws to fasten 1x3 furring strip
• Cement board siding
• Continuous drainage & acts as a
starter strip (not shown here but this
was actually preassembled to a
horizontal furring strip & tacked on
first to act as a ledger). We improved
with a ridge venting system; it cost
less & I received it the same day.
• Aluminum flashing covered the
foundation foam & went between the
polyiso & the house wrap. It matched
all of the other metal trim.
39
More Wall Details:
Cellulose, Insulation Caps
40
Pick the Right Fasteners
• We went from a heavier gauge 6” #3 Phillips head to a lighter gauge
6 & 5” torque screw (better self tapping, as well). It saved a ton of
time & cussing! We didn’t have to worry about the shear strength
because the siding fur-outs were on well supported ledgers.
41
Learn from Deconstruction
• As you deconstruct, you will find clues to how your home is performing. These
photos reveal air leakage: dusty fiberglass & moisture stains on the underside of roof
sheathing. This sheathing is a perfect example of an attic vs. (non-purposefully
vented) cathedral. The cathedral side shows where warm, moist air condensed on
the sheathing (rusty nails, too) & over time it would fail. The attic side of the
sheathing is fine even though the venting wasn’t great.
• Air sealing cathedral ceilings is critical.
Peak of Cathedral Ceiling/Roof
42
3” Window Build-out to Accommodate Polyiso
5” star head torque screws with construction adhesive
House wrap over that & then the furring strips
43
Polyiso to XPS Transition
• Polyiso doesn’t belong below
grade; XPS works better. We
put 2 layers of 1.5” extruded
polystyrene (XPS).
• 3 banks of windows were not
replaced because they were
newer.
• The build-out was capped with
aluminum to match the other
trim & to accommodate the 3”
polyiso.
44
Pictures Save a 1,000 Cusses
• After I foamed all of the difficult cavities & before we resheathed
the exterior, I took photos & made a little booklet for the crew &
for the insulator. From those photos, I’m sure that we saved
hours & hours, e.g., below: the insulator now knows exactly
which cavities need to be filled.
45
Interior Slab on Grade Retrofit
We tore up the carpet & insulated the slab with 1.5” of XPS
(R-7.5). The guys laid the nailers 16” on center & I wanted
24” on center (oh, well). New pre-finished oak floors on top.
46
What Worked & What Didn’t
YES
• Exterior approach vs. interior
• So far, sealing the soffit vents to maximize truss
heel insulation with closed cell spf ~R-6/inch
(solid R-20+)
• Maintained gable & roof vents
• Drainage plane with cement board
NO
• Exterior drainage tile. The water in the basement
is from a high water table or spring
47
Lessons Learned
• Find the right fastener for securing exterior foam. We went from a heavier gauge 6”
Phillips head to a lighter gauge 5½” star head & saved a lot of time.
• Order early if you are buying high performance windows; nail down the ETA.
• Exterior retrofits allow for a deep energy upgrade while not very intrusive for the
owner.
• Plan for surprises & budget accordingly. We found some rotten rim joists, also some
concrete that needed to be removed which added ~$600. We couldn’t get the
chimney out easily, so we stopped trying & built around it.
• We realized that the cathedral ceiling had existing insulation & we made a judgment
call to leave it to save on budget.
• We left 3 banks of windows that are low-E Andersens, this saved us ~$2,000. In all,
things that were left weren’t as good as something new, but the budget had
boundaries & there were other priorities.
• Shop early & wait for sales on products & materials. Look for discounted products
from big builders, lumberyards, & manufacturers. We bought a new ERV for $150
from a big builder.
• We modified plastic ridge venting to use for our siding starter strip & drainage plane
relief.
48
Most Helpful
Information Resources
• www.Buildingscience.com
• www.greenbuildingadvisor.com
Well thought out plan & risk/reward
evaluation. Should we leave some
insulation? Yes, if we can be assured of
great air sealing.
49
For Additional Information
www.E3Coalition.org
Data link to HOBO monitoring system
coming soon.
50
Homeowner/Project Team
Joanne Olson: patient
grandma, mother
Jim Olson: son, builder,
consultant
– jim@e3coalition.org
– E3coalition.org will have
data monitoring link
51

More Related Content

What's hot

Swedish Passivhaus Conference Laholm 2019
Swedish Passivhaus Conference Laholm 2019Swedish Passivhaus Conference Laholm 2019
Swedish Passivhaus Conference Laholm 2019Nick Grant
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House ProjectsTE Studio
 
Net Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenNet Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenMBHomeBuilders
 
Part l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsPart l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsSustainableEnergyAut
 
Passivhaus Designing for heating load 25th Passivhaus Conference
Passivhaus Designing for heating load 25th Passivhaus ConferencePassivhaus Designing for heating load 25th Passivhaus Conference
Passivhaus Designing for heating load 25th Passivhaus ConferenceNick Grant
 
