PRODUCTION PLANNING
AND PROCESS
PLANNING
Unit-3
PRODUCT PLANNING
• Product Planning is the ongoing process of
identifying and articulating market
requirements that define a product’s feature
set.
• Product planning serves as the basis for
decisions about price, distribution and
promotion.
EXTENDING ORIGINAL PRODUCT
INFORMATION
VALUE ANALYSIS
• Value, as defined, is the ratio of function
to cost. Value can therefore be increased by
either improving the function or reducing
the cost
LACK OF PRODUCT PLANNING
• Unsatisfied customer
• Durability deteriaration
• Lack of quality
• Loss of brand name., Etc
PROCESS PLANNING
ROUTING
SCHEDULING
DISPATCHING
FOLLOW UP
PROCESS PLANNING – INPUT INFO.
• PRODUCT
• PROCESS
• CAPACITY
• ORDERS
• DUE DATES
• RESOURCES
• ETC.,
STEPS IN PROCESS PLANNING
• Analyzing environment
• Establishing objectives or goals
• Seeking necessary Information
QUANTITY DETERMINATION –
BATCH PRODUCTION
• Economic batch quantity (EBQ), also called "optimal batch
quantity" or economic production quantity, is a measure used
to determine the quantity of units that can be produced at
minimum average costs in a given batch or production run.
• Economic Production Quantity model (also known as the EPQ
model) is an extension of the Economic Order Quantity
model. The Economic Batch Quantity model, or production
lot-size model, is similar to the EOQ model in that an optimum
is to be calculated for the batch quantity to be produced.
EBQ
In working with this EBQ model, principal assumptions are:
• The demand (D) is known and constant within a certain period of time
• The unit cost of the inventory item (U) is constant
• The annual holding-cost per unit (Ch) is constant
• The setup-cost per batch (C) is constant
• The production time (tp) is known and constant
• there is one kind of product
• There is no interaction with other products
• The aspect of time does not play a role, just the setup time does
• The setup cost is constant and does not act upon the batch quantity.
Variables
• K = setup cost
• D = demand rate
• F = holding cost
• T = cycle length
• P = production rate
Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)

More Related Content

What's hot

Product costing part5-actual costs
Product costing part5-actual costsProduct costing part5-actual costs
Product costing part5-actual costsNallasamy Mohanraj
 
COST ACCOUNTING CONCEPTSSSSS
COST ACCOUNTING CONCEPTSSSSSCOST ACCOUNTING CONCEPTSSSSS
COST ACCOUNTING CONCEPTSSSSSPujil Khanna
 
plant location
plant locationplant location
plant locationSanjay War
 
Plant location
Plant locationPlant location
Plant locationRavi Verma
 
5 need for selecting a suitable location
5 need for selecting a suitable location5 need for selecting a suitable location
5 need for selecting a suitable locationSalamat Ali
 
Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01Victor Molina
 
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRANOver head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRANDinesh Piran-Gdp
 
unit-vii material management -ABC analysis ppt
unit-vii  material management -ABC  analysis pptunit-vii  material management -ABC  analysis ppt
unit-vii material management -ABC analysis pptanjalatchi
 
COMPONENT OF COST BY G.DINESHPIRAN [DP]
COMPONENT OF COST BY G.DINESHPIRAN [DP]COMPONENT OF COST BY G.DINESHPIRAN [DP]
COMPONENT OF COST BY G.DINESHPIRAN [DP]Dinesh Piran-Gdp
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsStephen Ong
 
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...Srishti Bhardwaj
 
Inventory 100410143732-phpapp02 (1)
Inventory 100410143732-phpapp02 (1)Inventory 100410143732-phpapp02 (1)
Inventory 100410143732-phpapp02 (1)noluthando nkosi
 
cost accounting complete
cost accounting completecost accounting complete
cost accounting completeSunil Sharma
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizePhillip Leonard Petate
 

What's hot (20)

Product costing part5-actual costs
Product costing part5-actual costsProduct costing part5-actual costs
Product costing part5-actual costs
 
COST ACCOUNTING CONCEPTSSSSS
COST ACCOUNTING CONCEPTSSSSSCOST ACCOUNTING CONCEPTSSSSS
COST ACCOUNTING CONCEPTSSSSS
 
plant location
plant locationplant location
plant location
 
Plant location
Plant locationPlant location
Plant location
 
5 need for selecting a suitable location
5 need for selecting a suitable location5 need for selecting a suitable location
5 need for selecting a suitable location
 