2011 Passive House Conference, Synergy Case Study
2011 Passive House Conference, Synergy Case Study2011 Passive House Conference, Synergy Case Study
2011 Passive House Conference, Synergy Case StudyTE Studio
 
2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House LectureTE Studio
 
Deep Energy Retrofit of a High-Rise MURB
Deep Energy Retrofit of a High-Rise MURBDeep Energy Retrofit of a High-Rise MURB
Deep Energy Retrofit of a High-Rise MURBRDH Building Science
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy HausTE Studio
 
Innovating to Tackle Fuel Poverty
Innovating to Tackle Fuel PovertyInnovating to Tackle Fuel Poverty
Innovating to Tackle Fuel PovertySusan Lang-Bissell
 
First Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseFirst Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseTE Studio
 
Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...
Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...
Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...South West Observatory
 
ENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCEENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCESorin Ioana
 
Rho-Orion Investments: Our Story
Rho-Orion Investments: Our StoryRho-Orion Investments: Our Story
Rho-Orion Investments: Our StoryDon White
 
2016-HeatSmart-Presentation-MASTER
2016-HeatSmart-Presentation-MASTER2016-HeatSmart-Presentation-MASTER
2016-HeatSmart-Presentation-MASTERMatthew Johnston
 

What's hot (20)

Swedish Passivhaus Conference Laholm 2019
Swedish Passivhaus Conference Laholm 2019Swedish Passivhaus Conference Laholm 2019
Swedish Passivhaus Conference Laholm 2019
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House Projects
 
Net Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter AmerongenNet Zero Energy in Very Cold Climates by Peter Amerongen
Net Zero Energy in Very Cold Climates by Peter Amerongen
 
Part l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovationsPart l dwellings - nzeb and major renovations
Part l dwellings - nzeb and major renovations
 
Passivhaus Designing for heating load 25th Passivhaus Conference
Passivhaus Designing for heating load 25th Passivhaus ConferencePassivhaus Designing for heating load 25th Passivhaus Conference
Passivhaus Designing for heating load 25th Passivhaus Conference
 
2011 Passive House Conference, Synergy Case Study
2011 Passive House Conference, Synergy Case Study2011 Passive House Conference, Synergy Case Study
2011 Passive House Conference, Synergy Case Study
 
Karpiak Mulhall Passive House
Karpiak Mulhall Passive HouseKarpiak Mulhall Passive House
Karpiak Mulhall Passive House
 
Raritan Inn
Raritan InnRaritan Inn
Raritan Inn
 
Presentation Itfma Seminar 21 May08
Presentation Itfma Seminar 21 May08Presentation Itfma Seminar 21 May08
Presentation Itfma Seminar 21 May08
 
2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture
 
Deep Energy Retrofit of a High-Rise MURB
Deep Energy Retrofit of a High-Rise MURBDeep Energy Retrofit of a High-Rise MURB
Deep Energy Retrofit of a High-Rise MURB
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy Haus
 
Innovating to Tackle Fuel Poverty
Innovating to Tackle Fuel PovertyInnovating to Tackle Fuel Poverty
Innovating to Tackle Fuel Poverty
 
First Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseFirst Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit House
 
Nutech - Killeagh
Nutech - KilleaghNutech - Killeagh
Nutech - Killeagh
 
Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...
Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...
Theatre Royal Plymouth. The first Theatre in England To receive the Carbon Tr...
 
ENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCEENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCE
 
George beeler zero energy homes
George beeler zero energy homesGeorge beeler zero energy homes
George beeler zero energy homes
 
Rho-Orion Investments: Our Story
Rho-Orion Investments: Our StoryRho-Orion Investments: Our Story
Rho-Orion Investments: Our Story
 
2016-HeatSmart-Presentation-MASTER
2016-HeatSmart-Presentation-MASTER2016-HeatSmart-Presentation-MASTER
2016-HeatSmart-Presentation-MASTER
 

Viewers also liked

How to conduct a performance appraisal
How to conduct a performance appraisalHow to conduct a performance appraisal
How to conduct a performance appraisalvictoriacarter320
 
Caweingarten thc-case-studydec-04-2013
Caweingarten thc-case-studydec-04-2013Caweingarten thc-case-studydec-04-2013
Caweingarten thc-case-studydec-04-2013SmarterHomeGuide
 
What to Think About Before a 403(b) Plan Termination
What to Think About Before a 403(b) Plan TerminationWhat to Think About Before a 403(b) Plan Termination
What to Think About Before a 403(b) Plan TerminationJoe Urwitz
 
The Directed Trustee in the Post-Dudenhoffer World
The Directed Trustee in the Post-Dudenhoffer WorldThe Directed Trustee in the Post-Dudenhoffer World
The Directed Trustee in the Post-Dudenhoffer WorldJoe Urwitz
 
Employees performance appraisal
Employees performance appraisalEmployees performance appraisal
Employees performance appraisalvictoriacarter320
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10SmarterHomeGuide
 
2014年ノーベル生理学・医学賞 本当の主役はだれだ!?
2014年ノーベル生理学・医学賞 本当の主役はだれだ!?2014年ノーベル生理学・医学賞 本当の主役はだれだ!?
2014年ノーベル生理学・医学賞 本当の主役はだれだ!?bsiyouth
 
Nursing performance appraisal
Nursing performance appraisalNursing performance appraisal
Nursing performance appraisalvictoriacarter320
 
Performance appraisal for teachers
Performance appraisal for teachersPerformance appraisal for teachers
Performance appraisal for teachersvictoriacarter320
 

Viewers also liked (15)

How to conduct a performance appraisal
How to conduct a performance appraisalHow to conduct a performance appraisal
How to conduct a performance appraisal
 
Caweingarten thc-case-studydec-04-2013
Caweingarten thc-case-studydec-04-2013Caweingarten thc-case-studydec-04-2013
Caweingarten thc-case-studydec-04-2013
 
Beeler thc case_study
Beeler thc case_studyBeeler thc case_study
Beeler thc case_study
 
Renner thc case_study.pdf
Renner thc case_study.pdfRenner thc case_study.pdf
Renner thc case_study.pdf
 
Performance appraisal goals
Performance appraisal goalsPerformance appraisal goals
Performance appraisal goals
 
GBK Al-Manar English
GBK Al-Manar EnglishGBK Al-Manar English
GBK Al-Manar English
 
What to Think About Before a 403(b) Plan Termination
What to Think About Before a 403(b) Plan TerminationWhat to Think About Before a 403(b) Plan Termination
What to Think About Before a 403(b) Plan Termination
 
The Directed Trustee in the Post-Dudenhoffer World
The Directed Trustee in the Post-Dudenhoffer WorldThe Directed Trustee in the Post-Dudenhoffer World
The Directed Trustee in the Post-Dudenhoffer World
 
Brian Franklin Résumé 2015
Brian Franklin Résumé  2015Brian Franklin Résumé  2015
Brian Franklin Résumé 2015
 
Employees performance appraisal
Employees performance appraisalEmployees performance appraisal
Employees performance appraisal
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
2014年ノーベル生理学・医学賞 本当の主役はだれだ!?
2014年ノーベル生理学・医学賞 本当の主役はだれだ!?2014年ノーベル生理学・医学賞 本当の主役はだれだ!?
2014年ノーベル生理学・医学賞 本当の主役はだれだ!?
 
module 6 lesson 2
module 6 lesson 2module 6 lesson 2
module 6 lesson 2
 
Nursing performance appraisal
Nursing performance appraisalNursing performance appraisal
Nursing performance appraisal
 
Performance appraisal for teachers
Performance appraisal for teachersPerformance appraisal for teachers
Performance appraisal for teachers
 

Similar to Olson thc case_study

Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency
 
Presentation energy and comfort
Presentation  energy and comfort Presentation  energy and comfort
Presentation energy and comfort Ahmad Alshaghel
 
March5 2009-workshop-slides
March5 2009-workshop-slidesMarch5 2009-workshop-slides
March5 2009-workshop-slidesSWITCHOntario
 
Shawna henderson_cmhc_retrofitconf_oct009
  Shawna henderson_cmhc_retrofitconf_oct009  Shawna henderson_cmhc_retrofitconf_oct009
Shawna henderson_cmhc_retrofitconf_oct009Shawna Henderson
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slidesSWITCHOntario
 
Passive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid ClimatesPassive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid Climatesaiahouston
 
Net Zero heating system. 3700 sq ft two story with full basement
Net Zero heating system. 3700 sq ft two story with full basementNet Zero heating system. 3700 sq ft two story with full basement
Net Zero heating system. 3700 sq ft two story with full basementGreg Mulder
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy AssignmentsEamon Healy
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Farming Futures
 
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's NeighborhoodNew Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhoodlucyna99
 
GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014
GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014
GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014Gerald McClain
 
Gas Networks Ireland Technical Presentations- Part L
Gas Networks Ireland Technical Presentations- Part LGas Networks Ireland Technical Presentations- Part L
Gas Networks Ireland Technical Presentations- Part LNuTech Renewables Ltd
 
Passive house Presentation to West Bay School
Passive house Presentation to West Bay SchoolPassive house Presentation to West Bay School
Passive house Presentation to West Bay SchoolJames Dean
 
Heatstar Technical Advice paper - 'New 2022 building regulations'
Heatstar Technical Advice paper - 'New 2022 building regulations'Heatstar Technical Advice paper - 'New 2022 building regulations'
Heatstar Technical Advice paper - 'New 2022 building regulations'Heatstar
 
NBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsNBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsRDH Building Science
 

Similar to Olson thc case_study (20)

SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
 
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes project
 
Energy cork tea 29 oct15
Energy cork tea 29 oct15Energy cork tea 29 oct15
Energy cork tea 29 oct15
 
Presentation energy and comfort
Presentation  energy and comfort Presentation  energy and comfort
Presentation energy and comfort
 
March5 2009-workshop-slides
March5 2009-workshop-slidesMarch5 2009-workshop-slides
March5 2009-workshop-slides
 
Shawna henderson_cmhc_retrofitconf_oct009
  Shawna henderson_cmhc_retrofitconf_oct009  Shawna henderson_cmhc_retrofitconf_oct009
Shawna henderson_cmhc_retrofitconf_oct009
 
56706.pdf
56706.pdf56706.pdf
56706.pdf
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slides
 
Passive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid ClimatesPassive House Principles for Hot Humid Climates
Passive House Principles for Hot Humid Climates
 
GroupA_poster 2
GroupA_poster 2GroupA_poster 2
GroupA_poster 2
 
Net Zero heating system. 3700 sq ft two story with full basement
Net Zero heating system. 3700 sq ft two story with full basementNet Zero heating system. 3700 sq ft two story with full basement
Net Zero heating system. 3700 sq ft two story with full basement
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy Assignments
 
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
Introduction to Farm Renewables - Paul Holmes-Ling (Laurence Gould Partnership)
 
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's NeighborhoodNew Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
 
GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014
GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014
GeothermalHeatPump-DeerCrossingStillwaterOK first Four years revised Jun 26-2014
 
Gas Networks Ireland Technical Presentations- Part L
Gas Networks Ireland Technical Presentations- Part LGas Networks Ireland Technical Presentations- Part L
Gas Networks Ireland Technical Presentations- Part L
 
Passive house Presentation to West Bay School
Passive house Presentation to West Bay SchoolPassive house Presentation to West Bay School
Passive house Presentation to West Bay School
 
Residential house energy class a+
Residential house energy class a+Residential house energy class a+
Residential house energy class a+
 
Heatstar Technical Advice paper - 'New 2022 building regulations'
Heatstar Technical Advice paper - 'New 2022 building regulations'Heatstar Technical Advice paper - 'New 2022 building regulations'
Heatstar Technical Advice paper - 'New 2022 building regulations'
 
NBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsNBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance Retrofits
 

Recently uploaded

9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhidelhimodel235
 
Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...
Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...
Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...lizamodels9
 
Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...
Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...
Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...asmaqueen5
 
Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...asmaqueen5
 
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdfPurva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdffaheemali990101
 
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Low Rate Call Girls in Akshardham Delhi Call 9990771857
Low Rate Call Girls in Akshardham   Delhi Call 9990771857Low Rate Call Girls in Akshardham   Delhi Call 9990771857
Low Rate Call Girls in Akshardham Delhi Call 9990771857delhimodel235
 
8 Key Elements for Comfortable Farmland Living
8 Key Elements for Comfortable Farmland Living 8 Key Elements for Comfortable Farmland Living
8 Key Elements for Comfortable Farmland Living Farmland Bazaar
 
9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhidelhimodel235
 
call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in ...
Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in  ...Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in  ...
Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in ...asmaqueen5
 
9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhidelhimodel235
 
Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...
Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...
Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...Newman George Leech
 
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...Volition Properties
 
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...lizamodels9
 

Recently uploaded (20)

9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 34 Noida (Call Girls) Delhi
 
Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...
Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...
Cashpay_Call Girls In Gaur City Mall Noida ❤️8860477959 Escorts Service In 24...
 
Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Sarai Kale Khan Delhi 💯Call Us 🔝8264348440🔝
 
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
 
Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...
Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...
Call Girls In Madipur Metro Delhi꧁ +91)8447779280꧂Low Rate 2 short 2000 full ...
 
Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Pitampura Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
Call Girls in Janakpuri ↫8447779280↫Short 1500 Night 6000-Escorts Service In ...
 
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdfPurva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
Purva Palm Hills Devanahalli, Bangalore E- Brochure.pdf
 
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
 
Low Rate Call Girls in Akshardham Delhi Call 9990771857
Low Rate Call Girls in Akshardham   Delhi Call 9990771857Low Rate Call Girls in Akshardham   Delhi Call 9990771857
Low Rate Call Girls in Akshardham Delhi Call 9990771857
 
Low Rate Call Girls in Triveni Complex Delhi Call 9873940964
Low Rate Call Girls in Triveni Complex Delhi Call 9873940964Low Rate Call Girls in Triveni Complex Delhi Call 9873940964
Low Rate Call Girls in Triveni Complex Delhi Call 9873940964
 
8 Key Elements for Comfortable Farmland Living
8 Key Elements for Comfortable Farmland Living 8 Key Elements for Comfortable Farmland Living
8 Key Elements for Comfortable Farmland Living
 
9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 11 Noida (Call Girls) Delhi
 
call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Shahdara (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in ...
Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in  ...Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in  ...
Call Girls In Mundka Industrial Metro@꧂8447779280 ↬Enjoy ꧂Escort Service in ...
 