Facilities planning _lay_out_and_location_analysis
Facilities planning _lay_out_and_location_analysisFacilities planning _lay_out_and_location_analysis
Facilities planning _lay_out_and_location_analysis
 
Standard cost
Standard costStandard cost
Standard cost
 
Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01
 
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRANOver head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
 
Facility location
Facility locationFacility location
Facility location
 
The EOQ Model
The EOQ ModelThe EOQ Model
The EOQ Model
 
unit-vii material management -ABC analysis ppt
unit-vii  material management -ABC  analysis pptunit-vii  material management -ABC  analysis ppt
unit-vii material management -ABC analysis ppt
 
Eoq model advantage
Eoq model advantageEoq model advantage
Eoq model advantage
 
COMPONENT OF COST BY G.DINESHPIRAN [DP]
COMPONENT OF COST BY G.DINESHPIRAN [DP]COMPONENT OF COST BY G.DINESHPIRAN [DP]
COMPONENT OF COST BY G.DINESHPIRAN [DP]
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
 
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
 
Inventory 100410143732-phpapp02 (1)
Inventory 100410143732-phpapp02 (1)Inventory 100410143732-phpapp02 (1)
Inventory 100410143732-phpapp02 (1)
 
cost accounting complete
cost accounting completecost accounting complete
cost accounting complete
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot Size
 
Plant layout
Plant layoutPlant layout
Plant layout
 

Similar to Unit 3

PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL SIVASHANKAR N
 
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROLMohanumar S
 
PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1prakash0712
 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfahirwarrajeev198
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and controlkarthi keyan
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.PraveenManickam2
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptxhafidhisaidi
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxkshitij808555
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 

Similar to Unit 3 (20)

UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNINGUNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
 
Unit 1
Unit 1Unit 1
Unit 1
 
Unit 1
Unit 1Unit 1
Unit 1
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
unit 1.pptx
unit 1.pptxunit 1.pptx
unit 1.pptx
 
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
 
PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1
 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
 
ACCA
ACCAACCA
ACCA
 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
 
UNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTINGUNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTING
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Standard costing
Standard costingStandard costing
Standard costing
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 

More from MeganathanJ4

More from MeganathanJ4 (8)

Unitv
Unitv   Unitv
Unitv
 
Unit iv-
Unit iv-Unit iv-
Unit iv-
 
Unit iii
Unit iiiUnit iii
Unit iii
 
Unit ii engine auxiliary systems
Unit ii engine auxiliary systemsUnit ii engine auxiliary systems
Unit ii engine auxiliary systems
 
Unit i
Unit iUnit i
Unit i
 
Unit 5
Unit 5Unit 5
Unit 5
 
Unit 4
Unit 4Unit 4
Unit 4
 
Unit 2
Unit 2Unit 2
Unit 2
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Unit 3

  • 2. PRODUCT PLANNING • Product Planning is the ongoing process of identifying and articulating market requirements that define a product’s feature set. • Product planning serves as the basis for decisions about price, distribution and promotion.
  • 3.
  • 5. VALUE ANALYSIS • Value, as defined, is the ratio of function to cost. Value can therefore be increased by either improving the function or reducing the cost
  • 6. LACK OF PRODUCT PLANNING • Unsatisfied customer • Durability deteriaration • Lack of quality • Loss of brand name., Etc
  • 8. PROCESS PLANNING – INPUT INFO. • PRODUCT • PROCESS • CAPACITY • ORDERS • DUE DATES • RESOURCES • ETC.,
  • 9. STEPS IN PROCESS PLANNING • Analyzing environment • Establishing objectives or goals • Seeking necessary Information
  • 10. QUANTITY DETERMINATION – BATCH PRODUCTION • Economic batch quantity (EBQ), also called "optimal batch quantity" or economic production quantity, is a measure used to determine the quantity of units that can be produced at minimum average costs in a given batch or production run. • Economic Production Quantity model (also known as the EPQ model) is an extension of the Economic Order Quantity model. The Economic Batch Quantity model, or production lot-size model, is similar to the EOQ model in that an optimum is to be calculated for the batch quantity to be produced.
  • 11. EBQ In working with this EBQ model, principal assumptions are: • The demand (D) is known and constant within a certain period of time • The unit cost of the inventory item (U) is constant • The annual holding-cost per unit (Ch) is constant • The setup-cost per batch (C) is constant • The production time (tp) is known and constant • there is one kind of product • There is no interaction with other products • The aspect of time does not play a role, just the setup time does • The setup cost is constant and does not act upon the batch quantity. Variables • K = setup cost • D = demand rate • F = holding cost • T = cycle length • P = production rate Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)