Hot call girls in Moti Bagh🔝 9953056974 🔝 escort Service
Hot call girls in Moti Bagh🔝 9953056974 🔝 escort ServiceHot call girls in Moti Bagh🔝 9953056974 🔝 escort Service
Hot call girls in Moti Bagh🔝 9953056974 🔝 escort Service
 
9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi
9990771857 Call Girls in Noida Sector 03 Noida (Call Girls) Delhi
 
Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...
Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...
Eco-Efficient Living: Redefining Sustainability through Leech's Green Design ...
 
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
 
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
 

Olson thc case_study

  • 1. Road to Energy Independence Owner: Joanne Olson – Viroqua, WI Pre-retrofit Post-retrofit 1
  • 2. Energy Independence at 709 Independence Lane Deep Energy Reduction - A Staged Approach Stage 1: Exterior Retrofit Stage 2: Basement Retrofit with Appliance Upgrades Stage 3: Renewable Energy 2
  • 3. 3-Staged Approach (Due to Cost Considerations) Stage 1: Exterior Retrofit ~$70,000 (actual) Stage 2: Basement Retrofit ~$13,000 (wall & floor estimate) Stage 3: Renewable Energy ~$30,000 (hopeful, to get to net zero 6 KW system) • Replace appliances such as refrigerator, stove, & misc. throughout • Incentives & tax credits will help ~$20,000 • Total estimated cost to achieve near net zero: $93,000 • Energy savings won’t quite pay for upgrades, but added comfort & health are worth $450/month to finance project. • We hope that PACE financing will be available in the next few years. 3
  • 4. House & Household Summary • Household size: 1 grandma • 1948 ranch with basement • 2,052 ft2 finished floor area (1,100 up, 952 conditioned basement below grade) • 2x4 frame construction • Poorly insulated & drafty, single-pane windows • 30-year-old natural gas water heater & furnace (furnace is a first-generation condensing unit ~88% efficiency; we are waiting to replace it. It’s not a priority. We replaced the motor with a high efficiency motor). • Grandma is there full-time, with the exception of a few weeks of vacation per year. She does have visitors throughout the year; they add to the energy load. 4
  • 5. What’s the Energy Cost? Cost of Natural Gas (NG): $1.10/therm – @90% efficiency = $1.22 /therm (100,000 btus) – @90% efficiency = 82,000 btus/dollar Total bill ÷ Total usage (i.e., therms) = Cost/unit Cost of Electricity: $.13/kWh – @100% efficiency = $3.81/therm – @100% efficiency = 26,250 btus/dollar For heat/dryer/stove NG is 3.12 times more cost effective (electricity@ 90% efficiency) 5
  • 6. Project Highlights Eave extension, foamed with closed cell SPF eliminating soffit ventilation Exterior retrofit, eave extension, foamed bathroom wall, cellulose cavity insulation. R-30+ walls 3” polyiso on great room/cathedral roof added above existing insulation 3” polyiso above grade walls, 3” of XPS below grade 6
  • 7. Current Site Household Energy Use & THC1 Threshold (Based on Actual Usage) PRE • Heating: 120 MMBtu • Cooling: 2.5 MMBtu • Hot Water: 20 MMBtu • Everything Else: 23 MMBtu TOTAL: 165 MMBtu THC OPTION A: 12,000 kWh or 41 MMBtu 1(www.thousandhomechallenge.org) 0 20 40 60 80 100 120 140 160 180 mmbtu pre Heating Cooling Hot Water Everything Else TOTAL 7
  • 8. Pre- & Post-Direct Indicators of Performance Stage 1 of 3 • Btu/kWh per Household Pre = 165 MMBtu; Post = ~112 MMBtu • Household Annual Cost ($) – Pre $1,550 (NG) $600 (elec) Total = $2,150 – Post $600 (NG) $600 (elec) Total = $1,200 • Projected Post kWh/FFA (Finished Floor Area) 16 kWh per FFA (total energy use) • Water & Sewage About the same ~200 cubic feet/month (7.4 gallons = 1 cubic foot) – Important note: Natural gas is about ½ the cost of propane, so if propane were used it would be ~ double the energy cost & savings 8
  • 9. Site Energy Household Reductions (Stage 1) Joanne is pretty conservation minded already. She did share a freezer, but she recently bought one of her own. No renewables have been installed yet, so results are mostly efficiency savings. There is still room for some improvement. Behavioral Choices Efficiency Renewables Community Solutions 9
  • 10. Usage: Electric & Natural Gas -50 0 50 100 150 200 Total Heating Water Appliances PV and Thermal Pre-Retro Stage 1 Actual Stage 2 Modeled Stage 3 Modeled MMBtu (1,000,000 Btu=1 MMBtu) 56% reduction of total usage in Stage 1 66% reduction in Stage 2 - 97% reduction in Stage 3 41 MMBtu is the 75% reduction needed to meet the 1,000 Home Challange 10
  • 11. THC Thresholds -50 0 50 100 150 200 Pre Retro Stage 1 Stage 2 Stage 3 MMBtu Solar Appliances Hot Water Heating 41 MMBtu is the THC Threshold. We could probably reach it if she didn’t use the small space heater/fireplace (70% efficient heater vs. 90% furnace). 11
  • 12. THC REDUCTION MATRIX Stage 1: Joanne Olson ANNUAL HOUSEHOLD kWh- MODELED Usage-not actual Loads Current Use Proposed Usage Reductions - kWh/yr Target Use THC Threshold (breakout may be estimated) Efficiency Behavioral Choices Renewables Community Solutions (kWh/yr) Building Upgrades Equipment Upgrades On-site Offsets (kWh/yr) (kWh/yr) Heating 33,030 13,624 19406 11,017 Cooling Hot Water 8,251 4,413 3,838 All Else 4,233 894 3,339 1,058 Total 45,514 13,624 5,307 26,583 12,075 REDUCTION 18,931 KWh/yr 12
  • 13. Basis for Predicting Reductions 4 scenarios run using RemRate software 1) Baseline 2) Above grade exterior retrofit 3) Basement retrofit 4) Solar/renewables Software was fairly accurate in the 2nd scenario. The rest is yet to come! 13
  • 14. Modeled Usage - All Stages We used RemRate to perform several energy model ratings (HERS Rating) • Existing: 125 • Stage 1: 67 • Stage 2: 48 • Stage 3: 16 14
  • 15. Stage 1: Pre- & Post-Indirect Indicators of Performance Btu/kWh per HCDD1 has gone down substantially (see next slide). Home Energy Rating (HERS) • Pre: 125 • Post: 67 1 HCDD: heating & cooling degree day 15
  • 16. Heating Degree Days Look at Before and After Project Completed Oct 2009 16
  • 17. Gas Usage 2009-2010 Heating & Hot Water Only (Dryer & cooking are electric) Stage 1 retrofit mostly completed by 10/09 • 4 family members for 2 weeks in Dec 2010 - Lots of cooking & showers • Changed from electric to gas range Dec 2010 • ERV was set at 70% and now is @20%-30% Therms/Month 17
  • 18. Electricity Usage •Electricity increased because of greater dehumidifier use •High water table caused damp basement •With increased envelope tightness, dampness is amplified •To be addressed in Stage 2! • Installed ERV Nov 2010 • New sump pump Dec 2010 • New fan motor for furnace 2010 • Dehumidification & A/C 2009 & 2010 • New freezer July 2010 18
  • 19. Project’s Biggest Challenges/Opportunities Where to draw the line on “project creep?” • We could have spent much more time & money; each day brought more decisions. Cost of materials • We found & bought misordered insulation from a large construction company for about ½ price and ERV was 1/5 of the price. Spray foam was purchased from the manufacturer at a discount because of dated product. 19
  • 20. What Was Challenging? • To air seal we foamed & foamed & foamed. • We nearly created a thermal bridge-free house. We didn’t get the openings (windows & doors) because of the time & cost vs. the benefit. • The budget… we live in an area in which it will be difficult to recover costs at point of sale. The value proposition was increased comfort as well as lowered bills. 20
  • 21. What Worked Well? My crew! Once they understood all of the key concepts, such as the drainage plane, they didn’t need a lot of guidance. A mock-up wall section communicated effectively. • Grandma’s flexibility: She allowed me to make judgment calls on the spot as needed. She didn’t hover over the project. I don’t know if I could have inspired this type of confidence in all of my clients. This helped things move along. • Exterior retrofit: Minimal disturbance, all new siding & drainage plane. 21
  • 22. Building Enclosure Summary • Walls: 2x4 dense pack cellulose with 3” (R-20) of rigid polyiso. Fur out for drainage plane & cement board siding. Serious fiberglass windows with 7 series glass • Cathedral Roof: R-20 polyiso skin with existing fiberglass cavity & 2 inches of EPS for a total of R-40. Unvented • Attic: Sealed soffit venting with closed cell foam & R-60 cellulose throughout • Basement: Stage 2 22
  • 23. Cool Stuff! New Overhangs - New Unvented Soffit Before After Before After 23
  • 24. Air Leakage Blower Door Test Results PRE (June 21, 2009) 2,100 CFM 50 8 ACH 50 (includes basement) .45 CFM 50/Ft2 surface area (6 sides) POST (January 15, 2010) 700 CFM 50 2.6 ACH 50 (includes basement) .15 CFM 50/Ft2 surface area (6 sides) 24
  • 25. Ratios & Specs TOTAL AREA (Ft2) • Conditioned Space: 2,052 • Finished Floor Area: 2,052 • Shell Area: 4,716 • Foundation Wall: 665 • Slab Floor: 1,278 • Frame Floor: 0 • Rim & Band Joist: 95 • Above-Grade Wall: 1,376 • Window: 225.4 • Door: 34.0 • Ceiling: 1,302 • Skylight: 0.0 • Duct: 964.4 RATIOS • Window-to-Wall: 0.164 • Window-to-Floor: 0.110 WINDOW AREA BY ORIENTATION (Ft2) • North: 44.7 • Northeast: 0.0 • East: 38.0 • Southeast: 0.0 • South: 78.3 • Southwest: 0.0 • West: 64.4 • Northwest: 0.0 25
  • 26. Winter Comfort Heating System Current: – Stand alone natural gas fireplace for radiant space heat in “great room” the main room ~70% efficient – Old condensing forced air, tested at 90%! Thermostat settings: ~64º F Planned: Higher efficiency units. Possibly the Vertex hot water with water-to-air heat exchange 26
  • 27. Summer Comfort • Reducing Solar Gains: Lattice with seasonal plants shading south deck windows • Reducing Internal Gains: Vent cook stove • Creative Comfort: Ceiling fans & new overhangs • Mechanical Solutions: We left older central AC & will buy new as/if needed • We installed a Renewaire ERV to circulate air 27
  • 28. Water Heating Installed direct vent tankless Takagi water heater. It was what the plumber sold. I didn’t do my research first. • Eliminated all standby losses; efficiency is great. • Delivery of hot water is far from instantaneous! • Water use increased! Grandma couldn’t use the “trickle’” dishwashing & the initial hot water to the shower was wasted. Changed dishwashing technique from a “trickle” rinse to a tub wash. • Tankless selected to reduce standby losses but, in reality, the savings aren’t that great & the lag time involved in the system is annoying. If you shut off & then turn water back on you get a pocket of cold water. • Renewables: Stage 3 solar DHW. • Next job: combination space & water heating system. 28
  • 29. Good Air Quality • Key Pre-existing Problems: Radon 10 pl – Still exists… but ERV helps • Source Control Strategies: Stage 2 • Unanswered or Unresolved Issues: Can we afford a basement retrofit to address the radon? – We’re planning at least the perimeter wall retrofit & probably not the “basement lowering” • We made a much tighter house & changed the drying potential of the interior so we now use a dehumidifier in addition to our ERV. 29
  • 30. Mechanical Ventilation • Renewaire E130 • Simple design with dedicated ducts • Operated at low speed fairly consistently • Energy Use/Day: ~1,500 watts/day • Performance: We’re still working on the data such as the actual energy or anecdotal regarding RH or comfort. Both the comfort & relative humidity levels are higher. • Simple design worked well 30
  • 31. Mechanical Ventilation Do Differently? • Run ducts in attic under insulation. We built duct chases in the house which were more difficult & costly than running them in the attic. • We considered using the existing forced air duct work but opted to have a dedicated system to ensure reliable airflow. 31
  • 32. Major Appliances Space Conditioning: Nothing new yet. Old furnace is in good shape but upgraded the motor Combustion Venting: New direct vent tankless Takagi water heater Mechanical Ventilation: ERV & bathroom vent Operational Changes: Primarily use space heater… Less efficient but only heat specific spaces Change of Use: Water heater - Can’t use “trickle” dish washing & went to “tub” dish washing (no dishwasher) 32
  • 33. Electrical Use – Plug Loads • She bought a freezer & replaced the electric stove with gas. • Actions & Impact: Grandma was fairly good about conservation so we primarily focused on energy efficiency. • Observations: Higher humidity in home resulted in increased dehumidifier & energy use. We will address this in Stage 2. We are keeping an eye on radon levels. • Lessons Learned: Know budget & possible padding because of overruns. Also, prioritize. We didn’t buy a new refrigerator & we put those $$ toward a new building shell. 33
  • 34. Timeline & Major Steps • Stage 1: 2009 Exterior retrofit & new slab insulation in part of home (not basement) • Stage 1½: 2010 New appliances, i.e., refrigerator & stove • Stage 2: 2011 Basement retrofit • Stage 3: 2012 Solar PV & hot water 34
  • 35. Rapid Feedback & Monitoring • Utility bills say a lot • Monitoring temp & RH in the house. Use Kill A Watt meters to submeter plug loads • A live link by summer 2011! • Tracking utility bills (now) 35
  • 36. Non-Energy Benefits • Thermal comfort is incredible • Constant fresh air with ERV • Exterior should be virtually maintenance free for 20 years • Secured expenses… Fewer worries about energy costs 36
  • 37. Furring Strips Over Drainage Plane/House Wrap We waited & waited for the windows so we ended up furring out over the house wrap. This did not allow us to flash as planned. Timing is everything. We had to move the gas line (after the meter) to accommodate the new 4” of wall - he spun the pipe (it cost $60). 37
  • 38. Cathedral Retrofit The existing 6” Fiberglass insulation wasn’t perfect, but we decided that it would be financially prohibitive to remove it, so we left it. We then cut back the ridge sheathing & air sealed (foamed) it solid. The rafter tails were completely foamed. We performed a blower door test as we went, & it appears to be working well. One beam in the middle that we couldn’t foam showed some leakage, but we’re not sure how. We put in 3” beveled sub fascia build-up to take the 3” Foam insulation. Sheathing went on top of this, then tar paper, & then shingles. 38
  • 39. Basic Wall Design This is pretty close to what we did: • 3” of polyiso over bare sheathing • House wrap to define drainage plane • 6” screws to fasten 1x3 furring strip • Cement board siding • Continuous drainage & acts as a starter strip (not shown here but this was actually preassembled to a horizontal furring strip & tacked on first to act as a ledger). We improved with a ridge venting system; it cost less & I received it the same day. • Aluminum flashing covered the foundation foam & went between the polyiso & the house wrap. It matched all of the other metal trim. 39
  • 40. More Wall Details: Cellulose, Insulation Caps 40
  • 41. Pick the Right Fasteners • We went from a heavier gauge 6” #3 Phillips head to a lighter gauge 6 & 5” torque screw (better self tapping, as well). It saved a ton of time & cussing! We didn’t have to worry about the shear strength because the siding fur-outs were on well supported ledgers. 41
  • 42. Learn from Deconstruction • As you deconstruct, you will find clues to how your home is performing. These photos reveal air leakage: dusty fiberglass & moisture stains on the underside of roof sheathing. This sheathing is a perfect example of an attic vs. (non-purposefully vented) cathedral. The cathedral side shows where warm, moist air condensed on the sheathing (rusty nails, too) & over time it would fail. The attic side of the sheathing is fine even though the venting wasn’t great. • Air sealing cathedral ceilings is critical. Peak of Cathedral Ceiling/Roof 42
  • 43. 3” Window Build-out to Accommodate Polyiso 5” star head torque screws with construction adhesive House wrap over that & then the furring strips 43
  • 44. Polyiso to XPS Transition • Polyiso doesn’t belong below grade; XPS works better. We put 2 layers of 1.5” extruded polystyrene (XPS). • 3 banks of windows were not replaced because they were newer. • The build-out was capped with aluminum to match the other trim & to accommodate the 3” polyiso. 44
  • 45. Pictures Save a 1,000 Cusses • After I foamed all of the difficult cavities & before we resheathed the exterior, I took photos & made a little booklet for the crew & for the insulator. From those photos, I’m sure that we saved hours & hours, e.g., below: the insulator now knows exactly which cavities need to be filled. 45
  • 46. Interior Slab on Grade Retrofit We tore up the carpet & insulated the slab with 1.5” of XPS (R-7.5). The guys laid the nailers 16” on center & I wanted 24” on center (oh, well). New pre-finished oak floors on top. 46
  • 47. What Worked & What Didn’t YES • Exterior approach vs. interior • So far, sealing the soffit vents to maximize truss heel insulation with closed cell spf ~R-6/inch (solid R-20+) • Maintained gable & roof vents • Drainage plane with cement board NO • Exterior drainage tile. The water in the basement is from a high water table or spring 47
  • 48. Lessons Learned • Find the right fastener for securing exterior foam. We went from a heavier gauge 6” Phillips head to a lighter gauge 5½” star head & saved a lot of time. • Order early if you are buying high performance windows; nail down the ETA. • Exterior retrofits allow for a deep energy upgrade while not very intrusive for the owner. • Plan for surprises & budget accordingly. We found some rotten rim joists, also some concrete that needed to be removed which added ~$600. We couldn’t get the chimney out easily, so we stopped trying & built around it. • We realized that the cathedral ceiling had existing insulation & we made a judgment call to leave it to save on budget. • We left 3 banks of windows that are low-E Andersens, this saved us ~$2,000. In all, things that were left weren’t as good as something new, but the budget had boundaries & there were other priorities. • Shop early & wait for sales on products & materials. Look for discounted products from big builders, lumberyards, & manufacturers. We bought a new ERV for $150 from a big builder. • We modified plastic ridge venting to use for our siding starter strip & drainage plane relief. 48
  • 49. Most Helpful Information Resources • www.Buildingscience.com • www.greenbuildingadvisor.com Well thought out plan & risk/reward evaluation. Should we leave some insulation? Yes, if we can be assured of great air sealing. 49
  • 50. For Additional Information www.E3Coalition.org Data link to HOBO monitoring system coming soon. 50
  • 51. Homeowner/Project Team Joanne Olson: patient grandma, mother Jim Olson: son, builder, consultant – jim@e3coalition.org – E3coalition.org will have data monitoring link 51